Oki Yoga Prasetyo
Rancang-evaluasi detail engineering design vacuum siphon minihydro power plant pada saluran irigasi Lodagung = Design-evaluation of detail engineering design of vacuum siphon mini-hydro power plant at Lodagung Irrigation Channel
2018
 UI - Skripsi Membership
Rangga Damar Bagaskara
Analisis Risiko dalam Proses Pengadaan Barang dan Jasa untuk Overhaul Pembangkit Listrik Tenaga Uap = Risk Analysis in the Procurement Process of Goods and Services for Steam Power Plant Overhaul
Fakultas Teknik Universitas Indonesia, 2023
 UI - Tesis Membership
Elpatra Hadi
Peningkatan Keekonomian PLTU Mulut Tambang dengan Pembangunan Transmisi Saluran Udara 150kV ke Gardu Induk Konsumen Eksternal = Economic Improvement of Mine Mouth Steam Coal Fired Power Plant by Construction of Overhead Transmission Line 150kV to External Consumer Substation
Fakultas Teknik Universitas Indonesia, 2023
 UI - Tesis Membership
Marpaung, Fontes Romario
Penerapan Sistem Automatic Generation Control (AGC) pada Pembakit PLTA Mrica on Grid dalam Pengendalian Operasi Sistem Jawa Bali = Implementation of Automatic Generation Control System on Grid at Mrica Hydro Power Plant in Java Bali Operation System Control
Fakultas Teknik Universitas Indonesia, 2022
 UI - Tugas Akhir
Janice Angelina Djaja
Perancangan instalasi pembangkit listrik tenaga surya dalam mega proyek jembatan Selat Sunda = Designing the installation of solar power plant in mega project Sunda Strait bridge
2018
 UI - Skripsi Membership