Mufli Hazimah
Gambaran Komitmen dari Sisi Partisipasi Tim Lapangan Terhadap Pelaksanaan Toolbox Meeting Di PT. Wijaya Karya Pada Proyek Pembangunan Jalan Tol Cengkareng-Batu Ceper?Kunciran Tahun 2019 = Overview of Commitment In Terms Field Team Participation in Toolbox Meeting Implementation PT. Wijaya Karya, Toll Road Construction Project Cengkareng-Batu Ceper-Kunciran in 2019
Fakultas Kesehatan Masyarakat Universitas Indonesia, 2020
 UI - Skripsi Membership
Andrew Luis Krishna
Analisis risiko pajanan tsp di udara ambien outdoor proyek konstruksi Jalan tol Bacakayu Jakarta Tahun 2015 = Risk assessment of tsp exposure in ambient air at construction project site of Becakayu toll road Jakarta 2015
2016
 UI - Skripsi Membership
Karimah Alhabsyi
Gambaran tingkat risiko pajanan debu TSP (Total Suspended Particulate) yang terdapat di bagian bagging, NPK feeding section dan bengkel mesin di PT. Pupuk Kujang Tahun 2012 = Overview of risk level TSP (Total Suspended Particulate) exposure in bagging section NPK feeding section and workshop in PT. Pupuk Kujang 2012
Universitas Indonesia, 2013
 UI - Skripsi Membership
Andrea Halim
Fluktuasi harian konsentrasi total suspended particulate (TSP) sebagai akibat fluktuasi volume lalu lintas (Studi kasus Jalan Raya Margonda) = Daily fluctuations of total suspended particulate (TSP) as result of traffic volume fluctuations (Study case at margonda raya street)
2010
 UI - Skripsi Open
Irmi Nur Aini
Keselamatan dan manajemen risiko kesehatan kerja di ereksi gelagar dari konstruksi jalan tol yang ditinggikan: di salah satu wilayah Jakarta pada tahun 2019 = Occupational safety and health risk management in the erection girder of the elevated toll road construction: in one of Jakarta areas in 2019
Fakultas Kesehatan Masyarakat Universitas Indonesia, 2019
 UI - Skripsi Membership