Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 3 dokumen yang sesuai dengan query
cover
Laurentius Dimas Brahmantyo Satria
Abstrak :
The construction industry presents notable risk, especially in mechanical and electrical (M&E) work. This research will develop a construction safety plan with the aim of preventing and mitigating possible accidents caused by M&E work during the construction of residential flats in Indonesia. The quantitative research is carried out by conducting surveys in the form of questionnaires to various persons, such as professionals who are knowledgeable in the field of construction safety, in order to validate on the variables that the Author has chosen to focus on. A comprehensive safety plan that includes a thorough risk assessment, including appropriate safety target and program, will contribute to the development of effective construction safety plan for mechanical and electrical work in Indonesian residential flat constructions, ultimately improving the safety and well-being of the construction industry and the workers. ......Industri konstruksi memiliki risiko yang cukup besar, terutama pada pekerjaan mekanikal dan elektrikal. Penelitian ini bertujuan untuk mengembangkan perencanaan keselamatan konstruksi dengan tujuan mencegah dan memitigasi kemungkinan kecelakaan yang disebabkan oleh pekerjaan mekanikal dan elektrikal selama pembangunan rumah susun di Indonesia. Perencanaan keselamatan yang komprehensif yang mencakup penilaian risiko menyeluruh, termasuk sasaran dan program keselamatan yang tepat, akan berkontribusi pada pengembangan rencana keselamatan konstruksi yang efektif untuk pekerjaan mekanikal dan elektrikal pada konstruksi rumah susun di Indonesia untuk meningkatkan keselamatan dan kesejahteraan industri konstruksi dan para pekerja.
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Nur Ajizah
Abstrak :
Demi tercapainya pelaksanaan suatu proyek konstruksi yang memuaskan, hal ini tidak luput dari bagaimana peran sumber daya yang terlibat untuk tiap elemen pekerjaan yang ada. Perencanaan sumber daya menjadi hal yang sangat penting untuk diamati, sebelum perencanaan waktu dan biaya untuk proyek dilakukan. Perencanaan sumber daya tersebut diperoleh melalui pendefinisian lingkup-lingkup kerja menjadi elemen pekerjaan yang lebih mendetail. Penguraian pekerjaan-pekerjaan menjadi elemen pekerjaan yang lebih spesifik mampu membantu meminimalisir risiko kerugian yang akan diterima proyek pada tahap akhir pelaksanaan. Namun sayangnya, masih banyak proyek konstruksi di Indonesia yang belum mampu menekan angka kerugian kualitas, waktu dan biaya yang dikeluarkan lantaran tidak melakukan perencanaan sumber daya dengan baik. Hal ini disebabkan belum terciptanya suatu standar yang mampu menjadi acuan proyek-proyek konstruksi di Indonesia dalam menyusun elemen-elemen pekerjaan yang dibutuhkan. Sehingga, pada penelitian ini diuraikan proses perencanaan sumber daya untuk pekerjaan proyek konstruksi dengan berbasis WBS Work Breakdown Structure . Penelitian ini menitikberatkan pada perencanaan sumber daya khusus untuk pekerjaan mekanikal dan elektrikal pada bangunan gedung apartemen. Mengingat pekerjaan mekanikal dan elektrikal menjadi salah satu rumpun pekerjaan pada proyek konstruksi Indonesia yang belum memiliki standardisasi perencanaan sumber daya yang mendetail. Penyusunan standar perencanaan sumber daya berbasis WBS Work Breakdown Structure ini dilakukan dengan menerapkan metode Delphi. Penggunaan metode ini mengharuskan penulis melakukan validasi terhadap perencanaan sumber daya yang telah disusun kepada para pakar penelitian. Adapun pakar penelitian yang terlibat merupakan para ahli dengan pengalaman minimal 10 tahun dalam pekerjaan mekanikal dan elektrikal bangunan gedung apartemen. Dengan disusunnya standar perencanaan sumber daya pada pekerjaan mekanikal dan elektrikal dengan berbasiskan WBS Work Breakdown Structure , diharapkan dapat meminimalisir angka kerugian yang selama ini terjadi pada proyek konstruksi di Indonesia, khususnya untuk proyek bangunan gedung apartemen.
In order to achieve a satisfying construction project, we can not separate the role of the resources involved for each element of the work. Resource planning becomes a very important thing to observe, before the planning process of time and cost for the project is done. This resource planning can obtained by defining the scope of work into more detailed work elements. The decomposition process of work into a more specific work element can help minimize the risk of losses to be received by the project in the final stages of implementation. Unfortunately, there are still many construction projects in Indonesia that have not been able to reduce the number of quality losses, time and costs incurred due to not doing resource planning properly. This condition is due to the absence of a standard that can be a reference of construction projects in Indonesia in preparing the elements of work. Thus, this research will describe the resource planning process for the construction work based on WBS Work Breakdown Structure . This research focuses on designing the resource planning for mechanical and electrical work on apartment buildings. As given the mechanical and electrical work being one of the construction project work that do not yet have the standardization of detailed resource planning. The preparation of WBS Work Breakdown Structure based resource planning standard was done by applying the Delphi method. The use of this method requires the authors to validate the resource planning that has been prepared before to the experts that involved in this research. The research experts involved are experts with a minimum of 10 years experience in mechanical and electrical work of apartment buildings. With the compilation of resource planning standards on mechanical and electrical work based on WBS Work Breakdown Structure , it is expected to minimize the number of losses that have occurred in construction projects in Indonesia, especially for apartment building projects.
Depok: Fakultas Teknik Universitas Indonesia, 2018
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Achmad Oktafiono
Abstrak :
Kompleksitas pembangunan proyek stadion dengan penggunaan kontrak rancang-bangun atau design-build (DB) di Indonesia cenderung menimbulkan masalah yang memicu perselisihan. Salah satunya mengenai ketidakakuratan pengukuran volume pekerjaan mekanikal dan elektrikal (ME) karena adanya perbedaan cara pandang dari pihak-pihak yang terlibat dalam proses pengukuran. Oleh karena itu, pengembangan suatu standar pengukuran sangat diperlukan untuk memberikan acuan yang seragam. Penelitian ini bertujuan untuk mengembangkan SMM berbasis WBS untuk pekerjaan ME bangunan utama stadion dalam kontrak DB di Indonesia. Penelitian diawali dengan studi literatur mengenai dokumen proyek stadion berupa BQ, rincian anggaran biaya (RAB), rencana kerja & syarat-syarat (RKS), dan Peraturan Menteri (PerMen) PUPR No 28 2016 untuk menyusun WBS Pekerjaan ME Bangunan Utama Stadion. WBS yang disusun kemudian divalidasi oleh pakar melalui kuesioner dan wawancara dan dilakukan analisis Delphi. WBS yang telah divalidasi digunakan untuk mengembangkan SMM pekerjaan ME Bangunan Utama Stadion dengan mengacu pada SMM Indonesia dan luar negeri. SMM yang dikembangkan kemudian juga divalidasi oleh pakar melalui kuesioner dan wawancara dan dilakukan analisis Delphi. Selain itu, dilakukan juga pemodelan hubungan variabel untuk mengetahui korelasi pengembangan SMM berbasis WBS terhadap akurasi pengukuran volume pekerjaan menggunakan Structural Equation Modeling (SEM). Dalam pemodelan hubungan variabel WBS, SMM, dan Akurasi Perhitungan Volume Pekerjaan, proses penelitian yang dilakukan adalah studi literatur untuk menyusun konstruk dan indikator variabel, validasi konstruk & indikator variabel, pilot survey, survei responden. Hasil survei responden dilakukan analisis homegenitas, validitas & reliabilitas, kecukupan data, dan uji struktur model. Hasil penelitian ini menunjukkan SMM berbasis WBS Pekerjaan ME Bangunan Utama Stadion mampu mengurangi permasalahan perselisihan mengenai ketidakakuratan pengukuran volume pekerjaan ME Bangunan Utama Stadion yang menggunakan kontrak DB. ......The construction complexity of stadium projects with the use of design-build (DB) contracts in Indonesia tends to cause problems triggering disputes. One of which is regarding the inaccuracy of mechanical and electrical (ME) works volume measurements due to different perspectives of the involved parties on how to measure. Therefore, developing a measurement standard is necessary to provide a uniform reference. This research aims to develop a WBS-based SMM for the ME works of stadium main building in Indonesian DB contract. The research begins with literature study on stadium project documents in the form of BQ, detailed budget, work plan & requirements, and Ministry of Public Works and Housing Regulation No. 28/PRT/ M/2016 to compile ME works WBS of stadium main building. The WBS was then validated by experts through interviews questionnaires and a Delphi analysis was carried out. The validated WBS is used to develop SMM for ME works of stadium main building with reference to the Indonesian and overseas SMM. The developed SMM was then also validated by experts through interviews questionnaires and a Delphi analysis was also carried out. In addition, variable relationship modeling was carried out to determine the correlation of WBS-based SMM development toward the accuracy of work volume measurement using Structural Equation Modeling (SEM). In modeling the relationship between WBS, SMM, and work volume measurement accuracy, the research process carried out was literature study to develop constructs and variable indicators, variable constructs and indicators validation, pilot surveys, and respondent survey. The results of the respondent survey was analyzed for homogeneity, validity & reliability, data adequacy, and model structure testing. The results of this study indicate that the WBS-based SMM for the ME Works of stadium main building is able to reduce the dispute problem regarding the inaccuracy of ME work volume measurement in stadium main building with the use of DB contract.
Depok: Fakultas Teknik Universitas Indonesia, 2021
T-pdf
UI - Tesis Membership  Universitas Indonesia Library