The performance of a 20 MW gas turbine power plant was described by using the exergy analysis and data from the plant?s record books. The first and second laws of thermodynamics, as well as the mass and energy conservation law, were applied in each of the components. The results show that more exergy destruction occured in the combustion chamber up to 71.03% or 21.98 MW. Meanwhile, the lowest exergy occured in the compressor at 12.33% or 3.15 MW. Thermal efficiency of the gas turbine power plant, according to the first law, was 33.77%, and exergy efficiency was 32.25%.
2016
J-Pdf
Artikel Jurnal  Universitas Indonesia Library
cover
Awaludin Martin
Abstrak :
The performance of a 20 MW gas turbine power plant was described by using the exergy analysis and data from the plant’s record books. The first and second laws of thermodynamics, as well as the mass and energy conservation law, were applied in each of the components. The results show that more exergy destruction occured in the combustion chamber up to 71.03% or 21.98 MW. Meanwhile, the lowest exergy occured in the compressor at 12.33% or 3.15 MW. Thermal efficiency of the gas turbine power plant, according to the first law, was 33.77%, and exergy efficiency was 32.25%.
Depok: Faculty of Engineering, Universitas Indonesia, 2016
UI-IJTECH 7:5 (2016)
Artikel Jurnal  Universitas Indonesia Library
cover
Dodi Budiana
Abstrak :
Sistem Ketenagalistrikan Provinsi Aceh dipasok oleh Pembangkit Listrik Tenaga Mesin Gas (PLTMG) berbahan bakar Liquefied Natural Gas (LNG), PLTU Batubara dan PLTD berbahan bakar solar serta transfer dari sistem Sumatera Utara saat beban puncak. Dimana bahan bakar LNG mendapat kiriman dari Kilang Tangguh Papua yang diregasifikasi di Perta Arun Gas, Lhokseumawe Provinsi Aceh, sehingga biaya produksi nya mahal karena jauhnya sumber pasokan gas. Untuk mendapatkan biaya produksi listrik yang lebih murah dapat dilakukan dengan menggunakan potensi gas yang ada di provinsi Aceh. Pada penelitian ini akan menghitung nilai keekonomian dengan membandingkan pemakaian dua jenis bahan bakar gas yaitu bahan bakar gas mulut sumur dan gas LNG untuk pembangkit listrik PLTG dan PLTMG, untuk mengetahui biaya produksi listrik masing-masing pembangkit dengan bahan bakar yang sama. Berdasarkan hasil perhitungan, Pembangkit listrik tenaga mesin gas dengan bahan bakar gas mulut sumur memiliki biaya produksi dengan nilai keekonomian paling baik yaitu 1,231.12 Rp/kWh lebih rendah dari tarif listrik sebesar 1,467 Rp/kWh, serta memiliki IRR sebesar 21,15% dan waktu pengembalian modal 5,54 tahun. Dengan mengetahui nilai yang paling ekonomis untuk pembangunan pembangkit dengan bahan bakar gas mulut sumur maka dapat dijadikan dasar untuk pengambilan kebijakan dalam pemilihan pembangunan pembangkit listrik yang ekonomis untuk daerah dengan potensi gas seperti di provinsi Aceh.
The Aceh Province Electricity System is supplied by Gas Engine Power Plant (GEPP) fuelled by Liquefied Natural Gas (LNG), Coal-fired power plant and Diesel Engine with Diesel fuel and transfers from the North Sumatra system during peak loads. LNG fuel is sent by ship from the Tangguh Papua Refinery which is regasification in Perta Arun Gas, Lhokseumawe, Aceh Province, so the production costs are expensive due to the distance from the gas supply sources. To get cheaper electricity production costs, it can be done by using the gas potential in Aceh province. In this study, the economic value will be calculated by comparing the use of two types of gas fuel, namely wellhead gas fuel and LNG gas for Gas Turbine and Gas Engine power plants, to determine the cost of electricity production for each power plant with the same fuel. Based on the calculation results, gas engine power plant with fuel from the Wellhead Gas has the best production costs with value of IDR 1,231.12/ kWh lower than the electricity tariff of IDR 1,467 /kWh, and has an IRR of 21,15% and a payback period of 5,54 years. By knowing the most economic value for the construction of power plant with Wellhead Gas, it can be used as a basis for policy making in choosing an economical power plant development for areas with gas potential, such as in Aceh province
Depok: Fakultas Teknik Universitas Indonesia, 2021
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Alditho Farrasi Anantoputra
Abstrak :
ABSTRAK
PLTG Borang 60 MW, Palembang, menghasilkan polutan-polutan ke udara di sekitar, diantaranya SO2, NOx, CO, dan Total PM yang kemudian dipantau dengan alat CEMS. Selain pemantauan, perlu adanya penetapan strategi dan rencana aksi pengelolaan kualitas udara untuk masa akan datang dengan menggunakan faktor emisi. Faktor emisi merupakan nilai representatif yang mencoba untuk menghubungkan kuantitas suatu polutan yang dilepas ke atmosfer dengan aktivitas yang terkait dengan pelepasan polutan tersebut. Faktor emisi di beberapa wilayah berbeda-beda, di Indonesia sendiri menggunakan AP-42 sebagai sumber faktor emisinya. Pada penelitian ini dibahas mengenai perbandingan nilai total emisi tiap polutan antara polutan berdasarkan pendataan CEMS dengan faktor emisi berbagai sumber AP-42, IPCC, dan Kurokawa et al. serta pemilihan faktor emisi turbin gas yang cocok digunakan di Indonesia berdasarkan hasil perbandingan tersebut. Dengan menggunakan rumus dari PermenLH No. 21 Tahun 2008 untuk perhitungan total emisi berdasarkan pendataan CEMS dan PermenLH No. 12 Tahun 2012 untuk perhitungan total emisi berdasarkan faktor emisi dan kemudian kedua nilai ini dibandingkan, didapatlah nilai perbandingan yang paling mendekati, yaitu: nilai rata-rata data CEMS SO2 dengan faktor emisi AP-42 sebesar 1,87 , nilai rata-rata data CEMS NOx dengan AP-42 sebesar 9 , nilai maksimum CO dengan faktor emisi Kurokawa et al. sebesar 75,64 , dan nilai median Total PM dengan IPCC sebesar 40,6 . Faktor emisi yang baik digunakan di Indonesia adalah faktor emisi dari USEPA, yaitu AP-42.
ABSTRACT
Borang 60 MW Gas Power Plant, Palembang, produces pollutants which affected surroundings, such as SO2, NOx, CO, and Total PM, that monitored by CEMS. In addition to monitoring, it is necessary to establish a strategy and action plan for the management of air quality for the future by using emission factor. Emission factor is a representative value that attempts to associate the quantity of a pollutant released to the atmosfer with its releasing activities. Emission factors in several regions vary, in Indonesia Itself is using AP 42 as a source of emission factor. This experiment discussed about the comparison of total emission values of each pollutants based on CEMS data which are AP 42, IPCC, and Kurokawa et al., also selection of gas turbine emission factors that most suitable for use in Indonesia based on the comparison result. By using the formula from PermenLH No. 21 2008 for the calculation of total emissions based on CEMS and PermenLH Number 12 2012 for the calculation of total emission based on emission factor, these two values are compared. Data showed that the most approximate values of the comparability are the average value of SO2 based on CEMS with AP 42 emission factor is 1,87 , the average value of NOx based on CEMS with AP 42 emission factor is 9 , maximum value of CO based on CEMS with emission factor from Kurokawa et al. is 75,64 , and median value of Total PM with IPCC emission factor is 40,6 . In conclusion, the most suitable gas turbine emission factors for use in Indonesia is emission factor from USEPA, which is AP 42.
2017
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Zia Ru Ya Hilal
Abstrak :
Konsumsi energi listrik di kampus Universitas Indonesia mengalami peningkatan setiap tahunnya, ini terjadi karena peningkatan pembangunan gedung. Salah satu upaya untuk memenuhi kebutuhan ini adalah dengan adanya penambahan salah satu sistem pembangit yang disesuaikan dengan kondisi lingkungan dan potensi yang ada di Universitas Indonesia. Universitas Indonesia telah tersedia pipa gas dan potensi air danau untuk pendinginan pada sistem pembangkit. Sehingga pembangkit listrik tenaga gas tepat sebagai solusi. Untuk menaikan daya output agar sesuai kemampuan original dari manufaktur turbin gas, yakni dengan cara menurunkan suhu udara masuk ke kompresor/turbin gas tersebut, sehingga perancangan PLTG dengan mechanical refrigeration dirasa tepat dalam melengkapi solusi tersebut. Tulisan ini akan memaparkan rancangan dari pembangkit listrik tenaga gas yang dapat membangkitkan daya hingga 24 MW menggunakan software Cycle ? Tempo 5.0 Pada tulisan ini pula didapat analisis mechanical refrigeration, heat balance, kebutuhan bahan bakar pembangkit, nilai efisiensi, nilai heat rate, dan analisis finansial dari pembangunan pembangkit listrik mandiri untuk Universitas Indonesia. ......Electrical energy consumption at the University of Indonesia has increased every year, this occurs because of an increase in the construction of the building. One effort to fulfill this need is with the addition of power plant systems adapted to the environmental conditions and the potential in University of Indonesia. University of Indonesia's environment has provided gas pipeline and potential lake water for cooling the power plant system. So that proper gas power plants as a solution. To increase the power output to match the original capability of manufacturing gas turbines, namely by lowering the temperature of the inlet air to the compressor / gas turbine, so that the design of the power plant Mechanical refrigeration is appropriate in completing the solution. This paper will describe the design of a gas power plant that can generate power up to 24 MW using software Cycle - Tempo 5.0 This paper also analyzes obtained Mechanical Refrigeration, heat balance, the needs of fuel, the efficiency, heat rate value, and financial analysis independent of the power plant to the University of Indonesia.
Depok: Fakultas Teknik Universitas Indonesia, 2014
S55736
UI - Skripsi Membership  Universitas Indonesia Library
cover
Agung Priyambodho
Abstrak :
ABSTRAK
Listrik merupakan sumber energi primer masyarakat, dengan perkembangan ekonomi suatu wilayah maka pertumbuhan kebutuhan energi listrik akan meningkat sejalan dengan hal tersebut perlu dilakukan pembangunan pembangkit dan transmisi listrik yang terencana. Kalimantan Tengah merupakan wilayah indonesia yang memiliki sumber gas alam yang melimpah, dimana saat ini kondisi kelistrikan Kalimantan merupakan wilayah yang dapat dikatagorikan defisit listrik, serta pembangkit di Wilayah Kalimantan Tengah masih menggunakan pembangkit dengan bahan bakar diesel. Dengan meningkatnya kebutuhan listrik pada saat beban puncak dan tersedianya sumber gas alam di Kalimantan Tengah maka perencanaan pembangunan pembangkit bahan bakar gas harus dilakukan sejalan dengan program pemerintah dalam melakukan diversifikasi energi dari bahan bakar diesel menjadi bahan bakar gas. Tesis ini bertujuan untuk menentukan konfigurasi terbaik yang dapat digunakan terhadap variasi pembebanan listrik dan menurunkan biaya pokok produksi di wilayah Kalimantan Tengah dengan melakukan perencanaan konfigurasi pembangkit dengan pembebanan yang bervariasi pada saat pembebanan base load dan peak load, pembangkit yang akan digunakan adalah pembangkit jenis Gas Turbin dan Gas Engine. Dengan konfigurasi pembangkit base Load sebesar 40 MW dan peak Load 300 MW dan total biaya pokok produksi mencapai 1.313,26 Rp/kWh dimana nilai tersebut masih dibawah biaya pembangkitan rata-rata PLN untuk PLTD mencapai 2,300 Rp/kWh dan PLTG mencapai 3,306,22 Rp/kWh serta masih di bawah BPP Kalselteng sebesar 1,655 Rp/kWh dan Kaltim sebesar 1,357 Rp/kWh.
ABSTRACT
Electricity is a primary energy source for the community, with the economic development of a Region, the electric energy growth will increase. In line with the electricity growth, it is necessary to construct power generation and electricity transmission with well development and planned. Central Kalimantan is one of the Indonesian region which has abundant natural gas resources, although the electricity condition of Kalimantan Region Could be categorized as deficit of electricity, and there are many Power Plants in Central Kalimantan region that still using diesel as a primary fuel. With the increasing demand for electricity during peak loads and the availability of natural gas in Central Kalimantan, planning for Power Plant construction using gas as fuel in line with the government program for energy diversify replace diesel fuel into gas fuel. This thesis aims to analysis best power plant configuration for variable power demand and to lower the Power Plants production cost in the region of Central Kalimantan by utilizing the natural gas resources in Central Kalimantan to meet the electricity needs at the time of base load and peak load condition, to utilize the limited resources of gas fuel, Power Plant configuration that used in this study is Gas Turbines and Gas Engine type. The best configuration to supply the electricity demand at 40 MW for baseload and at 300 MW for peak load, Total cost of production reached 1.313.26 Rp kWh this cost is still below the cost of generating PLN for PLTD that reached 2,300 Rp kWh and PLTG that reached 3,306,22 Rp kWh and levelized electricity generating cost for PLTGU still below cost electricity of Kalselteng at 1,655 Rp kWh and Kaltim at 1,357 Rp kWh.
2017
T47655
UI - Tesis Membership  Universitas Indonesia Library
cover
Franky K. Koraag
Abstrak :
Pemeliharaan pembangkit listrik harus dilakukan dalam durasi yang direncanakan. Perpanjangan durasi pemeliharaan tidak hanya berdampak pada kinerja perusahaan pembangkit tetapi juga mempengaruhi pengoperasian sistem kelistrikan yang dilakukan oleh operator sistem. Oleh karena itu penting untuk mengetahui risiko-risiko utama dan urutan prioritasnya sehingga mitigasi dapat dilakukan. Mitigasi ini dapat meningkatkan efektivitas pemeliharaan. Penelitian ini dilakukan di Pembangkit Listrik Tenaga Gas (PLTG) Muara Karang Blok 1, Jakarta. PLTG ini diproduksi oleh General Electric dengan jenis turbin gas MS9000. Dalam studi ini identifikasi risiko dilakukan dengan mempelajari riwayat pemeliharaan selama 10 tahun terakhir. Selain itu, pendapat juga diminta dari para ahli yang berpengalaman dalam memelihara pembangkit listrik ini. Analisis risiko menggunakan metode matriks risiko untuk menyaring risiko yang telah diidentifikasi. Output dari matriks risiko ini adalah risiko-risiko utama yang harus dimitigasi. Selanjutnya untuk memprioritaskan risiko-risiko utama tersebut, metode Proses Hirarki Analitik (PHA) digunakan dengan bantuan responden ahli. Pada akhirnya penelitian ini menghasilkan risiko-risiko utama dengan urutan prioritasnya mulai dari retak pada flexible lead rotor generator, temuan kerusakan pada nozzle tingkat pertama, ketidaksesuaian hasil perbaikan part turbin, kegagalan sistem pelumasan bearing generator, tingkat curah hujan tinggi , part pengganti nozzle dan bucket datang terlambat, load tunnel terbakar, kebocoran H2 dari bushing / bracket generator, accessories gear baru tidak standar, kerusakan part torque converter, dan kebocoran saluran bahan bakar minyak saat start up PLTG Maintenance of power plants must take place within the planned duration. Extension of maintenance duration not only has an impact on the performance of the generating company but also affects the operation of the electricity system implemented by system operator. Therefore it is important to know the main risks and the order of priorities so that mitigation can be done. This mitigation can improve effectiveness of maintenance. This research was conducted at Muara Karang Gas Turbine Power Plant Block 1, Jakarta. The gas turbine is manufactured by General Electric with the type of MS9000 gas turbine. In this study, risk identification is done by studying the maintenance history of the last 10 years. In addition, opinions were also asked from experts who were experienced in maintaining this power plant. Risk analysis uses a risk matrices method to filter out the risks that have been identified. The output of this risk matrices is ​​the main risks that must be mitigated. Next to prioritize the main risks, the AHP method is used with the help of expert respondents. In the end this research produced the main risks in the order of priorities starting from cracks on flexible lead of generator rotor, damage findings at the first stage nozzle, incompatibility results of turbine parts repair, failure of the generator bearing lubrication system, high rainfall rate, replacement part of nozzle and bucket arrive late, load tunnel is burning, H2 leakage from generator bushing/bracket, new accessories gear is not standard, damage of torque converter part, and leakage of fuel oil line at startup of the Gas Turbine Power Plant