Ditemukan 3 dokumen yang sesuai dengan query
Agustinus Agung Prasetyo
Abstrak :
Penelitian ini bertujuan untuk menentukan critical waste pada suatu proses produksi, serta mengeliminasi secara sistematis guna meningkatkan kinerja dan kapasitas untuk memenuhi peningkatan permintaan dengan menggunakan metode Value Stream Mapping (VSM) dan Waste Assessment Model (WAM). Berdasarkan hasil analisis didapatkan tiga rekomendasi perbaikan yaitu penggunaan electronis kanban untuk mengontorl inventory di gudang penyimpanan material packaging, perancangan mesin pelipat kardus otomatis, dan modifikasi rol sebagai sarana transportasi barang finish good. Hasil evaluasi rekomendasi didapatkan perbaikan pada lini produksi berupa peningkatan kapasitas produksi menjadi 7189,54 box per hari, penurunan production lead time menjadi 154 detik, dan efisiensi man power sebanyak 2 orang.
This study aimed to determine the critical waste in a manufacturing process, as well as eliminating systematically to improve the performance and capacity to meet increased demand by using Value Stream Mapping (VSM) and the Waste Assessment Model (WAM). Based on the analysis we found three recommendations for improvement, namely the use of electronis kanban inventory control in warehouses for storage of packaging materials, automatic carton folding machine design, and modification of rollers for transportation of goods good finish. The evaluation results showed that improvements recommendations on the production line by increasing production capacity to 7189.54 box per day, a decrease in production lead time to 154 seconds, and the efficiency of man power by 2 people.
Depok: Fakultas Teknik Universitas Indonesia, 2014
T41787
UI - Tesis Membership Universitas Indonesia Library
Devid Perdana
Abstrak :
Dalam suatu proyek dibutuhkan sumber daya yang kompeten dan berkualitas dan dimanfaatkan dengan benar untuk tercapainya keberhasilan suatu proyek. Dalam menyelesaikan suatu proyek gardu listrik pada tahap eksekusi desain diperlukan sumber daya yang berkompeten, waktu yang efisien dan biaya yang optimal sehingga tercapai target penyelesaian proyek dengan biaya yang optimal serta yang sesuai dengan ekspetasi dari customer.
Salah satu masalah yang timbul selama tahap desain adalah waktu penyelesaian drawing yang lama yang disebabkan karena meningkatnya total beban kerja (loading total) selama pembuatan gambar pada proses desain. Hal itu menunjukkan bahwa adanya metode kerja yang tidak baik karena adanya aktivitas yang duplikasi, tidak efisien dan aktivitas yang dikerjakan tidak parallel sehingga menyebabkan waktu penyelesaian drawing yang lama. Oleh karena itu, diperlukan suatu perbaikan metode kerja pada tahap desain.
Metode analisa menggunakan peta aliran proses dan VSM (Value Stream Mapping) dapat digunakan untuk memperbaiki sistem kerja dalam pembuatan gambar pada tahap desain sehingga dapat mengurangi waktu penyelesaian drawing yang lama. Metode tersebut kemudian diuji untuk mendapatkan variable set up time yang paling berpengaruh terhadap total waktu beban kerja (loading total time).
......In a project resource needs qualified and competent and properly utilized to achieve the success of a project. In completing an electrical substation at the project execution stage of the design required a competent resource, time-efficient and cost optimal in order to reach the target project completion with optimum cost and in accordance with the expectations of the customers.
One of the problems that arise during the design phase is drawing a long turnaround time due to the increase in total workload (loading in total) during the making of image in the design process. It shows that the existence of a working methods which is not good because of the duplication of activities, inefficient and activities that do not parallel causing long turnaround time drawing. Therefore, we need a working system improvement at the design stage.
Method of process flow maps and VSM (Value Stream Mapping) can be used to improve the work method in the graphic at the design stage so as to reduce the completion time drawing a long. Those method is then tested to get a variable set up time that most influence on the total time workload (total loading time).
Depok: Fakultas Teknik Universitas Indonesia, 2014
T43679
UI - Tesis Membership Universitas Indonesia Library
Robby Anzil Firdaus
Abstrak :
Komponen utama produk A adalah bakteri fotosintetik. Salah satu permasalahan utama yang timbul pada proses produksi karena penggunaan bakteri fotosintetik adalah lamanya waktu fermentasi, dan menyebabkan tingginya biaya produksi. Salah satu cara yang dapat digunakan untuk mempercepat proses fermentasi adalah dengan menggunakan proses rekayasa genetika. Proses rekayasa genetika untuk menghasilkan bakteri dengan proses fermentasi yang lebih cepat telah dilakukan pada tahun 2012 di PT. X, dan telah mendapatkan satu bakteri.
Penelitian ini menggunakan metode Value Stream Mapping dan Cost Integrated Value Stream, untuk menganalisa proses produksi produk A. Proses current menggunakan bakteri tanpa rekayasa genetika, dan proses proposed menggunkan bakteri yang telah direkayasa secara genetika.
Dalam penelitian ini didapatkan hasil, total biaya produksi pada pross current sebesar Rp 6.384.655/batch dan total biaya produksi pada proses proposed sebesar Rp 4.119.867/batch. Dari hasil tersebut terjadi penurunan total biaya produksi sebesar Rp 2.264.788/batch atau sebesar 35%.
......Main component of product A is photosynthetic bacteria. One of the major difficulty that arise in the production process is the slow fermentation rate, which resulting in the high production cost. One of the suggested way to handle it is by genetic engeneering. The genetic engineered that taken places in 2012 on PT. X resulted in a higher fermentation rate bacteria.
This research use Value Stream Mapping method and Cost Integrated Value Stream, to analize production process of product A. Current process using non genetic engineered bacteria and proposes process using genetic engineered bacteria.
In this research the result are, total production cost in current process Rp.6.384.655/batch, and total production cost using genetic engineered bacteria Rp.4.119.867/batch. From the result there is a declining production cost of Rp.2.264.788/batch or 35% from the proposes process compared to the current process.
Depok: Fakultas Teknik Universitas Indonesia, 2015
T43615
UI - Tesis Membership Universitas Indonesia Library