Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 40948 dokumen yang sesuai dengan query
cover
Irfan Budiman
"Oil and gas exploration is increasingly moving to deepwater locations to meet the increasing energy demands. In this environment, floating structures with suction pile foundations are commonly used because their the cost-effectiveness. Some studies have been conducted to examine the behavior of suction piles in clays, but the clay conditions considered are typically normally consolidated and lightly overconsolidated. In this paper, the behavior of suction piles in underconsolidated clays and underconsolidated-normally consolidated clays adopted from actual deepwater soil conditions. The evaluation was performed using geotechnical 3D finite element software Plaxis. Suction piles with two different aspect ratios (L/D = 2 and 6) were considered, and the focus was on the effect of load angles (0? to 90?) and the effects of padeye position (0.5 L to 0.9 L). For short piles, the load angles had a relatively insignificant effect on the overall ultimate resistance, while for long piles, the angles affected the overall resistance considerably with a decrease in resistance up to about 50 percent. This different behavior could be explained from the observed pile deformation patterns. The padeye positions affected the pile resistances significantly as well with a decrease in resistance up to about 30 percent. Nevertheless, it can be concluded that the overall behavior of suction piles in a combined clay conditions is practically similar to that of piles in normally consolidated and overconsolidated clays."
Depok: Faculty of Engineering, Universitas Indonesia, 2015
UI-IJTECH 6:2 (2015)
Artikel Jurnal  Universitas Indonesia Library
cover
Rayandra Putra Andrianto
"Penelitian ini bertujuan untuk mengembangkan kerangka kerja yang sistematis dan objektif untuk memilih subkontraktor untuk Proyek Akasia Bagus dengan menggunakan metode Analytical Hierarchy Process (AHP) dan Teknik untuk Urutan Preferensi dengan Kemiripan dengan Solusi Ideal (TOPSIS). Studi ini mengevaluasi subkontraktor berdasarkan berbagai kriteria, termasuk biaya, lokasi, waktu pengiriman, dan kinerja historis. Metode AHP digunakan untuk menentukan pentingnya setiap kriteria relatif melalui perbandingan berpasangan, memastikan keselarasan dengan prioritas pengambil keputusan. Metode TOPSIS kemudian diterapkan untuk memeringkat subkontraktor berdasarkan kriteria berbobot yang diperoleh dari AHP, dengan menggunakan matriks keputusan yang dinormalisasi dan menghitung jarak dari solusi ideal. Hasil penelitian menunjukkan bahwa PT. PPI (A3) adalah subkontraktor peringkat tertinggi, diikuti oleh PT. Zeeco (A1), PT. Gasco (A4), dan PT. Cimmarron (A2). Temuan ini menyediakan kerangka kerja yang kuat dan andal untuk pemilihan subkontraktor, memastikan bahwa keputusan didasarkan pada data yang komprehensif dan akurat. Studi ini diakhiri dengan rekomendasi untuk meningkatkan proses pemilihan subkontraktor, dengan menekankan pentingnya pengambilan keputusan yang objektif, keselarasan strategis, dan peningkatan berkelanjutan. Industri Minyak dan Gas, Analytical Hierarchy Process (AHP), Technique for Order Preference by Similarity to Ideal Solution, Pemilihan Vendor, Pemeringkatan Vendor

This research aims to develop a systematic and objective framework for selecting subcontractors for the Akasia Bagus Project using the Analytical Hierarchy Process (AHP) and Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) methods. The study evaluates subcontractors based on multiple criteria, including cost, location, delivery time, and historical performance. The AHP method was employed to determine the relative importance of each criterion through pairwise comparisons, ensuring alignment with decision-makers' priorities. The TOPSIS method was then applied to rank the subcontractors based on the weighted criteria derived from AHP, using normalized decision matrices and calculating distances from ideal solutions. The results indicated that PT. PPI (A3) was the top-ranked subcontractor, followed by PT. Zeeco (A1), PT. Gasco (A4), and PT. Cimmarron (A2). The findings provide a robust and reliable framework for subcontractor selection, ensuring that decisions are based on comprehensive and accurate data. The study concludes with recommendations for improving subcontractor selection processes, emphasizing the importance of objective decision-making, strategic alignment, and continuous improvement."
Depok: Fakultas Teknik Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Fakhrian Abqari
"Industri Minyak dan Gas merupakan salah satu industri dengan kontribusi penghasil emisi yang cukup signifikan bagi akumulasi gas rumah kaca. Salah satu gas yang cukup memberikan dampak buruk yang signifikan saat berada di atmosfer adalah gas Metana. Sebagai upaya dalam menimalisasi emisi gas Metana, industri minyak dan gas mulai melakukan program reduksi emisi, salah satunya dengan melakukan evaluasi terhadap nilai emisi pada fasilitas terkait. Emisi dapat diperkirakan dengan beberapa cara (dari banyak referensi), seperti Pendekatan Faktor Emisi Rata-Rata Tingkat Fasilitas, Pendekatan Faktor Emisi Rata-Rata Tingkat Peralatan, dan Pendekatan Dispersi Terbalik. Hasil rata-rata tingkat fasilitas lebih tinggi dibandingkan rata-rata tingkat peralatan. Dari hasil perhitungan terdapat perbedaan sebesar 29% antara Rata-rata Pendekatan Faktor Emisi Tingkat Fasilitas vs. Rata-rata Faktor Emisi Tingkat Peralatan. Sedangkan metode dispersi terbalik akan memberikan hasil aktual kebocoran berdasarkan kegiatan pemantauan dan pengukuran nilai LEL yang dilakukan teknisi di lapangan. Namun pendekatan dispersi terbalik memerlukan data analisis total emisi fugitive yang lebih banyak dan perbaikan lebih lanjut agar menghasilkan estimasi yang lebih akurat. Setelah dilakukannya estimasi terhadap nilai emisi, perbaikan dapat diterapkan dengan memodifikasi peralatan sesuai Metode Teknologi Terbaik (Best Available Technique) dimana perkiraan efisiensi menghasilkan reduksi nilai emisi hingga hampir 100%. Namun penerapannya memerlukan analisis biaya dan manfaat lebih lanjut (total keuntungan-kerugian/harga karbon vs total investasi) karena nilai investasinya akan sangat tinggi.

The oil and gas industry is one of the industries with a significant emission-producing contribution to the accumulation of greenhouse gases. One gas that has a significant negative impact when it is in the atmosphere is methane gas. As an effort to minimize methane gas emissions, the oil and gas industry has begun carrying out emission reduction programs, one of which is by evaluating the emission values at related facilities. Emissions can be estimated in several ways (from many references), such as the Facility Level Average Emission Factor Approach, the Equipment Level Average Emission Factor Approach, and the Reverse Dispersion Approach. The average facility level results are higher than the average equipment level. From the calculation results, there is a difference of 29% between the average Emission Factor Approach at Facility Level vs. Average Equipment Level Emission Factor. Meanwhile, the reverse dispersion method will provide actual leak results based on monitoring activities and measuring LEL values carried out by technicians in the field. However, the reverse dispersion approach requires more total fugitive emission analysis data and further improvements to produce more accurate estimation. After estimating the emission value, improvements can be implemented by modifying the equipment according to the Best Available Technique where the estimated efficiency results in a reduction of the emission value for almost 100%. However, its implementation requires further cost and benefit analysis (total profit-loss/carbon price vs total investment) because the investment value will be very high."
Depok: Fakultas Teknik Universitas Indonesia, 2023
PR-pdf
UI - Tugas Akhir  Universitas Indonesia Library
cover
Partogi, Jeremie Larry
"Economic Order Quantity (EOQ) adalah metode pengukuran yang digunakan untuk menentukan volume dan frekuensi pesanan untuk memenuhi tingkat permintaan tertentu sambil meminimalkan biaya per pesanan. Dengan demikian, EOQ juga dapat diartikan sebagai jumlah optimal barang yang harus dipesan dalam periode tertentu, sehingga total biaya pemesanan dan penyimpanan barang tersebut dapat diminimalisir. Sasaran dari penelitian ini adalah dapat meminimalisir penggunaan stok material dan menekan biaya pemesanan. Permasalahan dari penelitian ini adalah bagaimana mengoptimalkan stok material agar tidak berlebihan. Kelebihan stok membuat perusahaan merugi karena dapat membuat material terlalu banyak dan berdampak pada biaya yang harus dikeluarkan untuk menjaga material tersebut. Oleh karena itu, perlu dilakukan penelitian ini dengan menggunakan Analisis ABC untuk mengkategorikan masing-masing kelas agar mendapatkan materi kelas “A”. Hasil penelitian ini, Lima stok material kelas “A” telah diolah dengan menerapkan metode EOQ dan diperoleh hasil yang optimal. Total biaya stok material sebelum menerapkan metode EOQ adalah $26.701.454,17 dan setelah menerapkannya, biaya dikurangi menjadi $3.102.032,99.

Economic Order Quantity (EOQ) is a measurement method used to determine the volume and frequency of orders to meet a given level of demand while minimizing the cost per order. Thus, EOQ can also be interpreted as the optimal number of material stock that must be ordered in a certain period, so that the total cost of ordering and storing these stocks can be minimized. The goal of this research is to minimize the use of material stock and reduce ordering costs. The problem of this research is how to optimize material stock so that it is not excessive. Excess stock makes the company lose money because it can make too much material and has an impact on the costs that must be incurred to maintain the material. Therefore, it is necessary to conduct this research using ABC Analysis to categorize each class in order to get class "A" material. The results of this research, five class "A" material stocks have been processed by applying the EOQ method and obtained optimal results. The total cost of material stock before applying the EOQ method was $26,701,454.17 and after applying it, the cost was reduced to $3,102,032.99."
Depok: Fakultas Teknik Universitas Indonesia, 2022
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Hascaryo Rat Kusumo
"Saat ini kebutuhan industry minyak dan gas bumi di Indonesia terhadap pekerja selam (commercial diver) untuk melaksanakan pekerjaan dalam air masih mengacu pada standar internasional. Welding Center (Sub Sea) University of Indonesia (WCSS) didirikan dengan tujuan untuk menghasilkan pekerja selam yang memiliki kualifikasi untuk melaksanakan pekerjaan inpeksi bawah air dengan metoda NonDestructive Testing (NDT). Tujuan dari penelitian ini adalah mencari kesenjangan terhadap kualifikasi yang dimiliki oleh pekerja selam WCSS UI saat ini dengan standar internasional yang diacu untuk pekerjaan inspeksi bawah air dengan metoda NDT dan memberikan rekomendasi perbaikannya.
Hasil dari penelitian ini adalah masih ditemukan kesenjangan antara kualifikasi pekerja selam WCSS UI dengan standar internasional yang diacu. Untuk kualifikasi sebagai pekerja selam yaitu memperoleh nilai pemenuhan standar sebesar 70% sedangkan untuk kualifikasi sebagai personel inspeksi NDT bawah air level 3.1U dan 3.2U sebesar 73.33% dan 33.33%. Rekomendasi perbaikan untuk menutup kesenjangan yang ditemui antara lain dari sisi materi latihan dan pelatihan yang sesuai standar, penambahan fasilitas pendukung pelatihan praktek dan tenaga pengajar professional yang tersertifikasi.

Today, commercial diver requirements for underwater jobs in Indonesian oil and gas industry are still refer to international standards, such as qualification and certification from well-known international association. Welding Center (Sub Sea) University of Indonesia (WCSS) established to generate qualified and competent commercial diver for underwater NDT inspection jobs. The objectives of this research are to analyze qualifications gap between WCSS UI commercial diver and international standards for underwater NDT inspection jobs.
The result shows that WCSS UI commercial diver still has qualifications gaps from international standards. For commercial diving category 70% compliance, for underwater NDT inspector level 3.1U and 3.2U are 73.33% and 30% respectively. Recommendations to improve qualification gaps such as to add training syllabus as per standards, training facilities and last but not least is having real world qualified and certified professional instructors.
"
Depok: Fakultas Teknik Universitas Indonesia, 2019
T53219
UI - Tesis Membership  Universitas Indonesia Library
cover
Dedy Hidayat
"ABSTRAK
Sumber energi bahan bakar konvensional di dunia semakin berkurang. Cadangan gas konvensional di Indonesia diperkirakan hanya tersisa 59 tahun. Diperlukan sumber energi baru untuk memenuhi kebutuhan energi di masa depan. Salah satu sumber energi nonkonvensional yang potensial adalah gas hidrat. Potensi gas hidrat Indonesia diperkirakan mencapai 850 TCF yang tersebar di Sumatera, Jawa, Kalimantan, dan Sulawesi. Penelitian ini membahas mengenai analisis teknik dan ekonomi pengembangan lapangan gas hidrat di Cekungan Kutai perairan Kalimantan Timur menggunakan metode depresurisasi dengan stimulus termal menggunakan metode wellbore electrical heating dan metode hot gas injection serta dua kontrak kerja sama blok migas non-konvensional, yaitu kontrak bagi hasil dan kontrak gross split. Estimasi potensi gas hidrat di cekungan Kutai adalah 10,01 TCF. Hasil simulasi produksi gas dengan program HydrateResSim menunjukkan bahwa semakin rendah variabel tekanan, maka laju alir dan kumulatif produksi gas semakin tinggi, sedangkan variabel temperatur tidak berpengaruh terhadap laju alir dan kumulatif produksi gas. Laju alir produksi gas dari hasil simulasi yaitu 4.432 m3/hari sampai dengan 20.515 m3/hari atau 0,16 MMSCFD sampai dengan 0,72 MMSCFD. Efisiensi energi EROI produksi gas dari gas hidrat pada penelitian ini berkisar antara 2,2 sampai dengan 21,1. Pada harga 6,5/MMBTU dan MARR 11,8 , keekonomian proyek untuk kontrak PSC dan gross split semuanya tidak layak. Harga jual gas minimum untuk kontrak PSC yaitu antara 18,43/MMBTU sampai dengan 200,63/MMBTU. Harga gas minimum untuk kontrak gross split 13,27/MMBTU untuk variabel tekanan 10 bar dan temperatur 13oC sedangkan untuk variabel lainnya tidak mampu mencapai IRR 11,8 . Keekonomian kontrak gross split lebih baik dari pada kontrak PSC dengan perbandingan parameter NPV, IRR, PI kontrak gross split lebih tinggi dari pada kontrak PSC dan untuk parameter POT kontrak gross split lebih rendah dari pada kontrak PSC.Kata kunci : efisiensi energi, gas hidrat, gross split, kontrak bagi hasil

ABSTRACT
Conventional fuel energy source in the world is decreasing. Conventional gas reserve in Indonesia is estimated about only 59 years left. New energy source is needed to fullfil energy demand in the future. One of the potential unconventional energy source is gas hydrate. Gas hydrate potential in Indonesia is predicted reached 850 TCF which spread in Sumatera, Jawa, Kalimantan and Sulawesi. This study will discuss technic and economic aspect of gas hydrate field development in Kutai Basin, East Kalimantan offshore by depressurization method combine with thermal stimulation using wellbore electrical heating method and hot gas injection methode and two contract scheme of unconventional oil and gas block which are production sharing contract and gross split contract. Gas in Place GIP estimation hydrate gas in Kutai basin is 10,01 TCF. Simulation results using HydrateResSim program show that the lower pressure variabel, the higher flowrate and cumulative production of gas, but for the change of temperatur variable doesn rsquo t give any effect to flowrate and cumulative production of gas. Gas flowrate from the simulation is about 4.432 m3 day to 20.515 m3 day or 0,16 MMSCFD to 0,72 MMSCFD. The efficiency energy EROI of the production process is about 2,2 to 21,1. At gas price 6,5 MMBTU and MARR 11,8 , the economic feasibility of the project for PSC contract and gross split contract are not feasible. Minimum gas price for PSC contract is 18,43 MMBTU to 200,63 MMBTU, and for gross split contract is 12,27 MMBTU for variable pressure 10 bar and temperature 13oC, others variable can not meet IRR 11,8 . Economic gross split contract is better than PSC contract where NPV, IRR, PI gross split contract are higher than PSC contract and POT gross split contract is lower than PSC contract. "
2018
T51631
UI - Tesis Membership  Universitas Indonesia Library
cover
Hamonangan, Palti Ferdrico Tumpal
"ABSTRAK
Penelitian ini bertujuan untuk menganalisis kesenjangan akuntansi atas penerapan PSAK 66 yang dibentuk melalui separate vehicle, memahami ketentuan transisi pada periode tahun buku penerapan pertama kali PSAK 66, serta penyajian kembali laporan keuangan konsolidasian PT Pertamina (Persero) per 31 Desember 2014. Metode yang akan digunakan di dalam penelitian ini adalah penelitian studi kasus, yang menitikberatkan pada studi literatur terhadap PSAK 66, dan manual akuntansi. Selanjutnya akan dilakukan analisis secara sistematis perihal analisis kesenjangan akuntansi beserta ketentuan transisi pada periode tahun buku penerapan pertama kali PSAK 66 dan penyajian kembali laporan keuangan konsolidasian PT Pertamina (Persero) per 31 Desember 2014. Hasil penelitian menunjukkan terdapat kesenjangan akuntansi atas penerapan PSAK 66 yang dibentuk melalui separate vehicle, yaitu PBE PT Nusantara Regas, PT Patra SK, PT Perta-Samtan Gas, dan PT Perta Daya Gas, dan tidak terdapat kesenjangan akuntansi perpajakan atas perubahan kebijakan akuntansi dari Metode Konsolidasi Proporsional ke Metode Ekuitas (metode one-line consolidation). Ketentuan transisi dari metode konsolidasi proporsional ke metode ekuitas (metode one-line consolidation) mensyaratkan Perusahaan untuk mengagregasikan (menggabungkan) sajian dalam laporan keuangan sebelumnya ke periode sajian per 01 Januari 2014, yang merupakan tanggal pertama periode tahun buku terdekat dari periode buku penerapan pertama kali PSAK 66. Penyajian kembali laporan keuangan konsolidasian Perusahaan sesuai PSAK 66 pada tanggal 31 Desember 2014, menyebabkan perubahan rasio keuangan yaitu terjadinya kenaikan kemampuan Perusahaan dalam menghasilkan keuntungan bersih setelah dipotong pajak, penurunan tingkat efisiensi penggunaan keseluruhan aktiva perusahaan dalam menghasilkan volume penjualan, dan penurunan kebutuhan dana perusahaan yang dibelanjai dari utang (financing).

ABSTRACT
The objective of this study is to understand the accounting gap analysis on the application of PSAK 66 when the joint arrangement is structured through a separate vehicle, understand the transition provisions at the beginning of the earliest period of the application of PSAK 66, and restated Consolidated Financial Statements as at December 31, 2014. The method uses in this study is a case study, which focuses on PSAK 66?s study of literature and Company's accounting manual. Further, this study will involve a more detailed, systematic gap analysis of accounting, and the transition provisions at the beginning of the earliest period of the application of PSAK 66, and restated Pertamina?s Consolidated Financial Statements as at December 31, 2014. The results show there were gaps in accounting for the application of PSAK 66 when the joint arrangement is structured through a separate vehicle, namely PT Nusantara Regas, PT Patra SK, PT Perta-Samtan Gas, dan PT Perta Daya Gas but there is no tax accounting gap when changing from proportionate consolidation to the equity method (one-line consolidation method). Restated consolidated financial statements in accordance with PSAK 66 as of December 31, 2014, has lead to changes in financial ratios, i.e. the increase of the Company's ability to generate earning after taxes, the decrease of the efficiency with which a company is deploying its assets to generate sales, and the decrease of financing needs from debt."
2015
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Andini Sari
"Sejak ditetapkannya putusan MK yang membatalkan beberapa pasal di UU Migas No. 22 Tahun 2001, struktur pengaturan kebijakan migas terlihat ambigu dan menyebabkan stabilitas ekonomi nasional terganggu. Keberpihakkan pemerintah masih relatif lemah dalam upaya peningkatan kemampuan nasional di bidang Migas. Bagaimana pemenuhan kebutuhan publik di Indonesia dapat berlangsung efektif dan pengadaan cadangan Migas di Indonesia. Kebijakan yang ada perlu dievaluasi kembali dan diadaptasikan, apakah sudah cocok dengan keadaan Indonesia sekarang ini. Fokus dari penelitian ini adalah menggangkat permasalahan Migas di dalam UU No. 22 Tahun 2001 dari sektor industri Migas yang berkaitan dengan struktur kelembagaan Migas dan bagaimana bentuk pengembangan Industri Migas kedepannya dapat lebih baik dan berkesinambungan.Penelitian ini menggunakan metode kualitatif. Hasil dari penelitian menunjukkan diperlukannya perbaikkan dari kebijakan Migas Indonesia berangkat perbaikkan dari yudicial review hingga pemberdayaan Migas, baik secara kontrol pengelolaan cadangan migas sehingga Indonesia kedepannya dapat melakukan kegiatan ekplorasi secara efisiensi dan efektif dan sesuai dengan ideologi UUD 1945, perbaikkan atas kelembagaan di Industri Migas dengan keberpihakkan pemerintah yang jauh lebih besar dalam kegiatan hulu migas. Kelembagaan dalam pengembangan industri Migas dikatakan dalam kepemilikan sumber daya Migas tetap menjadi milik negara dan industri hulu Migas dapat menyaring para pelaku bisnis dalam melakukan pengolahan migas. Maka diperlukan peran negara melalu kebijakan untuk mengatur sehingga tercipta keseimbangan antara tujuan komersial, sustainabilitas, ketahanan energi, kontribusi makro dalam perekonomian nasional, Lalu diperlukannya suatu kebijakan yang mengembangankan daya saing industri migas nasional dengan menggunakan suatu metode ndash; metode pengelolaan dan penerapan kegiatan dan struktur industri migas yang efektif dan efisien. Kata kunci : analisa kebijakan publik, neoliberalisme, New Institutional Economics / Kelembagaan, Daya Saing

Since the adoption of the Constitutional Court 39 s decision to cancel several articles in the Oil and Gas Law No. 22 In 2001, the structure of the oil and gas policy setting looks ambiguous and lead to national economic stability interrupted. government part is still relatively weak in improving national capabilities in the field of oil and gas. How to meet the needs of the public in Indonesia can be both effective and procurement of oil and gas reserves in Indonesia. Existing policies need to be re evaluated and adapted, if it matches the current state of Indonesia. The focus of this research is about problems in the Oil and Gas Law No. 22 of 2001 on Oil and Gas industry sectors associated with the institutional structure of oil and gas and how to shape the future development of oil and gas industry can be better and more sustainable.This study uses a qualitative method. Results from the study indicate the need for any improvement of oil and gas policies Indonesia departing the revision of judicial review to the empowerment of oil and gas, both management control oil and gas reserves that Indonesia in the future be able to carry out exploration activities in the efficiency and effectively and in accordance with the ideology of the 1945 Constitution, any improvement on institutional in Oil and Gas Industry with government part which far greater in the upstream oil and gas activities. Institutional development of oil and gas industry is said to be in the ownership of oil and gas resources remain the property of the state and the upstream oil and gas industry can filter businesses in conducting oil and gas processing. It is necessary role of the state through policies to regulate so as to create a balance between commercial objectives, sustainability, energy security, macro share in the national economy, then the need for a policy that develop competitiveness of the oil and gas industry nationwide by using a method a method of managing and implementing the activities and structure of the industry oil and gas effectively and efficiently. Key words public policy analysis implementation, neoliberalism, New Institutional Economics, Competitiveness."
Depok: Universitas Indonesia, 2016
T47413
UI - Tesis Membership  Universitas Indonesia Library
cover
Siregar, Marahalim
"Proyek-proyek migas dilakukan sebagai bagian dari dukungan terhadap fasilitas produksi sumber energi. Ada fenomena di pelaksanaan proyek migas, yaitu seringnya terjadi keterlambatan waktu penyelesaian dan kelebihan biaya dari yang direncanakan. Komunikasi merupakan hal yang penting diperhatikan dalam mendukung kesuksesan kinerja proyek. Dibuat suatu hipotesa bahwa peran peran PMO dapat meningkatkan efektivitas komunikasi proyek. Kuesioner dilakukan terhadap pimpinan proyek migas Indonesia. SEM-PLS digunakan untuk menganalisa hubungan antara masing-masing variabel. Hasil penelitian memperoleh faktor-faktor dominan dalam komunikasi proyek dan peran PMO. Hasil penelitian juga menunjukkan adanya pengaruh yang signifikan dari peran PMO terhadap komunikasi proyek dalam meningkatkan kinerja proyek migas.

Oil & gas projects are performed to support energy production facilities. There is a fenomena where project execution in oil & gas industry often have experiences in schedule delay and cost overrun compared to the plan. Communication is one of important thing which has impact to the project performance. Hipotesis was developed that PMO role can improve project communication effectiveness. Quesioner was performed distributed to the Oil & Gas Project Managers in Indonesia. SEM-PLS was used to analise relationship among variables. Result obtained dominan factors in project communication and also PMO role. Result also shows that PMO role has a significant influence in project communication to improve the project performance."
Depok: Fakultas Teknik Universitas Indonesia, 2016
T52855
UI - Tesis Membership  Universitas Indonesia Library
cover
Harry Patria
"[Studi-studi model eksplorasi secara umum menjelaskan prilaku eksplorasi dengan analisis variabel geologi dan ekonomi pada tingkat makro seperti wilayah, provinsi dan negara. Pada kenyataannya, cadangan migas dan kedalaman sumur masing-masing menentukan tingkat volume temuan dan biaya pengeboran yang dijelaskan secara spesifik pada tingkat basin geologis. Penelitian ini fokus pada tingkat pengeboran eksplorasi (wells drilled) dengan analisis analisis variabel geologi dan ekonomi menggunakan 32 basin geologis di Indonesia dalam periode 2004-2014. Hasil estimasi model empiris menunjukkan bahwa tingkat pengeboran eksplorasi ditentukan oleh tingkat keberhasilan penemuan migas (lag of success rate), volume temuan migas (lag of discovery size of oil and gas) dan lokasi basin (region). Sedangkan variabel ekonomi yang menentukan tingkat pengeboran eksplorasi terdiri dari harga minyak dunia (lag of oil price). Selain itu, deplesi minyak berdampak signifikan menjelaskan tingkat pengeboran eksplorasi dengan karakteristik basin Indonesia yang didominasi oleh mature oil fields.

Earlier studies of exploration models are generally characterized by equations describing the behavior of exploration at the macro-level analysis such as region, province or state-level. In reality, there is specific impact of geological basin characteristics to wells drilled’s decision. This study focuses on the geological and economic factors that particularly determine the wells drilled decision using an empirical model to analyze at the micro-level using disaggregated panel data of 32 geological basins in Indonesia over the period 2004-2013. The empirical results show that the number of wells drilled are determined significantly by lag of success rate, lag of discovery size of oil and gas and region of geological basin. Then, it shows that a lag of global oil price determined significantly the number of wells drilled, instead of a local oil price. Finally, oil depletion effect also determined significantly the number of wells drilled as the geological characteristic of geological basin dominated by mature oil fields., Earlier studies of exploration models are generally characterized by
equations describing the behavior of exploration at the macro-level analysis such
as region, province or state-level. In reality, there is specific impact of geological
basin characteristics to wells drilled’s decision. This study focuses on the
geological and economic factors that particularly determine the wells drilled
decision using an empirical model to analyze at the micro-level using
disaggregated panel data of 32 geological basins in Indonesia over the period
2004-2013. The empirical results show that the number of wells drilled are
determined significantly by lag of success rate, lag of discovery size of oil and gas
and region of geological basin. Then, it shows that a lag of global oil price
determined significantly the number of wells drilled, instead of a local oil price.
Finally, oil depletion effect also determined significantly the number of wells
drilled as the geological characteristic of geological basin dominated by mature
oil fields]
"
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2015
T44650
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>