Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 156655 dokumen yang sesuai dengan query
cover
M. P. Budi Arisman
"Merebaknya pandemi COVID-19 di akhir tahun 2019 telah melumpuhkan semua sektor baik sosial, budaya dan perekonomian. Tidak terlepas dari dampak tersebut, industri migas Indonesia juga merasakan dampak dari COVID-19 khususnya pada sektor hulu. Penelitian ini akan membahas implikasi COVID-19 pada salah satu proyek pengembangan di sektor hulu migas dengan mengidentifikasi dampak- dampak secara spesifik di masing-masing fase proyek dan keterkaitannya terhadap time & cost overrun. Melalui research question yang disusun, didapat dampak secara spesifik pada masing masing fase proyek (Engineering, Procurement, Construction & Installation) antara lain overrun pada labor cost, biaya cancellation akibat early termination pada chartered vessel, biaya extension untuk penyimpanan material dan biaya remobilisasi kembali untuk marine spread pada offshore campaign berikutnya. Berdasarkan penelitian didapat dampak terhadap proyek 8- 14 bulan keterlambatan dari sisi schedule dan 25%-27.5% dampak overrun terhadap cost.

The outbreak of the COVID-19 pandemic at the end of 2019 has impacted all social, cultural and economic sectors. As part of the outbreak, oil and gas industry in Indonesia is also experience the impact of COVID-19, especially in the upstream sector. The study will discuss the implications of COVID-19 as case study the development project in the upstream oil and gas sector by identifying specific impacts in each project phase and their relationship to time & cost overrun. Through the research questions, specific impacts of each phase of the project (Engineering, Procurement, Construction & Installation) are obtained, including overrun in labor costs, cancellation costs due to early termination of the chartered vessel, extension costs for material storage and costs. remobilization for marine spread in the next offshore campaign. Based on the research, there is 8-14 months impact on the project schedule and 25%-27.5% overrun on cost impact.

"
Jakarta: Fakultas Teknik Universitas Indonesia, 2021
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Januar Adi Murdani
"Umumnya pada proyek konstruksi industri migas di Indonesia dijalankan dengan model skema kontrak EPCI (Engineering, Procurement, Construction and Installation). Proyek konstruksi fasilitas migas lepas pantai merupakan proyek konstruksi yang kompleks sehingga fenomena perubahan tidak dapat dihindari. Perubahan dalam proyek diformalkan dalam change order. Change order pada proyek dapat memberikan dampak negatif berupa penambahan biaya yang membebani pemilik proyek. Penelitian ini membahas mengenai faktor penyebab terjadinya change order pada proyek EPCI pembangunan dan modifikasi fasilitas migas lepas pantai dari sudut pandang client. Survey kuisioner dilakukan kepada 44 responden yang merupakan tim manajemen proyek client yang berpengalaman dalam mengerjakan proyek konstruksi migas lepas pantai. Pada penelitian ini didapatkan bahwa faktor utama penyebab change order adalah: client meminta perubahan desain untuk mengakomodasi future development, client meminta perubahan desain untuk mengakomodasi perubahan karakteristik sumur, kesalahan dan ketidaksesuaian dokumen desain (FEED) milik client, pekerjaan tambah karena tidak tercantum pada FEED/kontrak dan client meminta perubahan spesifikasi.

Commonly the oil and gas industry construction projects in Indonesia are run with the EPCI contract scheme (Engineering, Procurement, Construction and Installation). Offshore oil and gas facilities construction projects are complex construction projects so that the phenomenon of change cannot be avoided. Changes in the project were formalized in change order. Change orders on projects can have a negative impact in the form of cost overruns that burden the project owner. This study discusses the causes of change order in the EPCI project for the development and modification of offshore oil and gas facilities from the client`s perspective. A questionnaire survey was conducted on 44 respondents who are client project management teams who are experienced in working on offshore oil and gas construction projects. In this study it was found that the main factors causing change order are: Client requests a design change to accommodate future development, the Client requests a design change to accommodate changes in the characteristics of the well, client`s design document errors (FEED), added work because it is not listed in the FEED / the contract and client request a specification change."
Depok: Fakultas Teknik Universitas Indonesia, 2019
T53967
UI - Tesis Membership  Universitas Indonesia Library
cover
Feryan Fhadin
"Penelitian ini membahas masalah keterlambatan dengan menggunakan metode studi kasus pada salah satu proyek EPC. Pekerjaan utama penyebab keterlambatan adalah pekerjaan piping sehingga dalam penelitian ini difokuskan pada pengendalian waktu pekerjaan piping. Penelitian ini merupakan penelitian dengan berbasis risiko, sehingga berangkat dari risiko yang ada maka pengendalian dapat dilakukan. Penelitian ini bertujuan untuk menemukan faktor risiko dominan penyebab keterlambatan pada pekerjaan piping tersebut. Jika faktor risiko dominan tersebut telah diketahui, maka akan dapat disusun strategi untuk mengendalikan risiko tersebut. Diharapkan dengan berhasilnya penerapan pengendalian pekerjaan piping tersebut, maka proyek tidak akan mengalami keterlambatan lagi dan dapat selesai tepat pada waktunya.

This research discusses the problem of delay in which the case study method on one of the EPC project. The main job of the cause of delay is the work of piping so that the research has focussed on piping work time control. This research is risk-based, so on the basis of such risks, it can control performed. This study aims to find the dominant risk factor causes of construction delay on the piping work. If the risk factor it was known that dominant, then the strategy will be prepared for control such risk. It is expected that the successful implementation control piping work, the project will not delay again and finished just in time."
Depok: Fakultas Teknik Universitas Indonesia, 2010
S50631
UI - Skripsi Open  Universitas Indonesia Library
cover
Arya Nugraha
"Tesis ini membahas kegiatan, risiko, dampak dari risiko terhadap kinerja waktu dan kinerja biaya proyek dan penanganan risiko tersebut pada proyek penyusunan rencana tata ruang dan wilayah kabupaten oleh konsultan perencana wilayah. Metode penelitian ini adalah deskriptif dengan studi kasus pada PT X selaku konsultan perencana wilayah.
Hasil penelitian adalah diperlukannya penanganan risiko yang terdapat pada setiap aktifitas proyek. Risiko tersebut antara lain durasi persetujuan DPRD, kesulitan pengadaan data, kesulitan pengadaan data BPS, durasi persetujuan owner, aktifitas tambahan di akhir proyek, aksesbilitas wilayah rendah, versi data yang berbeda-beda dan peta dasar yang tertunda.

This study focus on activities, risk, risk impact to time dan cost performance, and risk response in the urban and regional district planning by the urban and regional planning consultant. The research method is a descriptive case study on "X" consulting service as urban and regional planning consultant.
The research's results is risk in each project activities. Those risk are the duration of the legislative approval, difficulties in the data`s procurement, problem in Centers of Statistic data, owner duration approval, additional activities at the end phase of project, low accessibility, data vary, and base map pending/problem."
Depok: Fakultas Teknik Universitas Indonesia, 2008
T25324
UI - Tesis Open  Universitas Indonesia Library
cover
Nofrizal
"Dalam penelitian ini metode yang digunakan untuk analisis risiko dan evaluasi keekonomian di sektor hulu minyak dan gas adalah metode simulasi Monte Carlo dan analisis sensitivitas. Diasumsikan bahwa sumber variabel yang menyebabkan ketidakpastian di masa depan pada sektor tersebut adalah harga gas, tingkat inflasi indonesia, capital expenditures (Capex), operational expenditure (Opex) dan cadangan hidrokarbon yang terkandung dalam lapangan tersebut. Variabelvariabel tersebut yang mempengaruhi perhitungan cash flow yang dilakukan dengan menggunakan metode Discounted Cash flow (DCF) dan menggunakan konsep perhitungan Production Sharing Contract (PSC) dalam kontrak kerjasama telah diatur komponen-komponen bagi hasil produksi Gas antara kontraktor dan pemerintah untuk selanjutnya dilakukan simulasi Monte Carlo dan analisis sensitivitas untuk perhitungan cadangan hidrokarbon dan indikator-indikator keekonomian. Besarnya tarif diskon DCF dengan memperhitungkan risiko tingkat inflasi indonesia terhadap evaluasi lapangan Gas dan berdasarkan perhitungan valuasi yang telah dilakukan sebelumnya di Kontraktor Kontrak Kerja Sama (KKKS) dengan tarif diskon 10%.

In this research the methods used for risk analysis and economic evaluation in the upstream oil and gas sector is a monte carlo simulation methods and sensitivity analysis. Assumed that the source variables causes uncertainty in the future of the sector is the price of gas, Indonesian inflation rate, capital expenditures (Capex), operational expenditure (Opex) and hydrocarbon Reserves are contained in the field. The variables that affect the cash flow calculation is done using Discounted Cash flow (DCF) and using the concept of calculating the Production Sharing Contract (PSC) in cooperation contract has been set of components for gas production between the contractor and the government for the next step simulation Monte Carlo and sensitivity analysis for the calculation of hydrocarbon Reserves and economic indicators. The amount of DCF discount rate taking into account the Risks of inflation Indonesian gas field evaluations and calculations based on valuation has been done before in the Kontraktor Kontrak Kerja Sama (KKKS) with a 10% discount rate."
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2013
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Susanto
"Syarat kinerja proyek yang cukup baik adalah kesesuaian produk terhadap rencana yang erpenuhi, realisasi biaya dan waktu dimungkinkan lebih rendah dari rencana. Suatu pendekatan terhadap kondisi ideal evaluasi kinerja dilakukan sebagai studi pada proyek pembangunan gedung yang dilakukan PT.X dengan metode earned value yang merupakan salah satu alat yang digunakan dalam pengelolaan proyek yang mengintegrasikan biaya dan waktu.
Tujuan dari penelitian ini adalah memperoleh evaluasi kinerja proyek dari manajemen biaya dan waktu dengan metode earned value dengan indikator cost variance (CV), schedule variance (SV), SPI, CPI, EAC, dan ECD serta mengetahui biaya dan jadwal apa saja yang tidak sesuai dari rencana juga memperoleh tindakan koreksi apa yang dapat dilakukan oleh PT.X pada biaya dan jadwal yang tidak sesuai dengan rencana.
Metode penelitian yang dipilih yaitu dengan pendekatan kuantitatif berupa archival analysis ke lapangan. Archival analysis dimaksud adalah merupakan studi yang bersifat kuantitatif yang digunakan untuk meneliti penerapan earned value pada proyek ABC PT.X.
Hasil penelitian ini menunjukkan grafik ECD vs waktu rencana penyelesaian proyek dan grafik EAC vs RAPK, dari analisis kinerja waktu akumulasi tiap bulan, jenis pekerjaan yang paling terlambat adalah pekerjaan persiapan, tanah, pondasi bangunan gedung, basement, ground floor, struktur atas lantai 3. Sedangkan jenis pekerjaan yang paling rugi adalah pekerjaan tanah, pondasi bangunan gedung, basement, ground floor, struktur atas ruang mesin. Lalu dari beberapa jenis pekerjaan yang paling terlambat dan rugi, didapatkan perbandingan antara upaya proyek di lapangan dengan upaya yang dilakukan menurut pakar di lapangan.

Terms of a good project performance are the suiteness of the product according to the plan, the realization of costs lower than planned. An approach to ideal conditions as a performance evaluation is conducted on the development of building projects undertaken by PT.X with the earned value method, which is one of the tools used in the management of projects that integrate the cost and time.
The objective of this research is to obtain the performance evaluation of the project management cost and time with the earned value method with the indicators such as cost variance (CV), schedule variance (SV), SPI, CPI, EAC, and the ECD and the cost and schedule to know what's not according to work plan but also to obtain corrections which can be done by PT.X on cost and schedule.
The research method that was used is the approach of the form of quantitative analysis to the archival field. Archival analysis is referred as a quantitative study that is used to examine the implementation of earned value project on ABC PT.X.
The results of this research shows a graph of time versus ECD project plan and the settlement of the graph EAC versus RAPK, analysis of the performance of the accumulation of each month, the type of work which is delayed the most, preparatory work, land, building the foundation of buildings, basement, ground floor, the floor third landing. While the type of job loss are mostly of landwork, building the foundation of buildings, basement, ground floor, the upperstructure of the machine compartment. Then, of the several types of work and the loss, it was able to find the comparison between project efforts in the field with the efforts made by experts in the field.
"
Depok: Fakultas Teknik Universitas Indonesia, 2009
S50468
UI - Skripsi Open  Universitas Indonesia Library
cover
Meilia Evita
"[Dalam pelaksanaan proyek terdapat kemungkinan timbulnya sejumlah kejadian berbahaya yang jika tidak dilakukan pengelolaan yang baik akan berpengaruh terhadap kinerja proyek. Penelitian ini bertujuan untuk memperoleh strategi pengelolaan risiko kejadian berbahaya pada pelaksanaan proyek untuk meningkatkan kinerja proyek yang meliputi kinerja keselamatan kerja, biaya, dan waktu dengan objek penelitian adalah proyek pembangunan pembangkit listrik tenaga uap dan gas di Indonesia. Penelitian dilakukan dengan mengumpulkan data melalui studi literatur, survei kuesioner, dan wawancara. Analisis data dilakukan dengan mengidentifikasi penyebab dan dampak bahaya pada proyek yang berpengaruh pada kinerja keselamatan kerja, biaya, dan waktu berbasis manajemen risiko. Hasil penelitian berupa kejadian berbahaya yang paling berisiko terhadap kinerja keselamatan kerja, biaya, dan waktu yang menunjukan bahwa kejadian berbahaya yang paling berdampak terhadap kinerja keselamatan kerja adalah jatuh dari ketinggian sebesar 27,41% dan kejadian berbahaya yang paling berdampak pada kinerja biaya sebesar 24,32% dan kinerja waktu sebesar 22,65% adalah ledakan boiler. Produk akhir dari penelitian ini adalah strategi untuk pengelolaan penyebab kejadian berbahaya paling berisiko untuk meningkatkan kinerja keselamatan kerja, biaya dan waktu;Project Construction unavoidably had emergence of some hazardous events where it would affect project performance if it was not managed well and carefully. This research was aimed to obtain management strategy of hazardous events at some projects, covering Combined Cycle Power Plant in Indonesia, so that how big hazardous-event effect on project performance were able to be determined as cost, time, and work-safety performances. Collecting study of literature, questionnaire, and interview were implemented to support this research. Analysis of the data was carried out by identifying hazardous causes and impacts in project construction taking effect on performance of work safety, cost, and time according to risk management. The result showed that fall from high construction is main effect to work safety performance (27,1%) and boiler explotion is main effect to cost (24,32%) and time performances (22,65%) . The final product of this research are strategy to manage of the most risk causes hazardous event to improve the safety, cost and time performances, Project Construction unavoidably had emergence of some hazardous events where it would affect project performance if it was not managed well and carefully. This research was aimed to obtain management strategy of hazardous events at some projects, covering Combined Cycle Power Plant in Indonesia, so that how big hazardous-event effect on project performance were able to be determined as cost, time, and work-safety performances. Collecting study of literature, questionnaire, and interview were implemented to support this research. Analysis of the data was carried out by identifying hazardous causes and impacts in project construction taking effect on performance of work safety, cost, and time according to risk management. The result showed that fall from high construction is main effect to work safety performance (27,1%) and boiler explotion is main effect to cost (24,32%) and time performances (22,65%) . The final product of this research are strategy to manage of the most risk causes hazardous event to improve the safety, cost and time performances]"
Fakultas Teknik Universitas Indonesia, 2015
T43842
UI - Tesis Membership  Universitas Indonesia Library
cover
Leo Kristianto
"Penentuan desain dan jenis material yang akan digunakan merupakan hal yang penting dilakukan sebelum memulai sebuah proyek pembangunan. Perubahan desain struktur suatu bangunan dapat memberi dampak dari segi biaya dan durasi konstruksi bangunan tersebut. Penelitian ini akan membahas bagaimana dampak yang ditimbulkan akibat adanya perubahan desain tersebut, baik dari segi struktur maupun dalam segi biaya dan durasi pekerjaan. Penelitian akan berfokus pada studi kasus suatu bangunan kantor showroom yang hendak mengubah desain penutup atapnya dari dak beton menjadi rangka baja. Penelitian akan dilakukan dengan pemodelan numerik dengan Metode Elemen Hingga, serta analisis biaya dan durasi akan dilakukan dengan Analisa Harga Satuan Pekerjaan (AHSP) dan bagan balok.

Determination of design and type of material to be used is very important thing to do before initiating a construction project. Changes in the structure design of a building can give impacts in terms of project cost and duration in a building construction. This study will discuss on how the impact caused by changing the building design, both in terms of structure and of cost and duration. The research will focus on a case study of a showroom office building that intends to change the design of its roof covering from concrete roof to steel frames roof. The research will be carried out by numerical modeling with the Finite Element Method, as well as cost and duration analysis will be carried out by Analisa Harga Satuan Pekerjaan (AHSP)."
Depok: Fakultas Teknik Universitas Indonesia, 2020
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Andriani Karunia Prameiswari
"Proyek EPC memiliki tingkat risiko yang cukup tinggi. Permasalahan yang biasanya terjadi dalam proyek EPC adalah keterlambatan dan cost overrun. Pada proyek konstruksi, pengadaan material memiliki 50-60% dari total biaya. Angka tersebut cukuplah besar sehingga pengadaan material ini memiliki pengaruh yang cukup besar terhadap risiko yang mungkin saja terjadi dalam proyek EPC. Tujuan dari penelitian ini untuk mengidentifikasi faktor risiko yang berpengaruh, penyebab risiko dominan dan rekomendasi risiko.Data yang didapatkan akan dilakukan analisa risiko, analisa korelasi, analisa faktor dan analisa regresi. Hasil penelitian berupa faktor risiko dominan yang berpengaruh terhadap kinerja waktu yaitu "Perubahan Spesifikasi yang Mempengaruhi Pembuatan" dan "Ketidaktersediaan Material" sedangkan untuk kinerja biaya "Perubahan Spesifikasi Material" dan "Perencanaan dan estimasi biaya tidak dilakukan dengan tepat".

EPC project has high risk level. Problems that usually happen in EPC project are delay and cost overrun. On the construction project, 50-60 % of project work to be performed by material procurement. The percentage is large enough so that provision of material has a considerable influence on the risk that may occur in the EPC Project.fy factor influencing risk, the risk causes dominant and recommendation of risk. Data analyzed by risk analysis, correlation, factor analysis and regression analysis.The result is the dominant risk factor that affect the time performance are "Change specification that affect production" and "Not availability Material" while factor that affect cost performance are "Change specification that affect production" and "Planning and cost estimation not precisely""
Depok: Fakultas Teknik Universitas Indonesia, 2014
S55988
UI - Skripsi Membership  Universitas Indonesia Library
cover
Roy Gamma
"Penelitian ini menggunakan integrasi Earned Value Management dan Risk Management dalam melakukan rancangan mitigasi risiko keterlambatan proyek pipa gas alam. Dengan melakukan komparasi terhadap nilai Planned Value, Earned Value dan Actual Cost pada data historis dan hasil simulasi monte carlo (perangkat lunak Crystal Ball) diperoleh hasil bahwa dari 3 (tiga) skenario simulasi biaya dan waktu, skenario terbaik adalah skenario ke-2 di masing masing proyek. Pada minggu ke-21 di proyek 1, nilai Cost Performance Index (CPI) dan Schedule Performance Index (SPI) adalah 1; minggu ke-20 di proyek 2, nilai CPI dan SPI adalah 1; dan minggu ke-7 di proyek 3, nilai CPI dan SPI adalah 1.
Mitigasi risiko dilakukan pada aktifitas-aktifitas dalam jalur kritis ketiga proyek, sebanyak 14 (empat belas) aktifitas pada 9 (Sembilan) jalur kritis di proyek 1; 16 (enam belas) aktifitas pada 4 (empat) jalur kritis di proyek 2; dan 22 (dua puluh dua) aktifitas pada 2 (dua) jalur kritis di proyek 3. Nilai SPI pada awal proyek 1 dan 2 diatas angka '2', mengindikasikan aktifitas pengadaan material yang tidak dapat dipenuhi akibat proses produksi, transportasi, dan distribusi material yang tidak terencana. Langkah yang dapat dilakukan adalah memisahkan pengadaan material dari kegiatan konstruksi proyek.

The study used integration of Earned Value Management and Risk Management for conducting risk delays mitigation plan the natural gas pipeline project. By performing a comparison of Planned Value, Earned Value and Actual Cost on historical data and the results of a monte carlo simulation (Crystal Ball) that the results obtained from the 3 (three) cost and time simulation scenario, the best case scenario is the 2nd scenario in each project. At week 21 (twenty one) in the project no. 1, the Cost Performance Index (CPI) and Schedule Performance Index (SPI) value is 1; week 20 (twenty) in the project no. 2, the CPI and SPI value is 1; and the week 7 (seven) in the project no. 3, CPI and SPI values are 1.
Project risk had mitigated on the activities in the critical path of the three projects, a total of 14 (fourteen) activities in the 9 (nine) critical path in the project 1; 16 (sixteen) activity in 4 (four) critical path in the project 2; and 22 (twenty two) activity in 2 (two) critical path in the project 3. SPI value at the beginning of the project 1 and 2 above figures '2', indicated that the material procurement activities can not be met due to the process of production, transportation, and distribution of materials unplanned. The best actions to do is to separate the material procurement from construction activities.
"
Depok: Fakultas Teknik Universitas Indonesia, 2014
T43609
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>