The reactive power plays an important role in almost every power transmission industry. Assessing the reactive power, its component influences the voltage stability, voltage reliability, and transient stability in the grid is important to maintain the power transmission grid. Those components are also used to improve system efficiency, maintain the system ability to stand in the standard values to avoid unwanted tragedies, such as sudden voltage drop caused by sudden decrease of reactive power or when the transmission flow does not go in line caused by overloaded current increase. Those unwanted phenomena are potentially harmful to the system. In order to adjust the reactive power level into the needed and its components that are influenced by the reactive power values, the reactive power compensation devices are strongly needed. There are already some reactive power compensation devices in the recent industry. The performance factor, reliability, and the availability are considered in this bachelor thesis. Therefore, comparison and analysis will be conducted on the reactive power compensation devices and methodologies to determine the requirement and the placing of reactive power will be conducted. The need to control the reactive power is done by some devices, and the system is made so in such way in order to maintain its qualities, these qualities are going to be discussed mainly in this bachelor thesis. ......Daya reaktif memiliki peran penting di hampir setiap industri transmisi daya. Dengan daya reaktif, nilai dari komponen tersebut dapat mempengaruhi kestabilan tegangan, keandalan dan kestabilan sementara untuk menjaga jaringan transmisi listrik. Komponen-komponen tersebut juga digunakan untuk meningkatkan efisiensi sistem, menjaga kemampuan sistem untuk tetap pada nilai standar untuk menghindari tragedi yang tidak diinginkan, seperti penurunan tegangan secara tibatiba yang disebabkan oleh penurunan daya reaktif secara spontan atau ketika aliran transmisi tidak berjalan karena kelebihan beban. Fenomena yang tidak diinginkan tersebut berpotensi membahayakan sistem. Untuk menyesuaikan level daya reaktif dan komponennya menjadi sesuai, perangkat kompensasi daya reaktif sangat diperlukan. Sudah ada beberapa perangkat kompensasi daya reaktif yang tersedia di pasar. Faktor kinerja, kehandalan, dan ketersediaan akan dibahas di dalam skripsi ini. Oleh karena itu, perbandingan dan analisis perangkat kompensasi daya reaktif dan metodologi perlu dilakukan untuk menentukan kebutuhan dan penempatan daya reaktif. Kebutuhan untuk mengontrol daya reaktif dilakukan oleh beberapa perangkat dan membuat sistem sedemikian rupa untuk mempertahankan kualitas daya reaktif yang diinginkan. Pembahasan kualitas tersebut akan dibahas di dalam skripsi ini.
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Muhammad
Abstrak :
Tujuan utama Industri manufaktur adalah untuk memproduksi barang secara ekonomis agar dapat memperoleh keuntungan serta dapat menyerahkan produk tepat pada waktunya. Proses produksi yang tidak efektif dan efisien menyebabkan produksi tidak lancar. Lean production system membantu perusahaan untuk menjadi kompetitif, terutama dalam hal mengurangi pemborosan waste yang terjadi pada operasi mereka. Penelitian ini bertujuan untuk mengurangi waste produksi pada salah satu perusahaan otomotif dengan menggunakan Waste Relationship Matrix (WRM), Waste Assessment Questionnaire (WAQ) dan Value stream Mapping (VSM). Kegiatan dalam Industri otomotif ialah merancang, mengembangkan, memproduksi, memasarkan, dan menjual kendaraan bermotor di dunia. Ketiga metode tersebut bertujuan untuk mengidentifikasi serta menganalisa pemborosan waste yang terjadi serta melakukan perbaikan untuk mengeliminasi pemborosan tersebut. Dari hasil penelitian diperoleh jenis waste form yaitu waiting dan motion. Sedangkan jenis waste to yaitu inventory. Ketiga jenis waste tersebut adalah yang paling besar prosentasinya untuk terjadi pada proses assembly trimming pada lini proses produksi mobil. Setelah dilakukan implementasi perbaikan dengan menggunakan metode WRM dan VSM diperoleh hasil efisiensi waste yang terjadi pada jenis waste from yaitu motion dari 17.65 menjadi 15.75 , waiting dari 15.88 menjadi 13.12 , dan Lead Time turun dari 14.202 menit menjadi 12.322 menit dalam satu proses assembly trimming. Beberapa saran improvement yang dilakukan adalah penerapan sistem FIFO First in First Out , Melakukan improvement perubahan pada gerak dan perpindahan pekerja, dan Line Balancing pada lini proses asembly trimming proses produksi mobil.
The main purpose of a manufacturing industry is to produce goods economically in order to gain advantage and can deliver products on time. The production process is not effective and efficient cause of production is not smooth. Lean production helps companies to become competitive, especially in terms of reducing the waste that occurs in their operations. This study aims to reduce waste production at one of the automotive companies are using the waste relationship matrix WRM , waste assessment questionnaire WAQ and Value stream Mapping VSM . The main jobs in automotive industry are paln, develop, produce, market, and supplier the world motorized vehicle. The use of these three methods an intended to identify and analyze the waste that occurred and proposed improvement to eliminate the waste that occured. In the result kind of 'from' waste in the car assembly trimming process are Motion and Waiting waste. Kind of 'to' waste is Inventory that caused by another waste. Motion waste occured as waste. From the research results obtained type of waste form is waiting and motion. While the type of waste to the inventory. The third type of waste is the greatest procession to occur in the assembly trimming process on the production line of the car. After the implementation of the improvement using WRM and VSM methods obtained the results of waste efficiency that occurs in the type of waste from the motion of 17.65 to 15.75 , waiting from 15.88 to 13.12 , and Lead Time down from 14.202 minutes to 12.322 minutes in one assembly process Trimming. Several suggestions for improvement are the implementation of FIFO system First in First Out , Improving changes in movement and movement of workers, and Line Balancing on the process line asembly trimming car production process.
Depok: Fakultas Teknik Universitas Indonesia, 2017
S68241
UI - Skripsi Membership  Universitas Indonesia Library
cover
Muhammad Novel Hidayat
Abstrak :
ABSTRAK
Untuk mendapatkan temperatur pendinginan yang rendah diperlukan perbedaan tekanan yang tinggi. Perbedaan tekanan yang sangat tinggi mengakibatkan kerja kompresor semakin berat. Hal ini mengakibatkan turunnya efisiensi dari sistem refrijerasi sehingga perlu menggunakan sistem refrijerasi cascade. Pada pengeringan beku vakum diperlukan temperatur pendingin yang rendah pada evaporator yang berfungsi sebagai cold trap. Pengeringan beku vakum memerlukan energi untuk proses pengeringan dengan sublimasi sebesar 2870kJ/kg.s, dengan memanfaatkan panas buang kondenser sebagai pemanas dapat mengurangi waktu pengeringan. Oleh karena itu, perlu dilakukan analisa perubahan temperatur dan massa aliran refrijeran pada metode ini agar dapat mengetahui efisiensi sistem dan mengurangi energi yang dikonsumsi selama proses pengeringan berlangsung.
ABSTRACT
For reach of low refrigeration temperature is needed high difference pressure. High difference pressure cause increase compressor work. It is reduce efficiency of refrigeration system so need to use cascade refrigeration system. In freeze vacuum drying, is needed low refrigeration temperatur on evaporator which in function as cold trap. Freeze vacuum drying need energy for drying process by sublimation is 2870kJ/kg.s, by using heat loss condenser as heater can reduce drying time. Because of that, it is need to analyze of temperature change and flow rate refrijerant in this method to find out system efficiency and decrease energy consumption when drying process.
Fakultas Teknik Universitas Indonesia, 2011
S1124
UI - Skripsi Open  Universitas Indonesia Library
cover
Taufik Kurniawan
Abstrak :
Tujuan suatu Industri manufaktur adalah untuk memproduksi barang secara ekonomis agar dapat memperoleh keuntungan serta dapat menyerahkan produk tepat pada waktunya. Proses produksi yang tidak efektif dan efisien menyebabkan produksi tidak lancar. Lean production membantu perusahaan untuk menjadi kompetitif, terutama dalam hal mengurangi pemborosan yang terjadi pada operasi mereka. Penelitian ini bertujuan untuk mengurangi waste produksi pada salah satu perusahaan otomotif dengan menggunakan Waste Relationship Matrix (WRM), Waste Assessment Questionnaire (WAQ) dan Value stream analysis tools (VALSAT). Penggunaan ketiga metode tersebut bertujuan untuk mengidentifikasi serta menganalisa pemborosan (waste) yang terjadi. ......The purpose of a manufacturing industry is to produce goods economically in order to gain advantage and can deliver products on time. The production process is not effective and efficient cause of production is not smooth. Lean production helps companies to become competitive, especially in terms of reducing the waste that occurs in their operations. This study aims to reduce waste production at one of the automotive companies are using the waste relationship matrix (WRM), waste assessment questionnaire (WAQ) and Value stream analysis tools (VALSAT).The use of these three methods an intended to identify and analyze the waste that occurred.
Depok: Fakultas Teknik Universitas Indonesia, 2012
S1839
UI - Skripsi Open  Universitas Indonesia Library
cover
Díaz-Reza, José Roberto
Abstrak :
This book present the state of the art in Total Productive Maintainance (TPM) and its benefits. The authors present a survey applied to 368 manufacturing industries in order to determine their level of execution of TPM. Then a series of causal models are presented. For each model, the authors present a measure of the dependency between the critical success factors and the benefits obtained, allowing industry managers to differentiate between essential and non-essential activities. The content also allows students and academics to obtain a theoretical and empirical basis on the importance of TPM as a lean manufacturing tool in the context of industry 4.0.
Switzerland: Springer Cham, 2019
e20502792
eBooks  Universitas Indonesia Library
cover
Oki Yoga Prasetyo
Abstrak :
ABSTRAK
Dalam rangka ikut serta menyukseskan Program Listrik 35000 MW untuk meningkatkan produksi energi listrik nasional dan mengembangkan sumber EBT yang ekonomis serta ramah lingkungan, menurut rencana akan dibangun Pembangkit Listrik Tenaga Mini Hidro di Desa Jegu - Kab. Blitar - Jatim, dengan memanfaatkan potensi hidro ekisting bendungan Wlingi dan saluran irigasi Lodagung. Unit pembangkit akan beroperasi dengan memanfaatkan outflow irigasi bendungan Wlingi, tepatnya debit operasional harian saluran irigasi Lodagung sebelum dialirkan untuk keperluan pengairan. Analisa feasibility study diperlukan untuk mengidentifikasi kelayakan potensi dari segi teknis lapangan (hidrologi, geografi, geologi) dan desain perencanaan instalasi (sipil, mekanik, elektrik). Berdasarkan hasil olah data hidrologi menggunakan metode FDC, Log Pearson III, dan analisa debit rerata diperoleh debit desain minimum sebesar 7,00 m3/s; debit desain maksimum 14,22 m3/s; dan debit andalan sebesar 10,28 m3/s dengan probabilitas 87,5%. Berdasarkan data topografi dan geomorfologi lapangan didapatkan nilai tinggi jatuh asli sebesar 12,75 m. Berdasarkan analisis potensi energi pada awal tahap FS, diestimasikan daya listrik yang dibangkitkan mencapai 1,3 MW (ηs=86% ; ηm=90% ; ηe=95%) dengan produksi energi listrik andalan sebesar 8,1 GWh/tahun. Data hasil olah FS kemudian digunakan untuk mendesain Detail Engineering Design (DED). Desain PLTM menggunakan teknologi intake vacuum siphon dengan dua buah unit pembangkit, outputnya akan ditransmisikan melalui jaringan ekisting GI Wlingi. Desain PLTM yang direncanakan terdiri dari instalasi sipil (sistem vakum sipon: bangunan intake - headrace; sistem bifurikasi I, pipa pesat, sistem bifurikasi II, draft tube, dan tailrace). Instalasi mekanik yang direncanakan berupa turbin hidraulik. Instalasi elektrik yang direncanakan berupa generator dan komponen pendukung lain seperti trafo utama, kabel daya, pumpa vakum, dll). Evaluasi DED diperlukan untuk menguji kelayakan desain yang telah dibuat, identifikasi mencakup analisis parameter kerja dari desain PLTM yang dirancang. Hasil evaluasi DED sebagai berikut: desain aman terhadap bahaya kavitasi ; efisiensi sistem rata-rata ηPLTM = 69,15% (ηs=80,89% ; ηm=90% ; ηe=95%) ; Tinggi jatuh bersih artifisial rata-rata sebesar 11,4m ; Output daya listrik maksimum sebesar 1,24 MW dan produksi energi andalan sebesar 8,7 GWh/tahun dengan probabilitas 87,5%.
ABSTRACT
In order to participate in the succession of the 35000 MW Electricity Program to increase national electricity production and develop economical and environmentally friendly sources of EBT, planned Mini Hydro Power Plant in Jegu Village - Kab. Blitar - East Java, by utilizing the existing hydro potential of the Wlingi dam and Lodagung irrigation channel. The generating unit will operate by utilizing the Wlingi dam irrigation outflow, precisely the daily operational outflow of the Lodagung irrigation channel before being discharged for irrigation purposes. Analysis of the feasibility study is needed to identify the feasibility of potential in terms of technical field (hydrology, geography, geology) and design of installation planning (civil, mechanical, electrical). Based on the results of the hydrological data processing using the FDC method, Log Pearson III, and the average discharge analysis obtained a minimum design debit of 7.00 m3/s; maximum design debit of 14.22 m3/s; and the dependable debit is 10.28 m3/s with a probability of 87.5%. Based on topographic and geomorphological data from the field it was found that the value of the original fall height was 12.75 m. Based on the analysis of energy potential at the beginning of the FS stage, it is estimated that the electrical power generated reaches 1.3 MW (ηs = 86%; ηm = 90%; ηe = 95%) with dependable electrical energy production of 8.1 GWh/year. The results of the FS data are then used to design the Detail Engineering Design (DED). The design of the PLTM uses a vacuum siphon technology with two generating units, the output of which will be transmitted through the existing network of GI Wlingi. The planned PLTM design consists of a civil installation (vacuum siphon system: intake building - headrace; bifurication system I, penstock, bifurication system II, draft tube, and tailrace). Planned mechanical installation in the form of a hydraulic turbine. Planned electrical installations in the form of generators and other supporting components such as main transformers, power cables, vacuum pumps, etc.). DED evaluation is needed to test the feasibility of the design that has been made, identification includes analysis of the working parameters of the design of the MHP designed. The results of the DED evaluation are as follows: the design is safe against the dangers of cavitation; system efficiency the average ηPLTM = 69.15% (ηs = 80.89%; ηm = 90%; ηe = 95%); Artificial net height is 11.4m; Maximum electric power output is 1.24 MW and dependable energy production is 8.7 GWh / year with a probability of 87.5%.