Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 16 dokumen yang sesuai dengan query
cover
"This paper describes about the rarely Newton Raphson formulation for solving the power flow
problem, consist of the injetion 2n current equation written on rectangular coordinate. The Jacobian
matrix has same structure such as admittance matrix knot (Zn x Zn), where each network branch
represented by block (2 x 2). Execptable for PV bus. Diagonal-of block (2 x 2) from jacobian equation
was proposed as some in admittance matrix knot. The result indicate that the proposed methods for
solving the power flow is faster, its than the conventionally Newton Raphson formulation, expressed in
imbalanced power condition which written in polar coordinate.
"
Jurnal Teknologi, 15 (3) September 2001 : 303-310, 2001
JUTE-15-3-Sep2001-303
Artikel Jurnal  Universitas Indonesia Library
cover
cover
Wildan Soefian
"Pembangkit listrik tenaga diesel (PLTD) konvensional masih menjadi pilihan utama untuk sistem berskala kecil yang terisolasi dari jaringan luar. Ini dapat terjadi karena kelebihan PLTD yang memiliki waktu start cepat dan juga kegunaannya sebagai beban puncak. Bagaimanapun, Indonesia sebagai negara tropis memiliki potensi cahaya matahari yang tinggi dan berlangsung sepanjang hari. Karena mesin diesel dikenal memiliki operasional yang mahal, sementara Indonesia memiliki potensi surya yang tinggi, ide untuk menggabungkan sistem PLTD dengan PLTS (PV) sebagai suplai utama pada sistem berskala kecil dapat direalisasikan. Pembangkit hibrid PLTD-PV belum terbukti secara teknis. Maka dari itu, akan dilakukan simulasi pembangkitan hibrid PLTD-PV menggunakan perangkat lunak DIgSILENT PowerFactory. Beberapa studi yang dilakukan adalah studi aliran daya dan stabilitas dengan berbagai variasi skenario yang telah disiapkan. Hasil simulasi aliran daya dan stabilitas telah memenuhi standar yang berlaku dan telah terbukti secara teknis untuk menjadi pilihan sebagai suplai utama pada sistem kecil terisolasi dari grid luar.

Diesel power plants are still the main choice for a small system isolated from the grid. This can occur because of the fast start-up and its utility for the peak load which is diesel power plant excess. However, Indonesia as a tropical country has a high intensity of solar radiation that lasts all day long. Because diesel is less economically relevant and Indonesia also has a high potential of solar radiation, the idea of pairing diesel power plants with photovoltaic power generating on an isolated grid can be realized. A hybrid diesel-PV power system on isolated grids has not been proven technically. Therefore, a hybrid diesel-PV power system study will be conducted using the DIgSILENT PowerFactory software. Some of the studies that will be carried out including the study of power flow and stability within various scenarios that have been prepared. The outcome results show that the simulation of the hybrid diesel-PV power system has reached the existing standard and technically proven to be an option for the isolated grid."
Depok: Fakultas Teknik Universitas Indonesia, 2020
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
cover
cover
Arum Puni Rijanti
"Sistem kelistrikan Jawa-Bali pernah mengalami krisis sampai pertengahan tahun 2009, sumber: Kompas, Sabtu 31 Mei 2008. Pemadaman tidak bisa dihindari karena kapasitas pembangkit PLN tidak bertambah secara signifikan. Dengan pertumbuhan konsumsi listrik di atas 6 persen, cadangan daya pun terus tergerus. Rata-rata pertumbuhan pemakaian listrik pada kuartal I-2008 mencapai 6,8 persen, sementara target pertumbuhan dalam Anggaran Pendapatan dan Belanja Negara (APBN) 2008 hanya 1,9 persen. Dengan menggunakan patokan pertumbuhan itu pula, pemerintah menetapkan kuota bahan bakar minyak (BBM) untuk PLN sebanyak 9,1 kiloliter. Sementara itu, realisasi pemakaian BBM sampai April 2008 sudah mencapai 3,651 juta kiloliter atau 42,24 persen dari kuota. Cadangan daya tergerus menjadi 25 persen dari batas yang seharusnya 40 persen.
Sistem kelistrikan Jawa-Bali mengalami defisit 800-900 MW, yang mengakibatkan pemadaman bergilir di wilayah Banten, DKI Jakarta, Jawa Barat, Jawa Tengah, Jawa Timur Daerah Istimewa Yogyakarta dan Bali. Defisit disebabkan beberapa hal antara lain penurunan daya di sejumlah pembangkit PLN dan Swasta, kenaikan beban pemakaian listrik di Jawa-Bali, serta ketidaklancaran pasokan BBM ke pembangkit PLN. Hal ini terjadi karena masih dominan menggunakan pembangkit listrik berbahan bakar fosil. Cadangan bahan bakar fosil lama kelamaan akan habis kalau tidak disiasati dalam pemakaiannya. Penggunaan bahan bakar fosil ini pula yang dapat meningkatkan kadar emisi CO2 dan SO2 yang merupakan pemicu adanya pemanasan global.
Kajian ini bertujuan untuk melihat rencana optimasi pengambangan pembangkit listrik Jawa Bali dengan membandingkan pemakaian batubara dan nuklir bila dilihat dari nilai fungsi obyek, LOLP, emisi CO2 dan SO2. Diaman hasil tahun keluaran PLTN akan dipakai untuk perhitungan aliran daya bila PLTN masuk ke sistem Jawa Bali dan membandingkan rencana lokasi penempatan PLTN yaitu Banten dan Semenanjung Muria.

Electrical systems Java-Bali has experienced a crisis until the mid-2009, source: Kompas, Saturday, May 31, 2008. Extinction cannot be avoided because of PLN's generating capacity has not increased significantly. With electricity consumption growth above 6 percent, the reserves were dwindling resources. The average electricity consumption growth in the first quarter of 2008 reached 6.8 percent, while the growth target in the Budget Revenue and Expenditure (Budget) in 2008 only 1.9 percent. By using the same standards that growth, the government set a quota of oil fuel (BBM) to PLN 9.1 of kiloliters. Meanwhile, the realization of the use of fuel until April 2008 has reached 3.651 million kiloliters, or 42.24 percent of the quota. Backup power eroded to 25 percent of the limit should be 40 percent.
System of Java-Bali electricity deficit 800-900 MW, which resulted in rotating blackouts in the area of Banten, DKI Jakarta, West Java, Central Java, East Java, Yogyakarta and Bali. The deficit caused by several things including a decrease in the number of power plants and private sectors, an increase in electricity consumption load in Java-Bali, and the smooth fuel supply for power plants. This happens because it is still the dominant power plants using fossil fuel. Fossil fuel reserves will run out over time if not saving in its use. The use of these fossil fuels also can increase the levels of CO2 and SO2 emissions which are the trigger of global warming.
This study aims to look at plans floating power plant optimization Java and Bali by comparing the use of coal and nuclear when viewed from the value of object function, LOLP, CO2 and SO2 emissions. The results in output of nuclear power plants will be used to calculate the flow of power when nuclear power plants into the Java-Bali system and compare the plans of where to place nuclear plants Banten and Muria Peninsula.
"
Depok: Fakultas Teknik Universitas Indonesia, 2009
T26713
UI - Tesis Open  Universitas Indonesia Library
cover
Fahmi Firdaus Angkasa
"Pada tahun 2025 pemerintah menargetkan peran energi baru terbarukan (EBT) minimal 23% dari bauran energi nasional ketenagalistrikan. Salah satu jenis EBT adalah panas bumi yang menjadi salah satu potensi yang besar. Berdasakan data Kementiran ESDM, potensi energi panas bumi sebesar 28.579 MWe yang terdiri dari sumber daya sebesar 11.073 MWe dan cadangan sebesar 17.506 MWe. Selain itu berdasarkan RUPTL 2019-2028, komposisi bauran energi listrik regional Sumatera akan mencapai 38,5% bersumber EBT atau mencapai total 2647,1 MW yang terdiri dari air sebesar 20,1%, panas bumi sebesar 19,5%, dan sumber EBT lainnya sebesar 1,9%. Pada tahun 2019-2023, terdapat Pembangkit Listrik Tenaga Panas Bumi (PLTP) yang direncanakan akan memasuki sistem interkoneksi Sumatera Utara pada dengan total kapasitas 240 MW. Oleh karena itu, studi interkoneksi dibutuhkan untuk mengetahui efek dari pembangkit terhadap jaringan interkoneksi dan kesesuaian dengan standar yang ada. Studi interkoneksi yang dilakukan terdiri dari studi aliran daya, studi stabilitas sistem tenaga listrik, dan studi hubung singkat menggunakan perangkat lunak DIgSILENT Power Factory 2019 SP 4. Hasil dari studi aliran daya menunjukan level tegangan pada pembangkit dan dua Gardu Induk (GI) terdekat sesuai dengan aturan yang berlaku pada Aturan Jaringan Sistem Tenaga Listrik Sumatera 2007 2.1.b yang menyebutkan standar tegangan pada jaringan interkoneksi 150 kV harus selalu diantara 135 kV dan 165 kV (±10% tegangan nominal). Selain itu, stabilitas sistem tenaga listrik dilihat dari parameter tegangan, frekuensi dan sudut rotor. Jaringan interkoneksi tetap stabil ketika ada gangguan di salah satu generator pembangkit, gangguan di satu atau dua saluran antara pembangkit dan GI terdekat, dan pelepasan beban di salah satu GI. Ketidakstabilan terjadi ketika dua GI terdekat terisolasi dengan jaringan interkoneksi Sumatera yang menghasilkan pemadaman total. Sementara itu, penambahan kapasitas pembangkit pada sistem interkoneksi 150 kV Sumatera Utara menyebabkan nilai arus hubung singkat di GI meningkat. Seluruh nilai arus hubung singkat masih memenuhi standar IEEE Std C37.06-2009.

In 2025 the government is targeting the renewable energy at least 23% of the national electricity energy mix. One type of renewable energy is geothermal which has a great potential. Based on the Ministry of Energy and Mineral Resources Republic of Indonesia data, the potential for geothermal energy is 28,579 MWe consisting of resources 11,073 MWe and reserves 17,506 MWe. Further based on 2019-2028 RUPTL, the composition of Sumatra's regional electric energy mix will reach 38.5% from renewable sources or reach a total of 2647.1 MW consisting of water 20.1%r, geothermal 19.5%, and other renewable sources by 1.9%. In 2019-2023, there is a Geothermal Power Plant which is planned to enter the North Sumatra interconnection system with a total capacity of 240 MW. Therefore, an interconnection study is needed to determine the effect of the new power plant on the interconnection grid and compliance with the standards. Interconnection studies carried out consist of power flow, stability, and short circuit study using the DIgSILENT Power Factory 2019 SP 4 software. The results of the power flow study show that the voltage level at the power plant and the two closest substations is in accordance with the Grid code Electricity System Power System 2007 2.1.b which states the voltage standard on the 150 kV interconnection grid must always be between 135 kV and 165 kV (± 10% nominal voltage). In addition, the stability of the electric power system can be seen from the voltage, frequency and rotor angle parameters. The grid remains stable when there is a disturbance in one of the power plant generators, disturbance in one or two cables between power plant and the nearest substation, and the release of load in one of the substations. Instability occurs when it is isolated with the Sumatra interconnection grid which results in total blackouts. Meanwhile, the addition of generating capacity through PLTP in the 150 kV North Sumatra interconnection system causes the value of short circuit current in substations increase. All short circuit current still meets IEEE Std C37.06-2009 standard."
Depok: Fakultas Teknik Universitas Indonesia, 2020
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
M. Akbar Attallah
"Untuk mencapai pembangkitan listrik nol emisi karbon, diperlukan pembangkit listrik energi terbarukan (EBT) sebagai sumber energi utama. Peningkatan pembangkitan listrik EBT memunculkan permasalahan stabilitas tegangan dan frekuensi serta masalah keandalan dikarenakan oleh karakteristik ketidakpastian dan intermiten dari pembangkit listrik EBT yang menggunakan sumber energi yang tidak dapat dikendalikan.Penelitian ini bertujuan untuk merancang sistem VPP pada Kawasan Berikat Nusantara dengan menggunakan perangkat lunak XENDEE. Perangkat lunak XENDEE akan melakukan optimasi tekno-ekonomi untuk memperoleh konfigurasi besaran kapasitas dari komponen VPP yang terbaik. Hasil dari optimasi yang telah dilakukan menunjukkan bahwa skenario sistem VPP yang mengimplementasikan PLTS dengan skema tarif eksisting untuk sektor industri dapat melakukan penghematan biaya tahunan dan penurunan COE sebesar 27%. Kapasitas PLTS yang merupakan hasil optimasi dari perangkat lunak XENDEE berkapasitas sebesar 4.4 MWp. Adapun skenario lain dimana terdapat teknologi BESS pada sistem VPP dengan skema tarif Time-of-Use, yang dapat melakukan penghematan biaya tahunan dan penurunan COE sebesar 19.1%. Skenario ini menggunakan kapasitas PLTS sebesar 4.4 MWp, BESS 4.48 MWh, dan inverter 749 kW. Sistem VPP yang menggunakan BESS juga dapat melakukan peak shaving sehingga dapat menurunkan nilai beban puncak dari jaringan utilitas. Seluruh skenario dari hasil simulasi memiliki hasil analisa aliran daya dengan tegangan pada tiap bus yang mematuhi standar grid code dengan deviasi tegangan tertinggi bernilai 0.12% dari tegangan nominalnya.

To achieve zero-carbon emission electricity generation, Renewable Energy Resources (RES) are needed as the main energy source. The increase in RES raises problems of voltage and frequency stability, as well as reliability problems due to the uncertain and intermittent characteristics of RES. The solution to this challenge is a Virtual Power Plant (VPP) system. VPP is a system that aggregates multiple generation, load, and storage systems to replicate a large-scale power plant. VPP was introduced to RES generation  without sacrificing network stability and reliability, as well as offering many other technical and economic benefits. This study aims to design a VPP system in the PT KBN industrial area using XENDEE. XENDEE will perform techno-economic optimization to obtain the best capacity configuration of the VPP component. The optimization results indicate that by implementing a PV system within an existing tariff scheme for industrial load, a VPP system scenario can achieve annual cost savings and a reduction in COE of 30.2%. The optimized capacity of the PV system using XENDEE software is 4.4 MWp. Another scenario involves a VPP system with Battery Energy Storage System (BESS) technology and a Time-of-Use tariff scheme, which can achieve annual cost savings and a reduction in COE of 19.1%. This scenario uses a PV system capacity of 4.4 MWp, a BESS of 4.48 MWh, and an inverter of 749 kW. A VPP system that uses BESS can also perform peak shaving, thereby reducing the peak load value of the utility network. All simulation scenarios have power flow analysis results with voltages at each bus complying with the grid code standard, with the highest voltage deviation being 0.12% of the nominal voltage."
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Faya Safirra
"Dalam sistem tenaga listrik, penyaluran tenaga listrik yang baik merupakan hal yang vital dalam memenuhi kebutuhan beban. Pada sistem tenaga listrik Jawa Bali, terdapat permasalahan dalam transmisi tenaga listrik dari timur ke barat Jawa, yaitu ketidakseimbangan pembebanan jalur utara (Sirkit Ungaran-Mandiracan 1&2) dan jalur selatan (Sirkit Pedan-Tasik & sirkit Pedan-Kesugihan-Tasik) karena perbedaan impedansi saluran, juga masalah penurunan tegangan pada sisi barat Jawa. Permasalahan tersebut bisa diselesaikan dengan memasang UPFC pada sistem tenaga listrik Jawa Bali. Hasil simulasi menunjukkan bahwa pemasangan UPFC pada sirkit Pedan-Tasik dapat membantu meningkatkan transfer jalur selatan sampai sebesar 5% dan menurunkan transfer jalur utara sampai sebesar 5% untuk semua skenario transfer. Peningkatan nilai tegangan pada sisi barat Jawa yaitu region 1 dan 2 juga bisa didapat. Kestabilan sistem setelah terjadi gangguan juga bisa dicapai dalam waktu yang lebih singkat jika dibandingkan dengan sistem tanpa UPFC.
In electric power system, a good power transmission is vital in meeting the needs of the load. In Java Bali electric power system, there are problems in the transmission of electric power from east to west of Java, namely the loading imbalance of north transmission line (Ungaran-Mandiracan 1 & 2) and the south transmission line (Pedan-Tasik & Pedan-Kesugihan-Tasik) because of differences in line impedance, also the voltage drop problem on the west side of Java. Those problems can be solved by using the UPFC in the Java-Bali power system. The simulation results show that UPFC installation on Pedan-Tasik circuit can improve the transfer of the south transmission line up to 5% and lower the transfer of north transmission line up to 5% for all transfer scenarios. Increasing the voltage on the western side of Java, the region 1 and 2, can also be obtained. In addition, the stability of the system after an interruption can be achieved in a shorter time compared to system without UPFC."
Depok: Fakultas Teknik Universitas Indonesia, 2016
S65261
UI - Skripsi Membership  Universitas Indonesia Library
cover
Muhammad Ridwan
"Mengoperasikan sistem tenaga dengan biaya optimal terus dikembangkan dengan berbagai metode, yang terbagi menjadi metode matematis dan heuristik. Salah satu metode heuristik adalah algoritma genetika, dalam penelitian ini dikombinasikan dengan desain eksperimen untuk mencari jumlah biaya pembangkitan minimal. Penelitian ini menjelaskan algoritma genetika dan penggunaannya untuk optimisasi biaya pembangkitan dalam studi kasus case ieee 30 busbar dan Sistem Transmisi Jawa Bali 500kV.
Hasil ditunjukkan dan dibandingkan dengan metode matermatis dan heuristik lainnya, dimana pada kasus Jawa Bali 500kV dihasilkan biaya pembangkitan 19 lebih effisien dibandingkan kondisi awalnya dan 8 lebih efisien dibandingkan metode interior point. Hasil dari simulasi metode digunakan menunjukkan bahwa metode algoritma genetika dengan desain eksperimen menghasilkan optimalisasi biaya paling baik dibandingkan metode pembanding digunakan.

Power system operation optimization continues to expand with various algorithms, which are divided into mathematical and heuristic methods. One of effective heuristic method is genetic algorithm, which is combined with design of experiment to find the amount of possible generation with the lowest cost. This study describes genetic algorithm and the use of minimizing the amount of generation costs case ieee 30 buses and 500kV System of Java Bali.
The results is shown and compared to mathematical and another heuristic methods, which in the case of 500kV System of Java Bali the generation cost is 19 more efficient than initialisation condition and 8 lower cost than interior point method. The simulation result of the method shows that the genetic algorithm combined with design of experiment generated the best result than compared method.
"
Depok: Fakultas Teknik Universitas Indonesia, 2017
T48214
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2   >>