cover
Firmansyah Teguh Sugiarto
"ABSTRAK
Dalam pelayanan KRL Jabodetabek terdapat banyak faktor kualitas pelayanan, antara lain keselamatan, kenyamanan, keamanan, keteraturan dan informasi. Pembenahan dalam sektor perkeretaapian bukan hanya menyangkut pembangunan dan peningkatan infrastruktur fisik, tetapi faktor kualitas pelayanan khususnya ketepatan waktu perjalanan merupakan hal yang sangat penting. Faktor Ketepatan waktu mudah diukur dan mudah dikelola serta dari perspektif penumpang merupakan indikator penting pelayanan KRL. Namun tidak berarti faktor-faktor kualitas pelayanan lainnya tidak penting.
Penelitian ini bertujuan untuk mengidentifikasi faktor-faktor penyebab deviasi waktu perjalanan KRL Jabodetabek. Penelitian dilakukan di lintas Bogor dengan memperhatikan dampak pada lintas lainnya dan pertemuan antar lintas yaitu di stasiun Manggarai. Metode yang digunakan adalah analisa level risiko untuk mengetahui faktor yang paling berpengaruh dan analisa delphi untuk memvalidasi data oleh pakar. Hasil dari penelitian ini adalah variabel-variabel dominan penyebab deviasi waktu perjalanan KRL Jabodetabek dan rekomendasi tindakan untuk peningkatan kinerja ketepatan waktu perjalanan.

ABSTRACT
In the service of commuter electric train (KRL) of Jabodetabek, there are many factors of service quality, including safety, comfort, security, safety and information. Improvements in the railways sector is not only about the development and improvement of physical infrastructure, but the service quality factors, especially the punctuality is very important. The factor of punctuality is easily measured and easily managed as well as from the perspective of the passengers is an important indicator of service KRL. But it does not mean quality factors other services are not important.
This study aims to identify the factors that cause deviation of travel time KRL of Jabodetabek. The study was conducted in Bogor line by considering the impact of other line and intersection in Manggarai station. The method used is the level of risk analysis to determine the factors most influential and Delphi analysis to validate the data by experts. The results of this study is the dominant variables causing deviation of travel time KRL Jabodetabek and recommendations for action to improve the performance of punctuality.
"
Depok: Fakultas Teknik Universitas Indonesia, 2012
T31958
UI - Tesis Open  Universitas Indonesia Library
cover
Topo Tuwantoro
"ABSTRAK
Penelitian ini membahas mengenai permasalahan kegagalan pemenuhan pesanan
tepat waktu pada perusahan manufaktur produk-produk alat berat yang
berkarakteristik make-to-order atau engineered-to-order. Penelitian ini terdiri dari
dua langkah analisa yaitu analisa makro menggunakan Process-based
Performance Measurement Framework untuk mengidentifikasi proses yang
paling berpengaruh yang menyebabkan keterlambatan dan analisa mikro
menggunakan Business Process Simulation. Tujuan penelitian ini untuk
mendapatkan perbaikan proses bisnis yang optimal sebelum benar-benar
diterapkan. Hasil penelitian yang dilakukan menyarankan bahwa perbaikan proses
bisnis di area design engineering, PPC, Purchasing dan Production dapat
mengurangi waktu siklus bisnis proses, sehingga dapat menurunkan tingkat
keterlambatan.

Abstract
The focus of this study is about on-time delivery of order at a heavy equipments
manufacturer with characteristic make-to-order or engineered-to-order. This study
contains two stage analysis consist of macro analysis using process-based
performance measurement framework to identify processes which have significant
contribution to create delay and micro analysis using business process simulation.
The purpose of this study is identify improvements to optimize business processes
to minimize tardiness on delivery time. The researcher suggests that processes
such as engineering design, PPC, purchasing and production to be improved
minimize business process cycle time to gain on time delivery within acceptable
level."
2012
T31129
UI - Tesis Open  Universitas Indonesia Library
cover
Dewi Kartika
"Penelitian ini dilatarbelakangi adanya keterlambatan dalam penyelesaian klaim BPJS di RSUD Dr.Adjidarmo. Penelitian yang menggunakan pendekatan kualitatif dan observasi ini menemukan bahwa 85,56% berkas klaim sudah siap dalam bentuk txt file (soft copy). Namun, merujuk kepada Pedoman Implementasi JKN ternyata penyelesaian klaim rawat inap di RSUD Dr.Adjidarmo dinyatakan tidak tepat waktu. Penyebabnya adalah kurang SDM tenaga dokter dan verifikator BPJS, masalah kelengkapan dokumen klaim, tata letak ruang yang belum memadai, SIM-RS yang belum terintegrasi. Rumah Sakit memerlukan waktu untuk menyesuaikan perubahan sistem aplikasi INA-CBGs. Diperlukan kebijakan/prosedur tetap yang mengatur kepastian tugas, tanggungjawab dan wewenang setiap unit klaim. Disarankan agar meninjau kembali isi perjanjian kerjasama, menetapkan SOP dan mengembangkan monitoring dan evaluasi demi perbaikan kinerja penagihan klaim di RSUD Dr.Adjidarmo.

This research has done to respond challenge on the claim handling in RSUD Dr.Adjidarmo in the first three months of JKN implementation. This study used a qualitative approach and observation. The study revealed that 85,56% of the claims were ready in txt file. However, if we refer to MOH guideline, it is found that all claims were not timely ready. Inacuracy of the Inpatient claim settlement in Adjidarmo’s Hospital was caused by the lack of human resources/ doctors, personnel BPJS verifier, incomplete documents, layout of manager office, fragmented hospital information system, changing INA-CBGs application system and the absence of procedures and policies. It is expected that BPJS will set up policies and procedures to improve claim handling as well as develop monitoring and evaluation instruments."
Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2014
T41972
UI - Tesis Membership  Universitas Indonesia Library
cover
Slamet Prihadi
"Pendahuluan : Rumah Sakit Pusat Angkatan Darat Gatot Soebroto, merupakan rumah sakit Tingkat I dilingkungan TNI - AD / ABRI , dimana merupakan rumah sakit rujukan tingkat pusat untuk satuan-satuan kesehatan TNl - AD / ABRI yang ada di Indonesia. Sehingga daya tampung rumah sakit yang tersedia cukup besar yaitu sebanyak 1.082 tempat tidur. Namun kapasitas tersebut belum termanfaatkan secara maximal, dengan melihat indikator pelayanan yang ada seperti BOR= 48,49 ( standard= 60 - 80 ), LOS=15,71 ( standard= 6 - 9 ), BT0=17,69 ( standard= 40 - 50 ), TO1=16,69 ( standard = 1 - 3 ). Selain itu di RSPAD Gatot Soebroto juga masih terdapat permasalahan mengenai penanganan rekam medic pada bagian administrasi pasien, khususnya di bagian urusan rawat Inap / rawat mondoknya. Dimana masih terjadi keterlambatan pengembalian kartu rekam medis dari ruang unit rawat inap ke ruang unit penyimpanan pusat dibagian administrasi pasien. Menurut data prasurvey yang didapat peneliti, keterlambatan yang ada setiap bulan selama tiga bulan terakhir pada tahun 1995 adalah sebesar 20,33 buah atau 1,08 % perbulannya. Menurut Ketentuan dalam Permenkes RI No : 749.a I PER / XII / 1989 tentang rekam medis, telah dijelaskan segala sesuatunya tentang rekam medis termasuk diantaranya mengenal legalitas dan Cara pengembalian dan penyimpanan rekam medis. Selain itu dalam peraturan yang ada di RSPAD-GS atau Protap ( prosedurtetap ) rumah sakit tersebut dinyatakan bahwa rekam medis harus dikembalikan ketempat penyimpanan pusat setelah 2 X 24 Jam setelah penderita lepas rawat inap ke ruang unit penyimpanan pusat, jika hal tersebut terlampaui maka dikategorikan terlambat. Mengingat begitu pentingnya rekam medis maka keterlambatan pengembaliannya akan mempengaruhi proses pelayanan yang ada di rumah sakit tersebut. Dimana Rekam medis tersebut akan digunakan untuk pembuatan laporan sehubungan dengan fungsi rujukan dan fungsi lainnya pada RSPAD - Gatot Soebroto. Sebagaimana diketahui pada rumah sakit tersebut tenaga dokter yang melaksanakan pelayanan kepada penderita terdiri dari dokter militer dan dokter sipil, dan penderita yang dilayaninya terdiri dari penderita militer,penderita sipil TNI-AD / ABRI serta penderita masyarakat umum. Sehingga karakteristik penderita yang ada sangat bervariasi.
Tujuan : Penelitian ini bertujuan melihat gambaran hubungan antar keterlambatan pengembaiian kartu rekam medis dari ruang unit rawat inap penderita ke ruang unit peyimpanan pusat dengan dokter yang menangani penderita dan karakteristik penderita Rumah sakit Pusat Angkatan Darat Gatot Soebroto Jakarta.
Metodologi : Penelitian ini merupakan penelitian " Crossectional - Descriptif ". Pengumpulan data dilaksanakan dengan menyebarkan Check list pemantauan pengembalian kartu rekam medis ke ruang unit rawat Inap penderita dan keruang ruang unit penyimpanan pusat di bagian pasien, setama 3 (tiga ) minggu pada bulan Januari 1996. Analisa terhadap data yang terkumpul dilakukan dengan analisa Univariat yaitu untuk melihat distribusi variabel bebas dan variabel terikat, dan analias Bivariat dengan menggunakan Uji Mac Nemar pada kelompok dokter yang menangani penderita dan Uji Chisquare pada karakteristik penderita. Pada analisa bivariat dilakukan guna melihat gambaran hubungan antara variabel babas dan variabel terikat.
Hasil : Dalam penelitian ini didapatkan sampel sebanyak 1.024 buah kartu rekam medis. Kemudian peneliti mengadakan analisa terhadap l.024 buah kartu rekam medis yang dikembalikan dari ruang rawat inap penderita ke ruang unit penyimpanan pusat . Menurut hasil analisa Univariat terlihat bahwa kartu rekam medis yang ditangani oleh Dokter Spesialis sebanyak 720 buah yang terdiri dart 72 buah terlambat atau 10 % dan 648 buah tidak terlambat atau 90 %. Kartu rekam medis yang ditangani oleh Dokter umum sebanyak 304 buah yang terdiri 117 buah terlambat atau 38,49 % dan 187 buah tidak terlambat atau 61,51%. Pada kelompok Dokter Militer terdapat keterlambatan sebanyak 91 buah atau 14,99 % sedang tidak terlambat sebanyak 516 buah atau 85,01 %. Pada kelompok Dokter Sipil terdapat keterlambatan sebanyak 98 buah atau 23,51 % dan 319 buah tidak terlambat atau 76,49 %. Menurut karakterlstlk penderita yang terdiri dari kelompok penderita militer dan kelompok penderita sipil, terjadi distribusi variabel terikat sebagai berikut : pada kelompok penderita militer terdapat keterlambatan sebanyak 109 buah atau 16,87 % dan 537 tidak terlambat atau 83,13 %. Pada penderita sipil terdapat keterlambatan sebanyak 80 buah atau 21,16 % dan tidak terlambat sebanyak 298 buah atau 78,84 %. Pada penderita kelompok militer perwira terdapat keterlambatan sebanyak 13 buah atau 5,99 % dan tidak terlambat sebanyak 204 atau 94,01% , pada kelompok bintara terdapat keterlambatan sebanyak 34 buah atau 15,81 % dan tidak terlambat sebanyak 62 atau 28,97 %, pada kelompok tamtama terdapat keterlambatan sebanyak 62 buah atau 28.97% dan tidak terlambat sebanyak 152 buah atau 71,03%. Pada penderita kelompok sipil berdasarkan kelas perawatan yang ada keterlambatan pengembalian kartu rekam medis terjadi sebagai berikut : pada penderita kelas perawatan I terdapat perawatan II terlambat sebesar 14,54 % dan tidak terlambat sebesar 85,46 %, pada penderita kolas perawatan III terlambat 43,44% dan tidak terlambat 58, %. Pada hasil analisa Bivariat dengan menggunakan uji nilai dengan rumus Mac Nemar dan rumus Chisquare dengan penentuan nilai P = 0.05 didapatkan hasil sebagat berikut : Pada kelompok dokter yang menangani penderita ; menurut kelompok Dokter Speslalis dan. Dokter Umum terdapat penolakan terhadap hipotesa yang diajukan sehingga terdapat perbedaan yang bermakna antara keterlambatan pengembalian kartu rekam medis yang ditangal oleh dokter Spesialis dan keterlambatan yang ditangani oleh dokter umum. Sedangkan pada kelompok Dokter Militer dan Dokter Sipil didapatkan hasil uji yang menyatakan penolakan hipotesa yang diajukan sehingga disimpulkan bahwa terdapat perbedaan yang bermakna antara keterlambatan pengembalian kartu rekam medis yang ditangani oleh dokter mlliter dan keterlambatan yang ditangani oleh dokter sipil. Berdasarkan Karakteristik penderita yang ada didapatkan hasil uji sebagat berikut : Pada kelompok penderita Militer dan Sipil terdapat hasil uji Chisquare menunjukkan adanya penerimaan terhadap hipotesa yang diajukan, sehingga tidak terdapat perbedaan keterlambatan yang terjadi antara kelompok penderita sipil dan kelompok penderita militer.
Untuk kelompok penderita militer berdasarkan kepangkatan yang ada yaitu kelompok Pa, Ba Dan Ta didapatkan hasil uji Chisquare menunjukkan penolakan terhadap hipotesa yang diajukan, sehingga dapat disimpulkan bahwa terdapat perbedaan yang bermakna pada keterlambatan yang terjadi pada kelompok keterlambatan sebesar 7,53 %, tidak terlambat 92,47 %, pada penderita kelas penderita Pa , Ba dan Ta. Pada Kelompok penderita Sipil berdasarkan kelas perawatan yang ada, hasil uji nilai Chisquare menunjukan hasil penolakan hipotesa yang diajukan , sehingga dapat disimpulkan bahwa terdapat perbadaan yang bermakna pada keterlambatan yang terjadi pada kelompok penderita sipil kelas perawatan I, II dan III.
Daftar Bacaan : 44 (1957 - 1994 ).
PREFACE: Gatot Subroto Military Hospital is the first class military hospital and top referral military hospital in Indonesia. It has 1082 beds, but the capacity of the hospital its not utilize as well, for example BOR = 48.49% (standard = 60 - 80%), LOS = 15.71 days (standard = 6 - 9 days), BTO = 17.69 % (standard = 40 - 50%), TCI = 16,69 days (standard = i - 3 days). Besides, in this hospital there is a problem about the medical records, specifically at inpatient unit. The main problem in this area Is the delayed of returning medical records from inpatient unit to central storage at patient administering. Base on the pre-survey data, for the last 3 months during 1995 the number of delayed is 20.33 records or 1.08% per month. In Permenkes Rl No: 749.aIPERIX1I11989 about the medical records, has been explained clearly about the legality, the procedure of returning and saving of medical records. So was in standard procedure of Gatot Subroto hospital, it says that the medical record should be returned to the central storage in 2 x 24 hours after the patient left, if not it will be categorized as delayed. Regarding to the significant role of the medical record, the delayed of returning medical record will take effect on services process in the hospital. The medical record that is planned to be use as main material of report writing. Ws known, that the sums of doctors (as personal) who do the services are the gathering of military and civilian doctors. There are wide range of characteristics of the patients, this result is come from the policy that allowed many rather social groups to be served.
PURPOSE: The objective of the research is to describe the relationship between medical record card's delayed return (from the inpatient unit to central storage) with the doctor who handle the patient's case and it's characteristic in Ruah Sakit Pusat Angkatan Darat - Gatot Subroto Jakarta.
METHOD: This research Is "a Crossectional - Descriptive". Data were collected by spreading the check list control of medical record return's card to the Inpatient unit and the central storage room in patient administering, and these processes are take 3 weeks of January 1996. Data were analyzed by Univariat Analysis, the aim is to see the distribution of independent and dependent variable. And move along with Unlvariat Analysis there is Bivariat Analysis that operates the Mac Nemar Test to the groups of doctor whose deal with patients, and Chi-square Test to the patient's characteristic. Goal of this analysis is to see the description of relationship between independent variable and dependent variable.
RESULT: The Sample could be collected and analyzed in this research are 1.024 medical record's cards. Results of the Univariat Analysis show that 720 medical record handled by Specialized Doctor are consist of 72 card (10%) delayed and the rest (90%) not delayed. There are 304 medical record cards handled by not specialized doctor, consist of 117 (38.49%) delayed and 187 (61.51%) not delayed. In group of military doctor there are 91 card (14.99%) delayed and 516 card (85.01 %) not delayed, and in group of civilian doctor there are 98 card (23.51 %) delayed and 319 card (76.49%) not delayed. According to patient's characteristic those consist of military and civilian, there is dependent variable distribution as follow: in the group of military patient, the delayed cards are 109 (16.87%) and 537 (83.13%) not delayed. Civilian patient's groups have 80 card (21.16%) are delayed and 298 (78.84%) are not. There are 13 card (5.99%) delayed and 204 (94.01%) not delayed in the group of upper military officer, 34 card (15.81 %) delayed and 62 (28.97%) not delayed in the group of lower military officer and 62 card delayed (28.97%) and 152 card not delayed in the lowest rank of military officer. The delayed card have been resulted in the group of civilian patient In accordance with service classification could be described as follow; in group of 1st class patient there 7.53% are delayed and 92.47% are not, in 2nd class 14.54% are delayed and 85.46% are not and in 3rd class 43.44% are delayed and 56.56% are not. The Result from the Bivariat Analysis which used value test from Mac Nemar formula and Chi-square formula with marked value P=0.05, is as follow: In the point of the doctor who does the service that there sometime occurred rejection to the hypothesis have been proposed, it's resulting an important difference between medical record's card return delayed handled by military doctor and by doctor in common. In the point of the military doctor and general doctor, the test result have been found that there are certain rejection to the hypothesis proposed, and follow with those result is a brief summary as there is important difference between medical record card delayed return handled by military doctor and by doctor in Common. In the point of patient characteristic, les found the result of the test as follow; in the group of military and civilian patients there are acceptance to the hypotheses proposed, and in return there is no difference in delayed card return between group of military patient and civilian patients. In the group of military patient according to the military rank (Pa, Ba and Ba), the result of Chi-square test show there is rejection to the hypotheses. As a summary it can be said that there is important difference in delayed return occurred in groups of I , II and III class.
Readers: 44 (1957 -1994)
"
Depok: Universitas Indonesia, 1996
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Siregar, Maryadi Tirtana
"Penelitian ini bertujuan untuk memperoleh peningkatan ketepatan waktu pelayanan jasa service delivery kepada konsumennya pada perusahaan jasa pembasmi hama.Tesis ini akan memperlihatkan aktifitas pemborosan (waste) yang menyebabkan ketidakcapainya waktu service delivery yang diberikan oleh teknisi kepada setiap segmen konsumennya terhadap waktu service delivery yang sudah ditetapkan oleh perusahaan.
Perbaikan yang dilakukan untuk tercapainya ketepatan waktu service delivery yang ditetapkan oleh perusahaan dengan teknisi lapangannya adalah menggunakan pendekatan lean service dan analisa Six Sigma yang mudah diaplikasikan yang berfungsi untuk mempermudah dalam penentuan kategori aktifitas kerja. Peningkatan ketepatan waktu ini dilakukan dengan mengklasifikasi 3 kriteria aktifitas waktu nilai tambah yaitu non value added (NVA), business value added (BVA),dan value added (VA).
Hasil penelitian menunjukkan berdasarkan analisa six sigma, aktifitas yang memiliki klasifikasi aktifitas business value added dapat dikurangi waktu pekerjaannya, sehingga sisa waktu yang berlebih dapat digunakan untuk aktifitas value added (VA) yang kemudian dapat diketahui perbaikan nilai variasi dan sigma nya.

The objective of research is to obtain an improvement on pest control services punctuality based on company achievement target using an approachment in lean service and Six sigma analysis. In this tesis will be showing that waste activity is the reason why technician can not achieve in punctuality. Theanalysis method could be adopted easily and became additional value for the company and its clients.
The punctuality improvement have applied with classifying 3 criteria of work time activities, which one "Non-Value Added (NVA)", "Business Value Added (BVA)", and "Value Added (VA)".
Outcomes from he research have point out that the activity which classified as
"Business Value Added (BVA)" could have work time reduction, therefore excessive time left will be optimized for Value Added (VA) activity.
"
Jakarta: Fakultas Teknik Universitas Indonesia, 2014
T42541
UI - Tesis Membership  Universitas Indonesia Library
cover
Resky Fitriyanti Djuningsih
"ABSTRAK
Piutang merupakan bagian terbesar dari aktiva lancar suatu organisasi kesehatan. Sebanyak 15,71% piutang jaminan asuransi/perusahaan RSPJ berumur lebih dari 12 bulan dan sebanyak 58,4% melakukan pembayaran piutang dengan tidak tepat waktu. Jika hal ini tidak ditangani dengan segera akan menggangu keuangan rumah sakit. Penelitian ini bertujuan untuk menganalisis karakteristik asuransi/perusahaan, kesepakatan tertulis, dan tagihan dengan ketepatan waktu pembayaran piutang pasien rawat inap jaminan asuransi/perusahaan RSPJ. Penelitian ini menggunakan desain penelitian kuantitatif dengan rancangan studi cross sectional survey. Hasil penelitian menunjukkan bahwa dari 11 variabel yang diteliti, hanya 3 variabel yaitu jenis kepemilikan, batas jatuh tempo, dan diskon yang mempunyai hubungan dengan ketepatan waktu pembayaran piutang. Peneliti menyarankan agar RSPJ lebih selektif dalam memilih calon asuransi/perusahaan yang ingin mengadakan kerjasama dengan menggunakan prinsip 5C (character, capacity, capital, collateral, dan condition) dan perlu dilakukan evaluasi secara berkala terhadap kebijakan piutang yang sudah berjalan.

ABSTRACT
Accounts receivable is the largest part of the current assets of a health organization. As many as 15,71% of accounts receivable insurance/companies in RSPJ more than 12 months old and as much as 58.4% making payments receivable by not timely. If this is not dealt with immediately it would interfere with hospital finances. This study aims to analyze the characteristics of insurance/company, a written agreement, and the bill with the timely payment of accounts receivable inpatient insurance/companies at the Pertamina Jaya Hospital. This study used quantitative research designs with cross-sectional survey study design. The results showed that of the 11 variables studied, only 3 variables are the type of ownership, maturity limits, and discounts that have a relationship with the timely payment of receivables. The researcher suggests that RSPJ more selective in choosing candidates for insurance/companies who wish to enter into an agreement with the principle of 5C (character, capacity, capital, collateral, and condition) and should be evaluated periodically against existing receivables policy."
2011
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Suntana Sukma Djatnika
"Berdasarkan prioritas pembangunan nasional ke depan, Pemerintah bersama sektor swasta akan membangun proyek-proyek konstruksi infrastruktur jalan berskala besar. Globalisasi membuat pasar konstruksi lokal terbuka bagi perusahaan dan tenaga kerja asing. Sektor konstruksi di Indonesia sekarang ini masih menghadapi banyak masalah, antara lain kinerja daya saing tenaga kerja pekerjaan jalan. Secara umum kinerja daya saing dan kompetensi tenaga kerja pekerjaan jalan masih rendah jika dibandingkan dengan tenaga kerja asing. Kinerja tenaga kerja ini meliputi efektifitas, efisiensi, kualitas hasil kerja, ketepatan waktu, produktifitas dan keselamatan kerja. Apabila tidak dilakukan upaya peningkatan kinerja daya saing tersebut, di waktu mendatang pasar konstruksi dan tenaga kerja pekerjaan jalan berskala internasional di dalam negeri dapat didominasi oleh pihak asing.
Tujuan penelitian adalah meningkatkan kinerja daya saing tenaga kerja pekerjaan jalan dengan cara mengidentifikasi faktor yang mempengaruhi rendahnya kinerja daya saing, mengidentifikasi faktor penyebab dan dampak rendahnya kinerja daya saing dan melakukan analisis untuk merekomendasikan bagaimana meningkatkan kinerja daya saing tenaga kerja konstruksi pekerjaan jalan. Penelitian ini dibatasi pada proyek jalan berskala besar.
Jika peningkatan semua faktor kinerja dilakukan secara maksimal, berdasarkan hasil perhitungan simulasi teoritis tentang optimalisasi output pekerjaan jalan dapat diperoleh kisaran biaya langsung tenaga kerja bobot biaya tenaga kerja berada pada batas 6,52% - 11% dari total biaya langsung, bobot biaya material pada batas 44,60 % sampai 62,70 %, bobot biaya peralatan pada batas 19,58 % sampai 21,18 %, bobot biaya sub kontraktor pada batas 16,63 % sampai 30,48 %, dan bobot biaya overhead lapangan pada batas 4,50 % sampai 5,78%.
Peningkatan kinerja daya saing tenaga kerja pekerjaan jalan akan memberikan manfaat pencapaian efisiensi kerja, pelaksanaan pekerjaan yang lebih efektif, produktifitas lebih tinggi, waktu kerja sesuai dengan jadwal waktu pelaksanaan, mutu pekerjaan sesuai perencanaan dan tercapainya keselamatan kerja. Peningkatan kinerja daya saing ini akan membuat tenaga kerja pekerjaan jalan lebih siap dalam menghadapi globalisasi.

Based on the coming national development plan priority, Government and private sector will develop many large scale road constructions infrastructure projects. Globalization will make the domestic market opens to foreign construction companies and workers. Construction sector in Indonesia is still facing many problems; one of them is the construction worker competitive performance. In general the road worker competitive performance and competency are lower compare to foreign workers. The determinant factors of the worker competitive performance are effectiveness, efficiency, quality, timeliness, productivity and safety. Without any improvement of this situation in the coming future, the local construction market and the role of construction workers may be dominated by foreigners.
The objective of this research is to increase the road construction worker competitive performance, consist of the identification of the influencing factors, the identification the cause and impact of low competitive performance and analyzing the recommendation of improving the road worker competitive performance. This research was limited to large scale road construction project.
If all road construction worker competitive performance factors are being maximally improved, by theoretical simulation computation of the optimal road work output, the road construction worker direct cost range is between 6,52% to 11% from the direct cost, the material cost range is between 44,60 % to 62,70 %, the equipment cost range is between 19,58 % to 21,18 %, the sub contractor cost range is between 16,63 % to 30,48 %, and the project overhead cost range is between 4,50 % to 5,78 %.
The benefit of the road construction worker competitive performances improvement are working efficiency achievement, more effective works, higher productivity, timeliness according to the work time schedule, obtaining quality of works and work safety. This performance improvement will make the road construction worker more ready to face the global competition."
Depok: Universitas Indonesia, 2008
D925
UI - Disertasi Open  Universitas Indonesia Library
cover
Suntana Sukma Djatnika
"Berdasarkan prioritas pembangunan nasional ke depan, Pemerintah bersama sektor swasta akan membangun proyek-proyek konstruksi infrastruktur jalan berskala besar. Globalisasi membuat pasar konstruksi lokal terbuka bagi perusahaan dan tenaga kerja asing. Sektor konstruksi di Indonesia sekarang ini masih menghadapi banyak masalah, antara lain kinerja daya saing tenaga kerja pekerjaan jalan. Secara umum kinerja daya saing dan kompetensi tenaga kerja pekerjaan jalan masih rendah jika dibandingkan dengan tenaga kerja asing. Kinerja tenaga kerja ini meliputi efektifitas, efisiensi, kualitas hasil kerja, ketepatan waktu, produktifitas dan keselamatan kerja. Apabila tidak dilakukan upaya peningkatan kinerja daya saing tersebut, di waktu mendatang pasar konstruksi dan tenaga kerja pekerjaan jalan berskala internasional di dalam negeridapat didominasi oleh pihak asing.
Tujuan penelitian adalah meningkatkan kinerja daya saing tenaga kerja pekerjaan jalan dengan cara mengidentifikasi faktor yang mempengaruhi rendahnya kinerja daya saing, mengidentifikasi faktor penyebab dan dampak rendahnya kinerja daya saing dan melakukan analisis untuk merekomendasikan bagaimana meningkatkan kinerja daya saing tenaga kerja konstruksi pekerjaan jalan. Penelitian ini dibatasi pada proyek jalan berskala besar.
Jika peningkatan semua faktor kinerja dilakukan secara maksimal, berdasarkan hasil perhitungan simulasi teoritis tentang optimalisasi output pekerjaan jalan dapat diperoleh kisaran biaya langsung tenaga kerja bobot biaya tenaga kerja berada pada batas 6,52% - 11% dari total biaya langsung, bobot biaya material pada batas 44,60 % sampai 62,70 %, bobot biaya peralatan pada batas 19,58 % sampai 21,18 %, bobot biaya sub kontraktor pada batas 16,63 % sampai 30,48 %, dan bobot biaya overhead lapangan pada batas 4,50 % sampai 5,78%.
Peningkatan kinerja daya saing tenaga kerja pekerjaan jalan akan memberikan manfaat pencapaian efisiensi kerja, pelaksanaan pekerjaan yang lebih efektif, produktifitas lebih tinggi, waktu kerja sesuai dengan jadwal waktu pelaksanaan, mutu pekerjaan sesuai perencanaan dan tercapainya keselamatan kerja. Peningkatan kinerja daya saing ini akan membuat tenaga kerja pekerjaan jalan lebih siap dalam menghadapi globalisasi.

Based on the coming national development plan priority, Government and private sector will develop many large scale road constructions infrastructure projects. Globalization will make the domestic market opens to foreign construction companies and workers. Construction sector in Indonesia is still facing many problems; one of them is the construction worker competitive performance. In general the road worker competitive performance and competency are lower compare to foreign workers. The determinant factors of the worker competitive performance are effectiveness, efficiency, quality, timeliness, productivity and safety. Without any improvement of this situation in the coming future, the local construction market and the role of construction workers may be dominated by foreigners.
The objective of this research is to increase the road construction worker competitive performance, consist of the identification of the influencing factors, the identification the cause and impact of low competitive performance and analyzing the recommendation of improving the road worker competitive performance. This research was limited to large scale road construction project. If all road construction worker competitive performance factors are being maximally improved, by theoretical simulation computation of the optimal road work output, the road construction worker direct cost range is between 6,52% to 11% from the direct cost, the material cost range is between 44,60 % to 62,70 %, the equipment cost range is between 19,58 % to 21,18 %, the sub contractor cost range is between 16,63 % to 30,48 %, and the project overhead cost range is between 4,50 % to 5,78 %.
The benefit of the road construction worker competitive performances improvement are working efficiency achievement, more effective works, higher productivity, timeliness according to the work time schedule, obtaining quality of works and work safety. This performance improvement will make the road construction worker more ready to face the global competition."
Depok: Fakultas Teknik Universitas Indonesia, 2008
D925
UI - Disertasi Membership  Universitas Indonesia Library
cover
Denies Septorano
"Perkembangan bisnis konstruksi yang cepat dan dinamis, saat ini menuntut perusahaan untuk mampu bersaing dalam ketatnya kompetisi bisnis. Pendekatan strategi pemasaran dalam industri konstruksi di Indonesia, saat ini tidak sebatas bermain pada alat-alat promosi, tetapi lebih ditekankan pada pemberian nilai tambah pada produk yang dihasilkan dan menciptakan kualitas dari hubungan bisnis antara klien dan perusahaan sebagai strategi promosi perusahaan. Selain itu salah satu tujuan strategi pemasaran dari suatu perusahaan pada umumnya ditekankan pada kepuasan pelanggan, dari kepuasan pelanggan tersebut akan tercipta loyalitas konsumen, kemudian market share akan semakin meningkat, serta berakhir pada tingkat profitabilitas yang tinggi. Penelitian ini akan lebih jauh membahas mengenai faktor-faktor yang membentuk kepuasan pada perusahaan jasa konstruksi PT. Waskita Karya dan analisis kinerja perusahaan ditinjau dari kepuasan pelanggan dengan menggunakan pendekatan metode Importance Performance Analysis (IPA). Output dari penelitian ini adalah mendapatkan faktor-faktor yang membentuk kepuasan dan data tingkat kepuasan pelanggan dari pelayanan yang diberikan oleh PT Waskita Karya, yang dapat dijadikan tolak ukur keberhasilan pelayanan pada perusahaan tersebut serta mendapatkan faktor utama yang perlu diperbaiki untuk tetap memiliki keunggulan bersaing.

Rapid and dynamic developments in the construction business currently require companies to be able to compete in a tight business competition. Approach to marketing strategy in the construction industry in Indonesia, is not currently playing in limited promotional tools, but with more emphasis on providing added value to the products and creating quality of the business relationship between the client and the company as a promotional strategy of the company. Moreover one of the goals of the marketing strategy of a company is generally focused on customer satisfaction, customer satisfaction will create customer loyalty, and market share will increase rapidly, and end on a high level of profitability. This research will further discuss the factors influencing customer satisfaction in construction company PT.Waskita Karya, and analysis of company performance in terms of customer satisfaction by using the method of approach Importance Performance Analysis (IPA). The output of this research is to get the factors influencing customer satisfaction and customer satisfaction level data on services provided by PT Waskita Karya, which can be used as a benchmark of success in the service of the company and get the key factors that need to be improvedto retain competitive advantage.
"
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2014
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library