Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 8 dokumen yang sesuai dengan query
cover
Abstrak :
Energy audit for the electrical system in the commercial building. This papers presents some results of the energy audit that was conducted in the commercial building i.e a hotel to recommended measures to decrease energy costs every month by idenfifying of energy loss...
Artikel Jurnal  Universitas Indonesia Library
cover
Zulfah
Abstrak :
ABSTRAK
Tesis ini membahas audit energi pada peralatan utama pemanfaat gas sebagai bahan bakar pada industri minyak dan gas dengan mengambil studi kasus di lapangan Y, Kalimantan Timur. Audit energi perlu dilakukan untuk mengetahui efisiensi serta intensitas energi pada proses produksi di lapangan minyak dan gas bumi serta mengidentifikasi ruang-ruang perbaikan yang dapat dilakukan untuk meningkatkan efisiensi tersebut. Perhitungan efisiensi dan intensitas energi dilakukan pada peralatan utama pemanfaat gas berupa generator dan turbokompresor dengan pengambilan data untuk perhitungan dilakukan pada periode 2015 hingga 2017. Dari hasil perhitungan, didapatkan bahwa nilai efisiensi termal generator berkisar antara 13.54% - 17.45%. Nilai efisiensi ini dipengaruhi oleh load power generator, sehingga efisiensi generator akan semakin baik jika load power meningkat. Sementara itu, efisiensi termal kompresor berkisar antara 28,36% - 33,79%. Nilai efisiensi ini bergantung pada variabel proses serta volume gas yang dikompresi. Adapun nilai intensitas energi berkisar antara 64,554 - 71,064 dan emisi GRK yang dihasilkan berkisar antara 160,48-208,17 kt CO2 eq. Ruang-ruang perbaikan yang diidentifikasi untuk meningkatkan efisiensi dan menurunkan intensitas energi yaitu dengan mengoperasikan satu generator dan satu kompresor.
ABSTRACT
This thesis discusses about energy audit on main equipment consuming fuel gas in oil and gas by taking a case study at Field Y, East Kalimantan. Audit energy is essential to be carried out to understand the efficiency and energy intensity on oil and gas production facility and to identify room for improvement that is potential to be done to increase the said efficiency. Calculation on efficiency and energy intensity has been carried out on main equipment consuming fuel gas, which are generators and turbocompressors. Data from 2015-2017 were collected to perform the calculation. Calculation results showed that generator thermal efficiency range from 13,54% - 17,45% which was affected by generator load power itself. The efficiency will be improved if the load power is increased. Meanwhile, compressor thermal efficiency ranged from 28,36% - 33,79% depending on process variables and compressed gas volume. Energy intensity calculation result showed the value of 64,554 - 71,064 and greenhouse gas emission ranged from 160,48-208,17 kt CO2 eq. Room for improvements identified to increase efficiency and to reduce energy intensity are to operate one generator and one compressor in normal operation.
Depok: Fakultas Teknik Universitas Indonesia, 2018
T50030
UI - Tesis Membership  Universitas Indonesia Library
cover
Amalia Kumala Dewi
Abstrak :

Situasi Pandemi Covid-19 yang sudah mulai terkendali membuat banyak perkantoran mulai menerapkan sistem kerja Work From Office (WFO) kembali. Penerapan sistem kerja WFO tentu meningkatkan tingkat konsumsi energi listrik pada wilayah perkantoran. Tingkat konsumsi energi listrik di suatu gedung bergantung pada luas bangunan serta peralatan elektronik yang digunakan di gedung tersebut. Penggunaan energi listrik yang berlebihan mengakibatkan pemborosan energi listrik yang dapat berpotensi terjadinya pembengkakan tagihan listrik sehingga diperlukan metode konservasi energi yang salah satunya dapat dilakukan dengan melakukan analisis audit energi dengan Intensitas Konsumsi Energi (IKE) sebagai parameter untuk menentukan boros atau tidaknya konsumsi energi di sebuah bangunan. Kawasan Perkantoran INDY Bintaro Office Park tergolong gedung yang memiliki tingkat konsumsi energi efisien dilihat dari nilai IKE yang memenuhi standar yang berlaku. Namun, terdeteksi adanya pemborosan penggunaan energi listrik dan distorsi harmonik yang cukup menggangu dalam memenuhi kebutuhan penerangan pada Kawasan Perkantoran INDY Bintaro Office Park sehingga diperlukan upaya penghematan energi. Kawasan Perkantoran INDY Bintaro Office Park telah menerapkan peluang hemat energi dengan pemasangan panel surya untuk membantu memasok kebutuhan energi listrik, pemasangan kapasitor bank untuk memelihara kualitas daya, dan pemasangan sensor gerak yag terintegrasi dengan lampu pada beberapa ruangan.


The end of the pandemic of Covid-19 is in sight along with most companies in Indonesia started to adjust their work system to be fully WFO (Work From Office) which enables the raising of electricity bills in office area. Electricity consumption in a building depends on its area and various electronic appliance used. Excessive electricity consumption will cause a significant increase in electricity bills. Energy conservation is needed as an act of electricity saving and an energy audit is the first step to start a good energy management. Energy utilization index (EUI) is a parameter that specify whether a building is categorized as efficient or not in consuming the electricity. INDY Bintaro Office Park is categorized as an efficient building with an energy utilization index met the applicable standards. However, excessive electricity consumption and a significant harmonic distortion are detected on lighting substation. INDY Bintaro Office Park already implemented some energy conservation actions such as generating solar cells to fulfill its electricity needs, installing capacitor bank to maintain power quality, and integrating motion sensor on the lamp installed in several rooms.

Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Atifa Isanti
Abstrak :
ABSTRAK
Konsumsi energi gedung adalah faktor besar daiam biaya operasi gedung. Untuk melakukan penghematan energi, kita harus mengetahui karakter pemakaian energi dalam gedung, memilih dan menganalisa beberapa peluang panghematan energi (Energy Conservation Opportunity --ECO) dan menentukan ECO yang paling tepat. Hal ini kita lakukan dengan suatu audit energi gedung, yang dilakukan atas berbagai sistem mekanikal dan elektrikal (M&E) dalam gedung. Dalam tugas akhir ini, audit energi akan dilakukan atas tiga sistem mekanikal gedung, yaitu sistem plambing (air bersih dan air panas), sistem elevator, dan sistem HVAC di suatu gedung baru. Dengan audit energi, kita dapat mengetahui estimasi konsumsi energi gedung dan karakter konsumsi energinya. Dari eslimasi konsumsi energi tersabut, kita dapat melakukan pemilihan dan analisa pilihan ECO. untuk menentukan pilihan ECO yang paling manguntungkan paling banyak menghemat enargi untuk gedung tarsebut. Beberapa program komputer telah dikembangkan sebagai alat bantu audit energi. Dalam tugas akhir ini, penulis akan menggunakan program ASEAM2 (A Simplified Energy Analysis Method), yang telah dimodifikasi untuk digunakan di Asia Tenggara.
1996
S36574
UI - Skripsi Membership  Universitas Indonesia Library
cover
Rinaldy Dalimi
Depok: Fakultas Teknik Universitas Indonesia, 1997
LP-pdf
UI - Laporan Penelitian  Universitas Indonesia Library
cover
Yulhafidz
Abstrak :
Tesis ini membahas mengenai audit energi pada fasilitas utama dan fasilitas pendukung yang sudah cukup lama di Lapangan X provinsi Sumatra Selatan. Tujuan dilakukan audit energi adalah untuk mendapatkan profil konsumsi penggunaan bahan bakar dan intensitas energi serta kontribusi emisi gas rumah kaca (GRK) CO2eq di Lapangan X. Audit energi ini juga memberikan rekomendasi perbaikan (room for improvement) agar penggunaan energi menjadi optimal dan emisi gas CO2eq dapat diminimalisasi. Kerangka pemikiran mengacu pada ISO 50001:2011 mengenai Sistem Manajemen Energi. Analisis perhitungan menggunakan metode kuantitatif dengan Microsoft Excel®. Berdasarkan hasil penelitian, nilai intensitas energi dan emisi gas rumah kaca yang dihasilkan selama periode 2016, 2017 dan 2018 mengalami kenaikan. Nilai intensitas energi mengalami peningkatan dari 1,58E-01 GJ/TOE pada tahun 2016 menjadi 1,77E-01 GJ/TOE pada tahun 2018. Nilai emisi GRK mengalami peningkatan 21,48 kton CO2eq pada 2016 menjadi 23,30 kton CO2eq pada 2018. Peningkatan terjadi karena konsumsi bahan bakar fuel gas yang meningkat dan terjadi penurunan total produksi minyak dan gas bumi. Rekomendasi perbaikan yang didapat adalah dengan mengganti penggerak pada pompa transfer yang sebelumnya menggunakan gas engine menggunakan electric motor (elmot). Hal ini terlihat dari hasil simulasi yang menunjukkan nilai efisiensi generator meningkat hingga 20-an% dan terjadi penghematan penggunaan fuel gas. ......This thesis discusses about energy audit at the main and supporting facilities which quite old in Field X South Sumatra province. The purpose is to obtain a profile of fuel consumption, energy intensity and the contribution of CO2eq greenhouse gas (GHG) emissions in Field X. This also provides room for improvement so energy used is optimal and CO2eq emissions can be minimized. The frameworks used refers to ISO 50001:2011 on Energy Management Systems. Calculation analysis uses quantitative methods with Microsoft Excel®. Based on research, the value of energy intensity and greenhouse gas emissions produced during 2016, 2017 and 2018 has increased. Value of energy intensity increased from 1,58E-01 GJ/TOE in 2016 to 1,77E-01 GJ/TOE in 2018. Value of GHG emissions increased by 21,48 kton CO2eq in 2016 to 23,30 kton CO2eq in 2018. This occurred due to increase of fuel gas consumption and decrease in total oil and gas production. Room for improvement is to replace the drive on the transfer pump that previously used a gas engine with electric motor (elmot). This can be seen from the simulation that shows the efficiency of the generator increases by 20% and there is a savings in the use of fuel gas.
Jakarta: Fakultas Teknik Universitas Indonesia, 2021
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Cetra Palupi Rengganis
Abstrak :
Energi listrik sangat penting dalam aktifitas di gedung perkantoran, hal ini sangat menunjang dalam operasional di gedung perkantoran. Peralatan seperti pengkondisian udara merupakan peralatan yang banyak mengkonsumsi energi listrik. Hampir sekitar 57% penggunaan energi listrik digunakan untuk sistem pengkondisian udara. Hal ini merupakan suatu pemborosan energi jika tidak mempergunakan sistem dengan baik dan efisien. Untuk menanggulangi masalah tersebut dilakukan efisiensi energi. Salah satu metode yang sekarang dipakai untuk mengefisienkan pemakaian energi adalah konservasi energi. Konservasi energi adalah peningkatan efisiensi energi yang digunakan atau proses penghematan energi. Dalam proses ini meliputi adanya audit energi yaitu suatu metode untuk menghitung intensitas konsumsi energi suatu gedung atau bangunan. Berdasarkan audit awal terlihat bahwa pemakaian energi listrik lebih besar dipergunakan untuk sistem tata udara (57%) dan sistem pencahayaaan (13%). Berdasarkan hasil audit energi rinci, diperoleh harga IKE untuk system pencahayaan adalah masih lebih besar dari standard yaitu sebesar 15 Watt/m². Peluang Hemat Energi (PHE) pada audit energi di sistem tata udara yaitu dengan cara pembersihan pada unit AHU yaitu meliputi pembersihan saringan udara (filter), sudut kipas, sirip (fin) evaporator dan kisi keluaran (grill) pada unit-unit AHU. Peluang Hemat Energi (PHE) yang kedua adalah dengan Mengatur (setup) temperatur air keluar (Leaving Chilled Water Temperature = LCWT) pada chiller.
The electricity is very important element to support all activities in office building. The equipments like air condition (AC) needs more electricity to be operated. There is almost 57% of elecricity is used to support this system (air condition). This percentage desribes that air condition system is an equipment that needs more electricity in the office and its become inefficiency in using electricity. To take an overcome for this problem, we need to do efficiency in using energy. One of the method that now used to efficient the energy is called 'energy conservation'. Generally, this method is used to saving the energy. There is one thing that must be done in this activity, which is 'energy audit'. In this process, audit energy is one of method to calculate Intensity Consume Energy (IKE) at on particular building. The first preliminary audit shown that more energy, which is 57% is used to operate the air condition (AC) system and 13% is used to operate the lighting system. Based on details audit, IKE for lighting system is still higher/bigger from the maximum standard, which is 15 Watt/m². The opportunity of saving energy on audit energy in air condition system is done by cleaning up the AHU unit that consist of: cleaning up the filter, the propeller corner, fin, the evaporator and the grill in AHU units. The second Conservation Opportunity of Energy (COE) to saving the energy is done by set up the Leaving Chilled Water Temperature (LCWT).
Depok: Fakultas Teknik Universitas Indonesia, 2009
S50957
UI - Skripsi Open  Universitas Indonesia Library
cover
Hadi Prasetio
Abstrak :
Konservasi energi dalam dunia industri otomotif belum menjadi aktivitas yang dijalankan dengan konsisten sebagai tindakan praktis dalam usaha menekan rugirugi dan penghematan energi listrik serta mengurangi biaya produksi. Dalam proses produksinya, pelaku sektor industri masih menggunakan energi listrik tanpa terlalu memperhatikan peluang-peluang penghematannya. Penelitian ini membahas aktivitas-aktivitas pelaksanaan konservasi energi listrik di industri otomotif yang meliputi audit energi serta peluang penghematan energi dengan menerapkan teknologi yang lebih efisien baik secara teknis maupun ekonomis. Konservasi energi listrik adalah penggunaan energi listrik secara efisiensi tinggi melalui langkah-langkah penurunan berbagai kehilangan (loss) energi listrik pada semua taraf pengelolaan, mulai dari pembangkitan, pengiriman (transmisi), sampai dengan pemanfaatan. Fase-fase yang lengkap untuk melakukan manajemen energi ada tiga tahapan, yaitu: fase pendahuluan, fase audit dan analisis, serta fase pelaksanaan. PT.ADM PP, yang memproduksi body kendaraan bermotor, pasokan energi listriknya berasal gardu distribusi PK 87 dan PK 79 yang memiliki kapasitas masing-masing 3895 kVA serta genset 1000 kVA dan 500 kVA sebagai suplai listrik cadangan. Sistem distribusinya terbagi ke tujuh LVMDP untuk memberi energi ke fasilitas-fasilitas utama produksi yakni shearing line, press line, welding line, die maintenance facility, finish parts warehouse, dan inline packing. Konservasi energi listrik dilakukan dengan optimalisasi kapasitas daya terpasang, perbaikan faktor daya, serta reduksi distorsi harmonik arus pada sistem distribusi PT.ADM PP. Penurunan kapasitas langganan PLN pada PK 87 menjadi 3500 kVA dan PK 79 menjadi 3700 kVA. Perbaikan faktor daya direncanakan menggunakan bank kapasitor untuk meningkatkan faktor daya sistem yang pada awalnya di bawah 0,85 menjadi 0,95. Kemudian reduksi distorsi harmonik arus menggunakan filter harmonik akan menurunkan nilai THD arus awal yang besarnya di atas 20% menjadi 2,5%. Potensi penghematan energi dan pengurangan biaya yang diperoleh dari aktivitas konservasi energi listrik adalah sebesar Rp.17.405.000 per bulan dari penurunan kapasitas langganan listrik kemudian penghematan energi sebesar 2,40% per bulan dari perbaikan faktor daya dan 1,58% per bulan dari reduksi distorsi harmonik arus. Konsumsi energi spesifik PT.ADM PP turun 3,98% dari nilai awal sebesar 62,12 kWH/unit menjadi 59,65 kWH/unit.
The energy conservation has not become a consistently-done activity in automotive industry as a concrete effort to reduce losses and to save electrical energy and also to reduce the production cost. In the production process, the industrial sector stakeholders still use the electrical energy without concerning the electrical energy saving opportunities. This research investigates about the activities of electrical energy conservation in the automotive industry which consist of energy audit and energy saving opportunities through implementation of more efficient technology by considering the technical and economical aspects. Electrical energy conservation is to utilize the electrical energy with high efficiency through steps of electrical losses reductions in all of management levels, starting from the electrical generation, electrical transmission, until its utilization. Complete phases of energy management are consisting of preliminary phase, audit and analysis phase, and implementation phase. PT.ADM PP produces body components of automobiles. Its electrical energy supply comes from two electrical sub stations i.e. PK 87 and PK 79. The power capacity of each electrical sub stations is 3895 kVA. There are also 1000 kVA and 500 kVA generator sets as emergency electrical supply for PT.ADM PP. The distribution system consist of seven low voltage main distribution panels to supply energy for the main production facilities such as shearing line, press line, welding line, die maintenance facility, finish parts warehouse, and inline packing. Electrical energy conservation is done by optimizing the existing electrical power capacity, power factor correction, and reducing the total harmonic distortion of electrical current in the electrical distribution system of PT.ADM PP. The electrical power capacity of PK 87 is reduced to 3500 kVA and PK 79 is reduced to 3700 kVA. Power factor correction by installing capacitor banks increases the electrical power factor from under 0.85 to become 0.95. The total harmonic distortion of electrical current reduction using harmonic filters will reduce the THD from above 20% to 2.5%. The electrical energy saving and cost reduction which resulting from electrical energy conservation activities is as much as Rp.17,405,000 per month from the electrical power capacity reduction, then the energy saving from the power factor correction is 2.40% per month, and electrical current THD reduction has 1.58% power saving per month. Specific energy consumption is reduced from beginning value of 62.12 kWH/unit to 59.65 kWH/unit, equals to 3.98% reduction.
Depok: Fakultas Teknik Universitas Indonesia, 2008
S52315
UI - Skripsi Open  Universitas Indonesia Library