Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 7 dokumen yang sesuai dengan query
cover
cover
Agnes Ferinna
Abstrak :
Skripsi ini membahas tentang kelayakan finansial dengan menggunakan parameter benefit over cost ratio (BCR) dan incremental rate of return (IRR) dari berbagai solusi untuk memperbaharui sistem penyediaan air baku di Depok, Jawa Barat. Solusi yang diajukan dilatarbelakangi oleh banyaknya eksploitasi air tanah berupa pengunaan sumur dangkal dan tidak adanya jaringan perpipaan suplai air baku di Kota Depok. Solusi tersebut terdiri dari dua desain utama, yakni: sistem distribusi terpusat secara regional melalui konstruksi sumur dalam dan sistem distribusi terpusat secara keseluruhan melalui instalasi jaringan perpipaan. Kedua desain tersebut diskenariokan menjadi empat opsi implementasi, yaitu: 1) konstruksi sumur dalam 2) instalasi jaringan pipa 3) proses bertahap dalam bentuk instalasi jaringan pipa setelah operasi sumur dalam mencapai periode pengembalian atau payback period dan 4) proses bertahap dalam bentuk instalasi jaringan pipa setelah operasi sumur dalam mencapai titik impas atau breakeven point. Hasil analisis finansial menunjukkan bahwa opsi-1 lebih menguntungkan dari segi perbandingan keuntungan biaya dengan nilai BCR = 1.53 sedangkan opsi-4 lebih menguntungkan dari segi laju pengembalian investasi dengan nilai IRR = 33.42%. Akan tetapi pengambilan keputusan tidak dapat secara langsung ditentukan karena akan bergantung pada jenis kontrak dan harus dievaluasi dari berbagai aspek lain, seperti: aspek lingkungan, ekonomi dan hukum. ......The objective of this study is to measure the feasibility level of various proposed solutions to the current practice of water distribution system in Depok, West Java. The feasibility study is carried out through financial analysis in terms of benefit over cost ratio (BCR) and incremental rate of return (IRR). All proposed solutions are aimed to eliminate shallow-individual well utilization in Depok which has caused negative impacts regarding the geohydrological, environmental, groundwater sustainability, health and economy aspects. They consist of four options which are; 1) regionally centralized system that relies on deep well, 2) fully centralized system which relies on piping network, 3) staging progress in which deep wells are to be constructed and operated first until payback period has been reached and 4) staging progress in which deep wells are to be constructed and operated first until the accumulated benefit equals to the initial cost of piping network. The result of the financial analysis shows that option-1 is more desirable in term of the benefit over cost ratio with BCR = 1.53 and option-4 is more desirable in term of the incremental rate of return with IRR = 33.42%. The decision, however, cannot be made since it depends on the contract type of the project and should be evaluated further from other point of views.
Depok: Fakultas Teknik Universitas Indonesia, 2013
S46688
UI - Skripsi Membership  Universitas Indonesia Library
cover
Nurul Triaini
Abstrak :
ABSTRAK
Pemanfaatan Gas bumi di dalam negeri sampai saat ini masih belum optimal, karena masih terbatasnya infrastruktur jaringan pipa distribusi gas bumi dan juga terkandala dengan kapasitas pasokan gas yang ada, serta karena tidak seimbangnya peningkatan konsumsi gas bumi dengan peningkatan kapasitas pasokannya. Pembangunan dan rencana pengembangan infrastruktur pasokan gas bumi tidak seimbang dengan peningkatan kebutuhan gas bumi, dimana bumi untuk kebutuhan dalam negeri pada saat ini baru sekitar 41,6 % dan sisanya 58,4 % diekspor tujuan dari penulisan thesis ini adalah untuk menganalisis keekonomian jalur pipa distribusi gas bumi dari titik suplay ke beberapa konsumen di wilayah Jawa Tengah dan sekitarnya serta untuk menentukan besarnya tarif distribusi pada suatu jaringan pipa. Untuk mengetahui hal tersebut di atas, perlu dilakukan beberapa kegiatan diantaranya adalah melakukana analisis penyediaan dan permintaan, menentukan jalur pipa distribusi, menentukan aspek teknis dari pipa distribusi, analisis keekonomian dan analisis sensitivitas serta menghitung besarnya tarif distribusi. Dalam menganalisis prakiraan permintaan gas bumi Jawa Tengah dilakukan perhitungan berdasarkan kepada kebutuhan BBM, kemudian dilakukan switching kepada gas bumi. Dari hasil perhitungan keekonomian untuk pembangunan jaringan pipa distribusi Jawa Tengah ini dibutuhkan investasi sebesar 69,82 Juta USD, dan IRR sebesar 13 %, margin 1,49 USD/MMBTU, NPV 59,45 Juta USD , Payback Periode 8,84 tahun dan Rasio Benefit/Cost sebesar 1,89. Tarif distribusi gas bumi untuk setiap km sebesar 0,013 USD/MMBTU. Dilihat dari angka-angka tersebut, makapembangunan ini layak untuk dilakukan , dengan demikian akan terwujud pemanfaatan gas bumi, serta pemakaian energi di Kawasan Jawa Tengah akan beralih dari bahan bakar minyak ke gas bumi.
Fakultas Teknik Universitas Indonesia, 2007
T23781
UI - Tesis Membership  Universitas Indonesia Library
cover
Kartika Sismiantari
Abstrak :
Tesis ini bertujuan untuk mengetahui keekonomian jalur pipa distribusi gas bumi dari titik suplai ke konsumen di wilayah Papua Barat serta untuk menentukan besarnya tarif distribusi pada suatu jaringan pipa. Tahapan penelitian meliputi studi literatur, pengumpulan data, analisis supply and demand, menentukan skenario, analisis keekonomian, analisis sensitivitas, dan penarikan kesimpulan dan saran. Skenario yang diusulkan ada tiga. Pertama, skenario pembiayaan Pemerintah. Kedua skenario Pembiayaan Badan Usaha 100% Equity dan yang terakhir skenario pembiayaan melalui Badan Usaha 30% equity. Analisis Keekonomian Jaringan Pipa Distribusi Gas Bumi di Papua Barat dengan skenario pertama menunjukkan bahwa proyek ini akan ekonomis dengan harga Rp.3.887/m3. Skenario kedua akan ekonomis dengan harga Rp. 4.655,32/m3. Skenario ketiga akan ekonomis dengan harga minimal Rp.5.768,65/m3. Faktor yang berpengaruh terhadap terjadinya perubahan adalah eskalasi biaya operasi dan penurunan kebutuhan konsumen. ......This Tesis aims to analyze the economics of natural gas distribution pipeline from point of supply to consumers in the Sorong area and to determine the amount of the distribution tariff on a pipeline. Stages of the present study, in general includes the study of literature, data collection, analysis of supply and demand, determine the scenario, economic analysis, sensitivity analysis, and drawing conclusions and suggestions. There are three proposed scenarios. First, government financing scenario, the second scenario 100% Financing Entity Equity and the latter scenario enterprises financing through 30% equity. Economical Analysis of Natural Gas Distribution Pipeline in West Papua with the first scenario shows that the project will be economically priced Rp.3.887/m3. The second scenario would be economical at a price of Rp. 4655.32 / m3. The third scenario would be economical with minimal price Rp.5.768, 65/m3. Factor that influence the occurrence of change is escalating operating costs and decreased consumer demand.
Jakarta: Fakultas Teknik Universitas Indonesia, 2014
T41662
UI - Tesis Membership  Universitas Indonesia Library
cover
Eni Juliana
Abstrak :
PT X merupakan salah satu perusahaan niaga swasta berfasilitas yang bergerak dalam bidang penyaluran gas alam di wilayah Kabupaten Tangerang. Jaringan pipa distribusi gas yang dimiliki pipa mainline berukuran diameter 8 dan 6 inch, pipa konsumen berukuran 4 inch, dengan total panjang 39,5 km. Pada tahun 2014, PT X diakuisisi oleh PT Y dan menjadi anak PT Y dengan kepemilikan 100% saham. Untuk mengetahui potensi teknis dan keekonomian dari pengembangan aset jaringan pipa yang ada saat ini dalam periode sepuluh tahun mendatang, maka penelitian ini dilakukan. Penelitian dilakukan dengan cara melakukan evaluasi kinerja terhadap jaringan pipa yang ada saat ini, pemetaan sebaran industri di wilayah Kabupaten Tangerang, pembuatan desain teknis pengembangan jaringan pipa gas distribusi dengan menggunakan simulasi proses dan perhitungan keekonomian pengembangan jaringan pipa dengan asumsi semua dana berasal dari ekuitas. Kapasitas laju alir yang dioperasikan saat ini sebanyak 8,1 sampai dengan 9,72 MMSCFD dengan tekanan operasi 120 psig. Nilai keekonomian jaringan pipa existing adalah is NPV = 218.490,92 USD dan PI=1,15. Berdasarkan hasil simulasi proses, jaringan pipa yang ada saat ini memiliki kapasitas maksimum pipa sebesar 28,2 MMSCFD pada tekanan 210 psig. Untuk skenario pengembangan pipa hingga 80% dari kapasitas maksimum (22,6 MMSCFD), maka posisi dan desain pipa pengembangan yang memungkinkan antara lain: 1 km pipa Ø6? dan 3 km pipa Ø4? ke Jalan Industri III dan IV; 2 km pipa Ø4? ke Jalan Telesonik, Jalan Veteran, dan Jalan Jatake; 2 km pipa Ø4? ke Jalan Manis; dan 2 km pipa Ø4? ke Jalan Bhumimas. Total panjang pipa pengembangan adalah 10 km, dengan total biaya investasi sebesar USD 1.326.655,27. Tarif toll fee pipa distribusi ke ruas pipa pengembangan adalah 0,3081 USD/MSCF. Nilai keekonomian jaringan pipa distribusi keseluruhan existing dan pengembangan: NPV= 2.035.313,02 USD and PI=1,49. ......PT X is a private commercial company fully engaged in distribution of natural gas business in Kabupaten Tangerang area. The natural gas existing pipelines owned by PT X have 8 and 6 inches in diameter for mainline, and 4 inch for delivery pipeline with total length 39,5 km. In 2014, PT X was acquired by PT Y and became a subsidiary of PT Y with 100% ownership share. In order to know the technical and economic potential of pipeline development for ten years, the research was conducted. Research was done by evaluating the performance of the existing pipelines, mapping the industrial area in Kabupaten Tangerang, created technical design for pipeline development using process simulation software, and calculated the economic value for developing pipeline made, which the source of investments is from equity. The existing capacity used in operation is 8,1 to 9,72 MMSCFD with 120 psig operation pressure. The economic value for existing pipeline is NPV = 218.490,92 USD and PI=1,15. The maximum pipeline capacity is 28,2 MMSCFD in condition 210 psig operating pressure. To optimize the utilities of existing pipeline up to 80% of maximum pipeline capacity (22,6 MMSCFD), the potential position and pipeline design that fit for development are 1 km of Ø6 and 3 km of Ø4? pipe to Jalan Industri III&IV; 2 km of Ø4? pipeline diameter to Jalan Telesonik, Jalan Veteran and Jalan Jatake; 2 km of Ø4? pipeline to Jalan Manis, and 2 km of Ø4? pipeline to Jalan Bhumimas. The total length for pipeline development is 10 km, with USD 1.326.655,27 in total cost. The toll fee tariff for on development pipeline section is 0,3081 USD/MSCF. The economic value for overall existing pipeline and development: NPV= 2.035.313,02 USD and PI=1,49
Depok: Fakultas Teknik Universitas Indonesia, 2016
T46745
UI - Tesis Membership  Universitas Indonesia Library
cover
Fildzah Dhira Lestari
Abstrak :
ABSTRAK
Kebocoran jaringan pipa distribusi air bersih dapat menimbulkan risiko keselamatan air bersih berupa kontaminasi air dan penyebaran penyakit melalui air. Sehingga dalam mendukung, mengevaluasi, dan meningkatkan manajemen keselamatan air pada jaringan pipa distribusi, digunakan metode pendekatan kuantitatif salah satunyaQuantitative Microbial Risk Assessment (QMRA). Penelitian ini bertujuan untuk mengetahui kualitas air bersih terutama parameter E. coli di jaringan pipa distribusi, menganalisis penilaian risiko keterpajanan E. coli O157:H7, mengidentifikasi risiko penilaian efek kesehatan dan menganalisis karakter risiko bakteri tersebut. Metode penelitian menggunakan metode QMRA, yaitu identifikasi bahaya, penilaian paparan, penilaian efek kesehatan dengan model Beta-Poisson, dan karakterisasi risiko. Tahap identifikasi bahaya menetapkan paparan E. coli O157:H7 berasal dari air PDAM, dimana jalur paparannya adalah unboiled water, dengan rute paparan melalui proses menelan akibat aktivitas pemakaian air PDAM sehari-hari. Terdapat dua tipe penggunaan air, yaitu penggunaan air secara langsung dari jaringan pipa distribusi dan air dialirkan menuju tangki air. Identifikasi bahaya dilakukan dengan pemeriksaan kualitas air pada jaringan pipa distibusi, bahwa hasil menunjukkan kualitas air telah memenuhi Peraturan Menteri Kesehatan Republik Indonesia No. 492 Tahun 2010 untuk parameter fisik dan kimia. Namun untuk parameter biologis, konsentrasi E. colimaksimum ditemukan 49 MPN100 mL pada 1 responden (20) yang menggunakan tangki air. Penilaian paparan untuk menentukan dosis paparan akibat E. coli O157:H7 mendapatkan besarnya rata-rata kurang dari 0,01090,0026 organismeL dan 0,01440,0041 organismeL saat pemakaian air minimum dan maksimum. Dosis paparan meningkat pada responden yang menggunakan tangki air sebesar 946 dan 860 saat penggunaan air minimum dan maksimum. Tahap penilaian efek kesehatan menggunakan model Beta-Poisson dengan dan adalah 0,0571 dan 2,2183 mendapatkan bahwa rata-rata probabilitas infeksi harian pada jaringan pipa distribusi PDAM adalah kurang dari adalah 2,800x10-46,723x10-5 dan 3,698x10-41,046x10-4saat pemakaian air minimum dan maksimum. Bagi responden yang menggunakan tangki air, probabilitas infeksi harian meningkat sebesar 876 dan 785 saat penggunaan air minimum dan maksimum. Sehingga, pada tahap karakterisasi risiko, probabilitas infeksi tahunan adalah kurang dari 9,598x10-22,205x10-2 dan 1,236x10-13,127x10-2 saat pemakaian air minimum dan maksimum. Bagi responden pengguna tangki air, probabilitas infeksi tahunan meningkat sebesar 271 dan 204 saat penggunaan air minimum dan maksimum. Karena itu, evaluasi parameter fisik, kimia dan biologi perlu dilakukan berdasarkan waktu dan wilayah untuk meningkatkan performansi IPAB dan keselamatan konsumen.
ABSTRACT
Pipe leakage of clean water distribution network can cause clean water safety risks in the form of water contamination and waterborne disease. So that, in supporting, evaluating, and improving water safety management in distribution pipe network, a quantitative approach is used, which is Quantitative Microbial Risk Assessment (QMRA). This study aims to study the quality of clean water, especially E. coli in distribution pipe network; analyzing the exposure assessment of E. coli O157:H7, identification the risk of health effects assessment and analyzing the risk character. The research method uses QMRA method, namely hazard identification, exposure assessment, health effects assessment with Beta-Poisson model, and risk characterization. Hazard identification determines exposure of E. coli O157:H7 come from PDAM water, which the exposure path is unboiled water, with route of exposure through ingestion due to daily PDAM water usage activities. There are two types of water usage, its water usage directly from water distribution pipe and through water tank. Examining water quality carries out hazard identification, which water quality on the PDAM distribution pipe network has fulfilled the Regulation of the Minister of Health of the Republic of Indonesia No. 492 in 2010 for physic and chemical parameter. However, in biologic parameter, the maximum E. coli concentration was found to be 49 MPN100 mL in 1 respondent (20), who used water tank. Exposure assessment determines the exposure dose of E. coli O157:H7 on clean water distribution pipe network with the averages of doses are less than 0,01090,0026 organismsL and less than 0,01440,0041 organismsL at minimum and maximum of water usage, respectively. The exposure dose increase when the respondent use water tank, its 946 and 860 at minimum and maximum water usage. Health effects assessment usingBeta-Poisson model with and are 0,0571 and 2,2183, respectively. The averages of daily probability of infection on clean water distribution pipe network in PDAM are less than 2,800x10-46,723x10-5 and less than 3,698x10-41,046x10-4 at minimum and maximum of water usage, respectively. Respondent, who use water tank, have increased the daily probability of infection to 876 and 785 at minimum and maximum water usage. So that, in risk characterization, the annual probability of infection are less than 9,598x10-22,205x10-2 and 1,236x10-13,127x10-2 at minimum and maximum of water usage, respectively. For respondent who use water tank, it has increased to 271 and 204 at minimum and maximum of water usage, respectively. Therefore, evaluation in physic, chemical, and biology parameters needs to be done based on time and region to improve WTP performance and consumer safety.
2019
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Novio Valentino
Abstrak :
Gas alam memiliki peranan sangat penting dalam menyediakan energi yang bersih lingkungan. Sehingga, permintaan gas sebagai sumber energi terus meningkat dan relatif lebih tinggi dibandingkan minyak . Pemerintah akan mengoptimalkan pemanfaatan gas bumi sebagai bahan bakar melalu program Jaringan Gas Kota. Pemerintah pada tahun 2010 telah membangun jaringan gas kota, yaitu di antaranya di Kota Depok. Jaringan di bangun di Kelurahan Beji dan Beji Timur dengan jumlah Sambungan Rumah mencapai 4.000 sambungan. Oleh karena itu, maka dilakukan penelitian tentang pengembangan jaringan pipa distribusi gas di rumah tangga. Simulasi dilakukan menggunakan perangkat lunak sistem perpipaan. Hasil studi ini menghasilkan desain basis proses untuk jaringan pipa distribusi gas bumi dan dimensi pipa yang dibutuhkan untuk pengembangan jaringan pipa distribusi gas bumi. ......Natural gas has a very important role in providing a clean energy environment. Thus, demand for gas as an energy source continues to increase and the relatively higher compared to oil. The government will optimize the utilization of natural gas as a fuel through the City Gas Network program. Government in 2010 has built a network of city gas, which is among the city of Depok. Network built in East Beji and Beji with the number of house connections reach 4000 connections. Therefore, it conducted research on the development of gas distribution pipelines in the household. Simulations performed using the software pipeline system. The results of this study resulted in the design basis for the natural gas distribution pipelines and pipeline dimensions required for the development of gas distribution pipelines.
Depok: Fakultas Teknik Universitas Indonesia, 2012
S43358
UI - Skripsi Open  Universitas Indonesia Library