Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 13 dokumen yang sesuai dengan query
cover
Shankar
Abstrak :
Tesis ini membahas mengenai bagaimana penggunaan perhitungan line balancing untuk menyusun suatu layout dengan melakukan pengaturan workstation pada masing-masing proses. Pada tesis ini dicoba dilakukan pendekatan untuk 2 jenis ketebalan kaca yang memegang porsi sales paling besar, yaitu 5 mm dan 12 mm.Output yang dihasilkan lewat tesis ini adalah keseimbangan proses kerja diantara semua workstation yang ada di PT. Maruni DayaSakti sehingga didapatkan penggabungan workstation yang paling efisien dan pada akhirnya bisa diperoleh suatu layout yang paling efisien.
This thesis discusses the use of line balancing calculations to prepare a layout through workstation setting in each process. In this thesis, approach to be tested for 2 types of glass thickness which holds the largest share of sales, that is 5 mm and 12 mm. Output generated through this thesis is a balance of work among all the workstations in PT. Maruni DayaSakti, so it can obtained the most efficient workstations merging and ultimately we can have the most efficient layout.
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2009
T26602
UI - Tesis Open  Universitas Indonesia Library
cover
Bobby Meyer P.
Depok: Fakultas Teknik Universitas Indonesia, 2001
S37718
UI - Skripsi Membership  Universitas Indonesia Library
cover
Lavina Angeline
Abstrak :
Penelitian ini membahas peningkatan efisiensi lini produksi pada perusahan industri manufaktur sepeda motor dengan metode line balancing. Idle time yang terlampau tinggi di lapangan yang mengakibatkan ketidakseimbangan lintasan berpotensi menghambat pencapaian target produksi yang meningkat setiap tahunnya. Untuk memperbaiki hal tersebut, maka dilakukan proses line balancing. Proses line balancing dilakukan dengan Largest Candidate Rule (LCR), Kilbridge and Wester Column (KCW), Ranked Positional Weight (RPW), dan Binary Integer Programming (BIP). Hasil penelitian menunjukkan bahwa metode Binary Integer Programming (BIP) menghasilkan rancangan keseimbangan lintasan terbaik, dengan line efficiency meningkat hingga 95,36%, balance delay berkurang menjadi 4,64%, smoothness index turun menjadi 4,3, dan jumlah stasiun kerja berkurang menjadi 11. ...... This research discusses increasing efficiency of the steering handle production line by means of line balancing in a motorcycle manufacturing company. The high idle time causing disbalance in the line assembly can hinder the production target pursuit that increases each year. In order to prevent this, the process of line balancing is performed. The methods used for line balancing are Largest Candidate Rule (LCR), Kilbridge and Wester Column (KCW), Ranked Positional Weight (RPW), and Binary Integer Programming (BIP). This research shows that Binary Integer Programming (BIP) produces the best line balancing recommendation, increasing line efficiency up to 95.36%, lowering balance delay to 4.64%, decreasing smoothness index to 4.3, and reducing workstation needed to eleven.
Depok: Fakultas Teknik Universitas Indonesia, 2022
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
cover
Ardela Ari Wibowo
Abstrak :
Perkembangan ilmu pengetahuan dan teknologi mendorong setiap perusahaan untuk meningkatkan produktivitas dalam memproduksi suatu produk termasuk pada perusahaan fabrikasi jembatan. Peningkatan efisiensi pada lintasan produksi penting untuk membuat aliran produksi menjadi lebih lancar dan menghasilkan keluaran yang lebih besar. Salah satu cara yang dapat dilakukan untuk meningkatkan efisiensi adalah melakukan penyeimbangan lini dengan mengatur elemen-elemen kerja ke dalam stasiun kerja sehingga diperoleh keseimbangan waktu kerja yang baik. Penyeimbangan lini yang dilakukan dalam penelitian ini menggunakan dua metode yaitu Ranked Positioning Weight dan Moodie Young. Konfigurasi awal lintasan produksi memliki tiga stasiun kerja dengan efisiensi lini sebesar 73,25% dan balance delay sebesar 26,75%. Hasil penyeimbangan lini mengelompokan elemen kerja yang ada ke dalam 5 stasiun kerja dan menghasilkan peningkatan efisiensi lini menjadi 81,80% dan balance delay menjadi 18,20%.
The development of science and technology encourage companies to be competitive by increase their productivity. Efficiency in production line is necessary to make production flows more smoothly and as the result the company produce a greater output than before. One of method to increase efficiency is line balancing by distribute work elements into the work station in order to obtain a good balance of work time. This research using two methods to balance the production line: Ranked Positioning Weight and Moodie Young. The initial production line performance is measured. The production line has three work stations with line efficiency of 73.25% and balance delay amounted to 26.75%. The application of line balancing improve the production line performance. The work elements distribute into five work stations and as the result line efficiency raise to 81.80% and it reduce the balance delay to 18.20%.
Depok: Fakultas Teknik Universitas Indonesia, 2016
S63878
UI - Skripsi Membership  Universitas Indonesia Library
cover
Michael
Abstrak :
Baterai adalah salah satu komponen kelistrikan yang digunakan untuk menyimpan energi listrik. Pada masa kini, jenis baterai yang banyak digunakan adalah baterai bermaterial lithium. Material lithium memiliki power density yang relatif tinggi daripada material lainnya, namun material lithium sangat beracun dan berbahaya bagi makhluk hidup dan memerlukan penanganan khusus dalam pengoperasiannya, salah satunya dengan sistem manajemen baterai. Pada skripsi ini, dilakukan desain sistem manajemen baterai yang dapat memproteksi baterai dari overcharging dan dapat melakukan passive balancing pada hubung seri baterai lithium. Pada pengujian purwarupa, dilakukan uji coba rangkaian proteksi overcharging dengan memonitor nilai tegangan dan arus tiap sel baterai ketika diisi daya sedangkan uji coba rangkaian passive balancing dilakukan dengan mengukur nilai tegangan tiap sel baterai ketika diisi daya. Berdasarkan hasil pengujian purwarupa rangkaian proteksi overcharging dan passive balancing yang dibuat, rangkaian mampu memproteksi setiap sel baterai dari overcharging dan mampu menyeimbangkan tiap sel baterai hubung seri dengan prinsip passive balancing pada tegangan 3.75 Volt dengan arus pengisian 0.2 Ampere. ......Battery is an electrical component used to store electricity. Nowadays, the most widely used battery is the Lithium Ion battery. Lithium battery has a relatively high energy density compared to its predecessor, but is highly toxic and hazardous for living organisms and requires careful handling in its operation, one of such is to use a battery management system. In this thesis, an overcharging protection and passive balancing battery management system for series connected lithium battery is designed. The prototype testing is done by testing the overcharging protection capability by monitoring each cell voltage and current value when charged. The testing of passive balancing capability is done by measuring each cell voltage when charged. Based from the overcharging and passive balancing circuit prototype testing data, it is concluded that the prototype is able to provide cells overcharging protection and able to passively balance each series connected battery cell at 3.75 Volt using 0.2 Ampere of charging current.
Depok: Fakultas Teknik Universitas Indonesia, 2019
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Mohamad Bayuseno
Abstrak :
[ABSTRAK
VANET adalah sebuah jaringan tanpa infrastruktur yang terdiri dari entitas atau node bergerak yang memiliki perangkat wireless untuk berkomunikasi satu sama lain. VANET memiliki topologi yang dinamis yang disebabkan oleh mobilitas dari node-node pada VANET. Dalam simulasi pada vanet dibutuhkan model mobilitas yang mencerminkan keadaan sebenarnya. Model mobilitas menentukan pergerakan dari entitas/node, bagaimana node bergerak, kecepatan dan percepatan dalam VANET. Untuk mencegah kemacetan di jalan raya dilakukan load balancing/pengalihan arus kendaraan untuk membagi trafik kendaraan, dengan satu jalur jalan raya, kepadatan kendaraan akan sangat tinggi, pada topologi grid map dengan load balancing, kepadatan kendaraan dapat berkurang. Pada simulasi didapatkan penurunan kinerja pada model mobilitas grid map dengan load balancing. Pada load balancing, perubahan topologi yang menjadi lebih besar mengakibatkan penurunan kinerja dari load balacing pada model mobilitas gridmap dengan 19,3% pada delay, 5,08% pada packet delivery ratio dan 5,46% pada throughput dalam paramater AODV dan 0,01% pada delay, 12,70% packet delivery ratio dan 12,73% pada throughput dalam parameter DSDV.
ABSTRACT
VANET is an infrastucture less network that consist of entities or mobile nodes that contain wireless device for communicating each other. VANET has dynamic topology due to node mobility. VANET simulation is need mobility model that reflecting the real situation. Mobility model determines the movement of mobile nodes how their location, velocity and acceleration in VANET. To prevent congestion on the road, grip map topology is use to divide the traffic, with the one lane road map, the vehicles density will very high, with load balance grid map topology the vehicles density will separated to other road. On simulation result we get the decrease performance on the load balacing of grid map mobility model. On the load balancing dynamic topology will cause scalability of the network and impact to performance of mobility model. From simulation, load balancing of grid map mobility model has lower performace than common grid map with 19,3% on delay, 5,08% on packet delivery ratio, and 5,46% on throughput with AODV parameters and 0,01% on delay, 12,70% on packet delivery ratio and 12,73% on throughput with DSDV parameters;VANET is an infrastucture less network that consist of entities or mobile nodes that contain wireless device for communicating each other. VANET has dynamic topology due to node mobility. VANET simulation is need mobility model that reflecting the real situation. Mobility model determines the movement of mobile nodes how their location, velocity and acceleration in VANET. To prevent congestion on the road, grip map topology is use to divide the traffic, with the one lane road map, the vehicles density will very high, with load balance grid map topology the vehicles density will separated to other road. On simulation result we get the decrease performance on the load balacing of grid map mobility model. On the load balancing dynamic topology will cause scalability of the network and impact to performance of mobility model. From simulation, load balancing of grid map mobility model has lower performace than common grid map with 19,3% on delay, 5,08% on packet delivery ratio, and 5,46% on throughput with AODV parameters and 0,01% on delay, 12,70% on packet delivery ratio and 12,73% on throughput with DSDV parameters, VANET is an infrastucture less network that consist of entities or mobile nodes that contain wireless device for communicating each other. VANET has dynamic topology due to node mobility. VANET simulation is need mobility model that reflecting the real situation. Mobility model determines the movement of mobile nodes how their location, velocity and acceleration in VANET. To prevent congestion on the road, grip map topology is use to divide the traffic, with the one lane road map, the vehicles density will very high, with load balance grid map topology the vehicles density will separated to other road. On simulation result we get the decrease performance on the load balacing of grid map mobility model. On the load balancing dynamic topology will cause scalability of the network and impact to performance of mobility model. From simulation, load balancing of grid map mobility model has lower performace than common grid map with 19,3% on delay, 5,08% on packet delivery ratio, and 5,46% on throughput with AODV parameters and 0,01% on delay, 12,70% on packet delivery ratio and 12,73% on throughput with DSDV parameters]
Depok: Fakultas Teknik Universitas Indonesia, 2015
T44299
UI - Tesis Membership  Universitas Indonesia Library
cover
Faizal Fajar Nurroji
Abstrak :
[ABSTRAK
Perkembangan ekonomi politik di kawasan Asia Pasifik yang semakin dinamis berdampak pada lahirnya beberapa institusi ekonomi regional baru, termasuk salah satu yang menarik perhatian adalah Trans Pacific Partnership. Sebagai instutusi yang disponsori oleh AS, TPP diproyeksikan sebagai high level FTA yang tidak sekedar mencakup kesepakatan terkait perdagangan dan investasi namun juga isu-isu lain yang lebih kompleks seperti perlindungan hak cipta (IPR), perlindungan hak buruh, kompetisi terkait Badan Usaha Milik Negara, dan beberapa isu-isu lain dengan standard yang cukup tinggi. Dengan persyaratan seperti ini, maka menjadi menarik ketika Vietnam memutuskan untuk bergabung ke dalamnya. Setidaknya ada dua faktor yang membuat keanggotaan Vietnam dalam TPP menjadi menarik untuk dianalisa lebih lanjut, yang pertama adalah kedekatan antar Vietnam dengan Tiongkok yang selama ini terbangun, serta kemampuan Vietnam sebagai negara berkembang dalam memenuhi syarat-suarat tinggi yang sedang dirundingkan oleh TPP. Penelitian ini bertujuan untuk mengetahui faktor-faktor utama penyebab bergabungnya Vietnam ke dalam TPP. Adapun penelitian ini menggunakan metode kalitatif dengan pengumpulan data melalui studi pustaka dan wawancara baik langsung maupun tidak langsung kepada beberapa pihak yang terkait dengan keanggotaan Vietnam dalam TPP.
ABSTRACT
The development of Asia Pacific's political economy which has impacted on the birth of several new institutions, including Trans Pacific Partnership. As institution which sponsored mainly by the United States, TPP is projected as high level FTA since it covers not only common issues like trade and investment, but also other issues such as Intellectual Property Right, labor right protection, competition related to State Owned Enterprise, and other other high level issues. Based on these facts, it is interesting when Vietnam finally decide to join TPP. There are at least two factors which made Vietnam membership in TPP is interesting to be analyzed, first is about its close relation with China, and second is Vietnam's ability in achieving the high standard regulations set by TPP. This research aims to find out main factors which cause Vietnam to join TPP. This research uses qualitative method and literature study as well as direct or indirect interview in collecting data process, The development of Asia Pacific’s political economy which has impacted on the birth of several new institutions, including Trans Pacific Partnership. As institution which sponsored mainly by the United States, TPP is projected as high level FTA since it covers not only common issues like trade and investment, but also other issues such as Intellectual Property Right, labor right protection, competition related to State Owned Enterprise, and other other high level issues. Based on these facts, it is interesting when Vietnam finally decide to join TPP. There are at least two factors which made Vietnam membership in TPP is interesting to be analyzed, first is about its close relation with China, and second is Vietnam’s ability in achieving the high standard regulations set by TPP. This research aims to find out main factors which cause Vietnam to join TPP. This research uses qualitative method and literature study as well as direct or indirect interview in collecting data process]
2015
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Cansa Julisa Muhammad Yusuf
Abstrak :
Perencanaan dan penjadwalan produksi umumnya diperlakukan secara berurutan. Berdasarkan tinjauan kritis penerapan teknik simulasi untuk masalah Perencanaan dan Pengendalian Produksi (PPC) antara tahun 2022 dan 2014, literatur secara sistematis dipersempit dari sekitar 2.250 menjadi 131. Lima masalah yang dipertimbangkan dalam PPC adalah perencanaan sumber daya fasilitas, perencanaan kapasitas, perencanaan pekerjaan, perencanaan proses dan penjadwalan produksi. Pengembangan sistem pakar dalam penjadwalan menimbulkan banyak masalah dan berbagai pendekatan telah dicoba dalam sistem prototipe. Salah satu perusahaan manufaktur yang memproduksi lensa polycarbonate menerapkan sistem make to order. Berdasarkan penjadwalan produksi yang telah diterapkan, target penyelesaian pesanan selama 30 hari belum terpenuhi. Berdasarkan permasalahan pada penjadwalan produksi, dilakukan analisis penjadwalan produksi dan keseimbangan lini untu produksi lensa polycarbonate. Sehingga, dapat memenuhi target penyelesaian pesanan yang telah ditetapkan. ......Production planning and scheduling are generally treated sequentially. Based on a critical review of the application of simulation techniques to Production Planning and Control (PPC) problems between 2002 and 2014, the literature was systematically narrowed from about 2,250 to 131. The five problems considered in PPC are facility resource planning, capacity planning, work planning , process planning and production scheduling. The development of expert systems in scheduling poses many problems and many different approaches have been tried in prototyping systems. One of the manufacturing companies that produce polycarbonate lenses applies a make to order system. Based on the production scheduling that has been applied, the order completion target has not been met for 30 days. Based on the problem in production scheduling, analyzing by production scheduling and line balancing for polycarbonate lens production. So it can meet the target completion of orders that have been set.
Jakarta: Fakultas Teknik Universitas Indonesia, 2023
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Nencylia Mahmintari
Abstrak :
Line balancing adalah suatu metode penugasan sejumlah elemen kerja ke dalam stasiun kerja pada satu lintasan produksi sehingga tiap stasiun kerja dapat menyelesaikan tugasnya pada waktu yang sama (Prabowo, 2009). Desain line balancing yang tepat akan meminimalisir permasalahan bottleneck pada proses pengemasan. Bottleneck adalah adanya penumpukan produk pada work station tertentu sehingga dapat menghambat proses produksi (Napitulu, Sembiring & Hidayah, 2016). Tujuan dari penulisan ini adalah untuk membuat desain line balancing agar mendapatkan desain yang efektif dan efisien setelah dilakukan peningkatan kecepatan mesin Meguro SP 220-HSD dengan menentukan jumlah pekerja yang dibutuhkan pada tiap elemen kerja sehingga didapatkan keseimbangan pada jalur pengemasan 3 produk Vitacimin yang dilakukan selama Praktik Kerja Profesi Apoteker periode September - November 2020 di PT Takeda Indonesia. Metode pelaksanaan dilakukan dengan observasi data, merancang desain dan mengevaluasi desain yang telah dibuat. Evaluasi desain line balancing dilakukan pada kecepatan 150, 160 dan 170 rpm dengan melihat keseimbangan lini proses pengemasan dan menganalisa faktor-faktor yang mempengaruhi line balancing. Dari hasil evaluasi pada kecepatan 150 rpm, lini pengemasan Produk Vitacimin memiliki keseimbangan sedangkan pada kecepatan 160 dan 170 rpm, desain balancing yang dibuat masih memiliki permasalahan yaitu bottleneck pada beberapa work station. Bottleneck terjadi karena kecepatan rata-rata petugas pengemas (skill matrix) belum merata dan bahan conveyor belt yang digunakan pada lini proses memiliki sifat menempel pada kemasan primer produk. ......Line balancing is a method of assigning a number of work elements into a workstation on one production track so that each workstation can complete its task at the same time (Prabowo, 2009). The right line balancing design minimizes bottleneck problems in the packaging process. Bottleneck is the accumulation of products at certain work stations so as to impede the production process (Napitulu, Sembiring & Hidayah, 2016). The purpose of this writing is to create a line balancing design in order to obtain an effective and efficient design after an increase in the speed of Meguro SP 220-HSD machines by determining the number of workers needed on each element of work so that a balance is obtained on the packaging line of 3 Vitacimin products conducted during the Pharmacist Profession Working Practice period September - November 2020 at PT Takeda Indonesia. The implementation method is done by data observation, designing and evaluating the design that has been created. Evaluation of line balancing design is conducted at speeds of 150, 160 and 170 rpm by looking at the balance of the packaging process line and analyzing the factors that affect line balancing. From the evaluation results at a speed of 150 rpm, Vitacimin product packaging line has a balance while at the speed of 160 and 170 rpm, the balancing design made still has problems namely bottlenecks at some work stations. Bottleneck occurs because the average speed of the packing officer (skill matrix) has not been evenly distributed and the conveyor belt material used on the process line has the properties of sticking to the primary packaging of the product.
Depok: Fakultas Farmasi Universitas Indonesia, 2020
PR-pdf
UI - Tugas Akhir  Universitas Indonesia Library
<<   1 2   >>