Ditemukan 6 dokumen yang sesuai dengan query
cover
Siahaan, Kevin Marsahala
Abstrak :
Panel surya atap merupakan suatu terobosan dalam meningkatkan bauran energi terbarukan di Indonesia yang ramah lingkungan. Meskipun begitu, teknologi pembangkitan listrik ini tidak terlalu berkembang karena belum ada skema bisnis yang tepat. Penelitian ini bertujuan menganalisis potensi iradiasi matahari, seizing instalasi, potensi penjualan tenaga listrik dari instalasi panel surya atap, evaluasi proses bisnis, dan rekomendasi skema bisnis. Metodologi penelitian dilakukan dengan menggunakan Meteonorm Software untuk mengkalkulasi Global Horizontal Radiation. Kemudian, mengkalkulasinya dengan efisiensi modul, module mismatch, inverter, MPPT, kabel, dan shading untuk mengetahui produksi energi per kWh/m2. Hasil penelitian menunjukan bahwa skema bisnis Power Purchase Agreement dan sewa instalasi layak untuk diimplementasikan di kawasan industri Pulogadung berdasarkan Internal Rate of Return, Net Present Value, dan Pay Back Period. Penelitian ini merekomendasikan Power Purchase Agreement karena paling menguntungkan secara finansial dalam jangka panjang.
Solar photovoltaic rooftop is a breakthrough in increasing the renewable energy mix in Indonesia that is environmentally friendly. Even so, this electricity generation technology is not too developed because there is no appropriate business scheme yet. This research aims to analyze the potential of solar irradiation, seizing the installations, potential sales of electricity from solar photovoltaic rooftop installations, and evaluate business process and the recommendation. The research methodology was carried out using Meteonorm Software to calculate Global Horizontal Radiations. Then, it calculates with module efficiency, module mismatch, inverter, MPPT, cable, and shading to determine energy production per kWh/m2. The result of the study shows that the business schemes such direct purchase, installment purchase, power purchase agreement, and installation lease are proper to be implemented in Pulogadung Industrial Area based on Internal Rate of Return, Net Present Value, and Pay Back Period. This research recommends the power purchase agreement because it is the most financially profitable in the long term.
2018
T51779
UI - Tesis Membership  Universitas Indonesia Library
cover
Feriz Kausar
Abstrak :
Industri otomotif terus berkembang di Indonesia, bidang ini terpilih sebagai prioritas lima sektor manufaktur dalam program pemerintah Making Indonesia 4.0. Dengan target menjadi produsen mobil terbesar di ASEAN, berdampak pada pertumbuhan konsumsi listrik sektor otomotif sebesar 6% per tahun pada kuartal IV 2021. Dibutuhkan penambahan kapasitas daya listrik yang selaras dengan komitmen pemerintah untuk beralih ke energi terbarukan. Penerapan Pembangkit Listrik Tenaga Surya (PLTS) terdistribusi di sisi konsumen merupakan salah satu alternatif terbaik untuk penambahan kapasitas daya produsen otomotif yang diharapkan bisa bersaing di kancah internasional sebagai perusahaan berbasis energi bersih. Seperti yang diketahui, investasi PLTS masih menjadi tantangan bagi pelaku industri, maka, model bisnis third-party ownership (TPO) menjadi salah satu solusi alternatif dalam mengatasi masalah tersebut. Tujuan dari penelitian ini adalah menganalisis tekno-ekonomi PLTS terdistribusi dengan odel bisnis TPO dengan tiga skema, yaitu on-grid, stand-alone, dan hybrid, dengan studi kasus pabrik ATPM – S1. Metodologi yang digunakan adalah mendesain kapasitas dan sistem operasi PLTS terdistribusi menggunakan perangkat lunak Homer Pro, lalu menganalisis keekonomian dengan metode cashflow menggunakan 3 skenario tarif (ceiling price setara tarif PLN I-3, variatif, dan floor price yaitu pada saat IRR=WACC), dan performa panel surya. Skema bisnis TPO yang dianalisis dengan solar leasing skema fixed rent (FR) dan performance-based rent (PBR). Hasil penelitian ini menunjukkan bahwa skema on-grid dengan kapasitas PLTS sebesar 204 kWp, beroperasi dari pukul 06.00 s.d. 18.00, dengan nilai investasi sebesar 185.740 USD. Nilai IRR ketiga skenario tarif FR adalah 10,17%, 10,032%, dan 9,24%, sedangkan PBR sebesar 9,305%, 9,168%, dan 8,386%. Skema stand-alone menghasilkan kapasitas PLTS sebesar 1,570 MWp dengan Battery Energy Storage System (BESS) sebesar 9.000 kWh, beroperasi selama 24 jam, dengan nilai investasi 2.803.988 USD. Nilai IRR ketiga skenario tarif FR dan PBR adalah sama sebesar -13,44%, 10,295%, dan 9,24%. Skema hybrid menghasilkan kapasitas PLTS sebesar 800,28 kWp dengan BESS sebesar 4.000 kWh, beroperasi selama 24 jam, dengan nilai investasi 1.376.712 USD. Nilai IRR ketiga skenario FR adalah -3,89%, 10,77%, dan 9,24%, sedangkan PBR sebesar -4,93%, 9%, dan 7,48%. Nilai IRR pada PBR lebih rendah dibandingkan dengan FR, karena pada PBR terdampak degradasi daya panel surya. Skema hybrid dengan skenario 1 memiliki O&M yang selalu di atas pendapatan. Maka, penerapan TPO PLTS terdistrbusi pada ATPM – S1, hanya layak menggunakan skema on-grid solar leasing fixed rent. ......The automotive industry continues to grow in Indonesia, this field was chosen as a priority for the five manufacturing sectors in the government's Making Indonesia 4.0 program. With a target to become the largest car manufacturer in ASEAN, it will have an impact on the growth of electricity consumption in the automotive sector by 6% per year in the fourth quarter of 2021. It is necessary to increase electricity capacity in line with the government's commitment to switch to renewable energy. The application of distributed solar photovoltaic (DSPV) on the consumer side is one of the best alternatives to increase the capacity of automotive manufacturers which are expected to compete internationally as clean energy-based companies. As is well known, PV mini-grid investment is still a challenge for industry players, so the third-party ownership (TPO) business model is an alternative solution to overcome this problem. The purpose of this study is to analyze the techno-economy of distributed solar power with a TPO business model with three schemes, namely on-grid, stand-alone, and hybrid, with a case study of the ATPM – S1 factory. The methodology used is to design the capacity and operating system of distributed PV mini-grid using Homer Pro software, then analyze the economy with the cash flow method using 3 tariff scenarios (the ceiling price is equivalent to the PLN I-3 tariff, varied, and the base price is when IRR = WACC), and solar panel performance. The TPO business scheme analyzed by leasing solar fixed rent (FR) and performance-based rent (PBR) schemes. The results of this study indicate that the on-grid scheme with a PLTS capacity of 204 kWp, operates from 06.00 s.d. 18.00, with an investment value of 185,740 USD. The IRR values of the three FR tariff scenarios are 10.17%, 10.032%, and 9.24%, while the PBR are 9.305%, 9.168%, and 8.386%. The stand-alone scheme produces a PLTS capacity of 1,570 MWp with a Battery Energy Storage System (BESS) of 9,000 kWh, operating for 24 hours, with an investment value of 2,803,988 USD. The IRR values for the three FR and PBR tariff scenarios are the same at -13.44%, 10.295%, and 9.24%. The hybrid scheme produces a PLTS capacity of 800.28 kWp with a BESS of 4,000 kWh, operating for 24 hours, with an investment of 1,376,712 USD. The IRR values of the three FR scenarios are -3.89%, 10.77%, and 9.24%, while the PBR are -4.93%, 9%, and 7.48%. The IRR value for PBR is lower than FR, because PBR inhibits the decrease in solar panel power. The hybrid scheme with scenario 1 has O&M always above revenue. So, the application of TPO PLTS distributed to ATPM – S1, is only feasible to use the fixed rent on-grid solar leasing scheme.
Depok: Fakultas Teknik Universitas Indonesia, 2021
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Fery Permadi
Abstrak :
Penelitian ini bertujuan untuk melakukan perbandingan 4 skenario jenis teknologi solar photovoltaic system serta pemilihan skenario solar photovoltaic system berdasarkan nilai optimasi manfaatnya menggunakan metode linier programming pada segmen industri di Indonesia selama 25 tahun operasional. Penelitian dilakukan dengan melakukan studi kasus pada dua fasilitas pabrik perusahaan minuman di Indonesia di 2 lokasi yang berbeda. Studi kasus pertama berada di Kabupaten Bekasi, penelitian dilakukan dengan melakukan analisis energi ekonomi lingkungan serta mengoptimasi nilai manfaat PLTS atap yang sudah beroperasi sejak 2020. Studi kasus kedua berada di Kabupaten Semarang, penelitian dilakukan pada fasilitas pabrik yang belum dibangun PLTS atap, yakni dengan merencanakan pembangunan PLTS atap seluas 80% dari total luas atap yang dapat dipasang panel surya. Hasil penelitian menujukkan bahwa skenario 2 solar photovoltaic system dapat menghasilkan jumlah energi listrik dan CO2 yang dapat dikurangi lebih banyak dibanding skenario lainnya pada kedua studi kasus. Sedangkan skenario 4 solar photovoltaic system merupakan skenario dengan nilai ekonomi yang lebih baik dari skenario lainnya pada kedua studi kasus. Hasil optimasi penggunaan 80% luas atap pada studi kasus Bekasi 1 menunjukkan bahwa skenario 4 mampu memberikan nilai manfaat yang optimum yakni Rp 20,247,839,358 serta mampu meningkatkan jumlah energi listrik dan CO2 yang dapat dikurangi meningkat sebanyak 82%. Terakhir, hasil optimasi skenario 4 mampu meningkatkan jumlah persentase listrik PLTS atap terhadap total konsumsi listrik PLN menjadi 33%. Penggunaan skenario 4 solar photovoltaic sytem sebanyak 80% luas atap yang tersedia dapat mengurangi penggunaan listrik PLN (energi fossil) sebanyak 33% pada studi kasus Bekasi 1 dan 28% pada studi kasus Semarang. ......This study aims to compare 4 scenarios of solar photovoltaic system technology and the selection of solar photovoltaic system scenarios based on the optimization value of their benefits using the linear programming method in the industrial segment in Indonesia for 25 years of operation. The research was conducted by conducting a case study on two manufacturing facilities of a beverage company in Indonesia in 2 different locations. The first case study is in Bekasi Regency, the research is carried out by conducting an energy economic environmental analysis and optimizing the value of the benefits of solar rooftop photovoltaic system which has been operating since 2020. The second case study is in Semarang Regency, the research is carried out on factory facilities that have not built solar rooftop photovolatic system, namely by planning construction of solar roofotop photovolatic system covering an area of ​​80% of the total roof area that can be installed solar panels. The results of the study show that scenario 2 solar photovoltaic system can produce more electrical energy and CO2 that can be reduced than the other scenarios in the two case studies. While scenario 4 solar photovoltaic system is a scenario with better economic value than the other scenarios in the two case studies. The results of optimizing the use of 80% of the roof area in the Bekasi 1 case study show that scenario 4 is able to provide an optimum benefit value of Rp. 20,247,839,358 and is able to increase the amount of electrical energy and CO2 that can be reduced by 82%. Finally, the optimization results of scenario 4 are able to increase the percentage of electricity that generated by solar roofotop photovoltaic system to the total electricity consumption of PLN to 33%. The use of scenario 4 solar photovoltaic system as much as 80% of the available roof area can reduce the use of PLN electricity (fossil energy) by 33% in the Bekasi 1 case study and 28% in the Semarang case study
Depok: Fakultas Teknik Universitas Indonesia, 2022
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Adam Doni Mauladi
Abstrak :
Kebutuhan akan energi listrik terus berkembang seiring berkembangnya teknologi baik di dari bidang riset, bisnis hingga kebutuhan sehari-hari. Pembangkit energi fossil pun akan kehabisan sumber energi dalam beberapa dekade yang akan datang. Maka pengembangan EBT (energi baru dan terbarukan) dari berbagai sektor harus digencarkan. Salah satu bidang yang harus segera mengadopsi energi baru terbarukan adalah bisnis. Penelitian ini membahas mengenai aplikasi pengembangan model bisnis berbasis listrik mandiri dengan studi kasus peternakan terintegrasi dengan BSF (Black Soldier Fly) yang beroperasi di Gondang, Watumalang, Wonosobo (Koordinat Geografis: -07.354525,109.886423). Sesuai dengan semangat peternakan terintegrasi ini untuk melakukan kampanye melawan climate change, pengembangan solar photovoltaic untuk sumber energi di peternakan ini dapat menjadi sistem modular peternakan mandiri. Penelitian ini menggunakan analisis Tekno Ekonomi untuk menghitung potensi solar photovoltaic di lokasi dengan lahan ±400 m2 dan beban rata-rata 1,160805 kW dan potensi beban puncak pada 3,5 kW dengan random variability day-to-day 10% dan timestep 20%. Topologi yang dibangun adalah on grid ke PLN dengan dan tanpa baterai. Hasil perhitungan teknikal menunjukkan bahwa kapasitas Solar PV yang diperlukan untuk sistem ini 5,4 kWp dengan 18 modul. Hasil perhitungan parameter keekonomian menunjukkan sistem Solar Photovoltaic mampu menghasilkan ROI sebesar 65,83% (On-grid) dan 34,57% (Off-grid), menghasilkan IRR 5,53% (On- grid) dan 2,97% (Off-grid), dan menghasilkan LCoE USD 0,05193/kWh (On-grid) dan USD 0,06687/kWh (Off-grid). ......The need for electrical energy continues to grow along with the development of technology both in the fields of research, business to daily needs. Fossil energy plants will run out of energy sources in the next few decades. Therefore, the development of NRE (new and renewable energy) from various sectors must be intensified. One of the areas that must immediately adopt new and renewable energy is business. This study discusses the application of developing an independent electricity-based business model with a case study of integrated farms with BSF (Black Soldier Fly) operating in Gondang, Watumalang, Wonosobo (Geographical Coordinates: -07.354525,109.886423). In accordance with the spirit of integrated animal husbandry to campaign against climate change, the development of solar photovoltaic for energy sources in this farm can be a modular system of independent poultry. This study uses Technoeconomic analysis to calculate the potential of solar photovoltaic in a location with a land area of ±400 m2 and an average load of 1.160805 kW and a peak load potential of 3.5 kW with random variability day-to-day 10% and timestep 20%. . The built topology is on grid to PLN with and without batteries. The results of technical calculations show that the required capacity of Solar PV for this system is 5.4 kWp with 18 modules. The results of the calculation of economic parameters show that the Solar Photovoltaic system is able to produce an ROI of 65.83% (On-grid) and 34.57% (Off-grid), resulting in an IRR of 5.53% (On-grid) and 2.97% (Off-grid). -grid), and resulted in LCoE of USD 0.05193/kWh (On-grid) and USD 0.06687/kWh (Off- grid).
Depok: Fakultas Teknik Universitas Indonesia, 2021
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Francesco Theodore Budiman
Abstrak :
Energi listrik merupakan salah satu kebutuhan utama dalam kehidupan modern. Akan tetapi, pertumbuhan penduduk di Indonesia cenderung meningkatkan konsumsi listrik. Sementara itu, ketersediaan energi fosil semakin terbatas. Meskipun potensi energi matahari di Indonesia mencapai 207,8 GWp, pemanfaatan energi surya hanya mencapai peringkat keempat dalam penggunaan energi terbarukan, yakni sebesar 322,6 MW pada tahun 2023. Oleh sebab itu, pengoptimalan penggunaan energi surya melalui sistem pembangkit listrik tenaga surya (PLTS) sangat penting. Gedung Departemen Teknik Elektro Universitas Indonesia dengan konsumsi listrik yang relatif besar dijadikan sebagai lokasi studi. Penelitian mencakup simulasi konfigurasi PLTS Atap On-Grid dan Off-Grid dengan variasi penambahan generator set. PLTS Off-Grid juga disimulasikan dengan jenis Baterai Lead Acid dan Baterai Lithium Ion, dengan biaya komponen masing-masing $235,72/kWh dan $392,87/kWh, serta dengan spesifikasi teknis menurut standar HOMER Pro. Semua konfigurasi dan skema PLTS akan dibandingkan untuk mendapatkan yang paling optimal berdasarkan biaya Net Present Cost (NPC). Hasil simulasi HOMER Pro dan analisis menunjukkan bahwa Baterai Lithium Ion merupakan baterai yang paling optimal untuk PLTS Off-Grid. Penambahan generator set meningkatkan NPC pada sistem On-Grid optimal, tetapi menurunkan NPC pada sistem Off-Grid optimal. PLTS On-Grid akan optimal tanpa penambahan generator set. Sementara, PLTS Off-Grid akan optimal dengan penambahan generator set dan penggunaan Baterai Lithium Ion. Analisis ekonomi dengan parameter Net Present Value (NPV), Internal Rate of Return (IRR), dan Payback Period menunjukkan bahwa PLTS On-Grid tanpa generator set optimal layak untuk diimplementasikan. ......Electricity is one of the primary necessities in modern life. However, Indonesia’s population growth tends to increase electricity consumption. Meanwhile, fossil energy availability is becoming increasingly limited. Despite Indonesia’s solar energy potential reaching 207.8 GWp, solar energy utilization only ranked fourth in renewable energy usage, reaching 322.6 MW in 2023. Therefore, optimizing solar energy utilization through solar photovoltaics plants (PLTS) is crucial. The Department of Electrical Engineering Building at the University of Indonesia, with its relatively high electricity consumption, is chosen as the study site. The research includes simulating On-Grid and Off-Grid Rooftop PLTS configurations with variations in the addition of generator set. Off-Grid PLTS is also simulated with Lead Acid and Lithium Ion Batteries, with component costs $235.72/kWh and $392.87/kWh, respectively, and technical specifications according to HOMER Pro standards. All PLTS configurations and schemes will be compared to obtain the most optimal for one based on the Net Present Cost (NPC). The HOMER Pro simulation results and analysis show that adding generator sets increases the NPC in optimal On-Grid system but decreases it in optimal Off-Grid systems. On-Grid PLTS will be optimal without adding a generator set, while Off-Grid PLTS will be optimal with the addition of a generator set and the use of Lithium Ion Batteries. Economic analysis with Net Present Value (NPV), Internal Rate of Return (IRR), and Payback Period parameters indicates that optimal On-Grid PLTS without a generator set is feasible for implementation.
Depok: Fakultas Teknik Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Stefanus Adhika Pradhana
Abstrak :
Nowadays direct current (DC) microgrids have drawn more consideration because of the expanding use of direct current (DC) energy sources, energy storage, and loads in power systems. With this trend, a system of DC microgrid is needed to design and analyzed. A standalone solar photovoltaic (PV) system with a DC microgrid to supply power for DC loads is proposed. The proposed system comprises of a solar PV system with a boost DC/DC converter, a bi-directional DC/DC converter (BDC), and batteries. The whole system is supposed to work in harmony to gives a value of voltage and power according to what the loads need. There are 2 main working conditions for this system which are at night-time and daytime which each condition will represent real-life working conditions. In the simulation, there will be several scenarios to simulate the working condition of the system in their ideal condition and changing condition, and also the value of the load will be varied to ensure the system work when the load and working condition change. The complete system is designed and executed in a MATLAB/SIMULINK environment. The system will be analyzed to show how effective, stable, and viability especially in real-life working conditions. ......Saat ini microgrid arus searah (DC) telah menarik lebih banyak pertimbangan karena meluasnya penggunaan sumber energi arus searah (DC), penyimpanan energi, dan beban dalam sistem tenaga. Dengan kecenderungan ini, sistem microgrid DC diperlukan untuk merancang dan menganalisis. Sistem fotovoltaik surya (PV) mandiri dengan microgrid DC untuk memasok daya untuk beban DC diusulkan. Sistem yang diusulkan terdiri dari sistem PV surya dengan konverter DC/DC boost, konverter DC/DC dua arah (BDC), dan baterai. Keseluruhan sistem tersebut diharapkan dapat bekerja secara harmonis untuk memberikan nilai tegangan dan daya yang sesuai dengan kebutuhan beban. Ada 2 kondisi kerja utama untuk sistem ini yaitu pada malam hari dan siang hari yang masing-masing kondisi akan mewakili kondisi kerja sebenarnya. Dalam simulasi akan dibuat beberapa skenario untuk mensimulasikan kondisi kerja sistem dalam kondisi ideal dan kondisi yang berubah, serta nilai beban akan divariasikan untuk memastikan sistem bekerja saat beban dan kondisi kerja berubah. Sistem lengkap dirancang dan dijalankan dalam lingkungan MATLAB/SIMULINK. Sistem akan dianalisis untuk menunjukkan seberapa efektif, stabil, dan viabilitas terutama dalam kondisi kerja nyata.
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library