cover
Muhammad Arwin
Abstrak :
ABSTRAK
Penelitian terhadap sistem pembangkitan listrik pada FPU dilakukan untuk mencari penghematan biaya produksi listrik / Cost of Electricity (COE) dan biaya siklus hidup / Life Cycle Cost (LCC), dengan menjaga peluang kehilangan beban / Lost of Load Probability (LOLP) tetap dalam kriteria kehandalan. Setelah FPU beroperasi selama sembilan bulan, ditemukan fakta bahwa pembangkit listrik utama yang terdiri dari tiga tandem Pembangkit Turbin Gas (GTG), tidak pernah mengalami kegagalan pembangkitan dan memiliki cadangan berputar jauh melebihi kebutuhan beban serta Pembangkit Diesel Esensial (EsDG) dan Pembangkit Diesel Darurat (EDG) sebagai pembangkit pendukung, nyaris tidak pernah dioperasikan. Dengan faktor kapasitas pembangkit GTG yang rendah, terdapat potensi penghematan biaya kapasitas dan biaya energi yang dibangkitkan. Beberapa alternatif dikembangkan dengan variasi jumlah unit dan kapasitas pembangkit. Kelayakan dari alternatif diukur oleh nilai kehandalan dan keekonomian, yaitu LOLP, COE dan LCC. Didapatkan dari hasil analisis bahwa penggunaan dua buah GTG 6.1 kW merupakan alternatif paling optimum untuk pembangkitan listrik.
ABSTRACT
Study of electricity generation system on FPU has been conducted to find out optimization of Cost of Electricity (COE) and Life Cycle Cost (LCC), by keep maintains Loss of Load Probability (LOLP) within reliability requirement. After normal operation of FPU for nine months, it has founded that main generation system which consist of three tandem Gas Turbine Generators (GTGs) has never experienced a power outage and has spinning reserve far higher than overall load necessity, and the back-up generator of Essential Diesel Generator (EsDG) and Emergency Diesel Generator (EDG), almost never been utilized. As low capacity factor of GTG, there is oportunity to optimize capacity and energy cost during electicity generation. Several alteratives are developed with variation of unit number and capacity of generator. Feasibility of alternative is measure from value of reliability and economic paramaters, ie. LOLP, COE and LCC. The result of the analysis shows that utilization of two GTGs 6.1 kW is the most optimum alternative for electricity generation.
2018
T50818
UI - Tesis Membership  Universitas Indonesia Library
cover
Ardiantoro Dwi Basaltyo
Abstrak :
Dalam suatu perencanaan investasi, banyak hal yang menjadi pertimbangan dalam melakukan pengambilan keputusan investasi tersebut. Faktor yang paling mempengaruhi dalam pengambilan keputusan investasi pada umumnya adalah faktor biaya atau finansial. Oleh karena itu berkembang pula metode-metode pendekatan finansial yang dapat digunakan untuk melakukan analisa investasi, salah satunya adalah metode real optons. Metode real options dapat dikatakan sebagai pengembangan dari metode-metode sebelumnya, seperti yang jamak digunanakan yaitu metode discounted cash flow atau yang sering disebut dengan metode net present value tradisional. Sesuai dengan namanya, metode real options mengacu pada pemilihan opsi-opsi yang selalu terjadi dalam pengambilan keputusan investasi, opsi-opsi ini dapat berupa penundaan, ekspansi, pemberhentian proyek, pengantian, atau kombinasi dari opsi-opsi yang ada. Selain itu, keunggulan dari metode real options juga mengakomodir adanya faktor ketidakpastian yang juga merupakan faktor yang berpengaruh dalam hasil perhitungan investasi khususnya secara finansial. Penelitian ini bertujuan untuk melihat bagaimana pengaplikasian metode real options dalam analisa investasi secara finansial. Dalam penelitian ini penulis menggunakan proyek pembangunan pembangkit listrik tenaga mikro hidro (PLTMH) sebagai objek investasi, dengan membatasi penelitian pada opsi penundaan, selain itu dengan mempertimbangkan faktor ketidakpastian yang mempengaruhi nilai investasi PLTMH di masa yang akan datang. ......In an investment plan, there are many decisive factors that become the important factors in th decision making process of the investment. The most common factor that is recognized as the most important factor in investment decision making is the financial factor. Therefore, the development of financial analysis methods has grown over the time, one of wich is the real options analysis method. Real options is the development of the methods that have been broadly applied before, such as the discounted cash flow method or also known as the traditional net present value method. As mentioned I it's name, real options refers to the options that underlie the decision making process of an investment, these options in investment are varied, some of the examples can be deferral options, expansion options, shutting down options, or replacement options. One of the advanced poin of real options is that this method also addresses the volatility of factors that become determine the real value of an investment. This paper is intended to study the application of real options method in an investment plan in term of financial analysis. The object of investment of this study is the micro hydro power plant construction project. It focuses on analyzing the deferral options of this investment plan, and also taking into account the volatility factors that will determine the future value of this investment.
Depok: Fakultas Teknik Universitas Indonesia, 2008
S51884
UI - Skripsi Open  Universitas Indonesia Library
cover
Mornfavour, Precious
Abstrak :
Pengembangan energi di Tambak Lorok diperlukan karena daerah tersebut telah berkembang menjadi pemukiman kota yang modern. Usaha yang akan dilakukan berupa perancangan infrastruktur untuk stasiun pembangkit listrik tenaga gas dimana suplai gas ditransmisikan dari Situ Kepodang untuk keperluan gas turbin di Tambak Lorok, Semarang. Infrastruktur yang akan dirancang berupa Fasilitas Pengukuran dan Pengaturan Gas. Hasil dari penulisan skripsi ini berupa Front End Engineering Design atau Perancangan Detail Tingkat Lanjut dari fasilitas pengukuran dan pengaturan gas di Tambak Lorok berupa dokumentasi Piping and Instrumentation Diagram, Plot Plant, Isometric Design, Bill of Material dan juga model tiga dimensi dengan menggunakan software 3D. ......The energy development at Tambak Lorok Semarang is necessary because this region is generating into modern urban. The effort to overcome this problem is to design infrastructure for power generator station where gas is supplied from Situ Kepodang for gas turbine needs at Tambak Lorok, Semarang. The infrastructure is Gas Metering and Regulation Station. The result from this final project are consist of Piping and Instrumentation Diagram, Plot Plant, Isometric Design, Bill of Material and so with 3D model which designed with 3D software.
Depok: Fakultas Teknik Universitas Indonesia, 2009
S51932
UI - Skripsi Open  Universitas Indonesia Library
cover
Difi Nuary Nugroho
Abstrak :
Salah satu upaya untuk mengatasi krisis energi adalah mengurangi ketergantungan terhadap sumber energi fosil dengan cara memanfaatkan sumber energi alternatif. Salah satu energi alternatif yang dapat digunakan adalah energi angin. Energi angin dapat dimanfaatkan pada pembangkit listrik tenaga angin. Pembangkit listrik tenaga angin merupakan suatu metode untuk membangkitkan energi listrik dengan cara memutar turbin angin yang dihubungkan ke generator, kemudian energi listrik yang dihasilkan oleh generator disimpan dalam elemen penyimpan energi listrik (baterai). Energi listrik yang tersimpan dalam elemen penyimpan akan dibebankan kepada beban beban rumah tangga yang berdaya rendah sehingga dengan pembangkit ini akan terlihat penggunaan sistem pembangkit listrik tenaga angin ini dengan turbin angin berporos vertikal tipe savonius. ......One effort to overcome the energy crisis is to reduce dependence on fossil energy sources by utilizing alternative energy sources. One of the alternative energy that can be used is wind energy. Wind energy can be utilized in wind power. Wind power is a method for generating electrical energy by rotating wind turbines connected to generators, and electrical energy generated by the generator is stored in the elements of electrical energy storage (batteries). Electrical energy stored in the storage element will be charged to expense burden of households with low power so that this generation will be seen savings on residential electricity costs.
Depok: Fakultas Teknik Universitas Indonesia, 2011
S735