Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 63 dokumen yang sesuai dengan query
cover
Civitello, Andrew M.
New York: McGraw-Hill, 1994
624.068 CIV c
Buku Teks  Universitas Indonesia Library
cover
Maulana Mas Mohammad
Abstrak :
Penelitian ini dilakukan untuk menganalisis gap antara aktualitas implementasi pelaksanaan CSMS di kontraktor kontrak kerja sama bidang hulu migas proyek PGN Tie-In Saka Indonesia Pangkah Limited dengan pedoman perusahaan yang ada. Penelitian ini merupakan penelitian deskriptif dengan pendekatan kualitatif dan desain studi cross-sectional. Data pada penelitian ini didapatkan melalui observasi, wawancara dengan pihak perusahaan dan Kontraktor, dan data pendukung berupa laporan CSMS. Hasil dari penelitian ini menunjukkan bahwa proyek PGN Tie-In melakukan siklus CSMS mulai dari penilaian risiko, pra kualifikasi, seleksi, penilaian sebelum bekerja, penilaian berjalan, dan penilaian akhir sesuai dengan pedoman perusahaan. Secara garis besar, seluruh kegiatan pada setiap tahapan CSMS dilakukan sesuai dengan pedoman perusahaan, namun kegiatan yang belum sesuai dengan pedoman perusahaan adalah tahap verifikasi HSE Plan yang dilakukan setelah penghargaan diberikan. Dengan diimplementasikannya CSMS ini, Kontraktor berhasil mencapai target nol fatality dan nol lost time injury (LTI) hingga proyek selesai dikerjakan. ......This research was conducted to analyze the gap between the actual implementation of the CSMS implementation for contractor partnership contract in the upstream oil and gas sector of the PGN Tie-In Saka Indonesia Pangkah Limited project and the existing company guidelines. This research is a descriptive study with a qualitative approach and a cross-sectional study design. The data in this study were obtained through observation, interviews with the company and contractors, and supporting data in the form of CSMS reports. The results of this study indicate that the PGN Tie-In project carries out the CSMS cycle starting from risk assessment, pre-qualification, selection, pre-employment assessment, on-going assessment, and final assessment according to company guidelines. Broadly speaking, all activities at each CSMS stage are carried out in accordance with company guidelines, but activities that are not yet in accordance with company guidelines are the HSE Plan verification stage which is carried out after the award is given. With the implementation of this CSMS, the Contractor has succeeded in achieving the target of zero fatality and zero lost time injury (LTI) until the project is completed.
Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
New York: McGraw-Hill, 1971
R 658.924 CON
Buku Referensi  Universitas Indonesia Library
cover
Fransiska Maria Farida
Abstrak :
Keberhasilan penyelenggaraan proyek konstruksi ditentukan oleh kemampuan para pelaku utamanya (tim proyek pemilik , kontraktor dan konsultan ) dan tersedianya perangkat yang lengkap dan berkualitas . Pada zaman dahulu kontraktor mengerjakan hampir sebagian besar pekerjaan konstruksi. Pada saat ini pada tahap konstruksi kira - kira 80 % pekerjaan diserahkan ke subkontraktor. Akibatnya subkontraktor memainkan peranan penting dalam industri konstruksi dimana proyek bangunan gedung bertingkat tinggi kira-kira 80-90 % pekerjaan dikerjakan oleh subkontraktor . Sehingga pengelolaan subkontraktor oleh kontraktor utama sangat diperlukan. Berdasarkan pada hal ini, maka dilakukan penelitian mengenai pengelolaan subkontraktor dengan menyebarkan kuesioner yang berisi 5 hal yaitu : pemilihan subkontraktor , perjanjian dengan subkontraktor , persiapan pekerjaan subkontraktor dan penyelesaian pekerjaan subkontraktor . Data yang didapat dari hasil penyebaran ini kemudian diolah secara statistik dengan program SPSS 9.01 untuk mendapatkan variabel - variabel yang menentukan . Dari hasil pengolahan SPSS9.01 didapat variabel penentu adalah pengawasan pekerjaan ( X34 ) dan penempatan pengawas yang sesuai dengan kemampuannya ( X33 ). Variabel lain diluar 2 variabel penentu ini dicari dengan menggunakan dummy , didapat variabel pengaturan change orders sejak kontrak awal ( X30 ). Akibat dari sampel yang didapat kecil (18 sampel ) , maka perlu untuk diuji kembali apakah hasil yang didapat dapat mewakili populasi yang sedemikian besar tersebut . Pengujian dilakukan dengan menggunakan simulasi Monte Carlo . Berdasarkan hasil simulasi tersebut didapat bahwa pada saat 68 % data ke - 3 variabel penentu memiliki mean/rata - rata pada skala penilaian =3 ( biasa dilakukan tapi tidak rutin ), artinya pada skala penilaian 3( biasa dilakukan tapi tidak rutin ) sangat berpengaruh. terhadap pengelolaan subkontraktor , persamaan tidak berlaku pada skala penilaian 1 ( sama sekali tidak pernah dilakukan ), persamaan berlaku pada skala penilaian antara 2 ( dilakukan sesekali saja ) sampai 4 ( merupakan prosedur standar yang selalu dilakukan ), Apabila tidak ada pengawasan, tidak ada penempatan pengawas sesuai kemampuan dan tidak ada pengaturan change orders dikontrak awal , maka sangat berpengaruh ( pengaruh sebesar 100 % ) dan apabila selalu ada pengawasan setiap saat , pengawas selalu ditempatkan sesuai kemampuannya dan ada pengaturan secara detail change orders dikontrak awal , maka tidak berpengaruh terhadap kinerja waktu subkontraktor ( berpengaruh 0 % ).
The success of' handle construction project depends on the ability from owner's project team, contractor and consultant. In the traditional day, contractor handles almost all of construction work. In modern days, contractor gives about 80% from all the construction work to subcontractor. The consequence from this trend is make subcontractor play an important part in construction industry, which subcontractor handle about 80% from all of high rise building project work. From all of this, it's very important for contractor to manage its subcontractor. With this review, the writers do a research about managing subcontractor with spreading the questioner. There are five important things in the questioner. All of them are about choosing subcontractor, the dealing with subcontractor, the preparing, finishing step and the payment. We use SPSS 9.01 to handle all of data to get some determinant variables. There are three determinant variables that we got. There are controlling, using the right controller and change order. We just have little sample (eighteenth samples), so we need to check whether the sample can explain the population. We use Monte Carlo simulation to do this and we get that three variables can explain the population.
2001
T1904
UI - Tesis Membership  Universitas Indonesia Library
cover
Gerian Zalda
Abstrak :
Kecelakaan kerja dan atau penyakit akibat kerja menimbulkan kerugian baik terhadap tenaga kerja maupun terhadap perusahaan. Kerugian yang diderita tenaga kerja berupa cedera akibat kecelakaan kerja, gangguan mental, cacat sementara maupun cacat tetap. Sedangkan kerugian yang diderita perusahaan antara lain berupa pengeluaran biaya pengobatan, biaya perbaikan kerusakan peralatan, kehilangan nilai produksi karena proses terpaksa terhenti, penurunan produktivitas karena karyawan pengganti kurang terampil. Teori dari heninrich (1931) menyatakan 88 % terjadinya kecelakaan disebabkan oleh human error (unsafe acts), 10% dikarenakan kondisi yang tidak aman (unsafe condition). Dari konsep teori ini, Ferrel juga mengatakan kecelakaan adalah akibat dari sebuah rangkaian kejadian yang diawali oleh kesalahan manusia. Dan jenis-jenis kesalahan manusia menurut James Reason, 1990 antara lain: Kekeliruan/ Lapse (Kegagalan Memori / Lupa), Kesalahan/ Mistake (Kesalahan Komunikasi, Buruknya Pelatihan Kerja dan Aplikasi Dan Aturan Tindakan Disiplin Yang Buruk). Tujuan dari penelitian ini adalah untuk mengetahui faktor-faktor yang mempengaruhi kesalahan manusia dalam bekerja dari karyawan Kontraktor Departemen Well Work & Drilling PT, Chevron Pasific Indonesia Duri-Riau. Penelitian ini merupakan penelitian non-eksperimental dengan disain cross sectional dilakukan melalui wawancara kuisioner pada 75 responden dengan analisa univariat, analisa bivariat (Korelasi Pearson) dan analisa multivariat (analisa faktor konfirmatori). Hasil penelitian menghasilkan sebagai berikut: kesalahan Komunikasi sebesar 23 orang (30,66%) dengan hasil faktor konfirmatori 0,743, Buruknya Pelatihan Kerja sebesar 20 (26,67%) dengan hasil faktor konfirmatori 0,624, Aplikasi Aturan Tindakan Disiplin sebesar 17 orang (22,67%) dengan hasil faktor konfirmatori 0,602 dan kegagalan memori sebesar 15 (20%) dengan hasil faktor konfirmatori 0,567. Kesalahan Komunikasi merupakan faktor utama dari kesalahan manusia dalam bekerja dan hubungan kesalahan komunikasi dengan buruknya pelatihan kerja secara statistik terbukti mempunyai hubungan yang bermakna sebesar 0,471. Berdasarkan hasil penelitian ini, disarankan kepada perusahaan untuk Membuat perencanaan pemenuhan kebutuhan dan pengembangan tenaga kerja baik jangka pendek maupun jangka panjang dengan cara peningkatkan pelatihan kerja, perbaikan proses komunikasi yang meliputi upaya perbaikan komunikasi antara karyawan dan pimpinan dan antara sesama karyawan, melakukan pertemuan berkala antar pimpinan dengan karyawan dan antara sesama karyawan guna membahas dan sekaligus meningkatkan kinerja, memberi kesempatan bagi karyawan dengan berbagai latar belakang pendidikan dan jabatan untuk mengembangkan diri dengan memberikan tanggungjawab dan uraian tugas sesuai dengan keahlian yang dimiliki karyawan.
Accident work and or sickness the result of work to make injure for the employee or the company. The employee injure are wound the result accident of work, mentality annoyance, temporary or permanent. Even the injure for the company are expenses medicine cost, equipment destruction improvement cost, the lost of production value because the process necessary to stop, decrease of productivity because the less skill of substitute employee. Chevron Pacific Indonesia company is industrial appearance in petroleum that has high job risk level, especially after job complicated more increase to answer that challenging company should be able to give best service to employee. The power of human resource department is imported because as good as system and facility that have prepared if it is not supported by good human resource in to do their activity. So therefore if human resources development has prepared and supported by good system and facility, there is good job and increasing productivity. Theory of Heinrich (1931) said that 88% of accident caused by human error (unsafe acts), 10% caused unsafe condition. From this theory of concept, Ferrell also said that accident is result from arrange of rise is begin human error. According to James Reason (1990) that kind of human error is: Unintended Action (slip, lapse, and mistake) and Intended Action (Violation). The purpose of this research is for know factors related to human error in job at contractor department well work & drilling Chevron Pasific Indonesia company. This research is not experimental with design cross sectional has done by interview to 75 respondent with univariat analyses, bivariat analyses (Korelasi Pearson) dan multivariat analyses (konfirmatori factor analyses). The result of research result are mistake communication 23 persons (30,66%) with result factor konfirmatori 0,743, bad job training 20 (26,67%) person with result factor konfirmatori 0,624, application of bad rule disciplined 17 person (22,67%) with result factor konfirmatori 0,602 and memory failures 15 person (20%) with result factor konfirmatori 0,567. Mistake communication is first factor of human error in work and relation mistake of communications with bad job training of statistically proven have relation having a meaning of equal to 0,471. According to this research company suggested to make planning needing completely and employee developing for short or long term with job training increasing, improvement communication among employee and company and other employee, making perpetual meeting among company and employee and other employee to discuss and increase. Work system, giving opportunity to employee with much kind of education backgrounds and position to develop them to give responsibility and job descriptions in conformity with employee skill.
Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2006
T19111
UI - Tesis Membership  Universitas Indonesia Library
cover
Anindya Julianto
Abstrak :
ABSTRAK
Menentukan strategi yang tepat membuat perencanaan proyek penting berdasarkan perjanjian kerja, perjanjian itu dibuat untuk melindungi kedua belah pihak dalam melaksanakan pekerjaan. Tujuan dari penelitian ini adalah untuk mengidentifikasi kerangka kerja manajemen risiko dari sektor kontraktor telekomunikasi di Indonesia. Sebagian besar perusahaan telekomunikasi telah menerapkan sistem pembayaran ditunda berdasarkan kesepakatan. Proses penelitian ini mengembangkan kerangka kerja, evaluasi, dan mitigasi. Penelitian ini telah dilakukan dari penelitian sebelumnya terkait dengan risiko proyek dan manajemen risiko dalam perspektif kontraktor untuk mengembangkan kerangka kerja awal. Data dibangun dari penelitian sebelumnya dan sampel diambil dari beberapa perusahaan sejenis. Pendekatan kuantitatif yaitu survei dan wawancara ahli untuk mengkonfirmasi kerangka awal kemudian divalidasi dengan forum diskusi kelompok. penelitian ini diharapkan dapat mengetahui apa risiko dan mengurangi tingkat risiko tertinggi dengan mitigasi risiko. Penelitian ini mengusulkan kepada praktisi untuk mengelola rencana proyek dengan mempertimbangkan risiko proyek dan juga untuk para pemangku kepentingan atau investor untuk memutuskan investasi pada proyek ini.
ABSTRACT
Determine the right strategy of make project planning is important based on work agreement, the agreement was made to protect both parties in carrying out the work. The aim of this paper is to identify risk management framework for telecommunication contractor sector in Indonesia. Most of telecommunication companies have applied with postpone paymen system by agreement. The process of this paper is developing the framework, evaluate, and mitigation. This paper has been conducted from previous research related with project risk and risk management in contractor perspective to develop initial framework. Data was generated from previous research and sample was taken from some similar companies. The quantitative approach which are survey and expert interview to confirm the initial framework then validating by forum group discussion. This paper expected to find out what the risk and reduce the highest risk level with risk mitigation. This paper proposed to practitioners for manage the project plan by considering project risk and also for stakeholders or investor to decide investment on this project.
Depok: Fakultas Teknik Universitas Indonesia , 2020
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
O`Hara, Robert A.
London: E & FN Spon, 1991
343.410 94 O'HA g
Buku Teks  Universitas Indonesia Library
cover
Civitello, Andrew M.
New York: McGraw-Hill, 2008
690 CIV c
Buku Teks  Universitas Indonesia Library
cover
Sahala Bachtiar
Abstrak :
Konstruksi merupakan suatu proses dimana rencana dan spesifikasi para perancang dikonversikan menjadi suatu struktur dan fasilitas fisik. Hal ini melibatkan pengorganisasian dan koordinasi dari semua sumber untuk proyek yaitu tenaga kerja, peralatan konstruksi, material-material tetap dan sementara, persediaan dan keperluan umum, dana/biaya, teknologi dan metode serta waktu penyelesaian proyek yang harus tepat waktu, dalam batas - batas anggarannya dan sesuai dengan standar kualitas dan pelaksanaan yang dispesifikasikan oleh perancang. Metode yang digunakan dalam penelitian ini menggunakan pengumpulan data primer dengan menyebarkan kuesioner kepada para kontraktor yang terlibat didalam pelaksanaan proyek pemeliharaan DPU DKI Jakarta. Dari hasil pengumpulan data sejumlah 35 sampel didapatkan 26 data yang dilakukan analisis statistik untuk mendapatkan model persamaan analisis regresi berganda. Dari analisis yang dilakukan dengan menggunakan bantuan paket program SPSS 10.0 didapatkan persamaan model regresi berganda linier. Adapun hasil dari penelitian ini menunjukkan bahwa peningkatan kinerja biaya yang didapatkan dari hasil analisis statistik dipengaruhi oleh 2 variabel secara linier yaitu, Kualitas Perkiraan Harga Peralatan yang digunakan, dan kualitas sumber bahan mentah.
Depok: Fakultas Teknik Universitas Indonesia, 2002
T1140
UI - Tesis Membership  Universitas Indonesia Library
cover
Bobied Guntoro
Abstrak :
ABSTRAK
Nama : Bobied GuntoroNPM : 1506697012Program Studi : Pasca SarjanaJudul : Penawaran Participating Interest Oleh Kontraktor Kontrak Kerja Sama Kepada Badan Usaha Milik Daerah Berdasarkan Peraturan Menteri Energi dan Sumber Daya Mineral Nomor 37 Tahun 2016. Tesis ini membahas tentang penawaran dan pengelolaan Participating Interest 10 oleh Kontraktor kepada BUMD ldquo;PI 10 rdquo; baik pengaturan mapun implementasinya sebelum maupun sesudah Undang-Undang Nomor 22 Tahun 2001 tentang Minyak dan Gas Bumi, khususnya sejak diterbitkannya Peraturan Menteri Energi dan Sumber Daya Mineral Nomor 37 Tahun 2016 tentang Ketentuan Penawaran Participating Interest 10 sepuluh persen Pada Wilayah Kerja Minyak dan Gas Bumi ldquo;Permen ESDM 37/2016 rdquo; . Penawaran PI 10 sebelum diterbitkannya Permen ESDM 37/2016 belum memberikan manfaat yang optimal bagi kepentingan nasional atau daerah. Belum optimalnya penawaran PI 10 tersebut dikarenakan pendanaan yang dibutuhkan untuk pengambilan PI 10 cukup besar, sehingga pada akhirnya Pemerintah Daerah atau BUMD bermitra dengan Badan Usaha swasta dengan pola bagi hasil yang tidak menguntungkan bagi BUMD dan berpotensi menimbulkan moral hazard dalam pengelolaan PI 10 . Tesis ini menggunakan penelitian yuridis normatif karena menitikberatkan pada penelitian kepustakaan yang intinya meneliti asas-asas hukum, sistematis hukum, dan sinkronisasi hukum dengan cara menganalisanya. Terbitnya Permen ESDM 37/2016 dapat menjadi terobosan tidak hanya untuk mengatasi permasalahan penawaran dan pengelolaan PI 10 kepada BUMD, yaitu bagi kemandirian kemampuan keuangan BUMD, kepastian hak Pemerintah Kabupaten, Pemerintah Provinsi, dan antar Pemerintah Provinsi, namun juga dapat mendukung solusi permasalahan perizinan daerah. Terobosan-terobosan yang dilakukan tersebut secara legalitas formal perlu diberikan landasan hukum yang sesuai di tingkat peraturan yang lebih tinggi sehingga memenuhi landasan yuridis dari keberlakuan suatu peraturan perundang-undangan.Kata kunci: PI 10 , BUMD dan Kontraktor.
ABSTRACT
Name Bobied GuntoroStudent Number 1506697012Program Post GraduateTitle The Offering of Participating Interest by Contractor To The Local State Owned Company Under The Minister of Energy and Mineral Resources Regulation Number 37 of 2016.This thesis discusses about the offering and management of Participating Interest 10 by Contractor to BUMD PI 10 either under regulation or implementation before and after Law Number 22 Year 2001 regarding Oil and Gas, especially since the issuance of Regulation of Minister of Energy and Resources Mineral Power Number 37 Year 2016 concerning Terms of Participating Interest of 10 ten percent of Oil and Gas Contract Area ESDM Regulation 37 2016 . The offering of 10 PI prior to the issuance of ESDM Regulation 37 2016 has not provided optimal benefits for national or regional interests. The non optimal PI 10 is due to the funding required for 10 PI is high enough, so in the end the Regional Government or BUMD partnered with Private Enterprise with a profit sharing pattern that is unprofitable for the BUMD and potentially generate moral hazard in the management of PI 10 . This thesis uses normative juridical research because it focuses on literature research that essentially examines the principles of law, systematic law, and legal synchronization by way of analyzing it. The publication of ESDM Minister 37 2016 can be a breakthrough not only to overcome the problems of offering and management of 10 PI to BUMD, that is for the independence of BUMD 39 s financial capability, certainty of the right of the District Government, Provincial Government and inter Provincial Government, however also to support solution for local license problem. Such breakthroughs in legal perspective need to be given appropriate legal basis at higher regulatory level so as to fulfill the juridical basis of the validity of a regulation. Key words PI 10 , Local State Owned Company, and Contractor.
2017
T48585
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7   >>