Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 14 dokumen yang sesuai dengan query
cover
Oentoeng Iskandar
Yogyakarta: Andi, 2004
693.71 OEN k
Buku Teks SO  Universitas Indonesia Library
cover
M. Yusup Satiadiwiria
Bandung: Sumur Bandung, 1982
693.71 YUS d (1)
Buku Teks SO  Universitas Indonesia Library
cover
Oentoeng Iskandar
Yogyakarta: Andi, 1999
693.71 OEN k
Buku Teks SO  Universitas Indonesia Library
cover
Bandung: Yayasan Lembaga Penyelidikan Masalah Bangunan, 1980
R 624. 28 PER
Buku Referensi  Universitas Indonesia Library
cover
Jakarta: Delta Teknik Group, 1991
693.71 GUN t
Buku Teks SO  Universitas Indonesia Library
cover
Loa Wikarya Darmawan
Jakarta: Badan Penerbit Pekerjaan Umum, 1984
693.71 LOA k
Buku Teks SO  Universitas Indonesia Library
cover
Bakti Prasetyo Utomo
"Dalam perancangan suatu konstruksi baja (steel structuye) dibutuhkan suatu desain serta proses produksi dan pemasangan yang telah terintegrasi, agar dapat menekan biaya yang dibutuhkan dan mempermudah proses pengerjaan dan pemasangannya.
Salah satu cara yang ditempuh dalam proses desain adalah dengan mengimplementasikan sistem CAD/CAM/CAE pada bagian engineering sebagai sumber awal informasi. Penggunaan sistem CAD dalam proses desain steel structure khususnya pada tahap preliminary design dan detail design sangatlah dirasakan keberadaannya mengingat akan pekenjaan steel structure bukanlah suatu pekerjaan kecil dan membutuhkan banyak iterasi dalam proses desainnya.
Penelitian ini adalah untuk membuat sistem perencanaan sebelum produk manufaktur dibuat detail desainnya untuk kemudian dilempar ke shop floor, sistem perencanaan dan pengendalian material yang telah banyak diterapkan diberbagai pihak industri adalah sistem klasifikasi dan kodeilkasi material atau part membering yang memiliki kemampuan dalam mendefinisikan komponen untuk pengendalian pengadaanl pemesanan raw marerial dan pengendalian proses produksinya secara sekaligus. Dengan demikian penerapan sistem klasifikasi dan kodefikasi komponen material membantu bagian engineering design dalam pengeluaran take of material dan bill of quantity-nya. Juga membantu bagian produksi dalam mengendalikan proses produksinya.

An Integrated design, production and installation processes are needed in the steel structure planning. Its purposes are to reduce cost and to make production and installation process more easily.
One way that have been implemented in a design process is by implementing CADICAMJCAE system in engineering department as the preliminary infomation resources.The use of CAD system in design process for steel structure especially at preliminary design and detail design is important because steel structure is not that kind of small work, it needs so many iteration in it?s design processes.
This research is carried out to make a planning system for detail design of the manufactured product before it is sent to the shop floor. One of the system that have been made in many companies is coding and classification system or part numbering that have the ability to define part/component to manage process of ordering material and also to control production process. Thus the implementation of material coding and classification system helps engineering design departement to produce take off material and bill of quantity and also helps production departement to control their production process.
"
Depok: Fakultas Teknik Universitas Indonesia, 2001
S37084
UI - Skripsi Membership  Universitas Indonesia Library
cover
Schulitz, Helmut C.
Boston : Birkhäuser, 2000
693.71 SCH s (1);693.71 SCH s (2)
Buku Teks SO  Universitas Indonesia Library
cover
Hart, Franz
New York : Nichols Pub., 1985
693.7 HAR m
Buku Teks SO  Universitas Indonesia Library
cover
Yonna Adriani Achmad
"Keberhasilan suatu proyek tidak hanya diukur dari bagusnya mutu yang dihasilkan, tetapi juga dari ketepatan waktu dan biaya yang dicapai. Kunci sukses dari suatu proyek terletak pada setiap tahapan yang dilalui, terutama tahap perencanaan. Apabila sebuah proyek direncanakan secara matang dan terperinci, maka kesalahan dalam tahap pelaksanaan akan relatif kecil. Perancang memegang peranan penting di tahap perencanaan, untuk merencanakan sesuatu seorang perancang narus mempunyai pengalaman dan pengetahuan yang cukup. Salah satunya pengetahuan adalah tentang bagaimana merencanakan material.
Material merupakan salah satu sumber daya di dalam proyek yang memegang peranan cukup penting, apabila material yang digunakan tidak tepat maka selain akan menambah waktu yang dapat menyebabkan keteriambatan dari jadwal yang ditentukan, juga dapat membuat biaya proyek semakin besar.
Penelitian ini bertujuan untuk mengetahui seberapa besar pengaruh pengetahuan dan pemahaman perancang akan material dalam usaha meningkatkan kinerja biaya pelaksanaan proyek konstruksi.
Penelitian ini diiakukan pada perusahaan-perusahaan konsultan yang melaksanakan proyek bangunan gedung bertingkat tinggi. Dalam penelitian ini digunakan metode kuesioner ditambah wawancara langsung kepada para perancang yang menangani proyek konstruksi sebagai bahan masukan untuk kuesioner itu sendiri.
Berdasarkan analisis data yang diperoleh didapatkan bahwa sebagai seorang perancang hams mempertimbangkan beberapa faktor apabila menginginkan kinerja biaya proyek meningkat. Faktor-faktor utama yang mempengamhi kinerja biaya proyek adalah mempertimbangkan ketinggian tiap lantai bangunan dan mengidentifikasi material."
Depok: Fakultas Teknik Universitas Indonesia, 2001
T754
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2   >>