Muchamad Imam Fitriantoro
"Penelitian ini membahas tentang analisis faktor-faktor penyebab munculnya konflik dalam pembangunan infrastruktur perkotaan dalam kasus pembangunan mega proyek New Yogyakarta Internantional Airport di Kecamatan Temon, Kabupaten Kulon Progo. Penulis menggunakan teori land-based elite domination dalam mesin pertumbuhan kota dan teori faktor-faktor penyebab dalam konflik pembangunan proyek infrastruktur. Temuan penulis membuktikan bahwa konflik dalam pembangunan tersebut dilatarbelakangi oleh konflik sumber daya lahan yang muncul karena konteks ekonomi politik yang terbangun oleh ambisi pemerintah untuk merespon kuatnya tekanan pembangunan suatu wilayah rural menjadi sistem wilayah urban/perkotaan dengan konsep aerotropolis dan MICE. Tekanan tersebut muncul dari kepentingan kelompok elit ekonomi politik baik elit pusat maupun daerah. Alih-alih adanya fakta dominasi kepemilikan lahan oleh elit politik lokal di DIY. Hal ini membuat konflik yang terjadi tidak semata-mata konflik pembangunan infrastruktur melainkan juga konflik lahan yang mengakar di dalam kebijakan pembangunan perkotaan. Adapun faktor-faktor lainnya yakni faktor buruknya tata kelola proyek dan faktor sosial. Faktor-faktor tersebut turut berkontribusi pada ekskalasi dan kontinyuitas konflik dari tahun 2012-2018. Oleh karenanya penulis mengelompokkan tiga kategori analisis yakni kebijakan pembangunan proyek yang bersifat elitis, faktor tata kelola proyek, dan faktor sosial.

This study discusses the factors causing conflict in the construction of the New Yogyakarta International Airport mega project in Temon, Kulon Progo. To support this research analitically, the author uses the theory of land-based elite domination in urban growth machine and the theory of causal factors in the conflict of infrastructure project development. The author's findings show that conflict in the development project is motivated by land conflicts that arise from political economy interest of government to respond the strong pressure of regional development into urban systems with the concept of aerotropolis and MICE. The pressure comes from economic elite institutions both central and regional. Instead it includes the fact that there were land domination by local political elite in DIY. This creates conflicts that occur not only in the scope of infrastructure building project but also in the scope of urban development policies. The other factors are poor project governance and social factors. These factors contributed to the escalation and prolongation of the conflict between 2012-2018. So the authors classifies three categories of analysis that consist of elitist project development policies, governance driver of conflict, and social driver of conflict."
Depok: Fakultas Ilmu Sosial dan Ilmu Politik Universitas Indonesia, 2019
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Atik Khomsiati
"Seiring dengan berjalannya kemajuan metode-metode yang digunakan dalam pelaksanaan suatu proyek konstruksi, maka banyak kemungkinan-kemungkinan ataupun alternatif cara untuk ataupun dalam pelaksanaan suatu proyek konstruksi hingga selesai.
Dilatarbelakangi atas hal tersebut, maka saya mencoba untuk mengangkat beberapa pekerjaan dalam suatu proyek konstruksi untuk di bahas. Proyek konstruksi yang di tinjau adalah proyek konstruksi perumahan. Beberapa pekerjaan yang di maksud adalah pekerjaan pasangan bata, plester, aci dan rangka atap. Pekerjaan-pekerjaan tersebut di pilih karena pada pekerjaan-pekerjaan tersebut dapat dikerjakan dengan cara yang lebih praktis dan adanya kemungkinan untuk penghematan biaya pelaksanaannya. Yaitu dengan menggunakan material-material alternatif dengan fungsi yang sama dan dapat menghasilkan suatu hasil atau produk yang lebih baik. Material-material alternatif tersebut adalah bata ringan, semen mortar dan rangka atap baja ringan.
Dengan melengkapi data-data selain dari buku panduan suatu produk tersebut, dapat di tambah dari kuisioner dan foto-foto. Sehingga setelah diolah dan perhitungkan kembali, dapat menghasilkan ataupun memberi pengaruh yang baik terhadap kontraktor yang melaksanakan suatu proyek konstruksi perumahan tersebut.

Through to the methods progress that are used in operational of construction project, there are so many ways or alternatives to complete the construction project. Because of that reason, I try to choose some works in construction project as the topics.
The construction project that I take is housing construction project. Some works are bricks work, plaster work and roof truss. Those works are chose because they can be done by the easier ways and make the cost more cheaper than the costom ones. The materials alternative with the same function can produce the product better than the costom ones. The materials alternative are light brick, mortar cement and light truss.
Besides the guide book from the products, we can also add the informations from quisioners and photographs. So we can analyze and get the results. And we can make the conclution for the contractor is : by using the materials alternative, we can get the good influences more than the costom ones.
"
Depok: Fakultas Teknik Universitas Indonesia, 2008
S50557
UI - Skripsi Open  Universitas Indonesia Library
cover
Salma Fadhilah
"Untuk mendukung hilirisasi di industri pertambangan, maka Undang-Undang mewajibkan pemegang Izin Usaha Pertambangan (IUP) dan Kontrak Karya (KK) untuk mendirikan smelter yaitu fasilitas pengolahan hasil tambang yang berfungsi untuk meningkatkan kadar logam sampai pada tingkat yang memenuhi standar sebagai bahan baku produk akhir. Dari faktor kebijakan diperoleh bahwa kebijakan memiliki peranan terhadap permasalahan keterlambatan pembangunan smelter di Indonesia. Oleh karena itu, evaluasi dan penyempurnaan regulasi sebagai solusi permasalahan perlu dilakukan agar pembangunan smelter sebagai upaya pelaksanaan hilirisasi pertambangan dapat terlaksana dengan baik. Penelitian dilakukan dengan cara mengumpulkan data primer kualitatif yang dianalisis menggunakan Structural Equation Modeling (SEM). Pada analisa hubungan variabel kebijakan dengan variabel kinerja waktu proyek, didapatkan bahwa variabel perizinan, jangka waktu, sanksi, dan insentif tidak berpengaruh secara signifikan, sedangkan variabel pengawasan dan keadaan kahar berpengaruh secara signifikan terhadap kinerja waktu proyek. Untuk itu, dilakukan pengembangan terhadap peraturan dalam bentuk diantaranya pengembangan aspek & kriteria pelaksanaan verifikasi, penentuan standar data verifikasi, instrumen berupa sarana pengawasan, instrumen berupa alat pengawasan, hingga penyusunan tindak lanjut terhadap keadaan kahar dan beberapa rekomendasi lainnya atas regulasi eksisting yang berkorelasi dengan variabel indikator yang paling berpengaruh secara signifikan yaitu pengawasan dan keadaan kahar.

To support downstreaming in the mining industry, the Law requires holders of Mining Business Permits (IUP) and Work Contracts (KK) to establish smelters, mining processing facilities that function to increase metal content to a level that meets standards as raw materials for final products. From the policy factor, it is obtained that policies play a role in the problem of delays in smelter construction in Indonesia. Therefore, evaluation and improvement of regulations as a solution to the problem need to be carried out so that smelter construction as an effort to implement mining downstreaming can be carried out properly. The study was conducted by collecting qualitative primary data which was analyzed using Structural Equation Modeling (SEM). In the analysis of the relationship between policy variables and project time performance variables, it was found that the licensing, time period, sanctions, and incentives variables did not have a significant effect, while the supervision and force majeure variables had a significant effect on project time performance. For this reason, development of regulations is carried out in the form of, among others, developing aspects & criteria for implementing verification, determining verification data standards, instruments in the form of supervision facilities, instruments in the form of supervision tools, to compiling follow-up actions for force majeure and several other recommendations for existing regulations that correlate with the most significantly influential indicator variables, namely supervision and force majeure."
Depok: Fakultas Teknik Universitas Indonesia, 2025
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Dian Subandini
"Tujuan penulisan adalah menganalisis aktivitas pengendalian internal PT. X terhadap proyek KSO. Penelitian merupakan studi kasus dengan metode penelitian berupa wawancara dan observasi serta studi kepustakaan. Karakteristik proyek KSO adalah bekerjasama dengan mitra mengerjakan suatu proyek, pencatatan akuntansi dengan metode ekuitas, dan memiliki NPWP tersendiri sehingga aktivitas pengendalian berbeda dengan proyek non KSO.
Penelitian menyimpulkan aktivitas pengendalian internal PT. X untuk proyek KSO sudah cukup memadai, dengan terpenuhinya tiga prinsip aktivitas pengendalian COSO. Beberapa perbaikan perlu dilakukan sehingga risiko dapat dimitigasi sampai level yang dapat diterima, sistem informasi memiliki general control yang baik, kebijakan dan prosedur dapat dilaksanakan dengan baik.

The purpose of writing is to analyze the activity of internal control of PT. X on KSO project. Research is a case study with research methods in the form of interviews and observation and literature study. The characteristics of the KSO project are to work with partners on a project, accounting records using the equity method, and have a separate NPWP so that control activities are different from non-KSO projects.
The study concludes that PT. X's internal control activities for the KSO project are sufficient, with the fulfillment of three principles of COSO control activities. Some improvements need to be made so that risks can be mitigated to acceptable levels, information systems have good general control, policies and procedures can be well implemented.
"
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2017
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Ibrahim
"Kolaborasi antar stakeholder dalam siklus hidup proyek sangat penting untuk meningkatkan kinerja proyek konstruksi rancang bangun. Penelitian ini bertujuan untuk mengidentifikasi faktor-faktor yang mempengaruhi keberhasilan kolaborasi tim proyek konstruksi rancang bangun sehingga didapatkan pengaruh dari model kolaborasi terhadap kinerja kolaborasi dengan faktor rentang batas geografis, profesional, stakeholder, dan budaya etnis dalam proyek kontstruksi rancang bangun di Indonesia. Penelitian ini menggunakan analisa faktor dan hubungan variabel dengan metode Structural Equation Modeling SEM . Hasil dari penelitian didapatkan rentang batas geografis dan budaya etnis berpengaruh secara signifikan pada kinerja kolaborasi.

Collaboration between stakeholders in the project life cycle is critical to improving design and build construction project performance. The purpose of this research is to identify the critical success factors of collaboration of design and build construction project team so that can be understand the influence of collaboration model to collaboration performance with the geographic, professional, stakeholder, and ethnic cultural boundary spanners in design and build construction project in Indonesia. This research uses factor analysis and variable relation with Structural Equation Modeling SEM method. The results of the research obtained geographical and ethnical boundaries significantly influence the collaboration performance."
Depok: Fakultas Teknik Universitas Indonesia, 2017
T48743
UI - Tesis Membership  Universitas Indonesia Library
cover
Poetera Ramadhan Agoes
"Pembangunan Infrastruktur di Indonesia, baik yang diinisiasi oleh pemerintah maupun pihak swasta dalam beberapa tahun terakhir mengalami pertumbuhan yang pesat. Tercatat, sampai dengan tahun 2023 terdapat total 201 proyek infrastruktur, terdiri dari sektor transportasi, sektor kawasan, sektor sumber daya air, sektor perumahan dan sektor energi yang masuk ke dalam proyek strategis nasional dan saat ini sudah terealisasi total 156 proyek. Namun, tingginya pertumbuhan pembangunan infrastruktur di Indonesia juga diikuti dengan meningkatnya kasus kegagalan konstruksi. Dalam periode tahun 2017-2022, telah terjadi peristiwa kegagalan konstruksi pada proyek infrastruktur yang melibatkan penyedia jasa konstruksi Badan Usaha Milik Negara (BUMN) dengan kualfikasi usaha perusahaan besar. Merujuk kepada peraturan Lembaga Pengembangan Jasa Konstruksi Nomor 12 Tahun 2009, perusahaan dengan kualifikasi besar harus memiliki sertifikat ISO 9001:2000 untuk sistem manajemen mutu. Badan Usaha Milik Negara (BUMN) dengan kualifikasi besar harus menerapkan pengendalian proyek yang baik berdasarkan sistem manajemen mutu ISO 9001:2000 mulai dari tahap perencanaan sampai dengan tahap pembangunan. Komunikasi yang merupakan satu dari tiga indikator strategi pengembangan budaya mutu, sistem kepemimpinan dan tingkat kematangan, turut andil dalam terjadinya kegagalan konstruksi. Dalam dunia konstruksi yang kompleks dan melibatkan beberapa individu atau kelompok, komunikasi yang mencakup pertukaran informasi yang efektif dan pemahaman terhadap informasi yang diterima berperan besar dalam kesuksesan proyek dan memenimalisir kegagalan konstruksi. Informasi harus didistribusikan kepada pihak yang tepat, secara akurat dan konsisten sehingga Distribusi Informasi yang merupakan satu dari lima parameter kontrol yang mempengaruhi sistem komunikasi. Tujuan dari penelitian ini adalah menentuan indikator-indikator dalam sistem komunikasi proyek konstruksi yang berpengaruh terhadap keberhasilan perusahaan jasa konstruksi bumn nasional dalam menurunkan tingkat kegagalan konstruksi dan menghasilkan strategi peningkatan distribusi informasi dalam sistem komunikasi proyek konstruksi yang perlu diterapkan pada perusahaan jasa konstruksi bumn nasional untuk menurunkan tingkat kegagalan konstruksi. Metode penelitian yang digunakan adalah validasi pakar, wawancara dan studi literatur. Hasil penelitian ini didapatkan  11 variabel dan 37 Indikator distribusi informasi yang berpengaruh dalam menurunkan kegagalan konstruksi.

Infrastructure development in Indonesia, both initiated by the government and the private sector, has experienced rapid growth in recent years. It is recorded that up to 2023 there will be a total of 201 infrastructure projects, consisting of the transportation sector, the regional sector, the water resources sector, the housing sector, and the energy sector, which are included in national strategic projects, and currently a total of 156 projects have been realized. However, the high growth in infrastructure development in Indonesia has also been accompanied by an increase in construction failures. In the period 2017–2022, there have been construction failures in infrastructure projects involving state-owned construction service providers (BUMN) with large company business qualifications. Referring to the Construction Services Development Institute regulation Number 12 of 2009, companies with large qualifications must have an ISO 9001:2000 certificate for a quality management system. State-Owned Enterprises (BUMN) with large qualifications must implement good project control based on the ISO 9001:2000 quality management system from the planning stage to the construction stage. Communication, which is one of the three indicators of a quality culture development strategy, leadership system, and level of maturity, has contributed to construction failures. In a complex world of construction involving several individuals or groups, communication that includes effective exchange of information and understanding of the information received plays a major role in project success and minimizes construction failures. Information must be distributed to the right parties accurately and consistently, so information distribution is one of the five control parameters that affect the communication system. The purpose of this study is to determine the indicators in the construction project communication system that influence the success of national state-owned construction service companies in reducing construction failure rates and produce strategies for increasing information distribution in construction project communication systems that need to be applied to national-owned construction service companies to reduce construction failure rates. The research methods used are expert validation, interviews, and literature studies. The results of this study obtained 11 variables and 37 indicators of information distribution that had an effect on reducing construction failures."
Jakarta: Fakultas Teknik Universitas Indonesia, 2023
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Julia Diaz Hidayati
"Pembangunan Yogyakarta International Airport mendorong pergeseran aktivitas maupun pertambahan aktivitas terhadap tanah-tanah yang berada di sekitarnya. Kawasan sekitar bandara akan ikut berkembang dan dimanfaatkan sebagai investasi terutama pada lahan yang mempunyai prospek dan menghasilkan keuntungan bagi berbagai pihak. Fenomena terjadinya perubahan harga tanah disekitar bandara tak dapat dihindari akibat tingginya permintaan terhadap tanah. Penelitian ini bertujuan untuk mengetahui perubahan harga tanah yang terjadi di Kabupaten Kulon Progo dengan adanya Yogyakarta International Airport serta faktor lainnya yang mempengaruhi perubahan harga tanahnya. Metode yang digunakan penelitian adalah deskriptif komparatif dengan membandingkan sebelum dan setelah dibangunnya bandara. Diketahui pada klasifikasi jarak kelas jarak dekat, perubahan harga tanah didominasi oleh kelas perubahan harga tanah yang tinggi. Harga tanah disekitar bandara sangat tinggi kemudian menurun seiring menjauhnya jarak terhadap bandara namun akan meningkat kembali pada saat mendekati pusat-pusat kegiatan. Selain jarak terhadap pusat-pusat kegiatan, harga tanah dipengaruhi oleh jenis penggunaan tanah dan aksesibilitas dari tanah itu sendiri.

The development of Yogyakarta International Airport making a shift in activities and increased activity to the it surrounding. The area around the airport will be developed and will be use as an investment, especially in land that has prospects and generates profits for various parties. The phenomenon of land price changes around the airport is inevitable due to high demand for land. This study aims to find out the changes in land prices that occur in Kulon Progo Regency with the presence of Yogyakarta International Airport and other factors that influence the change in land prices. The method used by the research is comparative descriptive by comparing before and after the construction of the airport. In the classification of near distances classification, land price changes are dominated by high classification. Land prices around the airport are very high then decrease as the distance away from the airport but will increase again when approaching another centers area. In addition to the distance to the centers of activity, the price of land is affected by the type of land use and accessibility.
"
Depok: Fakultas Matematika dan Ilmu Pengetahuan Alam Universitas Indonesia, 2021
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Benson
"Perusahaan jasa konstruksi BUMN publik Indonesia adalah perusahaan jasa konstruksi yang jumlah kepemilikan saham perusahaannya dimiliki oleh Pemerintah Republik Indonesia dengan jumlah minimal 51%. Saat ini, terdapat 4 BUMN konstruksi yang telah menjadi perusahaan publik. Kinerja BUMN konstruksi publik pada tahun 2018 yang diukur dengan mengadopsi dan modifikasi Malcolm Baldrige Criteria for Performance Excellence (MBCfPE) menempatkan 2 BUMN konstruksi publik pada kelas industry leader, 1 pada kelas emerging industry leader, dan 1 pada kelas good performance. Salah satu faktor penyebab rendahnya kinerja pada perusahaan konstruksi adalah perencanaan yang kurang baik. Manajemen portofolio proyek (MPP) dapat meningkatkan perencanaan sehingga kinerja perusahaan juga dapat meningkat. Tujuan dari penelitian ini adalah menganalisa faktor yang mempengaruhi keberhasilan portofolio proyek untuk meningkatkan kinerja perusahaan dengan objek BUMN konstruksi publik. Penelitian ini dilakukan dengan cara melakukan wawancara terhadap direksi BUMN konstruksi publik dimana data kemudian diolah untuk mendapatkan strategi meningkatkan kinerja perusahaan. Adapun hasil penelitian yang didapatkan adalah skala prioritas dalam meningkatkan kinerja perusahaan adalah strategi bisnis, persiapan masa depan, keseimbangan portofolio, kinerja proyek, sinergi antar proyek, pemangku kepentingan, dan aspek bisnis perusahaan.

Indonesia public construction state owned enterprise (SOE) is construction company that owned by the government of Indonesia by 51% or more. Currently there are 4 Indonesia state owned public construction company. These companies’ performance in 2018 are measured by adapting and modifying Malcolm Baldrige Criteria for Performance Excellence (MBCfPE) and putting 2 companies as industry leader, 1 as emerging industry leader, and another as good performance. One of the main reasons for low company performance is poor planning. Project portfolio management (PPM) can increase the planning quality and followed by increasing company performance. The purpose of this study is to analyze the critical success factors for PPM to increase company performance with Indonesia public construction SOE as object. This research is done by doing interview with directors from Indonesia public construction SOE and the data will be analize in order to know the strategy to improve company performance. The result of this research is that to improve company performance, the priority is business strategy, future preparedness, balance portfolio, project performance, project synergy, stakeholders, and company business aspect. "
Depok: Fakultas Teknik Universitas Indonesia, 2021
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Nara Adhisthana
"Pelaksanaan proyek konstruksi yang dikelola oleh kontraktor swasta dewasa ini tidak hanya mempertimbangkan aspek teknis seperti biaya, waktu, dan ruang lingkup tetapi juga aspek manajemen proyek yang sering berkaitan dengan kematangan internal perusahaan dalam mengelola proyek. Seiring dengan berkembangnya teori dalam bisnis konstruksi, terdapat pertimbangan aspek lainnya yaitu aspek sustainability. Teori sustainable construction lahir sebagai akibat dari kegiatan konstruksi yang diperkirakan berkontribusi terhadap 50 persen limbah padat di dunia. Salah satu bentuk konstruksi adalah konstruksi stasiun instrumen meteorologi yang semakin dibutuhkan di era dengan cuaca tidak menentu ini. Selain waktu pembangunan yang cukup lama, stasiun instrumen meteorologi akan dibangun di antara pemukiman warga dan akan digunakan untuk jangka waktu yang lama. Oleh sebab itu, penting bagi kontraktor untuk menerapkan praktik sustainability yang berfokus pada 3 pilar yaitu ekonomi, lingkungan, dan sosial. Penelitian ini bertujuan untuk mengetahui tingkat praktik su stainability dengan studi kasus proyek konstruksi stasiun instrumen meteorologi di 3 lokasi berbeda di Indonesia. Hasil penelitian dengan menggunakan metode Distance to Ideal Maturity Level (DIML) dan Importance Performance Analysis (IPA) menunjukan proyek di satu lokasi memiliki nilai terendah dengan nilai terendah yaitu 3 dari 5 tingkat sehingga perlu dilakukan perbaikan agar kematangan proyek meningkat.

Construction project run by private contractor has many aspects to consider other than cost, time, and scope but also other aspect such as project management which usually associates with maturity of a company in managing a project. As the theory in construction business developed, another aspect to consider is sustainability. Sustainability in construction usually known as sustainable construction theory, emerge as a result of waste generated by construction project which responsible for an estimated 50 percent of solid waste. Construction of a meteorological instrument station also takes part in contribution of solid waste. Due to weather uncertainty, more meteorological instrument stations are being construct progressively. Aside from the time consuming construction, it is also located among residential area which will be used for a long period of time. The sustainability theory itself has 3 pillars that is economy, environment, and social. Therefore, it is important for contractor to implement sustainability practices. The purpose of this article is to assess sustainability practices in case studies addressed to construction of meteorological instrument stations in 3 different locations in Indonesia. The result, which processed using Distance to Ideal Maturity Level (DIML) and Important Performance Analysis (IPA), shows one location with lowest maturity level (3 out of 5). Furthermore, recommendations on sustainability pra ctices are provided in order to improve the maturity level of the project."
Depok: Fakultas Teknik Universitas Indonesia, 2020
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Rahmawati Kusumastuti Roosadiono
"Keberhasilan suatu proyek konstruksi sangat tergantung pada pengendalian terhadap biaya, waktu/jadwal, dan kualitas. Salah satu faktor pengendalian tersebut yaitu pengendalian biaya menjadi lebih penting dibandingkan dengan yang lainnya, karena pada umumnya pengendalian biaya akan menentukan keberhasilan atau kegagalan suatu proyek konstruksi. Sehingga diperlukan suatu system pengendalian biaya untuk mendeteksinya secara dini kemungkinan terjadinya cost overruns yang dapat mengakibatkan bertambahnya biaya akhir proyek dan berkurangnya profit. Sistem pengendalian biaya ini, baik pada saat perencanaan (cstimasi), monitoring, dan controlling, akan sangat didukung keberhasilannya dengan adanya spesialis yang berkualitas (qualified) yaitu diantaranya cost engineer, cost estimators. Peran mereka menentukan pengendalian biaya yang efektif terutama pada saat pelaksanaan proyek.
Hasil penelitian pada skripsi ini menunjukkan bahwa faktor-faktor yang berpengaruh dalam proses pengendalian biaya ditinjau dari peran cost estimators berdasarkan skala intensitas pengukuran hasil kuisioner, analisa korelasi dan analisa regresi. Skala intensitas pengukuran menunjukkan bahwa faktor-faktor yang mempengaruhi proses pengendalian biaya adalah tugas dan tanggung jawab cost estimators dalam membuat bill of quantities, kualitas estimator dalam mengintrepretasikan gambar dan spesiflkasi, dan tugasnya dalam mempersiapkan dokumen. Sedangkan berdasarkan analisa korelasi faktor-faktor yang dapat meningkatkan kinerja biaya adalah cost estimators dituntut mempunyai pengetahuan yang baik dalam hal finansial (cash flow, anggaran, bunga), memahami dan mampu menggunakan sistem perhitungan/estimasi yang terdapat pada perusahaan, mampu menyusun strategi pada tahap penawaran (bid) dan negosiasi proyek, membuat laporan perbandingan antara standard cost dengan actual cost, membuat kurva S yang menunjukkan hubungan antara pekerjaan yang telah diselesaikan dengan waktu dan biaya, menganalisa penyimpangan biaya berdasarkan jadwal proyek, mempersiapkan dan membuat laporan perhitungan akhir (final costs) keuangan dan pekerjaan rutin, serta menganalisa penyimpangan prestasi terhadap kontrak. Kontribusi yang diberikan oleh variabel, hasil dari analisa regresi, untuk meningkatkan kinerja biaya adalah membuat laporan perbandingan antara standard cost & actual cost, mampu menyusun strategi pada tahap penawaran & negosiasi proyek.

The successful of a construction project depends on cost, schedule, and quality control. One of the most important control is to control cost rather than schedule or quality, because it usually determines the success or failure of a project. Therefore a cost control system is needed to minimize project failure due to cost overruns. This system including planning (estimating), monitoring, controlling (updating), should be supported by qualified engineers, such as cost engineering or cost estimators. Their roles are important in controlling cost, especially in construction phase.
This thesis is providing factors that affect process in controlling cost based on cost estimators' roles. Those factors are identified and ranked by degree of importance. The findings are indicate that cost estimators' roles in making of bill of quantities, cost estimators' quality in interpretation drawings and specifications, and preparing documents for payments of physical working in project are factors that affect process in controlling cost. Correlation analysis method are identified that having good knowledge in financial, understanding process of estimating in a construction company, cost estimators' ability in bidding and negotiating, reporting standard cost versus actual cost, making analysis of variance, analyzing cost overruns based on schedule, preparing and making final costs and analyzing variance between earned and contractual are variables that increasing total project cost performance. Regression analysis is finding that analyzing variance between earned and contractual, cost estimators' ability in bidding and negotiating are contributing in increasing total project cost performance.
"
Depok: Fakultas Teknik Universitas Indonesia, 2001
S34998
UI - Skripsi Membership  Universitas Indonesia Library