Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 18 dokumen yang sesuai dengan query
cover
Olivia Sary
Abstrak :
Teknologi Pembangkit Listrik Tenaga Surya (PLTS) semakin berkembang selain didorong oleh potensi energi surya yang melimpah juga didorong oleh harga modul surya yang semakin turun. PLTS Apung merupakan salah satu teknologi PLTS yang memiliki potensi besar di Indonesia, karena 2/3 luas Indonesia adalah perairan. Melihat perkembangan dan potensi PLTS Apung di Indonesia, perlu dibuat standar nasional karena masih banyak tantangan dalam penerapannya seperti ketidakpastian dampaknya terhadap lingkungan, kompleksitas dalam perancangan dan pengoperasian PLTS Apung di atas air. Penelitian ini bertujuan untuk menentukan prioritas kebutuhan Standar Nasional PLTS apung di Indonesia sehingga hasilnya akan dibuat rekomendasi kerangka standar nasional. Terdapat 3 kriteria tujuan standardisasi nasional yaitu Jaminan Mutu, efisiensi dan perlindungan konsumen, produsen dan lingkungan. Oleh karena itu penelitian ini menggunakan metode SWOT untuk mengetahui kelemahan dan tantangan PLTS Apung di Indonesia dan metode AHP untuk menentukan urutan prioritas kebutuhan Standar Nasional PLTS apung, sehingga hasilnya akan digunakan untuk menyusun rekomendasi standar. Hasil penelitian ini akan digunakan sebagai referensi dalam mendukung program pengembangan PLTS Terapung di Indonesia sehingga memudahkan pemerintah dan pemangku kepentingan menentukan strategi dan arah kebijakan. Dari hasil analisis AHP diperoleh kesimpulan bahwa prioritas standar nasional PLTS apung yang dibutuhkan di Indonesia saat ini adalah standar kajian kelayakan, sistem design dan ketahanan dan keamanan komponen, sehingga rekomendasi kerangka standar nasional dibahas dalam penelitian ini.  ...... Solar power plant technology is growing rapidly, apart from being driven by the abundant potential of solar energy, it is also driven by the decreasing price of solar modules. Floating PLTS is one of the solar power plant technologies that have great potential in Indonesia, because 2/3 of Indonesia's area is water. Seeing the development and potential of floating solar power plants in Indonesia, it is necessary to make a national standard because there are still many challenges in its implementation such as the uncertainty of its impact on the environment, complexity in the design and operation of floating solar power plants on water. This study aims to determine the priority needs of the National Standard for floating solar power plant in Indonesia so that the results will be made recommendations for the national standard framework. There are 3 criteria for national standardization, namely Quality Assurance, efficiency, and protection of consumers, producers, and the environment. Therefore, this study uses the SWOT method to determine the weaknesses and challenges of Solar power plants in Indonesia and the AHP method to determine the order of priority for the needs of the National Standard for PV mini-grid, so that the results will be used to develop standard recommendations. The results of this research will be used as a reference in supporting the Floating solar power plant program in Indonesia, making it easier for the government and stakeholders to determine strategies and policy directions. From the results of the AHP analysis, it was concluded that the priority national standards for floating solar power plants needed in Indonesia today are standards for feasibility studies, system design, and component resilience and safety, so that recommendations for the national standard framework are discussed in this study. 
Depok: Fakultas Teknik Universitas Indonesia, 2022
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Nayara Nabila
Abstrak :
Pembangkit Listrik Tenaga Surya (PLTS) merupakan salah satu jenis energi terbarukan yang memanfaatkan energi matahari (energi surya) menjadi salah satu sumber energi alternatif yang ramah lingkungan. Dalam performa kerjanya, PLTS dipengaruhi oleh tingkatan solar iradiasi dari matahari dan temperature lingkungan sekitar. Selain faktor utama tersebut, terdapat faktor eksternal lain diantaranya cuaca, bayang-bayang, debu, dan yang lainnya. Fenomena bayang-bayang dapat terjadi disebabkan karena adanya awan, kabut, pepohonan, bangunan-bangunan tinggi, dan yang lainnya. Bayang-bayang yang mengenai permukaan modul surya ini menjadi salah satu faktor yang dapat menurunkan kinerja PLTS dalam hal keluaran dari PLTS tersebut diantaranya tegangan, arus, dan efisiensi. Pada PLTS yang terpasang dalam jaringan listrik (on-grid), banyak kriteria yang perlu diperhatikan untuk memastikan PLTS cukup aman dan tidak mengganggu kinerja sistem. Salah satu kriteria tersebut adalah kestabilan tegangan dimana dapat didefinisikan sebagai kemampuan sistem untuk mempertahankan tegangan pada semua bus dalam sistem setelah mengalami gangguan. Pada tugas akhir ini, sebuah sistem di Lombok didesain untuk melakukan uji kestabilan tegangan ketika diintegrasikan dengan PLTS. PLTS yang diintegrasikan divariasikan shadingnya diantaranya 20%, 40%, 60%, 80%, dan 100%. Perubahan shading akan mengakibatkan karakter tegangan masing-masing dimana semakin besar shading maka semakin besar ketidakstabilan yang dihasilkan. ......Solar Power Generation is one of renewable energy type that utilizes solar energy to become one of the alternative energy sources that are environmentally friendly. In its work performance, PLT is influenced by the level of solar iradiance from the sun and ambient temperature. Apart from these main factors of solar cell performance, there are other external factors including weather, shadows, dusts, and others. Shadow phenomenon could occur due to the presence of clouds, fog, trees, high-rise buildings, and so on. The shadow which fall on the surface of the solar module is a major factor that reduce the performance of solar power plant in terms of the output of the solar power plant such are voltage, current and efficiency. In solar power plant which is installed in the elctricity network (on-grid), many components need to be considered to ensure that solar power plant is safe enough and does not interfere with system performance. One of those components is the voltage stability which can be defined as the ability of the system to maintain the voltage obtained by all buses in the system after experiencing interference. In this thesis, a system in Lombok is designed to test the voltage stability when intergrated with the solar power plant. Solar power plant which is integrated to the system varied by shading pattern such 20%, 40%, 60%, 80%, and 100%. The changes in shading phenomenon will result in the character of each output such voltage where the greater the shading, the greater the instability of the results
Depok: Fakultas Teknik Universitas Indonesia, 2019
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Hasmaratantra Dhaneswara
Abstrak :
Perkembangan harga dari PV belakangan ini telah membuat teknologi PV semakin terjangkau. Harga dari modul PV di US sudah menurun dari 60c/watt menjadi 40c/watt dalam 3 bulan belakangan ini., dan diperkirakan akan semakin menurun sampai sekitar 35c/watt kedepannya. Tujuan dari penelitian ini adalah untuk mencari karakteristik dari rugi-rugi pada saluran yang disebabkan oleh penetrasi PV dan mendapatkan lokasi optimum dan kapasitas PV optimum. Simulasi alliran daya dilakukan pada grid pulau sumba timur menggunaka software DIgSILENT Power factory 15.1. Pemasangan PV pada sistim distribusi radial dengan lokasi optiPerkembangan harga dari PV belakangan ini telah membuat teknologi PV semakin terjangkau. Harga dari modul PV di US sudah menurun dari 60c/watt menjadi 40c/watt dalam 3 bulan belakangan ini., dan diperkirakan akan semakin menurun sampai sekitar 35c/watt kedepannya. Tujuan dari penelitian ini adalah untuk mencari karakteristik dari rugi-rugi pada saluran yang disebabkan oleh penetrasi PV dan mendapatkan lokasi optimum dan kapasitas PV optimum. Simulasi alliran daya dilakukan pada grid pulau sumba timur menggunaka software DIgSILENT Power factory 15.1. Pemasangan PV pada sistim distribusi radial dengan lokasi optimum dan kapasitas optimum dapat mengurangi rugidaya aktif hingga 50 . Lokasi optimal dan persentase penetrasi optimal untuk sistim distribusi radial di Sumba Timur system Waingapu terletak di bus Kambajawa dengan penetrasi 40.
Recent price wars of the PV technology have made PV technology become more accessible. The price of solar modules in the US has already fallen from around 60c watt to 40c watt in the last quarter alone, and is expected to fall further to around 35c watt in the current quarter. The objectives of this research are to get the characteristic of line losses caused by PV penetration and get the optimum location and optimum PV penetration percentage. Load flow simulation was done on East Sumba Grid by using software DIgSILENT Powerfactory 15.1. Installation of PV in radial distribution system with optimum location and optimum percentage penetration able to decrease the active power losses up to 50 . Optimal location and penetration capacity percentage for radial distribution system in East Sumba Waingapu System Grid located in Kambajawa bus with 40 Penetration.
Depok: Fakultas Teknik Universitas Indonesia, 2016
S66050
UI - Skripsi Membership  Universitas Indonesia Library
cover
Gusdhi Rhazhya Ramadhan
Abstrak :

Penggunaan energi baru terbarukan di dunia semakin meningkat, begitu juga dengan Indonesia. Ketertarikan ini didukung oleh sifatnya yang ramah lingkungan dan salah satu cara yang efektif untuk melawan pemanasan global. PLTS adalah pembangkit listrik yang dapat mengkonversi energi surya menjadi energy listrik menggunakan panel surya.Namun,PLTS memiliki ketergantungan pada energy surya,ini karena energi surya dipengaruhi oleh cuaca dan kondisi awan yang mungkin bisa berubah dalam waktu singkat.Tentu di saat ada perubahan pada energi surya maka keluaran dari panel surya pun juga berubah. PLTS pada umumnya memiliki komponen elektronika daya yaitu inverter. Inverter digunakan untuk mengubah keluaran panel surya yang berupa arus searah (DC) menjadi arus bolak-balik (AC).Penggunaan komponen elektronika daya seperti inverter, ditambah keluaran panel surya yang cenderung fluktuatif merupakan disturbansi.Pada umumnya, inverter mempunyai frekuensi switching di atas 1Khz, atas dasar ini pada rentang 9-150 Khz inverter bisa menghasilkan disturbansi pada sistem PLTS.Namun, standardisasi untuk persyaratan emisi yang ada untuk inverter pada frekuensi 9 kHz-150 kHz kurang. Oleh karena itu, pada tulisan ini akan dilakukan penelitian mengenai karakteristik disturbansi pada frekuensi 9kHz-150 kHz pada sistem PLTS On-Grid di SPBU Kuningan. Pengukuran dilakukan di sisi keluaran dari inverter dan sisi output grid-tie inverter. Berdasarkan hasil dari pengolahan data, nilai disturbansi pada frekuensi ini cenderung konstan terhadap daya atau irradiasi, namun jika perubahan terjadi secara cepat maka nilai disturbansi juga mengalami perubahan.

 


The usage of renewable energy is increasing in many countries, Indonesia included. This spike of interest is supported by its environmental-friendly nature and the fact that it is one of the most effective ways to combat global warming.Solarpower plants are electricy generators with the ability to convert solar energy to electricity by using solar panels.However, solar power plants are indubitably dependent on solar energy, which can cause a fluctuation of output because solar energy is affected by weather and the clouds condition.Generally, solar power plants have a power electronics component called an inverter. Inverters are used to convert the output of solar panels, the direct current (DC), to alternating current(AC). The usage of power electronics such as inverters plus the fluctuation of the solar panelcommonly cause disturbansis.Invertes usually have a switching rate higher than 1 Khz, which can cause disturbansis in the range of 9-150 Khz throughout the whole system.However, there is little to none standardization regarding how much emission it is allowed to radiate at the 9-150Khz. With the aforementioned concerns in mind, this writing discusses research regarding the characteristics of disturbansis on the 9-150Khz frequency on the On-Grid solar power plants located at SPBU Kuningan.Measurement is done on the output side of the bidirectional inverter and the output side of the grid-tie inverter. The results of this disturbansi research shows that the disturbansi produced remains constant in correlation with changes in irradiance or power, however the disturbansi produced increases as the power output changes during a short interval.

 

Depok: Fakultas Teknik Universitas Indonesia, 2019
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Hutapea, Kevin Samuel Ivan Siantra
Abstrak :
Energi listrik merupakan salah satu faktor terpenting dalam kehidupan manusia hingga saat ini. Oleh karena itu, apabila terdapat suatu kawasan yang telah menjadi pemukiman masyarakat, maka sangat mendesak tempat tersebut untuk mendapatkan suplai energi listrik yang sesuai dengan kebutuhan. Namun, ada beberapa daerah di Indonesia yang masih belum mendapatkan pasokan listrik. Salah satu daerah yang belum mendapat pasokan listrik yang cukup adalah Kalimantan Barat. Masih ada beberapa daerah di Kalbar yang pasokan listriknya belum memenuhi kebutuhan, terutama saat terjadi beban puncak. Untuk mengatasi hal tersebut, pemerintah Indonesia melalui PLN mengadakan kesepakatan untuk mengimpor listrik dari Sarawak, Malaysia. Penulis melihat ada alternatif lain untuk memenuhi kebutuhan listrik yaitu dengan memanfaatkan energi terbarukan. Posisinya yang dilintasi garis khatulistiwa menjadikan pembangkit listrik tenaga surya sebagai salah satu solusi alternatif yang dapat ditetapkan untuk memenuhi kebutuhan listrik Kalbar. Dalam tugas akhir ini, penulis merancang konfigurasi sistem pembangkit listrik tenaga surya dan mengkaji lebih jauh aspek keekonomiannya dibandingkan dengan daya eksisting yang dipasok dari Malaysia. Analisis tekno-ekonomi akan dilakukan untuk menganalisis sistem tenaga energi terbarukan dengan sumber surya. Dengan demikian dapat dilihat dan dianalisis perbandingannya dari segi biaya keseluruhan, keandalan, kelayakan, dan efektivitas. Aspek optimasi penelitian ini adalah, net present cost (NPC), renewable penetration, dan cost of energy (COE). Tesis ini akan memberikan evaluasi kinerja keuangan dan energi dari solusi yang diusulkan menggunakan HOMER Pro. Hasil simulasi menunjukkan bahwa dengan penerapan photovoltaic dapat menekan biaya produksi energi karena separuh produksinya berasal dari energi terbarukan. Hasil penelitian ini juga menunjukkan bahwa penerapan sistem PV on-grid dapat mempercepat penyediaan listrik di Kalimantan Barat. ......Electrical energy is one of the most important factors in human life until this day. Therefore, if there is an area that has become a community settlement, it is urgent for that place to get the supply of electrical energy as needed. However, there are some areas in Indonesia that still have not received electricity supply. One of the areas that has not received sufficient electricity supply is West Kalimantan. There are still several areas in West Kalimantan where the electricity supply has not met demand, especially when peak loads occur. To overcome this, the Indonesian government through PLN entered into an agreement to import electricity from Sarawak, Malaysia. Author sees there are another alternative option to meet electricity needs which is by utilizing renewable energy. Its position which is crossed by the equator makes solar power plants one of the alternative solutions that can be set to fulfill West Kalimantan's electricity needs. In this thesis, author designed a configuration of solar power plant system and investigate further about the economical aspect comparing to existing power that supplied from Malaysia. Techno-economic analysis will be conducted to analyze the renewable energy power system with solar sources. By that way, it can be seen and analyzed the comparison in terms of overall cost, reliability, feasibility, and effectiveness. The aspects of optimizing this research are, net present cost (NPC), renewable penetration, and cost of energy (COE). This thesis will provide a financial and energy performance evaluation of the proposed solution using HOMER Pro. The result of the simulation shows that by implementing photovoltaic it can reduce the cost of energy since the half of production comes from renewable energy. The result of this research also shows that implementing on-grid PV system can accelerate electricity provision in West Kalimantan.
Depok: Fakultas Teknik Universitas Indonesia, 2021
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Kemala Putri Aprilianti
Abstrak :
Produksi energi listrik di Indonesia masih didominasi oleh sumber bahan bakar fosil. Dominasi ini meningkatkan emisi Gas Rumah Kaca (GRK). Di sisi lain, kebutuhan energi listrik terus meningkat bahkan masih terdapat desa-desa di wilayah Indonesia Timur yang belum teraliri listrik. Oleh karena itu, dibutuhkan energi alternatif untuk mengaliri listrik ke desa-desa tersebut tanpa menambah emisi GRK. Energi alternatif tersebut dapat berasal dari potensi lokal daerah, seperti Indonesia Timur yang memiliki potensi sinar matahari yang cukup tinggi sehingga cocok dimanfaatkan untuk implementasi Pembangkit Listrik Tenaga Surya (PLTS). Oleh karena itu, studi ini melakukan perancangan konfigurasi PLTS dan evaluasi terhadap hasil rancangan tersebut berdasarkan parameter produksi energi, faktor kapasitas, kinerja pembangkitan, dan rugi-rugi energi untuk menganalisis potensi PLTS. Perancangan dan evaluasi dilakukan dengan simulasi MATLAB berbasis GUI (Graphical User Interface) dan PVSyst sebagai pembanding. Dari hasil simulasi MATLAB bisa dinilai bahwa potensi implementasi PLTS 50 kWp di Indonesia Timur dapat memproduksi energi mencapai 84,79 MWh per tahun, dengan kinerja pembangkitan rata-rata 80,47% dan faktor kapasitas sebesar 23,54%. Perbedaan rata-rata antara hasil simulasi MATLAB dengan PVSyst sebesar 0,67%, sehingga hasilnya secara menyeluruh dapat dikatakan sama. ......The electricity production in Indonesia is still dominated by fossil fuels. This domination can increase Greenhouse Gas (GHG) emissions. On the other hand, electricity needs are increasing over the year and even there are villages in Eastern Indonesia which have not been electrified yet. Therefore, the alternative energy source is needed to electrify those villages without increasing Greenhouse Gas emissions. The alternative energy source can come from the local potential, such as Eastern Indonesia that has great solar energy potential to implement solar power plants. So, this study designs the solar power plant configuration and evaluates the configuration based on energy yield, capacity factor, performance ratio, and energy losses to analyze the solar power plant potential. The design and evaluation process is done by simulation with software MATLAB based Graphical User Interface and PVSyt as a comparison. As a result, the potential of implementing a 50 kWp solar power plant in Eastern Indonesia can produce energy that reaches 84.79 MW per year with an average performance of 80.47% and a capacity factor of 23.54%. The average difference between MATLAB and PVSyst simulation results is only 0.67%, so the results are the same.
Depok: Fakultas Teknik Universitas Indonesia, 2020
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Muhammad Risky Mirwandhana
Abstrak :
Pembangkit Listrik Tenaga Surya (PLTS) merupakan pembangkit yang memanfaatkan energi matahari untuk membangkitkan tenaga listrik. Energi matahari termasuk energi terbarukan yang ramah lingkungan dibandingkan energi fossil. Pemerintah melalui Peraturan Presiden No. 79 Tahun 2014, membuka peluang bagi pelaku industri, bisnis, komersial, hingga pemerintahan turut berperan dalam penggunaan energi yang ramah lingkungan, salah satunya adalah energi surya. Salah satu industri yang turut menggunakan energi surya adalah PT. Kahatex, yang menggunakan PLTS atap on-grid. Secara umum, PLTS terdiri atas 3 peralatan utama, yang terdiri atas: modul surya, inverter, dan panel distribusi. Energi dari matahari ditangkap oleh modul surya dan mengubah energi tersebut menjadi energi listrik. Proses pembangunan PLTS atap di PT. Kahatex mengikuti tahap-tahap mulai dari pengumpulan data, instalasi PLTS, pengujian, hingga serah terima dengan pengguna barang dan jasa. Dalam pelaksanaannya, faktor keselamatan kesehatan kerja dan lingkungan (K3L) merupakan faktor utama. Sehingga diperlukan analisis terhadap resiko menggunakan metode HIRA. Persiapan pekerjaan diperlukan sebelum memulai eksekusi pembangunan PLTS atap, berupa: penempatan kantor kerja, pemasangan scaffolding, dan peralatan alat angkut barang. Setelah persiapan selesai, maka proses instalasi modul surya, inverter, dan panel distribusi dapat dilakukan. Selama proses instalasi PLTS, para personel wajib mengutamakan prinsip K3L dalam eksekusinya. ......Solar power plant is a power plant which utilize solar energy to generate electricity. Solar energy is part of renewable energy which is environment friendly compared to fossil energy. Indonesian Government through Peraturan President No. 79 Tahun 2014, provides opportunity for industry, commercial, business, and also governance sectors to participate in utilization of green energy, such as solar energy. One of the industry sectors that utilizes solar energy is PT. Kahatex which implements rooftop on-grid solar power plant. Generally, there 3 main equipments used in solar power plant, such as: solar module, inverter, and distribution panel. Solar energy is absorbed by solar module and convert it to electrical energy. The process of rooftop solar power plant construction based on following steps: data collections, solar power plant installation, testing, and finally handover to end user. During construction process, environment, health, and safety (EHS) are crucial factors. Analysis of EHS is needed by using HIRA method. Preparation before the construction consists of: placement of work office, scaffolding installation, and lifting equipment preparation. After that, installation of solar module, inverter, and distribution panel are performed. During installation process, all teams must follow safety procedures.
Depok: Fakultas Teknik Universitas Indonesia, 2022
PR-pdf
UI - Tugas Akhir  Universitas Indonesia Library
cover
Daffa Aryo Utomo Sudranto
Abstrak :
Secara letak geografis, Indonesia terletak tepat pada garis ekuatorial sehingga paparan sinar mataharinya memiliki intensitas yang optimal selama 12 jam sepanjang tahunnya. Dengan memiliki letak geografis yang cukup strategis untuk menangkap paparan sinar matahari, Indonesia memiliki potensi energi surya sebesar 207.898 MW. Besarnya potensi tersebut, energi surya dapat dimanfaatkan dalam pemasangan Pembangkit Listrik Tenaga Surya (PLTS) untuk menghasilkan energi listrik Pada skripsi ini akan dibahas perancangan PLTS atap on-grid pada bangunan apartemen Ariama Service Residence yang memiliki kapasitas listrik sebesar 81,6 kVA. Salah satu metode untuk mengurangi biaya energi listrik pada apartemen tersebut adalah dengan melakukan pemasangan PLTS atap yang dapat berkontribusi untuk menyuplai energi listrik sehingga biaya listrik apartemen dapat berkurang. Perancangan PLTS atap dilakukan dengan dua perancangan, yaitu perancangan PLTS atap on-grid tanpa baterai dan PLTS atap on-grid dengan battery back-up. Hasil dari kedua rancangan tersebut akan dianalisis secara teknis dan ekonomi untuk dilihat kelayakan dari perancangan yang telah dilakukan. Dari hasil perancangan yang dilakukan, PLTS atap on-grid tanpa baterai dikatakan layak untuk dilakukan pemasangan. PLTS atap on-grid tanpa baterai dapat melakukan pembangkitan energi sebesar 54 kWh per hari dan berkontribusi sebesar 27,8% dari total rata-rata kebutuhan energi apartemen 81,6 kVA sebesar 194,16 kWh. Dari aspek ekonomi, PLTS atap on-grid tanpa baterai memiliki nilai LCOE sebesar Rp.880,266/ kWh di mana nilai tersebut di bawah nilai LCOE dari PT. PLN (Persero) sebesar Rp.1.119/kWh dan modal investasi yang diperlukan adalah sebesar Rp.309.099.000 yang dapat dikembalikan dalam waktu 11 tahun. Penghematan biaya energi listrik dari hasil pembangkitan dalam jangka waktu 20 tahun adalah sebesar Rp.926.119.656 dengan rata-rata penghematan biaya energi listrik per tahun sebesar Rp.46.309.982,8. ......Geographically, Indonesia is located right on the equatorial line so that the sun's exposure has an optimal intensity for 12 hours throughout the year. By having a strategic geographical location to capture sun exposure, Indonesia has a solar energy potential of 207,898 MW. Given the large potential, solar energy can be utilized in the installation of Solar Power Plants to generate electrical energy. This study will discuss on the design of on-grid rooftop solar power plants in the Ariama Service Residence apartment building which has an electrical capacity of 81.6 kVA. One method to reduce the cost of electrical energy in the apartment is to install rooftop solar power plants that can contribute to supplying electrical energy so that the apartment's electricity costs can be reduced. The design of the rooftop solar power is carried out with two designs, the on-grid rooftop solar power plants without a battery and the on-grid rooftop solar power plants with a battery back-up. The results of the two designs will be analyzed technically and economically to see the feasibility of the designs that have been carried out. From the results of the design, the on-grid rooftop solar power plants without batteries are said to be feasible for installation. The on-grid rooftop solar power plants without batteries can generate energy of 54 kWh per day and contribute 27.8% of the total average energy requirement of an 81.6 kVA apartment of 194.16 kWh. From the economic aspect, the on-grid rooftop solar power plants without batteries have a LCOE value of Rp.880,266/ kWh where the value is below the LCOE value from PT. PLN (Persero) of Rp.1,119/kWh and the required investment capital is Rp.309.099.000 which can be returned within 11 years. The savings in electrical energy costs from the generation of a 20-year period is Rp.926,119,656 with an average electricity cost savings of Rp.46,309,982.8 per year.
Depok: Fakultas Teknik Universitas Indonesia, 2021
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Yoga Adi Candra
Abstrak :
Pemerintah ditargetkan untuk bauran energi terbarukan minimal 23%. Kontribusi kapasitas pembangkit dari energi surya setara sebesar 6,5 GW dari total kapasitas pembangkitan energi terbarukan sebesar 45 GW pada 2025. Energi surya memiliki potensi lebih dari 200 GW dengan efisiensi teknologi photovoltaic yang tersedia saat ini. Namun, pemanfaatan energi surya dalam pembangkitan listrik masih kurang dari 100 MW. Tujuan penelitian ini adalah menganalisis selisih biaya tagihan litrik sebelum dan sesudah pemasangan PLTS, menentukan kecepatan pengembalian investasi pemasangan PLTS atap, mendeskripsikan dampak pemasangan PLTS atap terhadap pelanggan, PLN dan pemerintah. Hasil penelitian pada pelanggan daya 450 VA sebelum PV = Rp. 63.154, sesudah PV = Rp. 78.085 dan pada pelanggan daya 900 VA sebelum PV = Rp. 110.413, sesudah PV = Rp. 112.240. Skema export-import yang paling optimal adalah 85%. Potensi pengalihan subsidi listrik berjumlah Rp46.433.637.049.601 untuk pemasangan PLTS sebanyak 1.797.612 unit. ......The government is targeted to a renewable energy mix of at least 23%. The contribution of generating capacity from solar energy is equivalent to 6.5 GW of the total renewable energy generation capacity of 45 GW by 2025. Solar energy has the potential of more than 200 GW with the efficiency of photovoltaic technology currently available. However, the use of solar energy in electricity generation is still less than 100 MW. The aim of this study was to analyze the difference in the cost of electricity bills before and after PLTS installation, determine the speed of return on investment in PLTS installation, describing the impact of PLTS installation on customers, PLNs and the government. Research results on 450 VA power customers before PV = Rp. 63,154, after PV = Rp. 78.085 and at 900 VA power customers before PV = Rp. 110.413, after PV = Rp. 112.240. The most optimal export-import scheme is 85%. The potential for the shifting of electricity subsidies is Rp. 46,433,637,049,601 for the installation of 1,797,612 PLTS units.
Depok: Fakultas Teknik Universitas Indonesia, 2021
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Iqbal Ramadhani
Abstrak :
Saat ini, pertumbuhan populasi dan aktifitas bisnis di dalam suatu kota menciptakan permasalahn baru, yaitu pergerakan dari penduduk itu sendiri. Mass Rapid Transit atau Moda Raya Terpadu (MRT), yang termasuk di dalam transportasi public dengan jalur khusus terus membuktikan bahwa transportasi umum jenis ini sangat efektif dan efisien dalam menyelesaikan masalah tersebut dengan mengurangi tingkat kemacetan serta menciptakan lingkungan yang lebih hijau. Akan tetapi, MRT membutuhkan daya listrik dalam jumlah yang relative besar. Untuk memenuhi kebutuhan tersebut dan menciptakan lingkungan yang lebih hijau, sebuah studi dibuat. Studi ini memiliki metode dengan melakukan simulasi seberapa besar potensi Pembangkit Listrik Tenaga Surya (PLTS) dapat dibangun dalam fasilitas MRT Jakarta dan melakukan analisis dari aspek keteknikan, ekonomi, regulasi, dan strategi dari perusahaan tersebut. Hasilnya adalah PLTS sebesar 451,2 kWp dapat dibangun di atas Bangunan Workshop MRT Jakarta, memiliki Net Present Value (NPV) sebesar Rp 648.247.150. Adapun Biaya Kapasitas akibat instalasi PLTS dapat dihindarkan dengan melakukan skema Business to Business (B2B) dengan Perusahaan Utilitas Listrik Indonesia. ......Nowadays, the growth of population and business activities in a city is creating a new problem, which is the movement of the people itself. Mass Rapid Transit (MRT), which included in public transportation with a dedicated lane continues to prove that this kind of public transportation is effective and efficient to solve that problem by reducing congestion and creating a greener environment. However, MRT requires electrical power in a relatively big number. To meet this requirement and support a greener environment, a study is conducted. The method of this study is to simulate on how much potentially a solar power plant can be built on Jakarta MRT facility and conduct an analysis on engineering, economic, regulation, and strategic of the Company itself. The result is a 451.2 kWp Solar Power Plant could be built on the Workshop Building on Jakarta MRT, has NPV of Rp 648.247.150. The Cost of Capacity Charge could be avoided by giving the Power Utility Company of Indonesia a Business to Business (B2B) scheme.
Depok: Fakultas Teknik Universitas Indonesia, 2020
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2   >>