Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 5 dokumen yang sesuai dengan query
cover
Deshpande, M.V.
New Delhi: Tata McGraw-Hill, 1993
621.317 3 DES s
Buku Teks  Universitas Indonesia Library
cover
Kery Anindita Wakman
"Keandalan suatu sistem listrik pada suatu operasi kilang sangatlah penting untuk mendukung produksi. Pada kilang Tangguh LNG, peralatan esensial untuk mendukung operasi terhubung pada sistem emergency switchgear. Konfigurasi emergency switchgear saat ini merupakan single bus dan hanya disuplai dari satu sisi (couple normal at one end). Dengan kondisi seperti ini, saat terjadi kegagalan pada bus switchgear atau jika akan dilakukan pemeliharaan, maka mengharuskan sistem dipadamkan. Tetapi hal ini tidak mungkin dilakukan dengan konfigurasi yang ada, dikarenakan kilang akan mengalami shutdown serta kehilangan proses operasi emergency yaitu safe shutdown dan blackstart. Oleh karena itu diperlukan studi untuk menganalisa nilai keandalan dari konfigurasi sistem emergency switchgear yang ada. Tesis ini akan memaparkan analisa keandalan berdasarkan nilai unavailability dari konfigurasi emergency switchgear yang ada dan membandingkan dengan usulan desain yang baru dan kemudian dikaji dari sisi manajemen risiko finansial. Berdasarkan hasil analisa yang dilakukan, diperoleh bahwa dengan konfigurasi sistem emergency switchgear yang baru, waktu pemeliharaan dapat dilakukan tanpa menghentikan operasi kilang. Selain itu saat terjadi gangguan pada bus switchgear, operasi dari safe shutdown dan blackstart dapat tetap berfungsi. Nilai unavailability juga menurun dari 155.93 menit/tahun menjadi 11.6 menit/tahun. Selain itu, berdasarkan analisis manajemen risiko, nilai kerugian finansial juga dapat diturunkan.

The reliability of an electrical system in a refinery operation is very important to support production. At Tangguh LNG plant, the essential equipments to support operations is connected to the emergency switchgear system. The current emergency switchgear configuration is a single bus and is only supplied from one side (normal couple at one end). Under these conditions, when a switchgear bus fails or when maintenance is to be carried out, the system must be shutdown. However, this is not possible with the existing configuration, because the refinery will experience shutdown and lose the emergency operation process, which are safe shutdown and blackstart. Therefore, a study is needed to analyze the reliability value of the existing emergency switchgear system configuration. This thesis will describe a reliability analysis based on the unavailability value of the existing emergency switchgear configuration and compare it with the new design proposal and then be reviewed from the side of financial risk management. Based on the results of the analysis carried out, it was found that with the configuration of the new emergency switchgear system, maintenance time can be carried out without stopping the operation of the refinery. In addition, when there is a disturbance in the switchgear bus, the operation of safe shutdown and blackstart can still function. The unavailability value also decreased from 155.93 minutes/year to 11.6 minutes/year. In addition, based on risk management analysis, the value of financial losses can also be reduced."
Depok: Fakultas Teknik Universitas Indonesia, 2022
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Maulana Hidayatullah
"Kubikel Tegangan Menengah (TM) merupakan komponen penting dalam sistem distribusi tenaga listrik yang bekerja pada tegangan 20 kV. Kubikel TM memiliki komponen utama yaitu Circuit Breaker (CB) dan Trafo Instrumen berupa Voltage Transformer (VT). VT merupakan komponen yang sering mengalami kegagalan pada kubikel TM yang menjadi bagian dari sistem distribusi tenaga listrik, dimana akan terjadi kondisi yang menyebabkan inti besi VT mengalami saturasi. Zona saturasi ini akan membuat berapa pun nilai reaktansi kapasitansi (XC) yang dihasilkan dari jaringan sistem tenaga listrik akan sama nilainya dengan nilai reaktansi induktansi VT (XL), sehingga saling menghilangkan dan menyebabkan nilai impedansi menjadi sangat kecil dengan nilai mendekati nol. Rentang frekuensi yang sangat luas akan mampu memicu feroresonansi yang mengakibatkan arus besar mengalir pada sisi primer VT dan berpotensi menyebabkan kegagalan pada VT dan kubikel TM yang ditandai dengan ledakan. Penelitian ini akan dilakukan untuk mengetahui penyebab utama timbulnya feroresonansi akibat gangguan eksternal, pengaruh spesifikasi VT 20kV dan kubikel TM. Simulasi feroresonansi dilakukan dengan software ATPDraw, variasi gangguan eksternal, desain VT dan kubikel TM diberikan pada simulasi untuk melihat respon arus dan tegangan VT. Variabel gangguan eksternal yang diteliti meliputi gangguan operasi switching CB yang berdampak pada munculnya variasi nilai kapasitansi jaringan dan menghasilkan feroresonansi mode subharmonik dengan nilai tegangan mencapai 150% dari tegangan nominal pada rentang Cg = 0,005 – 0,1 µF dan 275,5% dari tegangan nominal pada rentang Cs = 0,05 – 1 µF, kemudian gangguan arus impuls petir yang akan memunculkan feroresonansi pada jaringan dengan nilai kapasitansi yang kecil, gangguan ini sangat berbahaya karena menimbulkan feroresonansi dengan amplitudo tegangan primer VT dapat mencapai 14.391% dari tegangan pengenal serta feroresonansi mode quasi-periodik yang dihasilkan dari gangguan hubung singkat satu fasa ke tanah yang  mencapai 201,47% dari nilai tegangan pengenal. Pemilihan desain VT dengan voltage factor 1,9Un/8h serta desain kubikel TM yang membebani burden VT dengan komposisi induktansi yang lebih besar dibandingkan resistansinya dan pembebanan mendekati 80% spesifikasi burden VT dapat memitigasi munculnya feroresonansi.

Medium Voltage (MV) Switchgear is an essential component in the electric power distribution system with a working voltage of 20 kV. MW Switchgear consists of Circuit Breaker (CB) and Voltage Transformer (VT). VT is one component that often fails in MW Switchgear in the power distribution system, where conditions cause the VT iron core to saturate. This saturation zone will make whatever capacitance reactance value ( ) that generated from the power system network will be the same value as the inductive reactance value of the inductance VT ( ), which causes the impedance value to be zero. A very wide frequency range will be able to trigger a ferroresonance which results in a large current flowing on the primary side of VT and has the potential to cause failure in VT and MV switchgear, characterized by an explosion. This research will focus on the main causes of ferroresonance emergence due to external disturbance, 20kV VT specification and MV Switchgear. Ferroresonance simulation is carried out by ATPDraw Software, external disturbance variations, VT and MV Switchgear specifications are given for simulation to observe the response of VT’s voltage and current. The variables studied include disturbances of CB switching operations which have an impact on the emergence of variations in network capacitance values and produce subharmonic mode ferroresonance with voltage value reaches 150% of the nominal voltage for Cg = 0,005 – 0,1 µF and 275,5% of the nominal voltage for Cs = 0,05 – 1 µF, then disturbances of lightning impulse currents which will cause ferroresonance in networks with small capacitance values, this disturbance is very dangerous because it creates ferroresonance with the amplitude of the primary voltage VT can reach 14.391% of the rated voltage, and quasi-periodic mode’s ferroresonance resulting from a single phase to ground fault which reaches 201.47 % of the rated voltage value. The choice of a VT design with a voltage factor of 1.9Un/8h and an MV Switchgear design which loads the VT burden with an inductance composition that is greater than its resistance and approaches 80% of the VT burden specification can mitigate the emergence of ferroresonance."
Jakarta: Fakultas Teknik Universitas Indonesia, 2023
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Ratri Prajwalita Dewimaruto
"ABSTRAK
Populasi DKI Jakarta pada tahun 2018 adalah 10467629 sementara total wilayah DKI Jakarta tetap di 662,33 KM2. Ini menunjukkan bahwa penggunaan SIG sangat cocok untuk digunakan di daerah padat penduduk dengan lahan sempit. Media isolasi dalam GIS adalah SF6. gas, oleh karena itu kualitas SF6. gas perlu dipertimbangkan. Analisis dan pengetahuan terkait SF6. kualitas gas diperlukan. Metode yang digunakan adalah Metode Magnus yang menggunakan parameter titik embun dan kadar air untuk menentukan kualitas gas SF6. Dengan mengetahui bahwa parameter ini dapat dinilai baik atau tidak kinerja GIS (Gas Insulated Switchgear). Prediksi usia SF6. operasi gas dilakukan dengan menggunakan metode Time To Failure (TTF) yang mengukur tekanan di setiap kompartemen dalam 10 tahun terakhir. Kemudian akan diproses dan berapa banyak waktu yang tersisa untuk GIS (Gas Insulated Switchgear) sebelum kegagalan terjadi. Hasil penelitian menunjukkan bahwa kualitas GIS di unit CSW Bulungan memiliki nilai terburuk di teluk Karet 2 - CB Main dengan nilai kadar air 283,5 ppmv dan titik embun -22,61 ° C. Prediksi usia operasi gas terburuk juga ditemukan di teluk Karet 2 - CB Main dengan usia operasi 11 tahun

ABSTRACT
The population of DKI Jakarta in 2018 is 10467629 while the total area of ​​DKI Jakarta remains at 662.33 KM2. This shows that the use of GIS is very suitable for use in densely populated areas with narrow land. Isolation media in GIS is SF6. gas, therefore SF6 quality. gas needs to be considered. Analysis and knowledge related to SF6. gas quality is required. The method used is the Magnus Method which uses the parameters of dew point and moisture content to determine the quality of SF6 gas. By knowing that this parameter can be assessed whether or not the performance of GIS (Gas Insulated Switchgear). Age prediction for SF6. Gas operations are carried out using the Time To Failure (TTF) method which measures the pressure in each compartment in the past 10 years. Then it will be processed and how much time is left for the GIS (Gas Insulated Switchgear) before the failure occurs. The results showed that the quality of GIS in the CSW Bulungan unit had the worst value at Karet 2 - CB Main bay with a moisture content of 283.5 ppmv and a dew point of -22.61 ° C. CB Main is 11 years old"
2019
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
"This handbook offers the whole knowledge of high voltage substations from their design and construction to the maintenance and the ongoing management, the entire asset life-cycle. The content of the book covers a range of substation topologies: Air-Insulated, Gas-Insulated and Mixed Technology Switchgear Substations together with the essential secondary systems. Additionally specialized substations such as ultra high voltage (UHV), offshore substations for wind power plants and the use of gas insulated lines are included.
The book includes topics, providing information for increased reliability and availability, asset management, environmental management aspects, and the adoption of appropriate technological advances in equipment and systems in substations.
The book was written by more than 30 experts from around the world and assembled through the Cigré study committee on Substations. This guarantees that the book contains information that is based on the global exchange and dissemination of unbiased information for technical and non-technical audiences.
Although there are other works containing references to Substations, this book is designed to provide a complete overview of the topic in one book, providing a valuable reference for anyone interested in the topic. "
Switzerland: Springer Cham, 2019
e20501846
eBooks  Universitas Indonesia Library