Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 18 dokumen yang sesuai dengan query
cover
Amsterdam: Gulf Publishing Company, 2009
621.867 2 PIP
Buku Teks  Universitas Indonesia Library
cover
"Presented in easy-to-use, step-by-step order, Pipeline rules of thumb handbook is a quick reference for day-to-day pipeline operations. For more than 35 years, the Pipeline rules of thumb handbook has served as the "go-to" reference for solving even the most day-to-day vexing pipeline workflow problems. Now in its 8th edition, this handbook continues to set the standard by which all other piping books are judged. Along with over 30% new or updated material regarding codes, construction processes, and equipment, this book continues to offer hundreds of "how-to" methods and handy formulas for pipeline construction, design, and engineering and features a multitude of calculations to assist in problem solving, directly applying the rules and equations for specific design and operating conditions to illustrate correct application, all in one convenient reference.
For the first time in this new edition, we are taking the content and data off the page and adding a new dimension of practical value for you with online interactive features to accompany some of the handiest and most useful material from the book :
- Interactive tables that takes data from the book and turns them into a sortable spreadsheet format that gives you the ability to perform your own basic filtering functions, show/hide columns of just the data that is important to you, and download the table into an Excel spreadsheet for additional use
- A graph digitizer which pulls a graph from the book and gives you the power to plot your own lines on the existing graph, see all the relative x/y coordinates of the graph, and name and color code your lines for clarity
- A converter calculator performing basic conversions from the book such as metric conversions, time, temperature, length, power and more.
"
Waltham, MA: Gulf Professional, 2014
e20427591
eBooks  Universitas Indonesia Library
cover
Soegiono
Surabaya: Airlangga University Press, 2007
621.867 2 SOE p
Buku Teks  Universitas Indonesia Library
cover
Houston, Texas: National Association of Corrosion Engineers, 1989
620.162 3 SYM p
Buku Teks SO  Universitas Indonesia Library
cover
"Buku "Express and standard : ductile iron pipelines" ini membahas tentang spesifikasi pipa besi."
[Place of publication not identified]: Pont. A. Mousson S. A., 1987
R 669.141 EXP
Buku Referensi  Universitas Indonesia Library
cover
Faruq Miftahus Shiddiq
"Inspeksi pada pipa minyak dan gas merupakan infrastruktur yang harus selalu dilakukan secara rutin untuk mendeteksi dan prediksi kerusakan yang akan terjadi di dalam pipa. Kemampuan navigasi untuk dapat berpindah dari satu lokasi ke lokasi lain serta melokalisasikan lokasi robot saat berada di dalam pipa sangat penting. Terlebih alat navigasi yang paling banyak digunakan yaitu GPS tidak dapat beroperasi pada lingkungan pipa. Maka untuk memenuhi keperluan tersebut robot harus mampu mengindera lingkungan disekitarnya dengan menggunakan sensor lain. Penelitian ini melakukan penginderaan lingkungan dengan menggunakan sensor depth camera yang kemudian diolah menjadi peta 2D dan lokalisasi robot dengan menggunakan Algoritma Hector SLAM (Simulataneously Localization and Mapping) dan menggunakan Robot Operating System (ROS). Dari hasil pengujian, algoritma Hector SLAM mampu melakukan pemetaan dengan persentase error sebesar 2,512% sedangkan untuk kemampuan lokalisasi memiliki persentase error sebesar 1.49%. Setelah dilakukan lokalisasi dan pemetaan, robot mampu untuk melakukan navigasi otonom dengan menggunakan navigation stack yang tersedia oleh ROS.

Inspection of oil and gas pipelines is an infrastructure that must be carried out regularly to detect and predict the damage that will occur in the pipeline. The navigational ability to be able to move from one location to another as well as to localize the robot's location while in the pipeline is very important. Moreover, the most widely used navigation tool, namely GPS, cannot operate in a pipeline environment. So, to meet these needs, the robot must be able to sense the surrounding environment by using other sensors. This research performs environmental sensing using a depth camera sensor which is then processed into 2D maps and robot localization using the Hector SLAM (Simulateously Localization and Mapping) Algorithm and using Robot Operating System (ROS). From the test results, the Hector SLAM algorithm is able to map with an error percentage of 2.512% while for localization capabilities it has an error percentage of 1.49%. After localization and mapping, the robot is able to perform autonomous navigation using the navigation stack provided by ROS."
Depok: Fakultas Teknik Universitas Indonesia, 2022
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Rahmat Budiman
"Kebutuhan gas sebagai bahan bakar di kilang minyak adalah sebesar 57 MMSCFD (Million Standard Cubic Feet per Day) pada tahun pertama sampai dengan tahun ketiga, kemudian bertambah menjadi 120 MMSCFD pada tahun ketiga sampai dengan tahun kesepuluh dan bertambah kembali menjadi 157 MMSCFD pada tahun kesepuluh sampai dengan tahun keduapuluh. Dikarenakan kebutuhan gas yang berkembang tersebut, maka perlu dilakukan perancangan desain yang optimal untuk memenuhi kebutuhan gas di kilang tersebut.
Tujuan dari penelitian ini adalah mendapatkan desain pipa transmisi gas yang optimal dan mengetahui kelayakan keekonomian dari pembangunan pipa transmisi tersebut. Berdasarkan kajian tersebut, maka desain yang digunakan adalah penggunaan pipa ukuran 18 inchi dengan tebal 0,5 inchi dan pipa ukuran 16 inchi dengan tebal 0.406 inchi.
Biaya investasi pembangunan pipa transmisi tersebut adalah sebesar USD 24.600.000,-. Nilai toll fee sebesar 0,271 USD/MSCF jika Internal Rate Return (IRR) ditetapkan sebesar 15%. Nilai Net Present Value (NPV) sebesar USD 7.537.206,- dan nilai Pay Back Period sebesar 11 tahun 8 bulan sehingga dapat disimpulkan proyek tersebut layak secara keekonomian.

Gas demand in the oil refinery amounted to 57 MMSCFD (Million Standard Cubic Feet per Day) in the first year until the third year, later raised to 120 MMSCFD in the third year until the tenth year and then increased to 157 MMSCFD in the tenth to the twentieth year. Due to growing gas needs, it is necessary to design the optimal design in addressing the needs of gas at the refinery.
The purpose of this research is to design an optimal gas transmission pipeline and determine the economic feasibility of the pipeline project. Based on these studies, the design is using of pipe 18 inches with 0,5 inches pipe wall thickness and 16 inches with 0,406 inches pipe wall thickness.
The investment cost of pipeline are USD 24.600.000,-. The toll fee is $ 0.37 / MSCF if the Internal Rate of Return (IRR) is set at 15%. Net Present Value (NPV) is USD 7.537.206,- and the value of Pay Back Period is 11 years and 8 months so it can be concluded that the project viable economical.
"
Depok: Fakultas Teknik Universitas Indonesia, 2016
T46739
UI - Tesis Membership  Universitas Indonesia Library
cover
"Tte h water hemma pro,one the most -important question of unsteady flow in pipelines....."
Artikel Jurnal  Universitas Indonesia Library
cover
Kurniawan
"Pemilik bermaksud untuk meningkatkan kapasitas Crude Distillation Unit (CDU) yang ada. Tujuan proyek ini adalah untuk meningkatkan kapasitas sebesar 20%. Kapasitas CDU akan ditingkatkan dari 125 MBSD menjadi 150 MBSD dengan komposisi minyak mentah berat baru (maks. Sulfur 0,37% wt). Tujuan lain dari proyek ini adalah untuk memverifikasi dan merancang apakah peralatan dan sistem yang ada memadai untuk kapasitas baru dengan investasi minimum, biaya operasi dan periode penutupan minimum. Perubahan kapasitas produksi akan menyebabkan perubahan dinamika fluida yang mengalir pada jaringan pipa dan peralatan eksisting yang dapat mempengaruhi tekanan fluida. Perhitungan hidraulik diperlukan untuk memahami dampak kapasitas produksi terhadap perubahan tekanan melalui pipa. Modifikasi pada penyesuaian pressure drop control valve dapat memastikan bahwa tekanan fluida di tempat tujuan (battery limit / peralatan) dapat tercapai. Hasil menunjukkan bahwa pipa dan sistem memadai untuk kapasitas baru dan tekanan pada battery limit dapat mengikuti persyaratan pemilik.

Owner intends to upgrade the existing Crude Distillation Unit (CDU). The objective of project is to upgrade the capacity by 20%. The CDU capacity shall be increased from 125 MBSD to 150 MBSD with new heavy crude composition (max. sulphur 0.37%wt). Another objective of this project is to verify and design whether the existing equipment and systems are adequate for the new capacity with minimum investment, operating cost and minimum shutdown period. Changes in production capacity will lead to changes the dynamics of the fluid flowing in the existing pipelines and equipment which can affect fluid pressure. Hydraulic calculation is needed to understand impact of production capacity on pressure changes through the pipelines. Modification on pressure drop control valve adjustment can ensure that fluid pressure at the destination (battery limit / equipment) can be achieved. Result shown that pipelines and systems are adequate for the new capacity and pressure at battery limit can follow owner’s requirement"
Jakarta: Fakultas Teknik Universitas Indonesia, 2021
PR-Pdf
UI - Tugas Akhir  Universitas Indonesia Library
cover
Kartika Sismiantari
"Tesis ini bertujuan untuk mengetahui keekonomian jalur pipa distribusi gas bumi dari titik suplai ke konsumen di wilayah Papua Barat serta untuk menentukan besarnya tarif distribusi pada suatu jaringan pipa. Tahapan penelitian meliputi studi literatur, pengumpulan data, analisis supply and demand, menentukan skenario, analisis keekonomian, analisis sensitivitas, dan penarikan kesimpulan dan saran. Skenario yang diusulkan ada tiga. Pertama, skenario pembiayaan Pemerintah. Kedua skenario Pembiayaan Badan Usaha 100% Equity dan yang terakhir skenario pembiayaan melalui Badan Usaha 30% equity. Analisis Keekonomian Jaringan Pipa Distribusi Gas Bumi di Papua Barat dengan skenario pertama menunjukkan bahwa proyek ini akan ekonomis dengan harga Rp.3.887/m3. Skenario kedua akan ekonomis dengan harga Rp. 4.655,32/m3. Skenario ketiga akan ekonomis dengan harga minimal Rp.5.768,65/m3. Faktor yang berpengaruh terhadap terjadinya perubahan adalah eskalasi biaya operasi dan penurunan kebutuhan konsumen.

This Tesis aims to analyze the economics of natural gas distribution pipeline from point of supply to consumers in the Sorong area and to determine the amount of the distribution tariff on a pipeline. Stages of the present study, in general includes the study of literature, data collection, analysis of supply and demand, determine the scenario, economic analysis, sensitivity analysis, and drawing conclusions and suggestions. There are three proposed scenarios. First, government financing scenario, the second scenario 100% Financing Entity Equity and the latter scenario enterprises financing through 30% equity. Economical Analysis of Natural Gas Distribution Pipeline in West Papua with the first scenario shows that the project will be economically priced Rp.3.887/m3. The second scenario would be economical at a price of Rp. 4655.32 / m3. The third scenario would be economical with minimal price Rp.5.768, 65/m3. Factor that influence the occurrence of change is escalating operating costs and decreased consumer demand."
Jakarta: Fakultas Teknik Universitas Indonesia, 2014
T41662
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2   >>