Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 5750 dokumen yang sesuai dengan query
cover
Hendra Susanto
Yogyakarta: Andi, 2013
657.869 HEN a (1)
Buku Teks  Universitas Indonesia Library
cover
Adrian, James J.
Reston, Virginia: Reston Publishing, 1979
657.869 ADR c
Buku Teks  Universitas Indonesia Library
cover
Yohanes Suparyono
Yogyakarta: Kanisius, 1981
742 YOH k
Buku Teks SO  Universitas Indonesia Library
cover
Goodlad, J.B.
London: Heinemann, 1974
657.869 GOO a
Buku Teks  Universitas Indonesia Library
cover
"Manajemen Konstruksi (MK) adalah suatu metode untuk mengelola proyek, dimana tahapan-tahapan dalam proses pembangunan yaitu ; tahapan pengembangan konsep (concept development phase), tahapan perencanaan (design phase), tahap pelelangan (tender phase), tahap pelaksanaan (construction phase), dan tahap pemeliharaan dan operasional (maintenance and operational phase) diperlukan sebagai satu sistem yang menyeluruh dan terpadu (integrated), dengan tujuan untuk mencapai hasil yang optimal dalam aspek biaya, mutu, dan waktu. Peran Manajemen Konstruksi dalam menjalankan suatu kegiatan pekerjaan atau proyek meliputi pengendalian waktu, biaya, administrasi dalam pencapaian fisik mulai dari tahap persiapan atau perencanaan sampai pengoperasian dan pemeliharaan proyek.
Secara historis, biaya kapital, jadwal, utilitas mendapatkan perhatian yang lebih
selama tahap perencanaan dan pelaksanaan. Dalam banyak kasus, sedikit perhatian yang
diberikan pada untuk karakteristik desain jangka panjang seperti kemudahan pemeliharaan.
kepercayaan, kemudahan pengoperasian dan faktor-faktor manusia seperti kemudahan
dalam menjalankan fungsi pemeliharaan.
Karena biaya efektif sebenarnya dari keseluruhan proyek adalah dayaguna dan biaya
sepanjang usianya, biaya pemeliharaan adalah sebagian besar dari biaya operasi total dari
seluruh fasilitas yang dibangun.
Penelitian ini difokuskan pada perencanaan anggaran operasional dan pemeliharaan
gedung pada gedung perkantoran menara sudirman dijakarta selatan sebagai studi kasus.
Pada penelitian ini akan menganaIisa data - data yang tersedia mengenai fasilitas -
fasilitas, peralatan - peralatan dan komponen - komponen gedung lainnya yang berpengaruh
pada biaya pemeliharaan dan operasional gedung.
Hasil akhir dari penelitian ini diharapkan dapat menyajikan suatu metode perencanaan
anggaran operasional dan pemeliharaan gedung yang optimal, baik dari segi waktu, mutu dan
biaya operasional dan pemeliharaan gedung."
Fakultas Teknik Universitas Indonesia, 2005
S35783
UI - Skripsi Membership  Universitas Indonesia Library
cover
Sinaga, Indra
Jakarta: Pustaka Sinar Harapan, 1992
720.2 SIN p (1);720.2 SIN p (2)
Buku Teks SO  Universitas Indonesia Library
cover
Tangerang: BPPT, 2009
Majalah, Jurnal, Buletin  Universitas Indonesia Library
cover
cover
Mohamad Taufik H.A
"Dalam pelaksanaan pembangunan proyek konstruksi di lingkungan PT. X sering mengalami berbagai hambatan, dimana hal tersebut mengakibatkan tidak tercapainya kinerja kualitas pencapaian hasil pekerjaan kontraktor seperti yang diharapkan. Adapun tujuan penelitian ini adalah untuk mendapatkan faktor risiko kualitas yang dominan pada tahap pelaksanaan konstruksi, serta mengetahui dampak, penyebab, dan tindakan koreksi yang harus dilakukan untuk meningkatkan kualitas pencapaian hasil pekerjaan di masa yang akan datang. Penelitian ini dikaji berdasarkan dari berbagai sumber literatur terutama literatur mengenai manajemen risiko dan manajemen kualitas pencapaian hasil pelaksanaan konstruksi. Metode penelitian yang dilakukan adalah dengan cara survei dan menyebarkan kuesioner kepada kontraktor dan para pihak yang terlibat (stake holder) pada proyek konstruksi di lingkungan PT. X. Dari penelitian yang telah dilakukan ditemukan 3 variabel faktor risiko kualitas yang dominan pada tahap pelaksanaan konstruksi berdasarkan analisis data yang telah dilakukan, adalah ketidak jelasan informasi lingkup pekerjaan pada saat penjelasan pekerjaan, Perencanaan (gambar/spesifikasi) yang salah/tidak lengkap, dan tidak efektifnya atau tidak adanya prosedur manajemen kualitas.

There are many problems during the implementation of the projects construction at area of PT. X, which is affected to the output of contractor to reach the expectation of quality performance. The purpose of this research is getting a dominant risk factor to influence the quality of construction stage, also finding a cause, effect and recommendation of the correction action in order to improve the quality performance in the near future This research is studied based on various source of literatures especially in concerning the management risk and management quality of output performance resulted by the construction stage. The method of this research is by doing the survey and giving questioners to contractors and stake holders in the area of projects at PT X. From the research it was found that are three variable of risk factors to the most dominant influent to the qualities of construction based on analysis data has been done, the variable are ; there are no clearly scope of work information on the bidding process, the planning (drawing/specification) are wrong and incompletely, and there are have not or ineffective procedure of quality management."
Depok: Fakultas Teknik Universitas Indonesia, 2009
T26755
UI - Tesis Open  Universitas Indonesia Library
cover
Simanjuntak, Sheba Hartaty
"Bangunan konstruksi dapat menghasilkan rancangan yang baik, bila awalnya telah dipikirkan bagaimana cara membangunnya. Kegagalan konsultan perencana memperkirakan bagaimana suatu rancangan dibangun oleh kontraktor dapat menyebabkan permasalahan yang menimbulkan kenaikan biaya dan keterlambatan jadwal pelaksanaan konstruksi. Permasalahan tersebut dapat diselesaikan dengan constructability yaitu dengan melibatkan tenaga ahli konstruksi yang berpengetahuan dan berpengalaman untuk ikut serta dan memberi masukan pada tahap perancangan. Hal ini lebih menjamin agar rancangan disusun dengan menggunakan metode dan teknologi yang dapat diterapkan oleh kontraktor.
Penelitian ini dilakukan dengan mengirimkan kuesioner ke berbagai perusahaan konsultan perencana yang berada di wilayah Jabotabek. Dan hasil penyebaran kuesioner diperoleh 30 kuesioner dan 50 kuesioner yang diterima kembali untuk dianalisis dengan menggunakan program SPSS.
Hasil analisis dengan model regresi berganda dapat menggambarkan adanya hubungan korelasi positif yang sangat kuat antara variabel-variabel peningkatan constructability pada perancangan oleh konsultan perencana dengan kinerja biaya. Model regresi berganda terdiri dari 3 (tiga) variabel penentu yang mempengaruhi kinerja biaya berdasarkan penilaian terhadap sampel dan koordinator proyek dari perusahaan konsultan perencana, yaitu :
1. Menyesuaikan pendekatan rancangan dengan metode konstruksi,
2. Mendefinisikan secara jelas batasan kontraktor dalam dokumen perancangan, dan
3. Secara aktif meminta masukan dari personil konstruksi pada setiap tahapan dan proses perancangan.
Dan hasil penelitian ini, peningkatan constructability pada perancangan dapat digunakan untuk menghasilkan kualitas rancangan yang dapat meningkatkan kinerja biaya pada pelaksanaan proyek-proyek konstruksi di Indonesia di masa mendatang.

Influence of Constructability Improvement in Design Phase to Project Cost Performance of Construction Projects in IndonesiaConstruction building could to products a good design, if the early to think how in manner to be constructed. Failure of designer to consider how the design should be implemented by contractor can result in scheduling problems and delays during the construction process. That problems could be solved with constructability namely by the construction expert involved who had knowledge and experience to joint and seek construction input in design. This has more to warrant in order that design to arrange by using technology and method that could apply of contractor.
This research has done in the designer companies with sent some questionnaires to several of designer companies in Jabotabek. From questionnaires spread result 30 from 50 questionnaires received to be viable analysis with used SP SS program.
The result of multiple regression analysis model shows that influence constructability improvement in design of designer will improving project cost performance. Multiple regression models has 3 of key variables influencing in cost performance carried out by estimates from persons of construction expert or project coordinator in designer's firm are:
(1) Integrate design approach with construction method,
(2) Clearly define contractor interface in the design document, and
(3) Actively seek construction input to all stages of the design process.
From these research resulted, construction improvement in design can be used to obtain the quality of design result that cost performance can be improvement in operation of projects construction in the future of Indonesia construction project.
"
Depok: Fakultas Teknik Universitas Indonesia, 2000
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>