Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 117260 dokumen yang sesuai dengan query
cover
Riangga Anugrah Pratama
"Project delay dapat menyebabkan pembengkakan biaya, dimana hal tersebut akan mengurangi nilai kontrak dan profit perusahaan. Dalam penanganannya, sering dilakukan tindakan antisipasi yang justru membutuhkan banyak biaya. Pada dasarnya, project delay dapat dicegah dengan tindakan antisipasi tanpa harus menambah banyak biaya, yaitu dengan menejerial yang baik dan pemilihan Sumber Daya Manusia yang bermutu. Manajemen waktu yang baik sangat dibutuhkan untuk mencegah terjadinya project delay.

Project delay causes cost overruns, where it can reduce the value of contract and corporate profits. In handling that, anticipation is often done while it needs high cost. Basically the project delay can be prevented by doing anticipation without having to add much cost, with good managerial and selection of qualified human resources. Good in time management is needed to prevent project delay"
Depok: Fakultas Teknik Universitas Indonesia, 2013
S53376
UI - Skripsi Membership  Universitas Indonesia Library
cover
Fajar Seno Adi
"ABSTRAK
Laporan magang ini membahas mengenai proses perencanaan, penganggaran, dan pengadaan material kecil maupun besar dalam proyek konstruksi Jalan Layang Non Tol oleh PT ABC untuk periode Juli ndash; Oktober 2016. Proses perencanaan, penganggaran, dan pengadaan material untuk proyek Jalan Layang Non Tol sudah sesuai dengan regulasi dan peraturan dari standar akuntansi keuangan di Indonesia. Hasil observasi dari penulis menemukan bahwa ada beberapa kesalahan prosedur yang dilakukan oleh PT ABC, namun kesalahan prosedur tersebut dapat diminimalisir oleh bagian pengadaan PT ABC.

ABSTRACT
This internship report explains about process of planning, budgeting, and procurement of flyover project by PT ABC that occurs from July 2016 to October 2016. This process of planning, budgeting, and procurement of flyover project has complied to regulation and rules form Indonesian Accounting Standards.From the observation, the writer found that there is some procedural mistake that has been done by PT ABC, but the procedural mistake could been minimized by Procurement Division from PT ABC."
2016
TA-pdf
UI - Tugas Akhir  Universitas Indonesia Library
cover
Citra Chergia
"Proyek konstruksi yang optimal merupakan proyek dengan anggaran biaya, durasi waktu, mutu hasil yang sesuai dengan perencanaan, serta memenuhi standarisasi Keamanan dan Kesehatan Kerja. Guna mencapai hal tersebut diperlukan suatu teknologi dan metode konstruksi yang inovatif serta diiringi dengan manajemen yang baik. Salah satu perwujudan perkembangan metode konstruksi adalah aplikasi struktur kolom komposit. Metode ini terus berkembang di seluruh dunia termasuk di Indonesia. Hal ini disebabkan karena sistem komposit memiliki beberapa keunggulankeunggulan dari segi waktu, kekuatan, dan dimensi dibandingkan dengan metode konstruksi sistem konvensional. Sistem struktur komposit terdiri dari balok, pelat, dan kolom.
Dalam penulisan tugas akhir ini, penulis melakukan pengamatan pada proyek bangunan gedung dengan mengambil studi kasus proyek investasi The City Tower yang merupakan proyek konstruksi kedua di Indonesia dengan aplikasi struktur kolom komposit. Meskipun metode kolom komposit cukup mahal, akan tetapi secara logis durasi waktu yang direncanakan akan lebih cepat dibandingkan dengan metode system konvensional. Namun pada kenyataannya di lapangan (Proyek The City Tower - Jakarta), masih terdapat potensi munculnya permasalahan yang mengganggu jalannya waktu pelaksanaan proyek. Permasalahan tersebut justru berasal dari faktor umum diluar hal-hal khusus yang berkaitan dengan kolom komposit.
Tujuan dari penelitian ini adalah untuk mengidentifikasi indikator utama yang dapat menyebabkan kemunduran waktu proyek konstruksi dengan aplikasi struktur kolom komposit. Penelitian ini didasarkan pendekatan manajemen risiko terhadap waktu serta menggunakan kuisioner dengan responden dari pihak kontraktor yang terkait dengan pekerjaan kolom komposit. Pengolahan data hasil kuisioner tersebut menggunakan metode risk ranking dengan analisis matematis / risk level dan analisis pendekatan /pembobotan Analytical Hierarchy Process (AHP).
Berdasarkan hasil penelitian, maka ditemukan bahwa aktivitas dan indikator yang paling rentan menyebabkan kemunduran waktu adalah keterlambatan pengadaan dan pengiriman material import pada aktivitas pekerjaan kolom komposit yang pertama yakni pemesanan, fabrikasi kolom baja, dan pengiriman kolom baja ke site.

The construction project is considered optimal if it is carried out in line with the planned budget, duration and quality of works and also in accordance to the Occupational Health and Safety Standard. To accomplish such objectives there is a need to implement innovative techniques and methods followed by good construction management. One of the realization of the latest development in construction methods is the application of composite column structure. This method has been developed, improved and implemented throughout the world including Indonesia. The fast development is due to the fact that this method (composite structure) has more advantages as compared to conventional construction system in terms of duration, strength and dimension of the overall work. Composite column structure comprised of slab, steel plate and column. It is true that composite structure is expensive however; from the overall construction point of view this system is much faster than the conventional system.
In writing this final assignment the author has observed building construction project as a case study in the investment project of The City Tower Building. This project is the second construction project in Indonesia applying composite column structure. From the observation in the City Tower Project it was found out that there were some problems emerged that might have a potency to delay the completion of the project. The problems however; were due to common factors (general in nature) rather than the composite column structure system itself.
Objective of this research was to identify the dominant factors that cause the delay in the construction period applying composite column structure system. The research was based on risk management of (construction) time using written questionnaire and asking contractors of composite column structure works as respondents. Data were then analyzed using risk ranking mathematical analysis/risk level analysis with weighted Analytical Hierarchy Process Approach (AHP).
The results found out that activities which were sensitive enough to cause delay in the construction period were procurement and delivery of imported material for construction of the first composite column. This factor comprised of fabricated steel column and delivery of this column to the project site.
"
Depok: Fakultas Teknik Universitas Indonesia, 2008
S35331
UI - Skripsi Open  Universitas Indonesia Library
cover
Abdur Rasyid Rozak
"Mengidentifikasi faktor masalah kinerja waktu keterlambatan merupakan bagian dari pengendalian proyek di mana hal tersebut merupakan langkah awal dari perjalanan proyek untuk menunjang kesuksesan proyek itu sendiri. Hal itu dapat dimengerti karena tingkat mengidentifikasi faktor keterlambatan proyek akan dapat mempermudah dalam pengontrolan proses atau kegiatan proyek yang beragam, termasuk dalam urutan kegiatannya.
Tujuan dari penelitian ini adalah mengidentifikasi dan menganalisis variabelvariabel faktor dominan penyebab keterlambatan yang mempengaruhi kinerja suatu pelaksanaan konstruksi pada proyek pembangunan Panti Asuhan Orphanage Home - Babakan Madang. Dalam mengidentifikasikan faktor-faktor penyebab keterlambatan proyek dilakukan pengumpulan data yang dilaksanakan dalam bentuk survei melalui penyebaran kuesioner. Data kemudian dianalisa dengan metode analisa AHP (Analytical Hierarchy Process ).
Dari hasil analisa data diperoleh faktor dominan penyebab keterlambatan pelaksanaan Proyek Gedung Orphanage Home adalah adanya perubahan desain selama konstruksi, sering terjadinya perubahan pekerjaan (rework), adanya peningkatan scope pekerjaan, biaya pelaksanaan konstruksi yang melebihi anggaran, dan keterbatasan anggaran untuk pembelian material/equipment. Terhadap permasalahan tersebut, dapat dilakukan tindakan antisipasi secara manajerial yaitu dengan pematangan desain dengan persamaan persepsi antara owner perencana, dan pelaksana, pemberian informasi kepada owner tentang baik buruknya dari bermacam-macam model desain sebelum dilaksanakan dan meningkatkan pengendalian biaya, terutama di quantity & biaya.

Identifying the delays of time factor is a part of the project control, which is the early step of project's process to succeed the project its self. It is understood because the identification level for the delays factor would much help in process controlling or in many variety projects, including in each activities order.
The objectives of this research are to identify and analyse the causal dominant factors of the orphanage home building project delays variables in Babakan Madang that influence the work performance of its construction. In order to identify of the project delays factors, data collecting is needed by surveying with questionnaires. Then the collected data would be analyzed using AHP (Analytical Hierarchy Process) method.
At the end of the final analysis report, we have found the causal dominant factors of the orphanage home project implementation delays, there are; the change of design during construction work, rework of the project, the increase of job scope, the over budget of construction implementation, and the limitation budget for equipment purchase. Contending the problem, there are managerial ways to anticipate, such as by comparing perception between the owners, planners and managers in way to maturing design, by giving information to the owners about the advantages and weaknesses of many design models before the project executed, and also by increasing expense control, especially for the quantity and expense budget.
"
Depok: Fakultas Teknik Universitas Indonesia, 2008
S35754
UI - Skripsi Open  Universitas Indonesia Library
cover
Nunu Nuramanu
"Pelaksanaan proyek konstruksi yang terdiri atas pekerjaan Engineering, Procurement, Construction dan Manajemen Proyek, dilaksanakan dengan melibatkan banyak pihak dan menggunakan berbagai sumber daya serta menghadapi berbagai masalah ketidakpastian dan risiko, yang bila terjadi akan memberikan dampak terhadap kinerja proyek, terutama terhadap kinerja waktu. Proyek pembangunan untuk fasilitas lepas pantai merupakan suatu proyek yang sangat sensitif terhadap waktu, dimana semua faktor risiko harus termitigasi dengan baik untuk menghindari keterlambatan penyelesaian, bahkan mencari potensi percepatan dengan mengusahakan semaksimal mungkin. Penentuan faktor risiko dominan baik negatif yang berimpak pada keterlambatan, maupun faktor positif yang berimpak pada percepatan, merupakan suatu tantangan yang signifikan, terutama dalam konteks penelitian ini, proyek dilakukan pada fasilitas yang masih berproduksi aktif di lokasi lepas pantai yang cukup jauh (90-150 km) dari daratan (shore base), kedalaman laut (80-100 meter) dan tinggi gelombang di Laut Cina Selatan. Tujuan dari penelitian ini adalah untuk mengetahui faktor-faktor risiko dominan yang mempengaruhi kinerja waktu proyek pembangunan migas lepas pantai di Indonesia, dari sisi owner. Proses di dalam manajemen risiko proyek yaitu mengidentifikasi faktor-faktor risiko, analisis risiko, evaluasi risiko, dan tindakan mengelola risiko, dikembangkan dalam penelitian ini dalam rangka upaya mencapai tujuan. Identifikasi faktorfaktor risiko (hipotesis) disusun dari literatur-literatur relevan, yang kemudian dipilah melalui validasi pakar. Selanjutnya faktor-faktor risiko terpilah ini diteliti melalui pengambilan data secara survei-kuesioner dengan responden para manajer proyek, dan tim inti yang memiliki pengalaman dalam proyek EPC migas lepas pantai. Responden-responden ini dianalisis kehomogenannya untuk mendapatkan pembacaan yang valid melalui tes 2 Sampel Bebas (Mann-Whitney U) dan K-Sampel Bebas (Kruskal-Wallis H) dengan program SPSS. Pada awal proses analisis data, dilakukan uji validitas dan reliabilitas dengan SPSS untuk memastikan apakah data yang diambil valid dan dapat dipercaya. Selanjutnya data diolah dengan standar AS/NZ 4360 untuk mendapatkan prioritas faktor risiko. Kemudian dilakukan evaluasi tes korelasi nonparametris Kendall-Tau untuk mengetahui hubungan antara variabel risiko dan dampaknya terhadap kinerja waktu. Di tahap akhir, dilakukan validasi pakar kembali terkait tindakan mengelola risiko, yaitu tindakan preventif dan korektif bila faktor-faktor dominan ini terjadi di masa depan.

The process of construction projects which handles Engineering, Procurement, Construction and Project Management are being held by a lot of personnel and departments, where complex problems, uncertainty, risks are mostly occur, and if happened will impact to work performance specially to timeline. Construction projects for offshore facilities are very vulnerable in matter of time, where every risk must be well mitigated to prevent delay, even targeting acceleration opportunities in maximum effort is a must. Defining dominant risk factors, both negative that effecting project delay and positive that giving acceleration is very challenging, specially based on the context of this research, where the construction is held in live facility located on offshore (90-150 km from shore base), with sea depth of 80-100 metres and the high wave of South China sea. The objective of this research is to point out dominant risk factors which effecting time performance of oil and gas offshore construction projects in Indonesia, from owner side. Steps in risk management project which are identifying risk factors, risk analysis, risk evaluation and risk response planning are developed in this research to gain the objective. Identification of risk factors (hypothesis) are arrayed from relevant literatures, and then are sorted by expert validation. Next, these will be examined through collecting data by survey-questionnaire of project manager and project core team respondents who are well experienced in offshore oil and gas EPC projects. The homogeneity of respondents needs to be checked to get valid reading through 2 Free Samples (Mann-Whitney U) and KFree Samples (Kruskal-Wallis H) tests with SPSS program. In the first step of data analysis, validity and reliability tests are conducted to guarantee that the data are valid and trusted. Then, they will be analyzed by AS/NZ 4360 standard to gain risk factors priority. Next, the data are evaluated by Kendall-Tau nonparametric correlation test for determining relation between risks and their effect to time performance. In the end, continued to another expert validation related to risks management, to identify preventive and corrective actions for assurance in future."
Depok: Fakultas Teknik Universitas Indonesia, 2021
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Lock, Dennis
Jakarta: Erlangga, 1981
658.404 LOC pt
Buku Teks SO  Universitas Indonesia Library
cover
Agustinus Putranto
"Penelitian dilakukan pada salah satu perusahaan konstruksi Indonesia yang telah menggunakan PMBOK sebagai acuan dalam penerapan manajemen proyek namun penerapan saat ini hanya sebagian dan masih belum optimal bahkan mulai ditinggalkan. Banyaknya proyek rugi, schedule pelaksanaan terlambat , mutu yang tidak baik dan sering terjadinya kecelakaan kerja sehingga perlu dilakukan evaluasi terhadap pelaksanaan manajemen proyek. Penelitian ini dilakukan untuk mengetahui peran manajemen proyek berbasis construction extension of PMBOK Guide 2016 terhadap kinerja proyek menggunakan Structural Equation Modelling. Hasil penelitian ini menyatakan terdapat 163 indikator dari 13 variabel yang terdapat pada construction extension of PMBOK Guide 2016 yang mempengaruhi kinerja biaya, mutu, waktu dan safety. Indikator yang mempengaruhi kemudian dianalisa menggunakan Importance Performance Map Analysis dengan hasil nilai performa variabel sebagai berikut: - Inisiasi Proyek 6.73 , Manajemen Biaya 8.57 , Manajemen Jadwal 8.44 , Manajemen K3L 8.11 , Manajemen Keuangan 5.96 , Manajemen Komunikasi 6.70 , Manajemen Lingkup 7.69 , Manajemen Mutu 7.99 , Manajemen Pengadaan 6.77 , Manajemen Proyek Terpadu 6.42 , Manajemen Resiko 6.50 , Manajemen,Stakeholder 6.56 , Manajemen Sumber Daya 6.58 . Nilai performa variabel dan indikator tersebut dijadikan indek kinerja proyek yang digunakan untuk mengukur penerapan manajemen proyek. Dan digunakan untuk menentukan strategi manajerial yang efektif agar meningkatkan kinerja proyek, dan meningkatkan efisiensi penggunaan sumber daya manajemen dengan pelaksanaan manajemen proyek berbasis Construction Extension of PMBOK Guide.

The study was conducted on one of the Indonesian construction companies that have used PMBOK as a reference in the implementation of project management but the current application is only partial and still not optimal even began to be abandoned. The number of loss projects, schedule implementation late, poor quality and frequent occurrence of accidents so that the need to evaluate the implementation of project management. This research was conducted to find out the role of project management based on construction extension of PMBOK Guide 2016 on project performance using Structural Equation Modeling. The results of this study indicate there are 163 indicators of 13 variables contained in the construction extension of PMBOK Guide 2016 that affect the performance cost, quality, time and safety. The influencing indicators are then analyzed using Importance Performance Map Analysis with the result of the variable performance values as follows Project Initiation 6.73 , Cost Management 8.57 , Schedule Management 8.44 , Management K3L 8.11 , Financial Management 5.96 , Communication Management 6.70 , Management Scope 7.69 , Quality Management 7.99 , Procurement Management 6.77 , Integrated Project Management 6.42 , Risk Management 6.50 , Management Stakeholder 6.56 , Resource Management 6.58 . The performance values of these variables and indicators are used as the project performance index used to measure the implementation of project management. And used to determine effective managerial strategies to improve project performance, and improve the efficient use of management resources with the implementation of project management based on Construction Extension of PMBOK Guide. "
Depok: Fakultas Teknik Universitas Indonesia, 2017
T49163
UI - Tesis Membership  Universitas Indonesia Library
cover
Boy Subirosa Sabarguna
Jakarta: UI-Press, 2011
658.404 BOY m
Buku Teks  Universitas Indonesia Library
cover
Buyung Prakarsa Perdana
"Pemanfaatan proyek yang lebih luas membutuhkan sebuah orientasi baru di dalam project management dan sebuah model baru untuk operasi yang lebih efektif di dalam organisasi. Project management office (PMO) hadir sebagai salah satu alternatif solusi untuk meningkatkan keseluruhan kinerja organisasi dengan meningkatkan prospek kinerja proyek dan meminimalkan kemungkinan untuk gagal. Penelitian ini bertujuan untuk mengetahui pengaruh peran-peran PMO terhadap kinerja proyek dengan menganalisa model struktural penelitian menggunakan metode partial least square (PLS). Pengolahan data dilakukan menggunakan metode deskriptif, yaitu hasil survey berupa wawancara dan kuesioner kepada pakar dan responden Analisa data deskriptif dan statistik dilakukan dengan bantuan software smartPLS 2.0. Hasil penelitian yang didapat adalah kapabilitas PMO memiliki hubungan yang paling signifikan terhadap kinerja proyek, kemudian tingkat kewenangan dan kontroling PMO.

Utilization of a wider project requires a new orientation in project management and a new model for more effective operations within the organization. Project management office (PMO) is present as an alternative solution to improve the overall performance of organizations by improving the performance prospects of the project and minimize the possibility of failure. This study aimed to investigate the effect of PMO roles on the project performance by analyzing the structural model by using partial least square (PLS). Data processing is done using the descriptive method, the survey results in the form of interviews and questionnaires to experts and respondents, and statistical analysis performed by utilizing smartPLS version 2.0. The results obtained are PMO capability has the most significant relationship to the project performance, then the level of authority and controlling."
Depok: Fakultas Teknik Universitas Indonesia, 2013
T33313
UI - Tesis Membership  Universitas Indonesia Library
cover
Ridha Satria
"Karena usianya yang sudah tua, fasilitas kilang kerap menghadapi ancaman insiden dan kecelakaan, bahkan cedera fatal dapat terjadi jika berjalan tanpa perencanaan pemeliharaan yang tepat. Proyek-proyek revitalisasi yang dilakukan ditujukan untuk mengganti, memperbaiki, atau menambah kapasitas produksi kilang yang sudah ada. Seperti proyek-proyek lain di sektor konstruksi, kinerja proyek revitalisasi cenderung mengalami kelemahan umum yang serupa dan berulang, yakni: penundaan proyek, pembengkakan biaya, ruang lingkup yang bertambah-tambah, kecelakaan operasional, proyek dibatalkan atau bahkan dihentikan. Mempertimbangkan tahap Perencanaan Proyek adalah waktu terbaik bagi sebuah proyek untuk mengalami pengembangan ide, melakukan perubahan ruang lingkup, menyiapkan rekayasa proyek yang sangat baik, dan lain-lain, maka penelitian ini memusatkan perhatian pada pemilihan dan prioritas proyek di tahap Perencanaan Proyek. Fokusnya kemudian diperdalam ke sub-tahap Perencanaan Proyek (inisiasi, konseptual, dan kajian lanjut) dengan tujuan menghilangkan proyek yang tidak layak, tidak menjanjikan, dan yang tidak dapat memenuhi persyaratan sebelum lebih banyak sumber daya organisasi dikeluarkan yang dapat memicu masalah lebih besar bagi organisasi, terutama masalah keuangan. Penelitian ini secara runut telah berhasil memberikan sebuah sistem pemilihan proyek yang berbasis Project Portfolio Management, dimulai dari dikembangkannya sebuah kerangka kerja (framework) berdasarkan studi literatur yang cukup panjang dan dalam. Kerangka kerja tersebut memuat langkah pemilihan proyek yang menerapkan gated system terdiri dari tiga tahapan, yaitu inisiasi, konseptual, dan kajian lanjut. Penelitian ini mampu menetapkan standar indikator-indikator yang menjadi kriteria seleksi proyek revitalisasi beserta bobotnya yang diperoleh melalui analisis data menggunakan SmartPLS. Analisis data yang dilakukan mampu memberikan bukti dimana proses seleksi baik pada tahapan inisiasi, seleksi dan kajian lanjut ikut mendorong keberhasilan portofolio proyek, dengan mediasi oleh variabel keberhasilan perencanaan proyek. Keberhasilan portofolio proyek akan berarti keberhasilan pada Portfolio Management Office (PMO) yang mengelola proyek-proyek revitalisasi di PT XYZ. Akhirnya, output dari penelitian adalah berupa template standar yang dapat digunakan untuk menilai usulan proyek secara transparan dan akuntabel.

Due to its ageing, refinery facilities face the thread of being suffered from incidents and accidents, even fatal injury may be caused if running without proper maintenance planning. The revitalization project is performed intended to replace, repair, or increase production capacity at an existing refinery. Like other projects in construction sector, the revitalization projects tends to experience the same common flaws in their performance; project delay, cost overrun, scope creeping, operational mishaps, cancelled or stopped. Since the best time for a project to experience idea development, conduct scope changes, prepare excellent project engineering etc is at Front-end stage, then this paper localized the attention on project selection and prioritization at the Front-end. The focus is then zoomed in to the sub-stage of Front-end (initiation, conceptual, and basic engineering design) to elliminate the infeasible and unpromising projects that cannot meet the requirement before more resources are expended which can ignite catastrophic event to organization, especially financial. This research has successively succeeded in providing a project selection system based on Project Portfolio Management, starting with the development of a framework based on a long and deep literature study. The framework contains steps for selecting projects that implement a gated system consisting of three stages, namely initiation, conceptual, and Front-End Engineering Design (FEED). This research was able to establish standard indicators which were the criteria for selecting the revitalization project along with their weights which were obtained through data analysis using SmartPLS. The data analysis carried out was able to provide evidence that the selection process, both at the stages of initiation, selection and (FEED), contributed to the success of the project portfolio, mediated by the variable of pre-project success. The success of the project portfolio will mean the success of the Portfolio Management Office (PMO) which manages "
Jakarta: Fakultas Teknik Universitas Indonesia, 2023
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>