Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 35833 dokumen yang sesuai dengan query
cover
Mohsen Mohammadi
"With the passage of time, supply chain processes have shifted toward IT-based business processes regarding service-oriented architecture (SOA) to augment the agility, integration, and flexibility of IT-based applications in enterprise networks. SOA, as a fast-growing paradigm in IT, uses Web service technologies and provides new pattern integration and interoperability in processes, services, and data. Consequently, many reference models have been developed in the field of SC processes to support the requirements for the related modeling, as well as to apply the development and implementation of supply chain information systems. The aim of this paper is to compare six main supply chain reference models regarding SOA and its underlying concepts and to identify which reference model can support different stages of information system development. The results show that no supply chain reference model can support both the coordination and interaction of process models in more detail and with a service-oriented approach in supply chain process modeling. Moreover, there is a need for a plausible methodology for business process modeling based on the service-oriented approach in the domain of supply chain management (SCM)."
Depok: Faculty of Engineering, Universitas Indonesia, 2018
UI-IJTECH 9:1 (2018)
Artikel Jurnal  Universitas Indonesia Library
cover
Muhammad Fadhlun Adzim
"Pemrosesan ulang kembali sebuah produk adalah hal yang biasa dilakukan didalam industri proses. Hal tersebut merupakan enabler untuk reverse supply chain di industri proses. Namun penelitian mengenai reverse supply chain di industri proses masih terbatas. Penelitian sebelumnya mengelola risiko reverse supply chain di industri proses secara terpisah yang dapat menyebabkan munculnya permasalahan baru.
Penelitian ini mengintegrasikan semua risiko sehingga proses manajemen risiko dilakukan secara menyeluruh. Untuk mengembangkannya, dibutuhkan daftar risiko dari aktivitas reverse supply chain secara menyeluruh di industri proses, dibutuhkan juga kriteria untuk risiko tersebut. Data yang didapat diolah dengan menggunakan AHP (Analytic Hierarchy Process) - PROMETHEE (Preference Ranking Organization Method for Enrichment Evaluation) berdasarkan preferensi dari ahli.
Telah dikumpulkan 8 kriteria dari penelitian sebelumnya, dengan bobot berdasarkan penilaian ahli sebagai berikut: biaya atau investasi tambahan (0.064), pengelolaan volume barang atau produk (0.040), kerugian karena gangguan (0.047), kecepatan recovery bisnis jika terjadi gangguan (0.111), keunggulan daya saing (0.088), lingkungan (0.241), tanggung jawab sosial (0.097), hukum dan undang-undang (0.312). Selanjutnya, penelitian ini melakukan prioritasisasi risiko dengan pendapat ahli dengan menggunakan PROMETHEE.
Penelitian menemukan urutan risiko dari yang paling tinggi ke rendah dimulai dari risiko regulasi, risiko lingkungan, risiko reputasi dan branding, risiko kualitas dan stabilitas, risiko pemindahan dan penanganan, risiko teknis, risiko informasi, risiko penjadwalan dan kapasitas, risiko kuantitas, risiko persediaan dan risiko perlawanan. Dari hasil analisis sensitivitas didapat bahwa 3 kriteria yang paling mempengaruhi hasil akhir PROMETHEE adalah kriteria biaya atau investasi tambahan, kriteria hukum dan undang-undang dan kriteria keunggulan daya saing.

Reprocessing a product is a common practice in the process industry. This is an enabler for the reverse supply chain in the process industry. But research on the reverse supply chain in the process industry is still limited. Previous research managed the risk of reverse supply chain in the process industry separately which could lead to new problems.
This research integrates all risks so that the risk management process is carried out thoroughly. To develop it, it requires a list of risks from the overall reverse supply chain activities in the process industry, and also the criteria for these risks. The data obtained is processed using AHP (Analytic Hierarchy Process) - PROMETHEE (Preference Ranking of Organization Method for Enrichment Evaluation) based on expert preferences.
8 criteria have been collected from previous studies, with weights based on expert judgment as follows: investment cost (0.064), volume management (0.040), business interruption value (0.047), business recovery time after interruption (0.111), competitive advantage (0.088), environment (0.241), social responsibility (0.097), legislation (0.312). Furthermore, this study prioritizes risk with expert opinion using PROMETHEE.
The research found the order of risk from the highest to the lowest starting from regulatory risk, environmental risk, reputation and branding risk, quality and stability risk, transfer and handling risk, technical risk, information risk, scheduling and capacity risk, quantity risk, inventory risk and risk of resistance. From the results of the sensitivity analysis, it was found that the 3 criteria that most affected the final results of PROMETHEE were the criteria for additional costs or investments, legal and legal criteria and criteria for competitive advantage.
"
Depok: Fakultas Teknik Universitas Indonesia, 2019
T53485
UI - Tesis Membership  Universitas Indonesia Library
cover
Andhita Dodi Risnata
"Since the implementation of the kerosene to LPG conversion program in Indonesia in 2007, LPG has become an essential commodity, so that the distribution process must be carried out correctly. One of the crucial activities in the LPG distribution process is planning the supply from the main terminal to the depots using a ship scheduling system. The current condition is that with the increasing consumption of LPG and the growing number of depots, there is often a deviation between planning and realization, which causes additional operating costs for LPG distribution. With the development of technology and very tight industrial competition, companies are required to run their business efficiently. One way to achieve these goals is by managing supply chain management so that products can be distributed on time, quality is maintained, and at low cost. It is necessary to determine and weigh the Key Performance Indicator (KPI) in measuring supply chain performance. The purpose of this research is to identify KPIs forLPG supply chain at the main terminal by identifying levels in the SCOR model, and weighting and determining KPIs using the Analytical Hierarchy Process (AHP) method. The results showed that there were 36 KPIs adapted to the performance measurement approach with the SCOR method, namely reliability, responsiveness, flexibility, cost and asset management. The highest weight at level 1 is obtained on the reliability dimension with a weight of 0.300, and for KPI the highest priority is minimum inventory with a weight of 0.083.

Sejak dijalankannya program konversi minyak tanah ke LPG di Indonesia pada tahun 2007, LPG menjadi komoditi yang sangat penting sehingga dalam proses pendistribusiannya harus dijalankan dengan baik. Salah satu kegiatan penting dalam proses pendistribusian LPG adalah perencanaan supply dari terminal Utama ke depot – depot. Kondisi saat ini dimana dengan semakin meningkatnya konsumsi LPG dan bertambahnya jumlah depot maka sering kali terjadi deviasi antara perencanaan dengan realisasi. Dengan adanya perkembangan teknologi dan persaingan industri yang sangat ketat, perusahaan dituntut untuk dapat menjalankan bisnis secara efisien, dimana salah satu cara untuk mencapai tujuan tersebut yaitu dengan mengelola management rantai pasok agar produk dapat didistribusikan dengan tepat waktu, terjaga kualitasnya dan dengan biaya yang rendah. Dalam pengukuran kinerja rantai pasok, terlebih dahulu diperlukan penentuan dan pembobotan Key Performance Indicator (KPI). Tujuan dari penelitan ini adalah mengidentifkasi KPI supply chain LPG di terminal Utama dengan identifikasi level dalam model SCOR, dan dilakukan pembobotan dan penentuan KPI dengan metode Analytical Hierarchy Process (AHP). Hasilnya penelitian menunjukkan terdapat 36 KPI yang disesuaikan dengan pendekatan pengukuran kinerja dengan metode SCOR , yaitu reliability, responsiveness, flexibility, cost dan asset management. Bobot tertinggi pada level 1 diperoleh pada dimensi reliability dengan bobot 0,300, dan untuk KPI dengan prioritas tertinggi adalah minimum inventory dengan bobot 0,083."
Depok: Fakultas Teknik Universitas Indonesia, 2021
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Aditya Mulya Pramana
"Tugas Akhir ini berisi laporan mengenai kegiatan magang yang dilakukan di PT. Surya Unggas Sejahtera, yaitu perusahaan yang bergerak di bidang distribusi frozen food dan daging beku impor. Magang ini bertujuan untuk mengetahui supply chain management yang dilakukan oleh PT. Surya Unggas Sejahtera pada saat menjalankan kegiatan perusahaannya. Sebagai peserta magang, penulis diarahkan ke setiap divisi untuk melakukan kegiatan serta menerapkan teori yang telah dipelajari oleh mahasiswa sewaktu berkuliah ke dalam kegiatan magang. Selain itu penulis juga melakukan analisis supply chain dan inovasi business process. Metode yang digunakan pada penelitian ini adalah metode kualitatif dalam bentuk deskriptif. Penulis melakukan analisis untuk mengetahui efisiensi proses, apabila teridentifikasi suatu proses yang tidak efisien, maka dilakukan pengembangan dan usulan inovasi business process. Inovasi business process yang dilakukan berfokus pada penggunaan database agar seluruh informasi perusahaan dapat diakses oleh pihak yang berkepentingan dan meningkatkan transparansi.

This final project contains a report of internship at PT. Surya Unggas Sejahtera, which is a company engaged in the distribution of frozen food and the import of frozen meat. This internship programs aims to find out the supply chain management that carried by PT. Surya Unggas Sejahtera activities. As an intern, the author directed to each division to do the activities and apply learned theories during college into internship activities. In addition, it is also conduct research on supply chain analysis and business process improvement. The method used in this study is a qualitative method in descriptive form. The author conducts an analysis to determine the efficiency of the process, if a process is not efficient then the development and innovation of business processes is carried out. Business process improvement carried out focusing on the use of databases so that all company information can be accessed by internal stakeholders and increasing transparency."
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2021
TA-pdf
UI - Tugas Akhir  Universitas Indonesia Library
cover
Gerardus Adyatma Ajietikto
"Laporan Magang ini membahas mengenai evaluasi pengendalian internal yang dilakukan pada proses permohonan Supply Chain Financing di PT HWK. Evaluasi pengendalian internal dilakukan berdasarkan COSO Framework 2013 yang memuat kerangka pengendalian internal, yaitu lingkungan pengendalian, penilaian risiko, aktivitas pengendalian, informasi dan komunikasi, serta pengawasan. Evaluasi pengendalian internal sendiri dilakukan pada tahap penilaian risiko dan aktivitas pengendalian yang dibandingkan terhadap prosedur pengajuan Supply Chain Financing di PT HWK. Berdasarkan hasil evaluasi, prosedur pengajuan Supply Chain Financing di PT HWK telah sesuai dengan standar berupa kerangka pengendalian internal yang dikeluarkan oleh COSO. 

This Internship Report discusses the evaluation of internal control carried out in the Supply Chain Financing application process at PT HWK. Evaluation of internal control is examined based on the COSO Framework 2013 which contains the internal control framework, namely the control environment, risk assessment, control activities, information and communication, and monitoring. Evaluation of internal control itself is carried out at the risk assessment stage and control activities, that are compared to the Supply Chain Financing application procedure at PT HWK. Based on the evaluation results, the application process of Supply Chain Financing at PT HWK is in accordance with the standards in the form of an internal control framework issued by COSO. "
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2022
TA-pdf
UI - Tugas Akhir  Universitas Indonesia Library
cover
Musyaffa Muhammad Naufal Erlangga
"

Penggunaan Model Supply Chain Operation Reference (SCOR) banyak diterapkan perusahaan untuk mengukur kondisi rantai pasoknya. Penelitian ini dilakukan pada PT.X yang bergerak di bidang industri obat herbal. Metode yang digunakan dalam penelitian kinerja rantai pasok ini adalah metode SCOR sebagai kerangka utama penelitian dan Analytical Hierarchy Process (AHP) sebagai metode pendukung untuk memberikan bobot penilaian pada indikator SCOR. Tujuan penelitian ini adalah untuk mengetahui kondisi kinerja rantai pasok perusahaan serta memberikan usulan rekomendasi strategi perbaikan jika ditemukan indikator yang berkinerja kurang baik. Terdapat 28 indikator kinerja tervalidasi yang akan diukur dalam model. Dari hasil pengukuran kinerja yang dilakukan pada rantai pasok proses produksi PT. X tahun 2022, nilai rata-rata kinerja rantai pasok perusahaan adalah sebesar 67,85% yang menunjukkan kinerja rantai pasok perusahaan termasuk ke dalam kategori rata-rata berdasarkan sisem Traffic Light Monitoring. Kinerja setiap indikator dipetakan ke dalam diagram IPA untuk mengetahui indikator mana yang memiliki Performance yang belum baik namun memiliki Importance yang tinggi sehingga perlu untuk diperbaiki atau ditingkatkan. Berdasarkan diagram IPA terdapat enam indikator dari rantai pasok proses produksi perusahaan yang harus ditingkatkan. Setelah dilakukan analisis lebih lanjut, penelitili mengusulkan rekomendasi strategi untuk meningkatkan kinerja indikator tersebut.


Many companies use the Supply Chain Operation Reference (SCOR) model to measure the condition of their supply chain. This research was conducted at PT.X which is specialized in herbal medicine industry. The method used in this supply chain performance research is the SCOR method as the main research framework and the Analytical Hierarchy Process (AHP) as a supporting method to give scoring weight to the SCOR indikator. The purpose of this study was to determine the condition of the company's supply chain performance and to provide recommendations for improvement strategies if indikators were found to be underperforming. There are 28 validated performance indikators that will be measured in the model. From the results of performance measurements carried out in the production process supply chain of PT. X in 2022, the average value of the company's supply chain performance is 67.85% which shows that the company's supply chain performance is included in the average category based on the Traffic Light Monitoring system. The performance of each indikator is mapped onto the IPA diagram to find out which indikators have poor performance but have high importance so they need to be repaired or increased. Based on the IPA diagram, there are six indikators of the company's production process supply chain that must be improved. After further analysis, the researcher proposes recommendations on strategies to improve the performance of these indicators.

"
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Brian Hernanda
"Untuk melakukan perbaikan yang berdampak pada rantai pasok, diperlukan pengukuran kinerja untuk mengetahui kondisi rantai pasok suatu perusahaan, yang akan menjadi titik awal upaya perbaikan. Penelitian ini dilakukan di gudang PT X Indonesia yang bergerak di bidang industri otomotif. Sebelumnya, belum ada model atau pendekatan sistematis yang digunakan untuk mengukur kinerja gudang di divisi logistik PT X Indonesia. Jika ukuran kinerja yang relevan dan standar dapat diterapkan, divisi logistik PT X dapat menjadi lebih efisien, memberikan dukungan yang lebih baik ke lokasi produksi dan secara tidak langsung menghasilkan kepuasan pelanggan yang lebih besar. Metode yang digunakan dalam penelitian ini adalah Supply Chain Operations Reference (SCOR) sebagai kerangka pengukuran kinerja, metode Analytical Hierarchy Process (AHP) untuk menentukan bobot untuk setiap indikator kinerja. Tujuan dari penelitian ini adalah untuk mengembangkan dan mengukur kinerja dalam kegiatan gudang; sistem pengukuran harus didasarkan pada model Supply Chain Operations Reference (SCOR). Ada 29 indikator kinerja (KPI) yang akan digunakan untuk mengukur dalam perspektif model SCOR untuk setiap level. Hasil pengukuran kinerja rantai pasok gudang PT. X Indonesia tahun 2019 Januari-September sebesar 78,55% yang menunjukkan kinerja perusahaan saat ini dalam kategori baik. Meskipun kinerja rantai pasok di gudang secara keseluruhan dapat dikatakan baik, namun masih ada beberapa metrik kinerja gudang (KPI) yang tergolong kurang. Setiap KPI kemudian akan dipetakan ke kuadran Importance Performance Analysis (IPA) untuk mendapatkan indikator mana saja yang menyebabkan kinerja supply chain perusahaan menurun. Dari kuadran IPA, terdapat 6 KPI dalam rantai pasokan gudang yang membutuhkan perbaikan segera. Oleh karena itu, diperlukan strategi untuk meningkatkan kinerja. Strategi yang diusulkan dianalisis menggunakan matriks prioritas dan diagram Pareto. Dari 9 strategi peningkatan kinerja yang diusulkan untuk memperbaiki 6 KPI yang kinerjanya kurang baik, 6 usulan strategi yang paling efektif yang sesuai dengan keadaan dan kemampuan perusahaan untuk diterapkan adalah memberikan reminder untuk membuat saran sistem, melakukan briefing operator setiap pagi sebelum jam kerja dimulai, memberikan penghargaan, hukuman, dan motivasi kepada karyawan, menerapkan 5S prinsip lean, dan merekrut lebih banyak pekerja yang berkualitas

To make improvements that have an impact on the supply chain, performance measurement is needed to determine the condition of a company's supply chain, which will be the starting point for improvement efforts. This research was conducted in the warehouse of PT X Indonesia which is engaged in the automotive industry. Previously, there was no model or systematic approach used to measure warehouse performance in the logistics division of PT X Indonesia. If relevant performance measures and standards can be applied, PT X's logistics division can become more efficient, provide better support to production sites and indirectly lead to greater customer satisfaction. The method used in this study is the Supply Chain Operations Reference (SCOR) as a performance measurement framework, the Analytical Hierarchy Process (AHP) method to determine the weights for each performance indicator. The purpose of this research is to develop and measure performance in warehouse activities; the measurement system should be based on the Supply Chain Operations Reference (SCOR) model. There are 29 performance indicators (KPI) that will be used to measure in the perspective of the SCOR model for each level. The results of measuring the performance of the warehouse supply chain of PT. X Indonesia in 2019 January-September of 78.55% which shows the company's current performance is in the good category. Although the overall supply chain performance in the warehouse can be said to be good, there are still some warehouse performance metrics (KPI) that are classified as lacking. Each KPI will then be mapped to the Importance Performance Analysis (IPA) quadrant to get which indicators cause the company's supply chain performance to decline. From the IPA quadrant, there are 6 KPIs in the warehouse supply chain that require immediate improvement. Therefore, a strategy is needed to improve performance. The proposed strategy is analyzed using a priority matrix and Pareto diagram. Of the 9 performance improvement strategies proposed to improve the 6 KPIs whose performance is not good, the 6 most effective strategy proposals that are in accordance with the circumstances and the company's ability to be implemented are to provide reminders to make system suggestions, conduct operator briefings every morning before working hours start, provide reward, punishment, and motivation to employees, apply the 5S lean principles, and recruit more qualified workers"
Depok: Fakultas Teknik Universitas Indonesia, 2020
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Dita Fitriana Anggraeni
"Penelitian dilakukan di Rumah Sakit XYZ yang mencapai indikator mutu dibawah target dalam proses pengadaan dan penerimaan obat dengan analisis kualitatif dan kuantitatif. Lingkup proses yang diteliti dalam penelitian ini mencakup proses perencanaan, pengadaan, penerimaan, penyimpanan, dan pendistribusian obat dengan menggunakan pendekatan lean six sigma untuk mengidentifikasi waste di dalam proses serta proses dengan tingkat kecacatan tertinggi. Hasil studi mendapatkan bahwa permasalahan utama dalam proses supply chain obat di RS XYZ adalah stok obat kosong. Beberapa faktor yang menyebabkan kosongnya stok obat di RS XYZ antara lain, penyelesaian dokumen purchase order dan kedatangan obat tidak sesuai dengan standar waktu yang telah ditetapkan, lock oleh vendor, kekosongan obat di principal, revisi purchase order dan faktur, serta variasi waktu approval purchase request. Bottleneck yang ditemukan dan menjadi salah satu penyebab stok obat kosong adalah proses penyelesaian dokumen purchase order yang merupakan proses dengan waktu terlama serta merupakan proses dengan nilai sigma paling rendah, yakni berada di rentang 1.2 hingga 1.8 di bulan Maret–Mei dan nilai defects per million yang cukup tinggi, yakni 365.714–580.000 di bulan Maret–Mei yang menunjukkan tingginya kecacatan berupa keterlambatan dalam proses penyelesaian dokumen purchase order. Tingginya variasi penyelesaian dokumen purchase order berdampak pada perencanaan penghitungan kebutuhan obat yang didasari pada penghitungan lead time.

This research used qualitative and quantitative analysis conducted at XYZ Hospital, which achieved quality indicators below the target in the supply chain process, specifically in the procurement and receiving of drugs. The scope of the processes examined in this study includes the planning, procurement, receiving, storage, and distribution of drugs using the Lean Six Sigma approach to identify waste within the processes and those with the highest defect rates. The study found that the main issue in the drug supply chain process at XYZ Hospital is drug stockouts. Several factors causing drug stockouts at XYZ Hospital include the completion of purchase order documents and drug arrivals not meeting the established time standards, vendor lock, drug shortages at the principal, purchase order and invoice revisions, and variations in the approval time for purchase requests. A bottleneck identified as one of the causes of drug stockouts is the process of completing purchase order documents, which is the longest process and has the lowest sigma value, ranging from 1.2 to 1.8 in March–May, with a high defects per million value of 365,714-580,000 in March–May, indicating a high defect rate in the form of delays in the purchase order document completion process. The high variation in the completion of purchase order documents impacts the planning of drug requirements calculation, which is based on lead time calculations.
"
Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Evi Kemala Dewi
"ABSTRAK
Tujuan penelitian ini adalah untuk mengetahui faktor yang berpengaruh pada project procurement agar efisien dan efektif berdasarkan pelaksanaan supply chain management proyek UTHO dan usaha untuk menghasilkan optimalisasi biaya pada project procurement dalam supply chain management PT. ABC Proyek UTHO. Metode penelitian yang digunakan adalah penelitian deskriptif kualitatif dengan menggunakan data primer hasil pengamatan dan wawancara serta data sekunder tentang pelaksanaan project procurement dalam supply chain management PT. ABC Proyek UTHO, untuk selanjutnya dianalisis.
Hasil analisis dan pembahasan menunjukkan bahwa faktor yang berpengaruh pada project procurement PT. ABC Proyek UTHO merupakan konsekuensi lanjutan dari penggunaan type efficient supply chain pada PT. ABC Proyek UTHO. Sedangkan kondisi manajemen biaya pada project procurement PT. ABC Proyek UTHO sebagai kondisi yang sebagian besar membutuhkan proses inovasi dari PT. ABC Proyek UTHO dan usaha yang dapat dilakukan untuk menghasilkan optimalisasi biaya pada project procurement dalam supply chain management PT. ABC Proyek UTHO adalah melaksanakan strategi yang sepenuhnya memperhatikan gambaran umum perusahaan, informasi umum Proyek UTHO, faktor yang mempengaruhi project procurement dalam supply chain management, serta kondisi manajemen biaya pada project procurement PT. ABC Proyek UTHO.

ABSTRACT
The purpose of this study was to determine the factors that influence the procurement project for efficient and effective supply chain management is based on the implementation of the project UTHO and effort to produce cost optimization in project procurement in supply chain management of UTHO Project PT. ABC. The research method used is descriptive qualitative research using primary data observations and interviews and secondary data on the implementation of project procurement in supply chain management of UTHO Project ABC UTHO, for further analysis.
The analysis and discussion shows that the factors that influence the procurement project at UTHO Project PT. ABC is a consequence of the use of advanced types of efficient supply chain in UTHO Project PT. ABC. While the conditions of the project cost management in procurement UTHO Project PT. ABC as a condition that mostly require the innovation process from UTHO Project PT. ABC and effort that can be done to produce the project procurement cost optimization in supply chain management of UTHO Project PT. ABC is to implement strategies that fully into account the general description of the company, general information UTHO Project, factors affecting the project procurement in supply chain management, as well as the conditions of the project cost management in procurement UTHO Project PT. ABC.
"
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2016
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Nur Hazbiy Shaffan
"ABSTRAK
Sistem supply chain management akan diimplementasikan kedalam blockchain menggunakan Hyperldger Blockchain. Proses yang dilalui adalah dengan menentukan bisnis model yang diperlukan dan kemudian mendesain ulang bisnis model untuk diterapkan ke dalam Hyperledger Composer. Hasil dari penelitian ini membuktikan bahwa blockchain berhasil diimplementasikan kedalam sistem supply chain management menggunakan hyperledger fabric dan hyperledger composer. Akses Read memilki durasi yang paling cepat, yaitu dengan rata- rata lebih cepat 33 dibandingkan dengan Create, 69 dibandingkan dengan Delete, serta 82 dibandingkan dengan Update. Update memiliki rata-rata durasi akses data paling panjang. Selain itu Query sangat memperlambat durasi akses data fungsi Read dengan durasi rata-rata akses data fungsi Read pada kategori 10 material naik hingga 12238,9, pada kategori 100 material naik 1950 serta pada kategori 1000 material naik 308 dari durasi akses data fungsi Read tanpa menggunakan query.

ABSTRACT
Supply chain management system will be implemented into blockchain by using Hyperldger Blockchain. The process that goes through is to determine the business model needed, then redesigning the business model to be applied to the blockchain system using Hyperledger Composer. The results of this study prove that the blockchain was successfully implemented into the supply chain management system by using hyperledger fabric and hyperledger composer. Read access has the fastest duration, which is 33 faster than Create, 69 compared to Delete, and 82 compared to Update. Updates have the longest average duration of data access. Besides that, Query greatly slows down the duration of data access Read function with the average duration of data access Read function in category 10 material rose to 12238.9, in category 100 material rose by 1950 and in category 1000 material increased by 308 from duration of data access function Read without using a query."
2019
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>