Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 13 dokumen yang sesuai dengan query
cover
Dalimunthe, Muhammad Erpandi
Abstrak :
ABSTRAK
Tesis ini membahas mengenai analisis trend kecelakaan kerja yang terjadi dari tahun 2007-2011 berdasarkan data PT JAMSOSTEK (Persero) kantor cabang gatot subroto I. Penelitian ini adalah penelitian yang bersifat deskriptif kualitatif. Hasil analisis penelitian adalah sebagian besar trend kecelakaan kerja disebabkan oleh tindakan pekerja yang tidak aman ketika bekerja (unsafe act). Hal ini sesuai dengan teori Domino dari Heinrich yang mengatakan bahwa kecelakaan disebabkan oleh 88% tindakan tidak aman (unsafe act), 10% kondisi tidak aman (unsafe condition) dan 2% unavoidable.
Abstract
The focus of this study is the trend analysis of accidents that occurred from 2007- 2011 based on data from PT JAMSOSTEK (Persero) branches Gatot Subroto I. This research is qualitative descriptive study. The results of the study analyzes the trend is largely caused by a work accident workers' unsafe act while working. This is consistent with the theory of Heinrich Domino said that 88% of accidents are caused by unsafe acts, 10% of unsafe conditions and 2% unavoidable.
2012
T31017
UI - Tesis Open  Universitas Indonesia Library
cover
Hendri
Abstrak :
Tesis ini membahas efektifitas penerapan SMK3 perusahaan KKKS GOKPL dalam menekan kecelakaan kerja kegiatan eksplorasi MIGAS di indonesia. Penelitian ini bersifat kualitatif dengan desain deskriptif. Hasil penelitian menyarankan implementasi SMK3 agar ditingkatkan karena terlihat efektif dalam menurunkan kecelakaan kerja, perusahaan agar melakukan audit secara rutin untuk memastikan bahwa SMK3 dijalankan oleh semua jenjang didalam organisasi dan dapat menjalankan perbaikan yang berkelanjutan, evaluasi SMK3 Kontraktor (CSMS) agar terus ditingkatkan,bisnis perusahaan banyak melibatkan kontraktor yang merupakan salah satu penentu terciptanya keselamatan dan kesehatan ditempat kerja, dan sangat mempengaruhi dalam menekan angka kecelakaan seperti yang telah dibahas dalam penelitian ini. ...... The focus of this study is to determine the GOKPL Company OHS-MS Implementation Level in reducing accident rate in Oil & Gas exploration activity. This is a qualitative study with descriptive design. The results suggest that OHSMS implementation be improved because it does effective in reducing accident rates, Company to conduct regular audits to ensure that OHSMS runs by all level towards continuous improvement, and evaluation of the Contractors Safety Management System (CSMS) to be improved, given the company's business involves some contractors, which is one of contributing factor in creating safe workplace, and affects the number of accidents.
Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2012
T40813
UI - Tesis Open  Universitas Indonesia Library
cover
Henri Yuwono
Abstrak :
Operation of gas pipelines by PT X, built in 1998 along 14.4 km of which has a danger of gas leaks and fires. Risk analysis is conducted to anticipate the risks that would arise in the gas distribution activities whose results are expected to provide input for the company. This relative risk analysis using semiquantitative methods Risk Rating Index with the approach where the risk of possible dangers (Sum Index) and consequences (Leak Impact Factor). The results showed that the pipelines are in high risk areas (Intolerable) and most of the factors that play a role in contributing to the failure of the operation of the pipeline is the design factor.
Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2012
T40815
UI - Tesis Open  Universitas Indonesia Library
cover
Ratna Eka Praktiwi
Abstrak :
Tingginya aktivitas operasional logistik di PT. Z mengharuskan mereka menggunakan crane berjenis mobil sebagai alat bantu lifting untuk kapasitas diatas 15 Ton. Upaya pengendalian yang diimplementasikan dalam menyertai tingginya aktifitas lifting adalah dengan menerapkan control of work yang menjadi produk K3. Tujuan dari penelitian ini adalah untuk menganalisa Implementasi program control of work tersebut dalam kegiatan lifting di PT. Z. Analisa tingkat pemenuhan standar dan pelaksanaan kegiatan lifting sesuai dengan control of work dikaji relevansinya terhadap data kecelakaan yang terjadi berdasarkan hasil audit dengan berbasis Loss Causal Model DNV dari teori Frank Bird Jr dan George L Germain. Hasil analisa menunjukan tingkat implementasi yang cukup baik yaitu 90%, namun sekecil apapun catatan incident, akan berpengaruh terhadap keberhasilan suatu organisasi dalam menerapkan program K3. Terjadinya incident nearmiss dan kerusakan ringan pada properti yang diakibatkan kelalaian personel dan kegagalan peralatan menjadi faktor penyumbang incident tersebut, yang menjadi fokus perhatian untuk ditingkatkan lagi sistem pengendaliannya. ......High activities of logistic operational in PT. Z requires them to use mobile crane as main lifting tool for lifting capacity above 15 Ton. To assist high lifting activity, control work system is implemented by addopting Control of Work from Safety Department (K3). The purpose of this research is to assess of implementation of the Control of Work in lifting activity at PT. Z. Analysis of compliance level to the standard and lifting activity based on standard is reviewed toward accident data occurred using Loss Causal Model DNV from theori of Frank Bird Jr dan George L Germain. Analysis result showing the implementation level reach 90%. However, no matter how minor the accident report, it will impact to the goal of the organization in implementing of the safety program. Nearmiss incident and minor property damage phenomenal caused by human error and peralatan fault become a main contribution of lifting accident which shall be a main concern for improvement.
Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2014
T39360
UI - Tesis Membership  Universitas Indonesia Library
cover
Wisnu Hidayat
Abstrak :
[Industri konstruksi merupakan salah satu industri yang mempunyai potensi bahaya tinggi yang dapat menyebabkan terjadinya kecelakaan, dimana menempati urutan jumlah kecelakaan tertinggi bila dibandingkan dengan sektor lain. PT. APIK merupakan kontraktor pembangunan gedung The H Residence yang telah menerapkan Sistem Manajemen Keselamatan dan Kesehatan Kerja, namun masih terdapat kasus kecelakaan. Perlu dilakukan suatu analisi persepsi risiko pada pekerja sektor konstruksi sebagai upaya pengendalian kecelakaan kerja. Tujuan penelitian ini adalah untuk mengetahui hubungan antara pendekatan psikomerik dengan persepsi risiko. Desain penelitian cross sectional, menggunakan kuesioner, analisis data mengunakan uji chi square. Hasil penelitian menunjukkan ada hubungan kesukarelaan, Pengetahuan terhadap sumber risiko dan risiko itu sendiri, pengendalian risiko, kebaruan risiko, potensi dampak, ketakutan, dan konsekuensi risiko, sedangkan kesegeraan efek risiko dan pengalaman ada hubungan dengan persepsi risiko. Disarankan bagi PT. APIK untuk melakukan kegiatan-kegiatan yang bersifat edukatif mengenai keselamatan kerja untuk membentuk persepsi risiko yang baik kepada pekerja; melakukan pelatihan berkala terutama cara pengendalian bahaya di tempat kerja; melakukan pengawasan terhadap pekerja untuk membiasakan peduli terhadap keselamatan mereka sendiri;The construction industry is one of the industries that have high hazard potential for accidents. It ranks the highest number of accidents compared to other sectors. PT. APIK is a building contractor of The H Residence project who has implemented OHSMS, but cases of accidents are still there. Necessary to do an analysis of the risk perceptionin construction worker as efforts to control the work accident. The purpose of this study was to determine the relationship between psycometric approach to the perception of risk.The study uses a cross-sectional study design and questionnaire. Meanwhile, chi square test were used to analyze data. The results showed there are any correlations between voluntariness of risk, , knowledge of risk (exprosure)), knowledge of risk (science), control over risk, newness, cronic-catastrophic, common–dread, and severity of consequence, while immiediacy of effect and and experience have no association with risk perception. Recommended for PT APIK to conduct activity in education concerning safety issues to increase the perception of risk for worker; training especially risk control measure, supervision to the worker to familiarize concerned about safety., The construction industry is one of the industries that have high hazard potential for accidents. It ranks the highest number of accidents compared to other sectors. PT. APIK is a building contractor of The H Residence project who has implemented OHSMS, but cases of accidents are still there. Necessary to do an analysis of the risk perceptionin construction worker as efforts to control the work accident. The purpose of this study was to determine the relationship between psycometric approach to the perception of risk.The study uses a cross-sectional study design and questionnaire. Meanwhile, chi square test were used to analyze data. The results showed there are any correlations between voluntariness of risk, , knowledge of risk (exprosure)), knowledge of risk (science), control over risk, newness, cronic-catastrophic, common–dread, and severity of consequence, while immiediacy of effect and and experience have no association with risk perception. Recommended for PT APIK to conduct activity in education concerning safety issues to increase the perception of risk for worker; training especially risk control measure, supervision to the worker to familiarize concerned about safety]
Universitas Indonesia, 2015
T44698
UI - Tesis Membership  Universitas Indonesia Library
cover
Muhamad Yasin
Abstrak :
Kecelakaan besar dalam industri minyak dan gas bumi meskipun relatif jarang terjadi namun sering bersifat katastropik, yang menyebabkan kematian pada pekerja dalam jumlah besar, kerusakan aset perusahaan yang bernilai tinggi dan pencemaran lingkungan. Meskipun penyebabkan utama kecelakaan sering disebabkan oleh faktor manusia, namun kegagalan manajemen tanggap darurat dalam menangani kecelakaan, memberikan kontribusi besar yang menyebabkan kecelakaan lebih parah dan kerugian semakin besar. Kesiapan manajemen tanggap darurat pada operasi hulu minyak dan gas mutlak diperlukan dalam upaya mempersiapkan penanganan setiap kecelakaan dan kondisi darurat. Dalam upaya untuk terus menjaga tingkat kesiapan dan efektifitas manajemen tanggap darurat secara regular perlu dilakukan proses evaluasi. Dalam penelitian ini penulis melakukan penelitian dengan melakukan evaluasi sistem sistem manajemen tanggap darurat di perusahaan hulu minyak dan gas yang beroperasi di laut dalam, dengan ketentuan pada National Fire Protection Association (NFPA) 1600 edisi 2013. NFPA 1600 edisi 2013 telah menyediakan proses evaluasi secara lengkap dan mandiri yang bisa diaplikasikan terhadap sistem manajemen tanggap darurat baik pada perusahaan maupun pemerintahan. Proses evaluasi menggunakan sepuluh elemen dari tahap implementasi tanggap darurat yang meliputi, rencana persyaratan umum, pencegahan ,mitigasi, informasi umum dan komunikasi krisis, peringatan pemberitahuan dan komunikasi, prosedur operasi, manjemen insiden, operasi tanggap darurat, rencana kelangsungan bisnis dan pemulihan, serta bantuan dan dukungan kepada karyawan. Dari hasil penelitian, menunjukkan bahwa perusahaan telah memenuhi sebagian besar ketentuan yang berlaku. Perusahaan juga telah memiliki sumber daya, infrastruktur dan prosedur yang diperlukan dalam penanganan tangap darurat. Namun pemahaman para pekerja dilapangan terhadap prosedur, peran dan tanggung jawab dalam melaksanakan operasi tanggap darurat masih kurang. Perusahaan perlu mempertimbangan sumber daya external dalam mendukung operasi darurat sehubungan kondisi operasi yang terpencil. Dalam business continuity plan, perusahan perlu mempertimbangkan alternatif tempat bekerja, untuk membantu proses pemulihan pada saat terjadi ganguan operasi. Sehubungan letak geografis fasilitas operasi yang berada di jalur laut bebas, perusahaan perlu mempertimbangkan risiko dan membuat strategi mitigasi yang tepat terhadap potensi bahaya dari operasi kapal dan nelayan pada fasilitas operasi.
Major accidents in the oil and gas industry is relatively rare, but it was cause catastrophic incident which lead fatality, assets and environmental loss. Although major of cause is human factors, but the failure of emergency management is part of major contribution that cause increasing severe of accidents and loss. The readiness of emergency management in upstream oil and gas operations is important to response emergencies. In order to continue maintain the level of readiness and effectiveness of emergency management, it is necessary to perform evaluation on regular basis. In this paper the authors conducted research to evaluate emergency management system in the upstream oil and gas company that located in the depth water area, with the requirement from the National Fire Protection Association (NFPA) 1600, 2013 edition. NFPA 1600 edition 2013 has provided self- assessment that can be applied to emergency management system both at the company and government. The evaluation process uses the ten elements of the implementation phase that consist: common plan requirements, prevention, mitigation, crisis communication and public information, warning, notification and communications, operational procedures, incident Management, emergency operations, business continuity and recovery, and employee assistance and support. From the research, shown that the company has not been fully complied with requirement of the NFPA 1600, 2013 edition. The Company has the resources, infrastructure and procedures that needs to address emergencies, but the understanding of the workers in the field related the procedures, roles and responsibilities in implementing emergency response need to be improved. Company need to consider external resources to support emergency operations. In The business continuity plan, companies need to consider alternative work place, to support the recovery process while interruption of operations occurred. Due to current position of facilities is located on international shipping line , the company need to develop appropriate mitigation strategies to address risk related ship that passed around facilities.
Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2015
T43955
UI - Tesis Membership  Universitas Indonesia Library
cover
Bintang Suryo Herdiansyah
Abstrak :
Penelitian ini bertujuan untuk memberikan gambaran persepsi risiko pengguna laboratorium kimia di Universitas X tahun 2015 menggunakan paradigma psikometri. Penelitian dilakukan terhadap 107 responden pada bulan Mei-Juni 2015 menggunakan desain cross-sectional, data primer berupa kuesioner. Parameter yang digunakan pada penelitian adalah skala likert dengan nilai 1(sangat tidak setuju)—4 (sangat setuju). Nilai rata-rata masing-masing dari 9 dimensi paradigma psikometri dihitung untuk melihat kecenderungan persepsi responden terhadap 9 dimensi paradigma psikometri. Hasil penelitian menunjukkan bahwa rata-rata nilai dimensi paradigma psikometri tergolong sedang (2,45—2,91 dari skala 4). Dimensi knowledge about risk in science, control over risk dan newness memiliki nilai persepsi yang paling rendah oleh seluruh responden. Persepsi risiko berdasarkan jenis kelamin dan status responden memiliki kecenderungan yang sama. Pelatihan secara kontinu perlu diberikan kepada pengguna laboratorium untuk melengkapi pelatihan di awal aktivitas maupun ketika aktivitas sedang berjalan, serta pelatihan untuk penyegaran secara periodik. Pelatihan ini harus dapat memastikan bahwa pemahaman dan kemampuan untuk melaksanakan tindakan perlindungan yang cukup guna mengurangi potensi bahaya yang ada dan risiko yang berhubungan dengan aktivitas di laboratorium. ......The purpose of this study is to provide an overview of chemical laboratory user risk perception at University X 2015 using psychometric paradigm. Research conducted on 107 respondents in the May-June 2015 using cross-sectional design, the primary data is obtained from questionnaire. This study used likert scale as follows : 1 (strongly disagree) -4 (strongly agree). The average value of each of the nine dimensions of psychometric paradigm is determined by the value of 1 (low), 2-3 (moderate), 4 (good). The results showed that the average value of psychometric paradigm dimensions were moderate (2.45 to 2.91 on a scale of 4). Dimensions of knowledge about risk in science, control over risk and newness has the lowest perceived value. Risk perception based on gender and status of the respondent shows the similar tendency. Continuous training should be provided to the user in the laboratory to complete the initial training activities as well as ongoing activities, as well as periodic refresher training. This training must be able to ensure that the understanding and ability to implement sufficient protection measures to reduce the potential hazard and risk associated with the activity in the laboratory.
Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2015
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Yusuf Zalaya
Abstrak :
ABSTRAK
Penelitian ini bertujuan untuk mengevaluasi tingkat pemenuhan terhadap implementasi prosedur tentang bekerja di ketinggian PT. Balfour Beatty Sakti Indonesia (WTC2 Project) tahun 2012. Penelitian ini menggunakan pendekatan kuantitatif dan kualitatif dengan desain penelitian potong lintang atau cross sectional yang dilakukan untuk mengetahui tingkat implementasi prosedur bekerja di ketinggian dan mengidentifikasi prosedur yang tidak terimplementasi bagi pekerja di ketinggian. Penelitian menggunakan total sampling dengan jumlah sampel sebanyak 106 orang. Pengumpulan data dilakukan dengan penyebaran kuesioner, wawancara terstruktur dengan informan, lembar observasi dan menggunakan telaah dokumen yang ada. Pengolahan data pada penelitian ini menggunakan SPSS untuk kuantitatif dengan menormalisasikan dengan rumus De Boer dan mstriks, table untuk data kualitatif serta dipresentasikan dengan traffic light system.

Dari hasil penelitian menunjukkan bahwa implementasi prosedur bekerja di ketinggian dalam variable tanggung jawab 60% dan variable prosedur kerja 47% sehingga tingkat implementasi prosedur bekerja di ketinggian sebesar 53,5% dalam kategori Merah dan data kecelakaan tahun 2012 dalam kategori Kuning. Tingkat implementasi prosedur bekerja di ketinggian di tabel tingkat implementasi dan tingkat kecelakaan termasuk dalam level 5 ( berbahaya ).

Dapat disimpulkan bahwa prosedur bekerja di ketinggian tidak terimplementasi dengan baik yaitu level 5 (berbahaya) di PT.BBS Indonesia. PT. BBS Indonesia perlu mengevaluasi dan meningkatkan pengawasan terhadap program yang prosedur bekerja di ketinggian. Melalui kegiatan evaluasi terhadap kepala departemen, melakukan perencanaan, pendataan dan pelaporan pelatihan untuk manajemen, pengawas dan pekerja, perencanaan dan pelaporan inspeksi peralatan dan area kerja.
ABSTRACT
This study aims to evaluate the level of compliance with the implementation of working at heights procedures for PT. Balfour Beatty Sakti Indonesia (WTC2 Project) in 2012. This study uses quantitative and qualitative approaches to the design of a cross-sectional studies conducted to determine the level of implementation of working at heights procedures and identify procedures that are not implemented for workers at height. The research uses total sampling with a sample of as many as 106 people. The data was collected by questionnaires, structured interviews with informants, observation sheets and use the existing document review. Processing the data in this study using SPSS for quantitative formula with normalizing with De Boer and matriks, table for qualitative data and was presented with a traffic light system.

From the study results showed that the implementation of work at height procedures 60% in a variable responsibility and 47% in variable working procedures. So that the level implementation of working at height procedures is 53.5% in the red category and Accident data in 2012 is in the Yellow category. Level of implementation of working at procedures in the level implementation working at height procedures table and the accident rate is in level 5 (dangerous).

Can be concluded that the works at a height procedure in PT.BBS Indonesia is not properly implemented because in level 5 (dangerous). PT. BBS Indonesia needs to evaluate and improve the monitoring program and standard of working at height according procedures. Through the evaluation of department heads, planning, data collection and reporting of training to management, supervisors and workers, planning and reporting of inspection equipment and work area.
2012
T30751
UI - Tesis Open  Universitas Indonesia Library
cover
Komang Dahlia Mawar Sari
Abstrak :
Peningkatan jumlah sepeda motor di Kota Depok berdampak pada peningkatan angka kecelakaan. Angka kecelakaan lalu lintas sepeda motor di Kota Depok disebabkan oleh faktor-faktor pengendara, kendaraan, jalan dan alam. Hubungan antara faktor-faktor penyebab dan angka kecelakaan lalu lintas sepeda motor di analisis secara kuantitatif menggunakan software statistik. Terdapat hubungan yang sangat signifikan dari beberapa subvariabel pengendara yaitu kelelahan, kelengahan, tidak tertib dan tidak terampil terhadap terjadinya kecelakaan lalu lintas sepeda motor. Sedangkan faktor penyebab yang paling dominan adalah ketidak tertiban pengendara sepeda motor sehingga diperlukan suatu kebijakan agar pengendara sepeda motor lebih tertib saat berkendara dan taat pada ramburambu lalu lintas. ......The increment of the motorbikes are impacted the increasing of numbers traffic accident in Depok. Some factors like; driver, vehicle, road and nature (situation around) that caused rate of motor bike traffic accident in Depok. Coherence in between the causes factor and rate of motorbike traffic accident are quantitatively analyzed using the statistic software. Found highly significant correlation of some sub variable of motorbike driver; fatigue, inadvertence, disorderly and lack of motorbike traffic accident skill (lack driving intuition or reflex motion). Actually the dominant factor is lack of discipline from motorbike driver, needed some policy that are able to encourages every motorbike driver orderly and obey the traffic signs.
Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2012
T30413
UI - Tesis Open  Universitas Indonesia Library
cover
Wahyu Sukmana
Abstrak :
ABSTRAK
Sistem perpipaan telah lama dikenal sebagai metode transportasi minyak dan gas bumi yang paling aman. Namun, seperti juga peralatan industri lainnya sistem perpipaan dapat mengalami risiko kegagalan. kegagalan atau ketidakmampuan jalur pipa menjalankan fungsinya tidak hanya bagi perusahaan tetapi juga bagi masyarakat dan lingkungan sekitar. Penelitian ini dilakukan untuk mendapatkan gambaran risiko relatif keberadaan jalur pipa ukuran 30 inchi antara Lawe-Lawe dan Tg. Jumlai sepanjang +/- 6.3 km yang akan digunakan dan diintegrasikan dalam sistem perpipaan Proyek Centralized Crude Terminal yang akan segera dibangun di lokasi Terminal existing. Penilaian risiko dilakukan secara semi-kuantitatif dengan menggunakan metode indeks yang dikembangkan oleh W. Kent Muhlbauer pada masing-masing section jalur pipa. Dari hasil penelitian diperoleh hasil : Nilai indeks rata-rata untuk komponen indeks kerusakan oleh pihak ketiga sebesar 50,86, indeks korosi sebesar 61,14, indeks desain sebesar 57,14 dan indeks kesalahan operasional sebesar 60,00. Komponen indeks kerusakan oleh pihak ketiga merupakan faktor paling tinggi yang menjadi penyebab kemungkinan kegagalan pada jalur pipa 30 inchi tersebut. Sedangkan section jalur pipa yang memiliki kemampuan menahan konsekuensi kegagalan paling rendah adalah pada section-6 (yaitu dengan nilai risiko relatif sebesar 18,45 dibandingkan nilai risiko relatif rata-rata sebesar 48,61), sehingga section pipa tersebut memiliki risiko kegagalan paling tinggi. Kegiatan inspeksi dan pengawasan harus lebih cermat dan intensif dilakukan pada section jalur pipa tersebut.

Kata kunci: Penilaian Risiko, Jalur Pipa Darat, Metode Indeks
2012
T31192
UI - Tesis Open  Universitas Indonesia Library
<<   1 2   >>