Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 5 dokumen yang sesuai dengan query
cover
Urlyagustina Rakhmawati
Abstrak :
Dengan semakin menipisnya cadangan minyak di Indonesia, sedangkan permintaan energi terus mengalami peningkatan, sehingga diperlukan sumber energi alternatif yang dapat mengurangi ketergantungan terhadap minyak bumi. Sumber Daya Gas Bumi di Indonesia saat ini sangat besar, namun pemanfaatannya belum optimal untuk kebutuhan domestik. Pemerintah telah melaksanakan program Diversifikasi BBM ke BBG, namun belum berjalan efektif. Penelitian ini memproyeksi penyediaan dan permintaan gas bumi hingga tahun 2050, sehingga dapat dipetakan produksi dan konsumsi setiap wilayah dengan adanya substitusi BBG terhadap BBM. Permodelan penyediaan dan permintaan gas bumi menggunakan pendekatan sistem dinamik. ...... With the depletion of oil reserves in Indonesia, while the demand for energy continues to increase, so we need an alternative energy source that can reduce dependence on petroleum. Gas Resources in Indonesia is very large, but not yet optimal utilization for domestic needs. The Government has been implementing fuel gas diversification program, but has not been effective. This research project the supply of and demand for natural gas by 2050, so it can be mapped production and consumption of each region with the substitution of fuel gas instead of fuel oil. Modeling the supply and demand for natural gas using a dynamic systems approach.
Depok: Fakultas Teknik Universitas Indonesia, 2013
T35431
UI - Tesis Membership  Universitas Indonesia Library
cover
Dedy Novandi
Abstrak :
ABSTRAK
Stasiun Pengisian Bahan Bakar Gas (SPBG) di Indonesia saat ini akan terus bertambah seiring dengan program pemerintah untuk diversifikasi energi BBM ke BBG, terutama SPBG Compressed Natural Gas atau disingkat SPBG CNG yang akan menjadi tempat pengisian gas ke moda transportasi darat baik untuk transportasi umum maupun pribadi. Untuk itu perawatan SPBG CNG tersebut harus diperhatikan agar pengisian gas tidak terganggu. Inspeksi berbasis resiko merupakan metode yang akan diterapkan untuk mengevaluasi strategi pemeliharaan SPBG CNG dengan menggunakan parameter dari resiko. Peralatan pipa,tabung penyimpanan CNG dan kompresor akan dievaluasi dan dikategorikan menjadi empat zona resiko yaitu dapat diterima, rendah, sedang, dan tinggi. Kemudian pada evaluasi dan struktur hirarki dalam menggunakan Analytical Hierarchy Process (AHP), empat kriteria; safety, biaya, nilai tambah dan kelayakan dijadikan untuk perbandingan pengambilan keputusan. Hasil akhir akan didapat strategi alternative yaitu preventive maintenance untuk area resiko sedang, corrective maintenance untuk area resiko rendah dan dapat diterima dan reliability centered maintenance untuk area resiko tinggi.
ABSTRACT
Compressed Natural Gas filling station in Indonesia will continue to grow in line with the government program of diversification energy from fossil fuel to gas fuel, especially compressed natural gas filling station or CNG filling station that will fill up the gas fuel to the public transportation or private. That was the reason for the maintenance of the gas filling station should be noticed that the gas filling is not compromised. Risk based inspection (RBI) methodology was proposed to evaluate the maintenance strategy in CNG filling station using parameter of risk. Equipments in this unit pipe, CNG storage and compressor were evaluated and categorized into four risk zone, acceptable, tolerable, unsatisfactory and critical based on the RBI result which covered five levels. To arrange the hierarchic structure on Analytical Hierarchy Process (AHP) and evaluation, four main criteria safety, cost, added value and feasibility were defined for pairwise judgments. Finally, possible alternative strategies; preventive maintenance using in unsatisfactory risk area, corrective maintenance using in tolerable and acceptable risk area and reliability centered maintenance were proposed in critical risk area.
Jakarta: Fakultas Teknik Universitas Indonesia, 2014
T41657
UI - Tesis Membership  Universitas Indonesia Library
cover
Yudo Pramudyanto
Abstrak :
Pembangunan jaringan distribusi gas untuk rumah tangga merupakan salah satu program prioritas nasional yang bertujuan untuk konversi energi dari LPG ke Gas alam, pengurangan subsidi serta penyediaan energi bersih dan murah. Saat ini upaya peningkatan pemanfaatan bahan bakar gas bumi hanya difokuskan untuk rumah tangga saja sehingga kurang diminati oleh pihak swasta karena kurang menguntungkan dan jangka waktu pengembalian investasi yang terlalu lama. Dengan adanya pengguna gas selain rumah tangga seperti pelanggan kecil tentu akan meningkatkan nilai keekonomian dari proyek ini dan mempercepat pengembalian investasi. Tesis ini bertujuan untuk menghitung berapa harga jual gas yang ekonomis bagi pelanggan khususnya apabila konsumennya merupakan gabungan dari pelanggan rumah tangga dan pelanggan kecil, serta membandingkan keekonomian dari pemanfaatan gas alam untuk rumah tangga jika dibandingkan dengan menggunakan LPG. Berdasarkan hasil perhitungan, diketahui bahwa skenario 1 menghasilkan harga gas Rp.11.560,00/m3 sampai Rp.17.620,00/m3, skenario 2 menghasilkan harga gas Rp.10.915,00/m3 sampai Rp.15.115,00/m3, skenario 3 menghasilkan harga gas Rp.8.865,00/m3, dan skenario 4 menghasilkan harga gas Rp.2.980,00/m3 sampai Rp.3.811,00/m3. Skenario terbaik adalah skenario 4 yang pelanggannya terdiri atas gabungan pelanggan rumah tangga dan pelanggan kecil yang memaksimalkan alokasi gas sebesar 2 MMSCFD. Dengan harga gas sebesar itu maka penghematan yang didapat dibandingkan dengan penggunaan LPG adalah sebesar Rp.64.780,00/m3 sampai dengan Rp.81.400/m3 per bulan untuk masing-masing rumah tangga. ......Construction of gas distribution networks to households is one of the national priority programs aimed at energy conversion from LPG to natural gas, reduction in subsidies and the provision of clean and cheap energy. Nowadays, efforts to increase fuel utilization of natural gas only focused for households and it less attractive to the private sector because it is less profitable and the investment payback period is too long. With the addition to household gas users such as small customers will certainly increase the economic value of this project and will accelerate the return on investment. This thesis aims to calculate how much gas price economical for customers, especially when the consumer is a combination of household customers and small customers, and comparing the economics of natural gas for households when compared with LPG. Based from the calculation, it is known that the first scenario gas prices is Rp.11.560,00/m3 to Rp.17.620,00/m3, scenario 2 gas prices is Rp.10.915,00/m3 to Rp.15.115,00/m3, scenario 3 gas prices is Rp.8.865,00/m3, and scenario 4 gas prices is Rp.2.980,00/m3 to Rp.3.811,00/m3. The best scenario is scenario 4 that its customers consist of a combined household customers and small customers that maximize the allocation of gas by 2 MMSCFD. Savings with the price of it compared to using LPG amounted Rp.64.780,00/m3 up to Rp.81.400/m3 per month for each household.
Depok: Fakultas Teknik Universitas Indonesia, 2016
T45121
UI - Tesis Membership  Universitas Indonesia Library
cover
Hemi Mauly Kurnianto
Abstrak :
Gas lift diperlukan untuk dapat mengangkat fluida gas yang ada di dalam sumur dengan baik pada sumur yang mengalami deplesi. Pada lapangan sumur X yang berada di daerah lepas pantai, diperlukan tekanan total gas lift 1700 psig untuk menjaga total produksi gas hingga sebesar 11 MMSCFD, sedangkan tekanan sumur saat ini adalah 650 psig. Untuk menaikkan tekanan tersebut diperlukan sistem kompresor. Kompresor sentrifugal memiliki masalah surge yang akan mengakibatkan kerugian secara ekonomi pada perusahaan pengelola lapangan gas. Pengendali yang digunakan adalah pengendali PI dan PID yang akan dilakukan penyetelan dengan metode Ziegler-Nichols dan Tyreus-Luyben lalu digunakan kriteria kinerja pengendali ISE Integral of Squared Error untuk evaluasi kinerja pengendali. Tesis sini juga akan menganalisis desain proses dinamik secara ekonomi dengan metode levelized cost. Hasilnya penyetelan open loop Ziegler-Nichols memiliki ISE yang lebih kecil hingga 99.33 pada konfigurasi kompresor sentrifugal dan 98.65 untuk konfigurasi kompresor reciprocating daripada metode closed loop Tyreus-Luyben. Konfigurasi kompresor reciprocating dengan pengendali PID dan penyetelan open loop Ziegler-Nichols mampu mengurangi 22.96 energi dibanding konfigurasi kompresor sentrifugal dengan pengendali PI dan penyetelan Tyreus-Luyben.
Gas lift is required to lift the fluid gas in the well on wells that depleted. In the field of X wells located in the offshore area, the necessary pressure of 1700 psig total lift gas to maintain the total gas production by up to 11 MMSCFD, whereas the current well pressure is 650 psig. To raise the necessary pressure compressor systems are applied. Centrifugal compressors have a surge problem that would result in economic losses to the company operating the gas field. PI and PID Controller is applied and tunned by Tyreus Luyben and Ziegler Nichols method. ISE Integral of Squared Error controller performance criteria is applied for controller`s performance evaluation. This thesis will also analyze the dynamic design process with levelized cost method. The result is open loop Ziegler Nichols tuning has a smaller ISE up to 99.33 on a centrifugal compressor configuration and 98.65 for reciprocating compressor configuration than closed loop method Tyreus Luyben. Reciprocating compressor configuration with a PID controller and Ziegler Nichols open loop tuning able to reduce 22.96 of energy compared with the centrifugal compressor configuration and tuning PI controller Tyreus Luyben.
Depok: Universitas Indonesia, 2016
T47456
UI - Tesis Membership  Universitas Indonesia Library
cover
Dewi Mersitarini
Abstrak :
ABSTRAK
Tesis ini membahas harga keekonomian gas di sektor Hulu dengan menganalisa harga keekonomian pengembangan lapangan atau Plant of Development-POD, Biaya Operasional, Abandonment Site Restoration beserta seluruh komponen keekonomian lainya seperti Asumsi harga, IRR, NPV, Tax, Perjanjian Jual Beli Gas serta komponen harga pada rantai nilai Industri Gas bumi dari hulu ke hilir dengan mempertimbangkan biaya-biaya yang dibutuhkan diantaranya biaya transmisi dan distribusi, pengalokasian gas, strategi dan kebijakan penetapan harga, skema penjualan serta type kontrak yang digunakan. Analisa ekonomi dilakukan dengan menghitung Net Back Value (NBV) serta Simulasi Monte Carlo untuk menggambarkan perubahan variable yang tidak pasti untuk mendapatkan sensitivitas dalam analisa ekonomi. Pada akhir penelitian ini diharapkan dapat diketahui seberapa besar harga keekonomian gas bumi di sektor hulu untuk alokasi kebutuhan gas domestic.
ABSTRACT
This Thesis discusses the economic price of gas in Indonesia by analyzing the economic price of field development and gas industry value chain from upstream to downstream taking into account the costs required by the producer gas (upstream costs), the cost of transmission and distribution, gas allocation, strategy and pricing policies, sales scheme and type of contract used. Economic analysis is done by calculating the Net Back Value (NBV) as well as Monte Carlo simulations to describe the uncertain variables change to get the sensitivity of the economic analysis. At the end of this study are expected to know how big the economic price of natural gas in the upstream sector for allocation of domestic gas demand, as a case study in this research will also be analyzed Gas Sale Contract in Upstream Oil Company which will be evaluated against the results of the analysis of economic gas prices in Indonesia based on the simulation results of the value chain
Depok: Fakultas Teknik Universitas Indonesia, 2014
T42028
UI - Tesis Membership  Universitas Indonesia Library