Ditemukan 7 dokumen yang sesuai dengan query
cover
L.E.R. Gloria Febriani
Abstrak :
Proyek pembangunan Ruang Publik Terpadu Ramah Anak (RPTRA) banyak mengalami perpanjangan waktu (time overrun) yang disebabkan karena pengelolaan pemangku kepentingan (stakeholder management) belum dilakukan dengan baik. Pemangku kepentingan sebagai pihak berkepentingan merupakan elemen penting untuk dikelola. Pada penelitian ini, kepentingan setiap stakeholder internal dan eksternal disurvey untuk mengidentifikasi kepentingan masing-masing stakeholder yang berpengaruh guna peningkatan kinerja waktu pada pembangunan RPTRA. Hasil survey tersebut dianalisa menggunakan software Structural Equation Modelling (Smart PLS 3.0) untuk selanjutnya dilakukan pengembangan peran dan tanggung jawab pemangku kepentingan berupa diagram alir komunikasi (flow communication) yang dapat meningkatkan kinerja waktu berdasarkan PMBOK. ......The Development of Integrated Child-Friendly Public Space (RPTRA) had experienced a lot of time overrun caused by poor management of the stakeholders. Stakeholders are the important elements to manage. In this research, surveys are conducted on the interests of internal and external stakeholder are identified in order to improve the time performance in the development of RPTRA. The identifications key based on the survey result were analyzed using Structural Equation Modeling (Smart PLS 3.0) software on development of roles and responsibilities among stakeholders subsequently in the form of communication flow that can improve the time performance based on PMBOK.
Depok: Fakultas Teknik Universitas Indonesia, 2017
T49605
UI - Tesis Membership  Universitas Indonesia Library
cover
Erwin Meidya Ramadhan
Abstrak :
ABSTRAK
Faktor waktu dan biaya sangat berpengaruh terhadap keberhasilan dan kegagalan pelaksanaan suatu proyek karena kedua factor tersebut menjadi tolak ukur keberhasilan proyek bila dilihat dari waktu penyelesaian tersingkat dengan biaya minimal tanpa mengabaikan hasil pekerjaan yang berkualitas, usaha untuk mengoptimalkan waktu dan biaya menjadi sangat penting. Untuk itu dilakukan optimasi perencanaan percepatan proyek menggunakan metode programa linier integer. Pada penelitian ini dilakukan optimasi tersebut dengan perangkat lunak lingo ver.11 kemudian penjadwalan tsb juga diselesaikan dengan menggunakan perangkat lunak Microsoft Project, ver 2016. Dari kedua penyelesaian tsb menggunakan perangkat lunak lingo dan Microsoft project memberikan hasil yang sama. Yang berarti M.S Project sebenarnya juga optimasi Program Linier Integer Salah satu caranya yaitu dengan menggunakan metode programa linier integer dibantu software Microsoft Project 2016 yang diaplikasikan pada proyek pembangunan kampus ITERA dengan waktu 210 hari, dimulai dari bulan februari sampai bulan agustus 2017. Tahapan perencanaan meliputi kegiatan persiapan, pekerjaan struktur, dan pekerjaan arsitektur. Penelitian ini mengkaji tentang optimasi waktu dan biaya pada proyek tersebut. Berdasarkan hasil pengolahan dan analisis data terbukti bahwa menggunakan software lingo 11 maka pekerjaan arsitektur dapat dipercepat dengan percepatan sekian hari kerja, dan kenaikan biaya biaya proyek sebesar Rp 75.960.000.
b>ABSTRACT<>br> Project 39 s duration and cost are among important factors and measures for the project to be completed with quality. The two factors determine whether the project is timely and least cost to invest. Effort to optimize the project duration and cost can be implemented through carrying out the analysis using linear integer programming method through application of microsoft project 2016. In this research, optimization is done with software lingo ver.11 and then the problem also be solved by using software Microsoft Project, ver 2016. Of both software, lingo and Microsoft project give same result. Which means, beside optimization of Integer Linear Program we can also use Microsoft Project for the problem. The analisys was done for the said project in ITERA campus university, development by the Local Government of the city of Bandar Lampung. The project was started from February to August 2017. Planning of the project followed three stages including project preparation, structural works, and architectural works. The study was done to assess and optimize the project duration and cost. Result indicated that linear integer programming approach using Lingo 11, through microsoft project 2016 software, was successfully proved that structural working time can be speed up by 32 days, while cost will increased by Rp 75.960.000.
2018
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Daniel
Abstrak :
Pada penelitian ini, diidentifikasi faktor-faktor produktivitas tenaga kerja dalam manajemen sumber daya manusia khususnya tenaga kerja ousourcing/tenaga kerja kontrak yang dilakukan dengan kuesioner survei. Dari hasil kuesioner survei dan analisa pengolahan data didapat faktor-faktor produktivitas tenaga kerja outsourcing/tenaga kontrak yang paling berpengaruh terhadap kinerja waktu proyek adalah faktor absensi pekerja, faktor tingkat keterampilan dan pelatihan tenaga kerja, faktor kerja lembur, faktor imbalan dan kompensasi, faktor penghargaan terhadap pekerja, faktor keselamatan pekerja dan faktor kontrol dan pengawasan jam kerja. Selain itu juga dilakukan rekomendasi tindakan terhadap faktor-faktor produktivitas tenaga kerja outsourcing/kontrak paling signifikan yang mempengaruhi terhadap kinerja waktu proyek yang ditemukan tersebut sehingga dapat mengurangi kemungkinan terjadinya keterlambatan kinerja waktu proyek akibat dari penurunan produktivitas tenaga kerja ousourcing/kontrak dalam proyek konstruksi. ......In this study, identified the factors of labor productivity in the management of human resources, especially labor outsourcing / labor contracts are done with the survey questionnaire. From the results of the questionnaire survey and analysis of data processing obtained the factors of outsourcing labor productivity / labor contract that most affect the performance of the project time is the factor worker absenteeism, and skill levels of manpower training, overtime factor, factor rewards and compensation, recognition factor to workers, factors of safety of workers and factors of control and supervision of working hours. It also made recommendations on measures the productivity of factors of outsourcing labor contracts that affect the most significant to the performance of projects in time and can reduce the possibility of project delays due to performance time of the decline in labor productivity ousourcing contracts in construction projects.
Depok: Fakultas Teknik Universitas Indonesia, 2009
T26637
UI - Tesis Open  Universitas Indonesia Library
cover
Adecya Ayu Cynantya
Abstrak :
Kesuksesan suatu proyek konstruksi diperoleh dari adanya penerapan dan pemeliharaan sistem manajemen mutu dengan melakukan peningkatan berkesinambungan kinerja proyek secara efektif dan efisien. Dibutuhkan adanya suatu kriteria kompetensi bagi seorang manajer proyek konstruksi yang dapat menjamin terlaksananya pengelolaan manajemen kualitas dalam suatu proyek, sehingga berpengaruh baik pada waktu pelaksanaan proyek. Penelitian ini bertujuan untuk mengetahui seberapa jauh tingkat pemahaman manajer konstruksi yang diperlukan dalam menjamin pengelolaan manajemen kualitas proyek konstruksi dalam hubungannya dengan aplikasi pemahaman tersebut terhadap kinerja waktu untuk mencapai kualitas proyek yang baik. Adapun kriteria tersebut mengacu pada LPJKN (Lembaga Pengembangan Jasa Konstruksi Nasional) dan level manajer proyek yang diteliti ada pada level Ahli Manajer Proyek Konstruksi Pratama, Ahli Manajer Proyek Konstruksi Madya, dan Ahli Manajer Proyek Konstruksi Utama. Penelitian dikhususkan pada studi kasus untuk PT.X. Pengolahan data dilakukan dengan menggunakan metode kuantitatif, yaitu hasil survey berupa kuesioner dan wawancara dari pakar dan responden diolah sesuai dengan metode yang digunakan, yaitu dengan analisa validitas reabilitas, analisa nonparametrik, metode statistik dengan analisa deskriptif, analisa korelasi, dan analisa regresi. Hasil dari penelitian ini adalah untuk tingkat pemahaman manajer proyek konstruksi dalam mengelola manajemen kualitas berkisar antara paham hingga sangat memahami manajemen kualitas tersebut, untuk tingkat kemampuan berkisar antara paham baik hingga sangat baik, dan aplikasi dari pemahaman berkisar antara sering hingga selalu menerapkan manajemen kualitas tersebut. Sementara tingkat pengaruh aplikasi dan pemahaman manajer proyek terhadap kinerja waktu berkisar antara cukup berpengaruh hingga sangat berpengaruh terhadap kinerja waktu proyek. Sehingga semakin tinggi tingkat pemahaman dan kemampuan seorang manajer proyek dalam manajemen mutu akan mempengaruhi aplikasi dari pemahaman tersebut dalam menjalankan suatu proyek sehingga akan menyebabkan peningkatan kinerja waktu proyek.
Success of construction projects can be done with application and maintain of a quality management systems. It is can do by project performance enhancement continuity in effective and efficient way. Some competencies criteria are needed for construction project manager. That criteria are assured and managed quality management in certain project. Then finally were influencing project construction period. This research intend as much as to know degree of comprehension project manager that is required to be assured and managed quality management in construction project. Applied of comprehension above coherences with time performance out of construction period in line by objective of proper project quality. The criteria are referred to LPJKN (Lembaga Pengembangan Jasa Konstruksi Nasional), National Construction Development Services Institution from Indonesia. The level?' of Project Manager respondents divided by Project Manager Expert Senior, Intermediate, and Junior Level. Focuses of research were study case wherewith X Construction Company. Analysis of data are done by quantitative method specifically by questioner and interview with professional expert and selected respondents by validity and reability analysis, nonparametric analysis, plus statistic method by means of descriptive analysis, correlative analysis, and regression analysis. The function aforementioned then followed by another phases so that can produce competencies factors that at the best comprehensive a construction manager within how to manage quality management with time performance project. As results of this research, the degree of comprehension project manager is between understand and very understand, the capability is between good and very good, and the application of the comprehension is between often and always implementing the quality management. Meanwhile, the applied of comprehension with the time performance out of construction period range from quite influencing and very influencing. So that the application of comprehension and capability of project manager to manage quality management could increase the time performance of construction project.
Depok: Fakultas Teknik Universitas Indonesia, 2008
S35318
UI - Skripsi Open  Universitas Indonesia Library
cover
Try Puji Satoso
Abstrak :
Kebutuhan akan hunian pada kota-kota besar di Indonesia semakin meningkat seiring dengan semakin sedikitnya lahan yang dapat digunakan sebagai lahan hunian. Sehingga lahirnya fenomena investasi hunian yang sangat meningkat pesat dalam bentuk high rise building. Dengan potensi investasi yang besar ini maka para investor akan menuntut kinerja proyek yang lebih tinggi dengan pelaksanaan proyek dengan waktu yang cepat dan biaya yang efektif. Untuk memenuhi tuntutan tersebut serta mendukung perkembangan teknologi dalam industri konstruksi, maka dibutuhkan metode konstruksi yang optimal yaitu metode konstruksi dengan menggunakan beton pracetak (precast concrete) untuk pekerjaan struktur dan pekerjaan arsitektur pada bangunan gedung tinggi. Namun kenyataannya, penggunaan metode beton pracetak ini masih dilakukan secara acak baik itu pada pekerjaan struktur maupun pekerjaan arsitektur. Sehingga belum dapat dipastikan apakah pelaksanaan metode pracetak dapat mengoptimalkan kinerja proyek. Adapun tujuan dari penelitian ini adalah untuk menghasilkan model metode pelaksanaan beton pracetak yang paling optimal terhadap kinerja proyek. Penelitian ini membandingkan pelaksanaan metode beton pracetak dengan metode konvensional pada pekerjaan struktur dan pekerjaan arsitektur untuk mendapatkan perencanaan penjadwalan proyek dan biaya pelaksanaan yang paling efektif dari kinerja proyek. Hasil penelitian menunjukkan dari keempat kombinasi metode yang dilakukan, kombinasi metode 2 yaitu pekerjaan pekerjaan balok dan pelat dengan metode beton pracetak dan pekerjaan dinding facade dengan metode konvensional merupakan kombinasi yang paling efektif dengan waktu dan biaya proyek yang paling optimal. ......The need for housing in big cities in Indonesia increased along with the decreasing amount of land that can be used as residential land led to the phenomenon of residential investment that increased rapidly in the form of high-rise building. In addition to high investment potential, investors will require higher projects performance with prompt implementation time and cost effective. In order to fulfil this requirement and to support technology development in construction industry, the optimal construction is highly needed by using precast concrete for structural and architectural works on high rise building project. However, the use of this precast concrete method is still implemented randomly, whether on structural or architectural work. Therefore, the implementation methods that can optimize the performance of precast projects has not been established. This research aims to produce the optimal model of precast concrete implementation method on the structural and facade work with the most optimum project performance. This research compared the implementation of the precast concrete method and conventional methods on structural and architectural to obtain the most effective project schedule planning and implementation cost. The research result shows that among four combination methods, the second method that used the combination of precast on beam and plat works and conventional method on wall and facade works is the most effective combination with optimal time and project cost.
Depok: Fakultas Teknik Universitas Indonesia, 2011
S1043
UI - Skripsi Open  Universitas Indonesia Library
cover
Harahap, Yudiansyah
Abstrak :
Dalam perencanaan schedule sebuah proyek, kaitannya dengan pelaksanaan aktivitas kerja proyek, bahwa tiap tahapan perencanaan tersebut selalu diperbandingkan dengan tiap-tiap aktivitas kerja proyek yang bersinggungungan dan berhubungan sehingga membentuk tiap-tiap aktivitas kerja. Dengan artian perencanaan sebuah schedule ini adalah pengakumulasian aktivitas kerja proyek yang ada. Menjadi sangat penting pelaksanaan estimasi penjadwalan sebuah proyek, mengingat hanya 20% dari keseluruhan proyek yang selesai tepat pada waktunya relatif terhadap original base line time-schedule. Untuk memperbaiki dan meningkatkan kinerja waktu pelaksanaan proyek dilakukan optimalisasi Sumber Daya yang dibutuhkan terhadap kapasitas ketersediaannya, mempersiapkan estimasi proyek terhadap aktivitas kerja proyek, durasi kerja proyek, diagram jaringan kerja proyek, dan analisa resiko estimasi faktorfaktor perencanaan penjadwalan proyek dengan mempertimbangkan kemampuan dan kapasitas workshop, sehingga pelaksanaan proyek di masa mendatang lebih terukur dan kinerja waktu dapat lebih meningkat.
Due to project planning and scheduling estimation, bearing of project work activity, that each planning stage oftentimes compared with every detail project work activity which intersect and correlate each others so that create interdependence ( predecessor and successor ) among others. In the other words, project schedule planning shall accommodate all accumulative project work activity whether it?s duration or it?s interdependence. Only 20 % from all project schedule estimation are finished timely relatively to their original base line time schedule. In the project schedule estimation, resources optimalization and prepare all entire work project activity estimation, work duration, also project network diagram and risk analyze shall be conducted to increase and improve the project execution time performance so that project execution is more measured, and project time performance increased.
Depok: Fakultas Teknik Universitas Indonesia, 2007
T40730
UI - Tesis Membership  Universitas Indonesia Library
cover
Utomo Dhanu Saputra
Abstrak :
Penelitian ini bertujuan mencari metode yang paling tepat pada manajemen proyek pembangunan menara telekomunikasi untuk itu dilakukan komparasi antara metode critical chain dengan metode critical path. Dilakukan penelitian manajemen waktu proyek pada pembangunan menara telekomunikasi, dimana dibuat penjadwalan dengan dua metode berdasarkan Project Management Body of Knowledge dan hasilnya diperbandingkan dengan faktor pembanding triple constraint dan faktor umum. Didapatkan hasil total durasi untuk metode critical chain adalah 197,75 hari sedangkan metode critical path mencapai 207 hari, dan disimpulkan bahwa metode critical chain lebih unggul pada faktor ruang lingkup, waktu dan output. Sedangkan metode critical path lebih unggul pada faktor input dan proses.
The purpose of this research is looking for appropriate method in Telecommunication Tower Construction Project Management by doing comparison between critical chain and critical path method. Researching in project time management of telecommunication tower construction which researcher made two scheduling, critical chain and critical path, base on Project Management Body of Knowledge and compare the result with triple constraint factor and general factor as comparator factors. The result of this research are total of duration of critical chain method is 197,75 days and total of duration critical path method is 207 days. Conclusion of comparison is critical chain method is better in scope, time and output factors whereas critical path method is better in input and process factors.
Depok: Fakultas Teknik Universitas Indonesia, 2008
S50383
UI - Skripsi Open  Universitas Indonesia Library