Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 36446 dokumen yang sesuai dengan query
cover
"Covering the principles and techniques you need to successfully manage an engineering or technical project from start to finish, Project management, planning and control is an established and widely recommended project management handbook.
With clear and detailed coverage of planning, scheduling and control, which can pose particular challenges in engineering environments, this sixth edition includes new chapters on Agile project management and project governance, more real-life examples and updated software information.
Ideal for those studying for project management professional (PMP) qualifications, project management, planning and control is aligned with the latest project management body of knowledge (PMBOK) for both the Project Management Institute (PMI) and the Association of Project Management (APM), and includes questions and answers to help you test your understanding. It is also updated to match the latest BS 6079 standard for project management in construction.
"
Oxford, UK: Butterworth-Heinemann, 2014
e20427660
eBooks  Universitas Indonesia Library
cover
Zaneta Alfiagnes Hodeka Sanjiwo
"ABSTRAK
Dalam proyek di industri minyak dan gas, intensitas dapat bervariasi dari waktu ke waktu, dan variasi ini menyebabkan aspek dinamis dari kompleksitas proyek. Kegagalan dalam mencapai ketepatan waktu proyek, biaya yang dianggarkan, dan kualitas tertentu menyebabkan pengaruh negatif yang tidak diinginkan dalam suatu proyek. Tujuan dari penelitian ini adalah mengurangi keterlambatan proyek EPC pada industri minyak dan gas.
Penelitian ini menghasilkan project planning yang disempurnakan dengan metode business process reengineering dengan waktu proses bisnis setelah perbaikan pada fase engineering berkurang menjadi 29,19 hari dengan peningkatan efisiensi 55% dan pengurangan waktu proses pada fase procurement menjadi 49,03 dengan peningkatan efisiensi 35%.

ABSTRACT
In projects in the oil and gas industry, the intensity may vary from time to time, and this variation underscores the dynamic aspect of the complexity of the project. The failure to achieve targeted time, budgeted cost, and specified quality result in various unexpected negative effects on the projects. The objective of this study is to reduce delays of EPC projects in the oil and gas.
This study resulted in improved project planning with business process reengineering method with the time of new process after improvement on the engineering phase is reduced to 29,19 days with an efficiency up to 55% and 49,03 days on the procurement phase with an efficiency up to 35%.
"
Fakultas Teknik Universitas Indonesia, 2015
S62546
UI - Skripsi Membership  Universitas Indonesia Library
cover
"A structured, data-driven approach to understanding core operations management concepts.
Anupindi shows how managers can design and manage process structure and process drivers to improve the performance of any business process"
New Jersey: Prentice-Hall, 2006
658.5 MAN
Buku Teks SO  Universitas Indonesia Library
cover
Agung Andika Putra
"Tingginya risiko dan ketidakpastian dalam tahap pelaksanaan manajemen material pada proyek EPC dapat menjadi salah satu penyebab penyimpangan biaya proyek. Salah satu strategi pengendalian untuk meminimalkan terjadinya penyimpangan biaya adalah mendeteksi sedini mungkin risiko risiko yang dapat terjadi pada tahap pelaksanaan manajemen material yang dituangkan kedalam prosedur pengendalian biaya material disetiap tahapan pelaksanaannya.
Penelitian ini bertujuan untuk menentukan alternatif preventive dan corrective action serta merekomendasikan pengembangan prosedur pengendalian biaya material berbasis risiko berdasarkan risiko utama penyebab penyimpangan. Untuk mengetahui besarnya frekwensi dan dampak risiko penyebab penyimpangan biaya material dilakukan penilaian secara kualitatif terhadap salah satu proyek yang mengalami penyimpangan biaya terbesar pada PT.Y, dengan melakukan wawancara pakar dan kuisioner kepada tim inti proyek yang mempunyai pengalaman dalam proyek EPC.
Analisa data diolah dengan analisa risiko kualitatif untuk memperoleh risiko utama penyebab penyimpangan, kemudian untuk dapat menentukan preventive dan corrective action serta rekomendasi pengembangan prosedur pengendalian biaya material berbasis risiko digunakan metode delphi.
Hasil analisa data ditemukan delapan penyebab utama terjadinya penyimpangan biaya material yaitu: Terjadi kesalahan dalam menentukan spesifikasi material karena kontrak yang kurang jelas; Terjadi kesalahan dalam menentukan spesifikasi material karena kurang lengkap atau akuratnya data informasi mengenai jenis-jenis material yang efektif; Terjadi revisi spesifikasi material akibat kesalahan pada design material (misdesign); Terjadi kesalahan dalam menentukan spesifikasi material karena kesalahan dalam memahami spesifikasi material yang tertera didalam kontrak; Terjadi pembelian ulang material karena kesalahan dalam penentuan spesifikasi material; Meningkatnya biaya pembelian material akibat tingginya harga material dipasaran; Meningkatnya biaya pembelian material akibat fluktuasi harga material dipasaran; Terjadi instalasi ulang material karena kesalahan design spesifikasi material.

The height of the risk and the uncertainty in the implementation stage of the material management in the EPC project could become one of the causes of project cost deviation. One of the controlling strategies to minimize the occurrence of the cost deviation is detecting the risks earlier that could happen in the implementation stage of the material management which is presented in the material cost controlling procedure in each implementation stage.
This research aimed to determine the alternative preventive and corrective action and also to recommend the development of the material cost controlling procedure based on the risk according to the main risk of the deviation cause. To recognize the frequency value and the impact of the risk as the cause of material cost deviation, it would be carried out by the assessment qualitatively towards one of the projects experienced in the biggest cost deviation to PT.Y, by interviewing experts and spreading questioner to the key person in the core project team that had experiences in the EPC project.
Data analysis would be processed by the qualitative risk analysis to find the main risk of the deviation cause, afterwards to be able in determining preventive and corrective action along with recommendation of the material cost controlling procedure development based on the risk used by the Delphi method.
Data analyzes resulted that eight main causes of material cost deviation were found, there are: Fault in determining material specification because of the unclear contract; Fault in determining the material specification because the data information about effective material kinds is not accurate and incomplete; revision of the material specification as the consequence of faulty in material design; the fault happened in determining the material specification because of the misunderstanding in defining the material specification that stated on contract; material repurchasing because of fault in determining of the material specification; the Increasing of material purchasing cost as consequence of material price increasing on market; the Increasing of material purchasing cost as consequence of material price fluctuation on market; material reinstallation happened because of the faulty design in material specification.
"
Depok: Fakultas Teknik Universitas Indonesia, 2008
T40652
UI - Tesis Open  Universitas Indonesia Library
cover
Izin Hendri Riyatno
"Proyek engineering proqunenment dan contruction EPC dilaksanakan dengan melibatkan banyak pihak dan memakai berbagai macam sumber daya. dan juga menghadapi banyak masalah ketidakpastian dan risiko. jika terjadi. mempunyai dampak terhadap kinerja proyek dari penelitian ini adalah untuk mengetahui faktor-faktor risiko di tahap engineering yang niempengaruhi kinerja biya pada proyek LPC dari sisi kontraktor. Proses didalam manajemen risiko proyek adalah identifikasi faktor-faktor risiko. analisa risiko. evaluasi risiko. dan tindakan mengelola risiko).
Penelitian untuk mengetahui faktor-faktor risiko dilakukan secara kualitatif. dengan menganalisis data persepsi !ang didapat dari kuisioner dengan responden tim engineering atau team inti proyek perusahaan EPC yang ada di Indonesia dan yang mempunyai pengalaman dalam projek EPC. analisa data diolah dengan mendapatkan prioritaslrangking faktor dan dilakukan analisa levelrisiko.
Hasil analisa data dengan AHP dan analisa level risiko menunjukkan ada lima belas faktor risiko Lltama di tahap engineering j anng berpengaruh terhadap kinerja biaya proyek EPC j,ang terbagi dalam 6 kelonipok faktor, yaitu : proses desain, sumber daya, kebutuhan pemilik, ketersediaan waktu, performa. Tindakan pencegahan dan koreksi dari kelima belas faktor dominan tersebut yang didapat dari pakar dan referensi digunakan sebagai masukan terhadap prosedur engineering yang tersedia. sehingga dampak dari faktor-faktor risiko tersebut dapat di analisir.

Engineering. Procurement. and Constrruction projects (EPC) there involved with many people and used a lot of resources. faced a lot of uncertainty and risk. which we happened. would be impact the performance of the project.
This research objective is to identify the risk factors that influenced cost performance on engineering phase of EPC project. from the contractor's point of view. The project risk management processes are risk factor identification, the risk analysis, risk evaluation, risk response or risk treatment.
The risk factors research try to find out qualitatively, by analyzing the perception data as the result of the questioners to the engineering tim. the core team of the EPC project and whorn had the experienced in EPC project. Risk Analysis quantified tlie risk variable fro111 the questioner result, and then the data will be processed with the
Analytic Hierarchy Process (AHP) i11 order to have the priority factor. There are tifteen main risk factor that influence cost performance of EPC pro-ject divided on 6 (six) category : Design process. resources. client needs. site survey. time availability. engineering team performance. Preventive action and correction to be taken as per experts and reference shall be used as input for establish engineering procedure. so that influence of risk factor shall be minimized."
Depok: Fakultas Teknik Universitas Indonesia, 2008
T24458
UI - Tesis Open  Universitas Indonesia Library
cover
Indra Sakti Wijayanto
"ABSTRAK
Kesuksesan proyek dengan kerangka agile dapat diukur dari ketepatan waktu, biaya, dan kepuasan stakeholder proyek. Studi kasus di PT Javan Cipta Solusi menunjukkan bahwa tingkat keberhasilan proyek dari sisi ketepatan waktu hanya mencapai 64%, belum sesuai dengan harapan pihak manajemen yang memiliki target mencapai 80%.
Penelitian ini bertujuan untuk menyusun peringkat faktor yang berpengaruh terhadap keberhasilan proyek dengan kerangka agile di PT Javan Cipta Solusi dan memberikan rekomendasi untuk perbaikan pelaksanaan proyek. Penelitian dilakukan secara kualitatif dengan melakukan studi literatur, wawancara, dan kuesioner terhadap stakeholder internal perusahaan. Data yang diperoleh dianalisis menggunakan AHP untuk menyusun peringkat faktor keberhasilan proyek.
Hasil dari penelitian ini, terdapat sembilan faktor yang perlu diperhatikan dalam mendukung keberhasilan proyek Agile. Faktor yang memiliki peringkat teratas adalah terkait keterlibatan pengguna. Rekomendasi perbaikan yang diberikan kepada PT Javan Cipta Solusi terkait keterlibatan pengguna adalah dengan mengikutsertakan pengguna dalam tools yang digunakan untuk task management. "
2019
TA-Pdf
UI - Tugas Akhir  Universitas Indonesia Library
cover
Oberlender, Garold D.
"The latest, most effective engineering and construction project management strategies. Fully revised throughout, this up-to-date guide presents the principles and techniques of managing engineering and construction projects from the initial conceptual phase, through design and construction, to completion. The book emphasizes project management during the beginning stages of project development to influence the quality, cost, and schedule of a project as early in the process as possible. Featuring an all-new chapter on risk management, the third edition also includes new sections on: Ensuring project quality, The owner's team, Parametric estimating, Importance of the estimator, Formats for work breakdown structures, Design work packages, Benefits of planning, Calculations to verify schedules and cost distributions, Common problems in managing design, Build-operate-transfer delivery methods Based on the author's decades of experience in working with hundreds of project managers, this essential resource includes many new real-world examples and updated sample problems. "
New York: Mcgraw-Hill Education, 2014
658.404 OBE p
Buku Teks SO  Universitas Indonesia Library
cover
Oberlender, Garold D.
New York: McGraw-Hill, 1993
658.404 OBE p
Buku Teks SO  Universitas Indonesia Library
cover
Sarah Shahnaz Ilma
"Fasilitas Integrated Cold Storage sangat dibutuhkan oleh Kementerian Kelautan dan Perikanan. Pembangunan fasilitas ICS di Kabupaten Kampar oleh PT. S di tahun anggaran 2018 membuktikan bahwa manajemen proyek yang efektif harus diterapkan. Satu cara untuk menilai kinerja manajemen proyek PT. S adalah dengan menilai proses kontrol biaya selama proyek tersebut. Kontrol biaya adalah proses pengawasan status proyek untuk memperbaharui biaya proyek dan mengatur perubahan pada biaya dasar. Proses kontrol biaya dianalisa menggunakan Earned Value Analysis.
Hasil dari penelitian ini menunjukkan bahwa manajemen proyek dari PT. S menghadapi banyak tantangan dalam mempertahankan planned values. Tantangan terbesar datang dari faktor-faktor penyebab keterlambatan di fase konstruksi yang mencakup cuaca, kualitas rendah dari SDM dan distribusi barang dan material. Hasil analisa kasus ini berujung pada kerangka manajemen proyek yang bisa digunakan untuk pekerjaan selanjutnya.

Integrated Cold Storage facilities are much needed by Indonesian Marine and Fisheries Ministry. The construction of ICS facility in Kampar District by PT.S in fiscal year 2018 proved that efficient project management must be implemented. One way to measure the performance of PT. S PM is by examining the control cost process throughout the project. Control Costs is the process of monitoring the status of the project to update the project costs and managing changes to the cost baseline. Control cost process is analyzed using Earned Value Analysis.
The results showed that PT. S was not able to manage their cost efficiently The biggest challenge is caused by delaying factors in construction phase which include weather, low quality in manual labor and distribution of materials and goods. The analysis resulted in improved project management framework that can be used in future projects.
"
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2019
T53704
UI - Tesis Membership  Universitas Indonesia Library
cover
Donny Bangkit Ariwibowo
"Proyek Pembangunan Bendungan Bener Paket 4 yang dilaksanakan oleh PT. Adhi Karya (Persero) TBK. merupakan bagian dari Proyek Strategi Nasional National. Praktik Keinsinyuran kali ini adalah mengevaluasi penyelenggaraan Earned Value Management. Batasan pada penelitian ini adalah 1. Data yang digunakan adalah data Proyek Pembangunan Bendungan Bener Paket 4. 2. Data cashflow berdasarkan laporan keuangan Proyek Pembangunan Bendungan Bener Paket 4. 3. Pengamatan dilakukan dari awal proyek hingga akhir proyek (berdasarkan data laporan bulanan dan time schedule. 4. Penelitian hanya dikhususkan pada masalah kinerja biaya dengan metode earned value concept. Berdasarkan analisis dan pembahasan yang telah dilakukan, dari awal proyek sampai dengan bulan November 2021 kinerja biaya proyek tidak baik faktor utama yang berpengaruh terhadap indeks kinerja biaya proyek adalah akibat biaya langsung maupun biaya tidak langsung yang dikeluarkan sedangkan realisasi progress belum berjalan baik di proyek. Hal ini yang menyebabkan nilai ACWP lebih besar dari BCWP sehingga kinerja biaya proyek di awal menjadi tidak baik karena nilai CPI < 1. Sedangkan mulai bulan Desember 2021 sampai dengan Oktober 2022 kinerja biaya proyek sudah baik ditunjukkan dengan nilai CPI >1.

Bener Dam Construction Project package 4 implemented by PT. Adhi Karya (Persero) TBK. is part of the National Strategy Project. This Engineering Practice is evaluating the implementation of Earned Value Management. The limitations of this study are 1. The data used are data from the Bener Dam Package 4 Construction Project. 2. Cash flow data is based on the financial reports of the Bener Dam Package 4 Construction Project. 3. Observations were made from the beginning of the project to the end of the project (based on monthly report data and time schedule 4. This research is only devoted to the issue of cost performance using the earned value concept method Based on the analysis and discussion that has been carried out, from the start of the project to November 2021 the project cost performance was not good. The main factor influencing the project cost performance index is due to cost direct and indirect costs incurred while the realization of progress has not gone well in the project. This is what causes the ACWP value to be greater than the BCWP so that the initial project cost performance is not good because the CPI value is < 1. Meanwhile from December 2021 to October 2022 the project's cost performance has shown good d with a CPI value > 1."
Depok: Fakultas Teknik Universitas Indonesia, 2022
PR-pdf
UI - Tugas Akhir  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>