Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 51358 dokumen yang sesuai dengan query
cover
Natalia Tanan
[Place of publication not identified]: [Publisher not identified], 2012
JJJ 29:2 (2012)
Artikel Jurnal  Universitas Indonesia Library
cover
Hariwibowo
Depok: Fakultas Teknik Universitas Indonesia, 1998
S49002
UI - Skripsi Membership  Universitas Indonesia Library
cover
Ratna Dewi Fajri
"Hasil Sakernas Agustus 2020 menunjukan bahwa lebih dari 800.000 pekerja asal DKI Jakarta, 1,8 juta pekerja asal Jawa Barat, dan 600.000 pekerja asal Banten adalah pekerja komuter dimana mereka melakukan perjalanan lintas kabupaten/kota secara rutin setiap harinya. Tingginya mobilitas antar provinsi ini menyebabkan terjadinya kepadatan lalu lintas, salah satunya di Kota Depok yang berperan sebagai kota penyangga DKI Jakarta. Salah satu penyebab masalah lalu lintas di Kota Depok adalah keberadaan Terminal tipe C di Jalan Margonda Raya. Untuk menguraikan kepadatan lalu lintas tersebut, Pemerintah Kota Depok membangun Terminal Jatijajar dengan tipe A dan mengalihkan operasional bus AKDP dari Terminal Margonda ke Terminal Jatijajar. Pemindahan layanan bus AKDP ini akan membuat jumlah pengunjung Terminal Jatijajar meningkat. Terminal yang dirancang untuk menjadi Kawasan Transit Oriented Development ini akan melayani transportasi publik berupa angkutan kota, trans Jakarta, AKDP, dan AKAP. Konsep TOD yang digunakan juga didukung dengan disediakannya fasilitas penunjang seperti area Park n Ride dan zona Drop Off bagi pengguna terminal yang menggunakan kendaraan pribadi. Pergerakan pejalan kaki di Terminal tipe A seperti Terminal Jatijajar ini menjadi penting untuk diperhatikan. Dalam Master Plan Terminal Jatijajar yang dibuat Badan Pengelola Transportasi Jabodetabek (BPTJ) sudah merencanakan bagaimana pergerakan orang di Terminal. Analisis pergerakan pejalan kaki dilakukan guna melihat bagaimana kondisi fasilitas pejalan kaki pada rancangan tersebut. Analisis dilakukan menggunakan aplikasi PTV Vissim dengan model mengacu pada Master Plan yang telah dibuat BPTJ selaku pengelola pusat. Model akan disimulasikan dengan jumlah pejalan kaki atau pedestrian input bervariasi; free flow, rancangan kapasitas pesimis, moderat, dan optimis. Setelah itu, hasil simulasi berupa travel time (waktu pergerakan pejalan kaki di area terminal pada rute-rute yang telah dibuat) pada kondisi eksisting dianalisis untuk kemudian model usulan dibuat. Model usulan ini akan menjadi alternatif desain fasilitas pejalan kaki yang dapat mempersingkat waktu perjalanan yang dibutuhkan.

The August 2020 Sakernas show that more than 800,000 workers from DKI Jakarta, 1.8 million workers from West Java, and 600,000 from Banten are commuter workers who travel across districts/cities regularly every day. The high mobility between provinces causes traffic congestion, one of which is in Depok, which acts as a buffer city for DKI Jakarta. One of the causes of traffic problems in Depok is the existence of a Type C Terminal on Jalan Margonda Raya. To describe the traffic density, The Government built the Terminal Jatijajar with type A and divertedAKDP bus operations from Terminal Margonda to Terminal Jatijajar. The transfer of the AKDP bus service will increase the number of visitors at Terminal Jatijajar. The terminal, designed to be a Transit Oriented Development Area, will serve public transportation in the form of Angkutan Kota, Trans Jakarta, AKDP, and AKAP. The TOD concept is also supported by supporting facilities such as park-n-ride areas and drop-off zones for terminal users who use private vehicles. Pedestrian movement in Type A Terminals such as Terminal Jatijajar is crucial. The Terminal Jatijajar Master Plan made by the Jabodetabek Transportation Management Agency (BPTJ) has planned a network where people move in the Terminal. Pedestrian movement analysis is done to see how the condition of the pedestrian facilities in the design is. The analysis was done using the PTV Vissim application with the model referring to the Master Plan that had been made by BPTJ as the central manager. The model was then simulated with the pedestrian input varies; free flow, pessimistic, moderate, and optimistic capacity design. After that, the simulation results in the form of travel time (pedestrian movement time in the terminal area on the routes that have been created) in existing conditions are analyzed and a proposed model is made. The proposed model will be an alternative design that can shorten the required travel time."
Depok: Fakultas Teknik Universitas Indonesia, 2022
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Kharisma Adikara
"Pemerintah Provinsi DKI Jakarta berupaya mengurangi tingkat kemacetan di Jakarta dengan salah satu programnya yaitu penyediaan fasilitas pejalan kaki yang nyaman dan lebar. Dalam pelaksanaannya diterapkan konsep complete street yang artinya pembagian ruang jalan yang berfungsi untuk berbagai macam pengguna dan kemampuan, termasuk penyandang disabilitas. Konsep demikian mengandung konsekuensi melibatkan kepentingan banyak pihak karena kewenangan pada sektor yang berbeda diemban oleh instansi yang berbeda pula. Namun, terdapat permasalahan kolaborasi stakeholder yaitu koordinasi antar lembaga yang belum berjalan dengan baik serta integrasi dengan Perangkat Daerah terkait dalam pelaksanaan program belum maksimal. Masalah tersebut ditengarai disebabkan karena melibatkan kepentingan banyak stakeholder, di mana terdapat perbedaan pandangan dan ego sektoral. Penelitian ini mengidentifikasi stakeholder internal dan stakeholder eksternal yang berpengaruh pada pembangunan fasilitas pejalan kaki di DKI Jakarta dan mengidentifikasi indikator yang mempengaruhi kolaborasi, serta mengembangkan manajemen stakeholderĀ untuk meningkatkan kolaborasi. Metodologi yang digunakan adalah analisis stakeholder berbasis PMBOK 6th Edition, khususnya pada proses identifikasi stakeholder dan perencanaan keterlibatannya. Berdasarkan analisis stakeholder, maka disusun dokumen daftar stakeholder, pemetaan kekuasaan-kepentingan, penilaian keterlibatan stakeholder, dan dirumuskan strategi perencanaan keterlibatanstakeholder.

One of the programs run by the Jakarta Capital City Government is to lower the amount of traffic in the city by offering spacious and comfortable pedestrian areas. The entire street idea, which divides road space to accommodate different user kinds and abilities, including those with disabilities, is used in its implementation. This concept has the consequence of involving the interests of many parties because authority in different sectors is carried out by different agencies. Stakeholder participation does, however, have certain drawbacks, including poor institutional coordination and subpar program execution integration with pertinent regional apparatus. It is believed that this issue arises when multiple stakeholders' interests are involved, leading to disparities in sectoral perspectives and egos. This research identifies internal stakeholders and external stakeholders who influence the construction of pedestrian facilities in Jakarta and identifies indicators that influence their collaboration, and developing stakeholder management to improve collaboration. The methodology used is stakeholder analysis based on PMBOK 6th Edition, especially in the process of identifying stakeholders and planning their engagement. Based on the stakeholder analysis, documents were prepared: stakeholder registers, power-interest mapping, stakeholder engagement assessment, and strategy for plan stakeholder engagement."
Depok: Fakultas Teknik Universitas Indonesia, 2024
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Khresna Putera Tama
"ABSTRAK
Pembangunan Stasiun MRT Mass Rapid Transport di kawasan blok M akan lebih memudahkan masyarakat Jakarta dan luar kota Jakarta untuk mengunjungi tempat pemberlanjaan Blok M. Selain stasiun MRT yang akan di bangun, di kawasan Blok M juga telah tersedia terminal bus, baik itu bus biasa dan terminal bus way BRT koridor 1 yang berada pada lokasi yang sama. Dengan jumlah penumpang yang keluar di Stasiun MRT blok M sebanyak 26,612 orang perhari, jika tidak di dukung dengan jalur pedestrian yang memadai tentunya mereka akan kesulitan untuk menuju terminal bus yang berada 300 meter dari stasiun MRT Blok M. Dengan keadaan situasi pedestrian yang ada di blok M sekarang, khususnya di jalan Melawai X yang menghubungkan station MRT dan terminal bus. Maka tidak memungkinkan bagi penumpang yang berjalan kaki untuk menuju arah terminal bus dengan nyaman karena disepanjang jalan tersebut jalur pedestrian belum ada atau telah di alih fungsikan sebagai tempat berdagang atau parkir kendaraan. Maka di butuhkan jalur pedestrian yang layak untuk para penumpang tersebut agar lebih mudah mengakses moda transportasi yang lain.

ABSTRACT
Construction of MRT Station Mass Rapid Transport on the Block M region will be facilitated public of Jakarta and outside Jakarta to visit central trade on Block M. In addition to the bus terminal on the Block M region has available, whether it is regular bus and bus way BRT first corridor in the same location. With the number of passengers that came out at the Block M MRT station as much as 26.612 people rsquo s per day, if it is not supported by an adequate pedestrian path they would have difficulty to get to the bus terminal which is located 300 meters from the MRT station Blok M. With pedestrian situations in block M today, particularly at Melawai X street that connects the MRT station and bus terminal. Then it is not possible for passengers to walk towards the bus terminal comfortably, because along the street the pedestrian path does not exist or has been replaced it rsquo s function as a trade or parking areas of vehicles. Then it takes a decent pedestrian path for the passengers to make them easier access to other transportation modes."
Depok: Fakultas Teknik Universitas Indonesia, 2016
S66398
UI - Skripsi Membership  Universitas Indonesia Library
cover
Arya Pradipta
[Place of publication not identified]: [Publisher not identified], 2010
WPP 22(1-5)2010
Artikel Jurnal  Universitas Indonesia Library
cover
Muhammad Iqbal Pahlefi
"Pejalan kaki dapat menyeberang jalan secara aman apabila disediakan fasilitas yang sesuai dengan kondisi lalu lintas. Tujuan dari penelitian ini adalah menganalisis karakteristik penyeberang jalan pada fasilitas zebra cross dan pelican fixed time. Karakteristik tersebut dapat dijadikan referensi dalam merancang fasilitas penyeberangan di masa mendatang. Variabel-variabel pejalan kaki yang dianalisis diantaranya adalah kecepatan menyeberang, jenis kelamin dan tingkat kepatuhan. Karakteristik pengemudi dan kondisi fasilitas juga dianalisis untuk mendapatkan perbedaan yang mendetil antara penyeberangan zebra cross dan pelican fixed time.
Berdasarkan analisis, laki-laki menyeberang lebih cepat dibandingkan perempuan, kecepatan laki-laki adalah 1,286 m/detik dan 0,978 m/detik sedangkan kecepatan perempuan adalah 1,224 m/detik dan 0,905 m/detik. Kecepatan individu menyeberang lebih cepat dibandingkan platoon, kecepatan individu adalah 1,261 m/detik dan 0,934 m/detik sedangkan kecepatan platoon adalah 1,113 m/detik dan 0,849 m/detik. Perempuan cenderung lebih mematuhi peraturan dibandingkan laki-laki. Penyeberangan pelican fixed time lebih direkomendasikan untuk arus dan kecepatan lalu lintas lebih tinggi bila dibandingkan oleh penyeberangan zebra cross.

Pedestrians can cross the road safely if the facilities need to be provided in accordance with traffic conditions. The purpose of this study was to analyze the characteristics of the pedestrian crossing on zebra cross and pelican fixed time facilities. These characteristics can be used as a reference in designing pedestrian facilities in the future. The variables that been analyzed include pedestrian crossing speed, gender and obedience. Characteristics of the driver and condition of facilities were also analyzed to obtain detailed differences between zebra cross and pelican fixed time facilities.
Based on the analysis, the male to cross more quicker than women, the male speed is 1,286 m/sec and 0.978 m/sec while the female speed is 1.224 m/sec and 0.905 m/sec. Individual to cross more quicker than platoon, individual speed is 1,261 m/sec and 0.934 m/sec while the platoon speed is 1,113 m/sec and 0,849 m/sec. Women are more likely than male to obey the regulations. Pelican fixed time facilities is recommended for higher traffic flows and speeds than zebra cross.
"
Depok: Fakultas Teknik Universitas Indonesia, 2015
S58231
UI - Skripsi Membership  Universitas Indonesia Library
cover
Dea Meirina Sari
"Penelitian ini bertujuan untuk mengkaji karakteristik pejalan kaki, menganalisis kelayakan fasilitas pejalan kaki, dan menganalisis efektifitas pemanfaatan jembatan penyeberangan. Lokasi studi berada di ruas Jalan Raya Lenteng Agung arah Utara. Pengumpulan data dilakukan dengan dua cara. Pertama, penggunaan perangkat kamera untuk menentukan jumlah pejalan kaki dan kecepatan. Kedua, dengan kuesioner untuk mengetahui alasan penggunaan fasilitas dan saran.
Hasil perhitungan menghasilkan Level Of Service (LOS) dari semua ruas di daerah studi berkisar antara LOS A sampai C, dimana LOS C adalah LOS untuk fasilitas Jembatan Penyeberangan Orang (JPO). Adapun efektifitas penggunaan JPO ditunjukkan dalam bentuk persentase jumlah pengguna JPO terhadap jumlah total penyeberang, yaitu sebesar 50.26%.
Hasil analisis alasan penggunaan JPO dengan kuesioner menunjukkan keselamatan merupakan alasan utama pejalan kaki menggunakan JPO dan alasan kelelahan bagi pejalan kaki yang tidak menggunakan JPO. Selain itu, penerangan dan perbaikan trotoar adalah hal utama yang dibutuhkan untuk fasilitas pejalan kaki.
Berdasarkan kajian ini, perlu adanya evaluasi lebih lanjut tentang spesifikasi teknis fasilitas pejalan kaki yang ada saat ini dan perlu adanya kajian tentang penyeberang bawah tanah atau tambahan fasilitas untuk penyeberang lansia atau cacat tubuh.

Pedestrians are frequently blamed as one of the sources of traffic jam.The aims of this study are to examine the characteristics of pedestrians, to analyze the feasibility of pedestrian facilities, and to analyze the effectiveness of the utilization of the pedestrian bridge at a certain congested location. It is located on Jalan Lenteng Agung - north direction. Data collections were done in two ways. First, recorded by using camera to determine the number of pedestrians and speed. Second, the questionnaire to determine the reason of using facilities and suggestions.
The analysis shows that Level of Service (LOS) of all the segments are ranged from LOS A to LOS C, where LOS C for pedestrian bridge. The effectiveness of the use of the pedestrian bridge which is represented by the ratio of pedestrian bridge users to total number of crossing people is 50.26%.
The results of the questionnaire analysis indicate that safety is the main reason for pedestrian use the pedestrian bridge and exhausting is the reason for pedestrians who do not use the pedestrian bridge.
From this study it is suggested that it is necessary to provide more lighting and to repair the sidewalk, and it is needed further evaluation on the technical specification of pedestrian facilities that was created by Dirjen Bina Marga in 1990 and further study on the underground pedestrian facility or additional facilities for elderly and disable pedestrian.
"
Depok: Fakultas Teknik Universitas Indonesia, 2017
S69112
UI - Skripsi Membership  Universitas Indonesia Library
cover
Rohilfa Riza
"Jalan merupakan suatu ruang publik yang semua orang mempunyai hak yang sama untuk menggunakannya, baik pengguna kendaraan, pedestrian pada semua umur dan pedestrian penyandang cacat. Tetapi pada kenyataannya, secara umum keadaan jalan di kota besar di Indonesia tidak memberikan rasa aman kepada pedestrian, baik dalam menyeberang jalan maupun berjalan di trotoar. Tulisan ini memaparkan bagaimana suatu desain jalan raya dapat mengatur segala aktivitas diatasnya sehingga memberikan rasa aman kepada pedestrian, yaitu berkenaan dengan pengontrolan kecepatan kendaraan di titik fasilitas penyeberangan, penataan fisik untuk mengatur aktivitas pedestrian dan penyandang cacat. Pada kesimpulan terdapat banyak faktor yang memengaruhi penataan fisik ini, diantaranya pemilihan penataan fisik untuk salah satu pengguna jalan dapat member hambatan kepada pedestrian yang lain, oleh karena itu harus mempertimbangkan pengguna yang dominan beraktivitas di jalan tersebut. Selain itu, kebudayaan dan kebiasaan manusia yang beraktivitas juga berpengaruh dalam pemutusan penataan fisik jalan.

Street is a kind of public space where everybody has the same right to do any activities on it, whether it is for the vehicles, any age?s pedestrian or the difables. But in fact, generally the streets condition at Indonesia could not make pedestrians feel safe to do activities on it, such as cross the street and walking on the sidewalk. This paper explain how a street design could give feel safe to pedestrians to do activities on the street, involved to control vehicles speed where pedestrian crossing street, to control pedestrian activities, and physical street design for difables. In conclusion, many factors influence it, such as choice a street design for one pedestrian would create obstacle for others, for that reason, it should considers dominant user who do activities on it. Furthermore, culture and habit of human doing activities on it, also influence the choice of a physical street design."
Depok: Fakultas Teknik Universitas Indonesia, 2008
S48628
UI - Skripsi Open  Universitas Indonesia Library
cover
Dicky Setiawan Bahrun
Depok: Fakultas Teknik Universitas Indonesia, 2000
S48215
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>