Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 3 dokumen yang sesuai dengan query
cover
Firdaus
Abstrak :
ABSTRAK
Platform Jacket yang telah difabrikasi di darat akan dibawa/ ditransportasi ke site dengan menggunakan kapal tongkang (barge) untuk di-install di lapangan migas. Selama proses transportasi diperlukan suatu pengikatan struktur jacket ke deck barge agar struktur Jacket tetap stabil diatas barge. Sistem pengikatan yang disebut seafastening ini harus di desain kuat untuk menerima beban yang diakibatkan oleh pergerakan (motion) kapal, yakni tiga gerakan translasional (surge, sway, heave) dan tiga gerakan rotasional (pitch, roll dan yawn). Gerakangerakan ini menimbulkan percepatan pada barge yang berakibat timbulnya gaya tambahan pada struktur diatasnya dan hal ini mempengaruhi tegangan pada seafastening. Perangkat lunak Multi Operational Structural Computer System (MOSES) dipergunakan sebagai alat bantu untuk permodelan Barge dan Jacket, serta perhitungan karakteristik Response Amplitude Operator (RAO) yang diakibatkan oleh beban lingkungan. Selanjutnya untuk menghitung tegangan yang terjadi pada seafastening, digunakan perangkat lunak Structural Analysis Computer System (SACS) dengan pembebanan berupa beban mati, beban angin dan beban inersia yang diakibatkan oleh motion kapal tongkang/ Barge. Besarnya tegangan harus memenuhi kriteria Unity Check (UC).
ABSTRACT
Platform Jacket which fabricated in yard will be transported to the site with barge for installation. During the transport process, strong fastening system from jacket to deck barge is required so that the Jacket Structure remains stable on Barge. Fastening system that called seafastening must be in strong designs to accept the load caused by the movement of the barge, three translational motion (surge, sway, heave) and three rotational movement (pitch, roll and yawn). These movements cause the acceleration of the barge which result in the emergence additional force on the structure above, and this influences the stress at seafastening. Multi Operational Structural Engineering Simulator (MOSES) software is used as a tool for modeling of Barge and Jacket, as well as the calculation of the characteristics Response Amplitude Operator (RAO) caused by environmental. Furthermore, to calculate the stress that occurs in seafastening, software Structural Analysis Computer System (SACS) is used, with the loads on a construction during seafastening is dead load of the structure, wind load and innertia load caused by the motion of barge / Barge. The magnitude of the stress of seafastening must meet the criteria of Unity Check (UC).
2016
S63765
UI - Skripsi Membership  Universitas Indonesia Library
cover
Purnomo Rusdiono
Abstrak :
Pengembangan lapangan migas marjinal wilayah lepas pantai pada skema Production Sharing Contract (PSC) gross split memiliki tantangan teknis dan ekonomis. Pada penelitian ini berfokus pada analisis secara ekonomis terhadap pengembangan lapangan migas lepas pantai marjinal. Metode pengembangan lapangan menggunakan tiga skenario yaitu skenario I dengan Konvensional Platform; skenario II dengan Floating Production Storage and Offloading (FPSO); skenario III dengan Sea Moveable Platform (SMP). Analisis ekonomis menggunakan indikator penganggaran modal, seperti NPV, IRR, dan Payback Period. Evaluasi keekonomian dilakukan untuk mencari metode terbaik pengembangan lapangan migas marjinal dengan menerapkan skema PSC Gross Split. Diharapkan dari skenario pengembangan tersebut, mampu meningkatkan keekonomian perusahaan. Selanjutnya dilakukan analisis sensitivitas untuk mengetahui sensitivitas perubahan parameter berikut: biaya kapital (CAPEX), biaya operasi produksi (OPEX), dan harga minyak dan gas berpengaruh terhadap nilai NPV, IRR, dan bagian pemerintah. Hasil penelitian menunjukkan bahwa skenario terbaik adalah Skenario I untuk produksi 7 tahun maupun produksi 10 tahun. Analisis keekonomian menunjukkan bahwa Skenario I dengan waktu produksi 7 tahun memberikan NPV sebesar USD 37,6 juta, IRR sebesar 30,1% dengan Payback Period 3 tahun. Sedangkan untuk waktu produksi 10 tahun diperoleh NPV sebesar USD 35,9 juta, IRR sebesar 25,2% dengan Payback Period 3 tahun. ......The development of marginal oil and gas fields in the offshore area in the gross split Production Sharing Contract (PSC) scheme has technical and economic challenges. This research focuses on economic analysis of the development of marginal offshore oil and gas fields. The field development method uses three scenarios, scenario I with Conventional Platforms; scenario II with Floating Production Storage and Offloading (FPSO); scenario III with Sea Moveable Platform (SMP). The duration of production time uses 7 years and 10 years. Economic analysis uses capital budgeting indicators, such as NPV, IRR, and Payback Period. An economic evaluation was carried out to find the best method for developing marginal oil and gas fields by applying the Gross Split PSC scheme. It is expected from the development scenario, it can improve the companys economy. The sensitivity analysis is then performed to determine the sensitivity of the following parameter changes: capital costs (CAPEX), production operating costs (OPEX), and oil and gas prices affect the value of NPV, IRR and the Government take. The results show that the best scenario is Scenario I both of production time 7 years and 10 years. The economic analysis show that Scenario I with production time 7 years is attributed to NPV of USD 37.6 million, IRR of 30.1% with Payback Period of 3 years. While for production time 10 years, NPV of USD 35.9 million, IRR of 25.2% with Payback Period of 3 years.
Depok: Fakultas Teknik Universitas Indonesia, 2020
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Rizki Reynaldi
Abstrak :
ABSTRAK
Penurunan produktivitas reservoar migas adalah masalah yang dihadapi lapangan produksi minyak dan gas bumi. Enhanced Oil Recovery EOR dengan waterflooding merupakan salah satu cara yang dapat dilakukan sebagai solusi untuk mempertahankan produksi dengan menjaga tekanan reservoar. Pemodelan pore pressure yang akurat dapat membantu dalam melakukan upaya waterflooding. Tesis ini bertujuan untuk memodelkan geomekanika reservoar lapangan migas yang berada di Cekungan Sumatera Utara dengan melakukan proses pemfilteran data sumur sebagai langkah awal untuk membangun model pore pressure yang akurat. Wilayah studi penelitian ini adalah lapangan produksi tua di Cekungan Sumatra Utara. Lapangan ini memiliki banyak data sumur produksi. Data sumur tersebut harus dipilih yang masih cocok dengan data seismik yang tersedia untuk membangun model pore pressure yang akurat. Penggunaan pore pressure model memungkinkan semua informasi yang berkaitan dengan geomekanika pengeboran dan produksi dapat diamati. Data tekanan sumur yang diukur dalam reservoar telah disaring untuk membangun model. Dalam penelitian ini telah diintegrasikan data seismik tiga dimensi 3D dalam membangun distribusi model yang mencakup sebagian besar area lapangan. Penelitian ini menggunakan lebih dari 100 data sumur yang telah berproduksi lebih dari 40 tahun. Tahap filtering menghasilkan 43 sumur untuk membangun model log pore pressure satu dimensi. Model pore pressure tersebut didistribusikan dengan data seismik 3D yang disajikan dalam parameter akustik impedansi. Hasil model menunjukkan bahwa ada variasi parameter pore pressure di lapangan ini, yang merupakan sumber informasi penting dalam melakukan upaya waterflooding yang sukses di masa yang akan datang.
ABSTRACT
Reservoir depletion is a problem faced by mature oil and gas production fields. Enhanced Oil Recovery EOR by waterflooding is one of solutions to maintain the reservoir pressure. An accurate pore pressure model can be helpful in performing a successful waterflooding. This thesis aims to model the geomechanics of oil and gas reservoir which is located in the North Sumatra Basin by performing well data filtering as a first step to build an accurate pore pressure model. The study area of this research is a mature production field in North Sumatra Basin that has been depleted for many years. This field has many production well data. These well data must be filtered based on the pressure changes from seismic data acquisition as a reference in order to construct an accurate pore pressure model. The use of pore pressure model allows all information related to geomechanics of drilling and production can be observed. In this study, the pore pressure was distributed throughout the field that was guided by 3D seismic data. 100 productive wells that have been performed for more than 40 years of production are used, which was applied to the filtering. The filtering stage resulted in 43 wells to construct one dimensional pore pressure model, which was integrated to the 3D seismic data presented in acoustic impedance parameter. The model shows that there are variations of the geomechanical parameter on the field which is a helpful information in performing a successful waterflooding project in the future.
2017
T48192
UI - Tesis Membership  Universitas Indonesia Library