cover
Fakultas Teknik Universitas Indonesia, 1993
S35988
UI - Skripsi Membership  Universitas Indonesia Library
cover
Ryan Geza
Abstrak :
Pembangkit Listrik Tenaga Gas di Indonesia memiliki potensi yang sangat baik, meskipun nilai efisiensinya sangat rendah karena tingginya temperatur ambient di Indonesia. Hal ini dapat diantisipasi dengan mengombinasikan turbin gas dengan turbin uap menjadi Pembangkit Listrik Tenaga Gas dan Uap (PLTGU) yang memiliki efisiensi yang tinggi. Namun demikian, upaya peningkatan efisiensi turbin masih perlu dilakukan mengingat sumber energi bahan bakar yang semakin menipis dan mahal. Dengan memanfaatkan laju aliran uap dari Heat Recovery Steam Generator (HRSG) sebagai sumber panas untuk sistem pendingin absorption chiller, temperatur udara masuk turbin gas dapat diturunkan hingga temperatur 20°C. Hal ini mengakibatkan peningkatan daya turbin gas sebesar 10,94 MW serta peningkatan efisiensi termal sebesar 2,98%, walaupun pengurangan laju aliran uap pada HRSG membuat turbin uap kehilangan daya sebesar 2,343 MW. Secara keseluruhan, total daya output yang dihasilkan PLTGU dengan pemasangan sistem pendingin absorption chiller dapat meningkat sebesar 8,597 MW. ......The potential of gas power plant in Indonesia is very high though it has a very low efficiency due to high ambient temperatures in Indonesia. This condition can be anticipated by combining a gas turbine with a steam turbine into Gas and Steam Power Plant (GSPP) which has high efficiency. However, the effort to increase the efficiency of the turbine is still needed considering fuel energy sources is dwindling and becoming more expensive. By utilizing the flow rate of steam from the Heat Recovery Steam Generator (HRSG) as a heat source of absorption chiller cooling system, inlet air temperature of gas turbine can be lowered to a temperature of 20°C. This results the power of gas turbine and the thermal efficiency increases by 10.94 MW and 2.98% respectively, although the reduction of the steam flow rate in HRSG makes the steam turbine loss power by 2,343 MW. As a whole, the total power output generated by GSPP through the installation of absorption chiller cooling system can be increased by 8,597 MW
Depok: Fakultas Teknik Universitas Indonesia, 2015
S59299
UI - Skripsi Membership  Universitas Indonesia Library
cover
Fajar Gumilang
Abstrak :
Potensi gas CBM di Kalimantan Tengah dapat digunakan sebagai pasokan bahan bakar pembangkit PLTGU namun belum adanya standarisasi harga jual gas CBM menyebabkan nilai keekonomian dari pembangkit berbahan bakar CBM perlu dikaji khususnya untuk harga produksi listrik yang cukup sensitif terhadap harga bahan bakar. Dalam perencanaan pengembangan pembangkit di Pulang Pisau Kalimantan Tengah akan dibangun pembangkit berkapasitas 2 x 60 MW, dengan memperhatikan produk pabrikan yang ada maka pembangkit yang dipilih adalah pembangkit berkapasitas 2 x 64 MW dengan total kapasitas 130,7 MW. Evaluasi pembangunan pembangkit PLTGU 130,7 MW dilakukan untuk menentukan harga produksi listrik dari kegiatan pembangkitan menggunakan cadangan CBM yang ada. Evaluasi akan dilakukan dengan analisa sensitifitas harga listrik terhadap perubahan harga gas CBM dan nilai IRR. Harga listrik akan dibandingkan dengan pembangkit PLTD, PLTU dan PLTGU Konvensional. Berdasarkan perhitungan dalam model finansial didapatkan kenaikan harga gas 1 US$/Mmbtu, harga listrik akan naik 0,007 US$/KWh. Untuk harga gas CBM 7US$/Mmbtu pada base case IRR sebesar 14% Interest Rate 10% didapatkan harga listrik PLTGU sebesar 0,083 US$/KWh. Pada kondisi base case harga listrik PLTGU dengan CBM mampu bersaing dengan PLTD. Meskipun lebih rendah, harga listrik PLTU akan jauh meningkat jika eksternalitas dimasukan dalam komponen biaya. Dan keterbatasan bahan bakar gas yang menyebabkan harga listrik PLTGU tinggi dapat ditekan dengan memanfaatkan gas CBM sebagai bahan bakar alternatif. ......CBM gas potential in Central Kalimantan can be used as a combined cycle power plant fuel supply, but the lack of standardization of CBM gas price led to the economic value of the CBM-fired plants need to be studied in particular for the production of electricity prices is quite sensitive to fuel prices. In planning the development of plants at Home Knives Central Kalimantan plant will be built with a capacity of 2 x 60 MW, taking into account the manufacturer's product then selected plants are plants with a capacity of 2 x 64 MW with a total capacity of 130.7 MW. Evaluation of 130,7 MW Combined Cycle Power Plant construction is done to determine the price of electricity production from generation activities using existing CBM reserves. Evaluation will be conducted with sensitivity analysis to changes in electricity prices CBM gas prices and the value of IRR. Electricity prices will be compared with diesel generators, combined cycle power plant and Conventional. Based on the calculation of the financial model obtained gas price increase 1 U.S. $ / MMBTU, electricity prices will go up 0.007 U.S. $ / kWh. For CBM gas price 7US $ / MMBtu in the base case IRR of 14% Interest Rate 10% Combined Cycle Power Plant electricity prices obtained for 0.083 U.S. $ / kWh. In the base case conditions with CBM CCGT electricity prices competitive with diesel. Although lower, the price at the plant will be much improved if externalities are included in the cost components. And limitations of the fuel gas combined cycle causing high electricity prices could be reduced by utilizing the CBM gas as an alternative fuel.
Depok: Fakultas Teknik Universitas Indonesia, 2013
T35518
UI - Tesis Membership  Universitas Indonesia Library
cover
Adam Wicaksono
Abstrak :
Pembangkit Listrik Tenaga Gas Uap (PLTGU) berperan penting dalam memenuhi kebutuhan listrik masyarakat. Namun, terdapat beberapa masalah seiring dengan perkembangan teknologi, perubahan lingkungan alam dan sosial yang dapat mempengaruhi keberlanjutan PLTGU. Oleh sebab itu, diperlukan kerangka evaluasi keberlanjutan PLTGU yang meliputi dimensi lingkungan, sosial dan ekonomi. Tujuan penelitian ini adalah untuk membuat model evaluasi keberlanjutan PLTGU dengan menggunakan pendekatan Triple Bottom Line dan menggunakan model tersebut untuk mengetahui tingkat keberlanjutan PLTGU. Penelitian ini menggunakan pendekatan kuantitatif dengan metode Life Cycle Assessment (LCA) dan Analytical Hierarchy Process (AHP). Hasil penelitian menunjukkan bahwa kinerja keberlanjutan PLTGU pada dimensi lingkungan, sosial dan ekonomi berturut turut adalah 39%, 19%, dan 17% dengan jumlah nilai 75%. Berdasarkan nilai pada ketiga dimensi tersebut, dapat disimpulkan bahwa kondisi keberlanjutan PLTGU Tanjung Priok berada pada kondisi sustainable. ......Combined Cycle Power Generation (PLTGU) plays an important role in meeting the electricity needs of the community. However, there are several problems along with technological developments, changes in the natural and social environment that can affect the sustainability of the PLTGU. Therefore, a PLTGU sustainability evaluation framework is needed which includes environmental, social, and economic dimensions. The purpose of this study is to create a model for evaluating the sustainability of the PLTGU using the Triple Bottom Line approach and using this model to determine the level of sustainability of the PLTGU. This study used a quantitative approach with the method of Life Cycle Assessment (LCA) and Analytical Hierarchy Process (AHP). The results show that the sustainability performance of PLTGU on the environmental, social, and economic dimensions were 39%, 19%, and 17%, respectively, with a total score of 75%. Based on the scores for these three dimensions, it can be concluded that the sustainability condition of the Tanjung Priok PLTGU is in sustainable condition.
Jakarta: Sekolah Ilmu Lingkungan Uiniversitas Indonesia, 2021
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Rachmad
Abstrak :
Dengan kompleksitas tinggi dan kebutuhan dana investasi yang cukup besar maka penentuan asumsi - asumsi menjadi penting pada proyek pembangkit tenaga listrik. Penentuan asumsi ini akan mempengaruhi hasil dari analisis kelayakan financial yang dilakukan untuk menentukan diterima atau ditolaknya proyek. Selain itu analisis sensitivitas terhadap asumsi - asumsi utama perlu dilakukan untuk mengetahui pengaruhnya terhadap kelayakan financial proyek pembangkit PLTGU combined cycle 660 MW. Proyek ini juga menghadapi ketidakpastian akan harga bahan bakar dan tarif energi. Untuk itu perlu dilakukan analisis keputusan manajemen terhadap indikator - indikator kelayakan financial sebelum diambil keputusan terhadap proyek. Metode discounted cash flow digunakan dalam melakukan analisis kelayakan financial proyek PLTGU combined cycle 660 MW untuk mendapatkan indikator NPV dan IRR berdasarkan pendekatan koefisien beta PT ABC. Pendekatan koefisien beta ini penting karena PT ABC belum listing dipasar modal, sehingga hasil analisis diharapakan mendekati kondisi risiko pasar yang sesungguhnya. Asumsi - asumsi yang ditetapkan menjadi input dan economic model yang dibangun untuk melakukan analisis sensitivitas dan kelayakan financial dengan simulasi terhadap skenario pesimis, normal dan optimis untuk loan interest dan discount rate, harga bahan bakar serta capacity factor pembangkit. Analisis sensitivitas memperlihatkan bahwa proyek pembangkit memiliki sensitivitas tinggi terhadap harga bahan bakar gas dan capacity factor pembangkit. Tingkat pengembalian proyek memenuhi target yaitu lebib besar dart discount rate proyek pada harga bahan bakar USD 2,7 - 3 IMMBTU dengan fleksibilitas tinggi pada capacity factor pembangkit. Sedangkan pada harga pasar, USD 5 IMMBTU tingkat pengembalian proyek memenuhi target pads capacity factor 60% keatas dengan soft loan, sedangkan dengan commercial loan target tingkat pengembalian proyek tidak terpenuhi. Soft loan umumnya diperoleh dari pinjaman luar negeri Pcmerintah Republik Indonesia kepada lembaga - lembaga keuangan Intemasioanl seperti ADB dan JBIC yang diteruskan kepada PT ABC. Penerusan pinjaman ini digunakan untuk membiayai proyek - proyek Perusahaan dan tidak diikat jaminan. Dari hasil simulasi terhadap tiga skenario yang ditetapkan memperlihatkan bahwa indikator kelayakan financial proyek PLTGU combined cycle 660 MW memiliki NPV positif pada harga bahan bakar natural gas USD 2,7 - 3,0 IMMBTU dengan dana investasi soft loan dan commercial loan. Untuk harga bahan bakar USD 5 IMMBTU proyek memiliki NPV negatif pada commercial loan, sedangkan dengan soft loan proyek memiliki NPV positif pada capacity factor diatas 60%. atau proyek berada dalam kondisi option zone. Kondisi option zone ini perlu dikaji lebih lanjut sebelum manajemen memutuskan menerima proyek tersebut. Sebagai kesimpulan dari analisis ini adalah penentuan koefisien beta dart PT ABC, perusahaan yang belum listing, menjadi penting agar penilaian proyek PLTGU combined cycle 660 MW mendekati kondisi resiko pasar yang sesungguhnya. Hasil perhitungan, koefisien beta PT ABC adalah 0,74. Analisis keputusan manajemen terhadap indikator kelayakan financial, memperlihatkan bahwa proyek PLTGU combined cycle memiliki tingkat resiko rendah dan layak diterima pada skenario normal dengan loan interest 3,75% dan harga bahan bakar USD 3 MMBTU.
Power Plant Project is always complicated and involving huge investment therefore selecting proper 'assumptions' on the Financial Analysis is important. Those assumptions will be having direct impact the result of Financial Analysis in order to justify whether the project is feasible of not. On the development of Combined Cycle Power Plant 660MW, the sensitivity analysis on the primary assumptions has to be done to observe its influence toward financial feasibility. Though the project is having high uncertainty on fuel price and energy tariff. It is necessary to analyze the management decisions toward financial feasibility indicators before taking the decision of this project. The discounted cash flow method is used in this Feasibility Study in order to find out the NPV and IRR indicators. It is base on beta coefficient approach of PT ABC. The approach has to be done due to PT ABC is not Public Company yet. This approach will be resulting close to the actual market risk. The assumptions taken, is used for the input data of Economic Mode' established to run the sensitivity analysis and financial feasibility with simulation toward pessimist, normal and optimist scenarios for loan interest, discount rate, fuel price and plant capacity factor. The sensitivity analysis shows that the power plant project has high sensitivity toward natural gas fuel price and plant capacity factor. Internal rate of return of this project is feasible i.e greater than discount rare, at fuel price of USD 2, 7 - 3 per MMBTU with high flexibility of plant capacity factor. Meanwhile at the gas fuel market price USD 5 per MMBTU and soft loan basis, the internal rate of return of this project is feasible on the 60% at plant capacity factor and its not feasible by using Commercial loan. Generally, soft loan come from government loan (government to government) to international financial institution like ADB and JBIC with two stages loan scheme, this loan will be used by PT ABC in financing the entire company project with government guarantee. Refer to the simulation on the three scenarios shows that financial feasibility indicators for 660 MW combined cycle power plant project have positive NPV at natural gas fuel price for 2,7 - 3,0 per MMBTU for both soft loan and commercial loan. At USD 5 per MMBTU of fuel price, the project shows negative NPV at commercial loan and positive NPV at 60% plant capacity factor or more by soft loan. It is mean the project is in the Option Zone. In this Zone, it is necessary to conduct further evaluation before management decides to precede the project. As a conclusion, the determination of PT ABC beta coefficient is important considering they are not Pubic Listed Company. It will make the analysis of 660 MW combined cycle power pant project close to actual market risk condition. The beta coefficient calculation result for PT ABC is 0, 74. An analysis of management decision toward financial feasibility indicators showing that 660 MW combined cycle power plant project is feasible and lower risk by 3,75 % of loan interest and fuel price at USD 3 per MMBTU scenario.
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2007
T19677
UI - Tesis Membership  Universitas Indonesia Library
cover
Wahyu Hanaldi
Abstrak :
Keandalan dan efisiensi pada suatu pembangkit listrik menjadi suatu indikator penting dalam system tenaga listrik. Pembangkit yang mengalami derating atau gangguan akan berdampak signifikan terhadap system kelistrikan. Sedangkan pembangkit yang tidak efisien akan menjadi pilihan terakhir dalam pembangkitan tenaga listrik. Peralatan yang mengalami kerusakan dapat berdampak jangka panjang berupa penurunan umur dan turunnya efisiensi.Sehingga hal ini diperlukan suatu perawatan yang optimal sehingga meningkatkan keandalan pembangkit dan menurunkan biaya operasional. Paper ini bertujuan untuk optimisasi pemeliharaan prediktif berbasis resiko untuk mencegah dampak ganda pada pembangkit.Penelitian ini dilakukan dengan metode pemetaan resiko dan menghitung waktu pelaksanaan maintenance dan dapat menurunkan biaya operasi dan pemeliharaan. ......The reliability and efficiency of power plants become an important indicator in electrical power system. Generators and other supporting equipment that experience derating or disturbance will deteriorate on the electrical power supply. Thus, predictive maintenance becomes essential effort to improve the efficiency and reliability of the plant. In this study, we investigate the risk based predictive maintenance on 740 MW MuaraKarang Combined Cycle Power Plant CCPP, Indonesia through the risk mapping methods. The steps in risk assessment including risk identification, risk analysis, risk evaluation and risk treatment were employed to analyze the MuaraKarang CCPP. We found that the optimized maintenance schedule played significant influence to the reliability and efficiency and have direct consequences to the operation and maintenance cost.
Depok: Fakultas Teknik Universitas Indonesia, 2018
T50623
UI - Tesis Membership  Universitas Indonesia Library
cover
Rivaldo Garchia
Abstrak :
Seperti kita ketahui, Indonesia memiliki banyak sumber energi yang dapat dimanfaatkan sebagai bahan bakar pembangkit listrik, antara lain Energi Air, Energi Surya, Energi Angin, Energi Panas Bumi dan Energi Gas. Pembangkit listrik tenaga gas memiliki banyak keunggulan dari energi yang laiinnya karena tidak bergntung pada kondisi cuaca seperti angin, intensitas cahaya atau laju aliran air. Potensi gas alam indonesia sebagai sumber bahan bakar Pembangkit Listrik Tenaga Gas (PLTG) sangat melimpah. Menurut studi badan geologi kementerian Energi dan Sumber Daya Alam (ESDM), potensi gas alam yang ada di Indonesia pada tahun 2008 saja mencapai 170 TSCF, dengan komposisi tersebut Indonesia memiliki reserve to production (R/P) mencapai 59 tahun ke depan. Pembangkit listrik tenaga gas memiliki efisiensi yang cukup rendah akibat temperatur gas buang yang masih tinggi. Efisiensi dapat ditingkatkan dengan memanfaatkan sistem pendingin untuk menaikkan efisiensi kerjanya. Namun apabila pembangkit tersebut telah dibuat dengan siklus kombinasi menjadi gas dan uap maka ada sistem pendingin menjadi kurang optimum karena gas buangnya sudah terpakai sebagai sumber panas HRSG. Dalam penelitian ini temperatur udara masuk gas diturunkan hingga temperatur 15o C. Untuk penurunan temperatur ambient hingga 150C terjadi kenaikan daya output turbin gas sebesar 15,14 MW dan kenaikan efisiensi themal siklus sebesar 3,9 %. Sumber panas yang didapatkan generator chiller berasal dari HRSG dengan laju aliran massa steam sebesar 6,37 kg/s. Hal ini mengakibatkan penurunan daya output turbin uap berkurang sebesar 3,27 MW. Akan tetapi, dengan adanya sistem pendingin pada absorption chiller ini daya output yang dihasilkan oleh turbin gas meningkat sebesar 11,87 MW. ......As we know, Indonesia has many sources of energy that can be used as fuel for power generation, among others, Air Energy, Solar Energy, Wind Energy, Geothermal Energy and Energy Gas. Gas power plants have many advantages of energy because it does not bergntung laiinnya on weather conditions such as wind, light intensity or rate of water flow. The potential of Indonesian natural gas as a fuel source Gas Power Plant (power plant) is very abundant. According to the study of geological bodies Ministry of Energy and Natural Resources (EMR), the potential of natural gas in Indonesia in 2008 alone reached 170 TSCF, with the composition of Indonesia has a reserve to production (R / P) reached 59 years into the future. Gas power plants have a fairly low efficiency due to the exhaust gas temperature is still high. Efficiency can be improved by utilizing the cooling system to increase its efficiency. However, if the plant has been made with a combined cycle gas and steam into the existing cooling system becomes less optimal because the exhaust gas has been used as a heat source HRSG. In this study the gas intake air temperature is reduced to a temperature of 15°C. To decrease ambient temperatures of up to 150C an increase in power output of 15.14 MW gas turbine and an increase in efficiency of 3.9% themal cycles. The heat source is obtained chiller generator comes from HRSG with steam mass flow rate of 6.37 kg / s. This resulted in a decrease in the steam turbine output power is reduced by 3.27 MW. However, the presence of the absorption chiller cooling system's power output generated by gas turbines increased by 11.87 MW.
Depok: Fakultas Teknik Universitas Indonesia, 2015
S59273
UI - Skripsi Membership  Universitas Indonesia Library
cover
Fitria Nurina Listya Ningrum
Abstrak :
Konstruksi adalah salah satu pekerjaan paling berisiko yang dipengaruhi oleh gangguan dengan paparan stres panas. Stres akibat panas berasal dari kombinasi suhu lingkungan tempat kerja, metabolisme tubuh pekerja, pakaian kerja, dan karakteristik pekerja. Penelitian ini adalah penelitian kuantitatif dengan studi cross-sectional yang dilakukan pada bulan April-Mei 2019 dengan 181 responden. Hasilnya menunjukkan bahwa indeks WBGT luar ruangan berkisar antara 25,3°C hingga 36,8°C. Setelah dibandingkan dengan PERMENKES nomor 70 pada tahun 2016, ditemukan bahwa 100% pekerja mengalami stres akibat panas. Hasil kuesioner menunjukkan 174 responden (96%) mengalami setidaknya satu keluhan kesehatan, dengan keluhan tertinggi banyak berkeringat (92,3%). Hasil pengukuran efek fisiologis menunjukkan bahwa ada hubungan yang signifikan antara tekanan darah, denyut nadi, saturasi oksigen, dan suhu tubuh antara sebelum bekerja dengan setelah bekerja (nilai p <0,05). Berdasarkan hasil, manajemen proyek disarankan untuk melakukan berbagai upaya dalam mengendalikan stres panas, untuk meminimalkan dampak gangguan panas pada pekerja. ......Construction is one of the most risky jobs that is affected by interference with heat stress exposure. Stress due to heat comes from a combination of workplace environmental temperature, worker's metabolism, work clothes, and worker characteristics. This research is a quantitative study with a cross-sectional study conducted in April-May 2019 with 181 respondents. The results show that the outdoor WBGT index ranges from 25.3°C to 36.8°C. After comparing with PERMENKES number 70 in 2016, it was found that 100% of workers experienced heat stress. The results of the questionnaire showed 174 respondents (96%) experienced at least one health complaint, with the highest number of complaints sweating (92.3%). The results of measurement of physiological effects showed that there was a significant relationship between blood pressure, pulse, oxygen saturation, and body temperature between before work and after work (p value <0.05). Based on the results, project management is advised to make various efforts in controlling heat stress, to minimize the impact of heat disruption on workers.
Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2019
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Abstrak :
Jenis pembangkit minyak dan gas yaitu PLTU minyak, PLTG dan PLTGU serta PLTD masih ada di beberapa tempat di P. Jawa dan Bali. Selain PLTU minyak, PLTU batubara telah banyak dibangun di Indonesia.
600 JITE 1:12 (2011)
Artikel Jurnal  Universitas Indonesia Library
cover
Hafidz Nurhantoko
Abstrak :
Getaran suatu komponen mesin yang telah melewati standar yang ditentukan dapat menurunkan performa kerja mesin dan menyebabkan kerusakan sehingga dapat terjadi overhaul. Oleh karena itu dibutuhkan sebuah sistem pemantauan kondisi getaran pada komponen mesin. Tujuan dari penelitian ini adalah untuk menentukan waktu dimana komponen akan mengalami kerusakan berdasarkan data kondisi terdahulu dan mendiagnosa penyebab getaran yang terjadi sehingga dapat menghasilkan suatu penjadwalan pemeliharaan berdasarkan jangka waktu yang telah ditentukan. Metode yang digunakan ialah analisa kecenderungan yang disesuaikan dengan ISO 10816 dan analisa spectrum getaran. A Kondisi getaran yang terjadi pada unit High Pressure Boiler Feed Pump 2 yaitu DE Pompa = 7,19 mm/s pada bulan Maret tahun 2019, DE Motor = 4,60 mm/s pada bulan Agustus tahun 2019, NDE Pompa = 4,51 mm/s pada bulan September 2019, dan NDE Motor = 4,53 mm/s pada bulan Juli tahun 2020. Pada analisa spectrum ditemukan bahwa terjadi gejala kerusakan antara lain Blade Pass Frequency, Rotor Bar Pass Frequency, Journal Bearing Looseness, Resonansi, dan Unbalance. ......Vibrations of a machine components that have passed the prescribed standards can decrease the performance of the work of the machine and cause damage that can happen to an overhaul. Therefore it takes a vibration condition monitoring system on the engine components. The purpose of this research is to determine the time in which the components will be damaged based on the previous conditions and diagnose the cause of the vibration that occurs so it can generate a maintenance scheduling based on the time period specified. The method used is the trending analysis that adapted to ISO 10816 and vibration spectrum analysis. Measurement of vibration conditions has been conducted on two units High Pressure Boiler Feed Pump, as measured at four points, namely the Drive End of the pump, the Motor Drive End, Non Drive End of the pump, the Non Drive End Motor on each point made on the axial axis, horizontal and vertical. The conditions of the vibration that occurs at the unit 39 s High Pressure Boiler Feed Pump 2 IE DE Pump 7.19 mm s in March 2019, DE Motors 4.60 mm s in August of 2019, NDE Pump 4.51 mm s in September 2019, and NDE Motor 4.53 mm s in July to know 2020 n. On the analysis of the spectrum found that symptoms of damage among other Blade Pass Frequency, Rotor Bar Pass Frequency, Journal Bearing Looseness, Resonance, and Unbalance.
Depok: Fakultas Teknik Universitas Indonesia, 2018
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2   >>