Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 67 dokumen yang sesuai dengan query
cover
New York : Simon & Schuster , 2003
720.483 TAL
Buku Teks  Universitas Indonesia Library
cover
Tri Mulyawan
Abstrak :
Perkiraan biaya pekerjaan struktur gedung, yang merupakan suatu bagian terpenting dalam perencanaan suatu proyek. Suatu model matematika perkiraan biaya awal dengan menggunakan metode regresi dari data-data aktual perkiraan biaya struktur gedung yang telah dilaksanakan pada proyek-proyek swasta dan proyek pemerintah. Data-data perkiraan gedung tersebut telah menghasilkan nilai sangat berarti antara jumlah biaya terhadap jumlah lantai dan luas tipikal. Ditemukan pula parameter-parameter lain yang mempengaruhi perkiraan biaya antara lain yaitu beton, besi, bentuk gedung, jenis gedung dan peralatan yang digunakan. Untuk mendapatkan parameter-parameter metode regresi dengan cara membuat kuadrat terkecil (Method of Least Square) yaitu dengan cara membuat jumlah kuadrat kesalahan minimum. Pemeriksaan model terhadap koefisien determinasi yang berhasil dapat menemukan fungsi dari regresi yang paling cocok sehingga berguna dalam mengevaluasi berapa besar perkiraan biaya struktur gedung tersebut. Agar hasilnya lebih akurat maka dilakukan pembuktian dengan data perkiraan biaya aktual sehingga akan terlihat berapa penyimpangan yang akan terjadi dari perkiraan biaya yang dihasilkan analisis regresi dengan data biaya aktual.
Depok: Universitas Indonesia, 1999
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Nurul Inayah Wardahni
Abstrak :
Bangunan gedung tinggi merupakan gedung dengan tinggi minimal 22 meter atau setara dengan 8 lantai dengan fungsi hunian, komersil, ataupun perkantoran yang mampu mengurangi penggunaan lahan secara horizontal. Selama masa operasionalnya, saat ini penerapan proses pemeliharaan dan perawatan bangunan gedung tinggi di Indonesia dinilai masih belum dilakukan secara efektif. Hal ini disebabkan karena rendahnya kebijakan dan standar pedoman terkait pemeliharaan dan perawatan bangunan gedung tinggi, rendahnya koordinasi antar pihak, dan tidak mengintegrasikan sistem pemeliharaan gedung dengan teknologi terkini. Oleh karena itu, perlu untuk mengidentifikasi elemen dan indikator yang dapat digunakan untuk mengevaluasi implementasi pemeliharaan-elektronik di gedung-gedung tinggi baik dari segi efektivitas maupun efisiensi. Tujuan penelitian ini yaitu mengidentifikasi variabel yang berpengaruh terhadap kinerja pemeliharaan bangunan gedung, serta persamaan model struktural hubungan antara variabel e-maintenance yang telah diidentifikasi terhadap kinerja pemeliharaan bangunan gedung tinggi. Metode yang digunakan dalam penelitian ini adalah metode delphi dan metode structural equation modeling partial least square dengan menggunakan perangkat lunak Smart-PLS 3.2.4. Hasil dari penelitian ini diperoleh indikator dari e-maintenance yang mempengaruhi kinerja pemeliharaan bangunan gedung tinggi sebanyak 71 indikator, hubungan antar variabel dalam e-maintenance hasil olahan SEM-PLS, serta rekomendasi pengembangan untuk masing-masing hubungan antar variabel. ......High rise buildings are buildings with a minimum height of 22 meters or equivalent to 8 floors with residential, commercial, or office functions that are able to reduce horizontal land use. During its operational period, currently the implementation of the high rise building maintenance in Indonesia is considered not to be carried out effectively. This is due to the low policy and standard guidelines related to building maintenance, low coordination between parties, and not integrating building maintenance systems with the latest technology. Therefore, it is necessary to identify elements and indicators that can be used to evaluate the implementation of e-maintenance in high rise buildings both in terms of effectiveness and efficiency. The purpose of this study is to identify the variables that influence the performance of high rise building maintenance, as well as the structural equation model on of the relationship between the e-maintenance variables that have been identified on the performance of maintaining high rise buildings. The method used in this research is the Delphi method and structural equation modeling-partial least square method using Smart-PLS 3.2.4 software. The results of this study obtained indicators of e-maintenance that affect the maintenance performance of high rise buildings as many as 71 indicators, the relationship between variables in the e-maintenance of the SEM-PLS results, as well as the development recommendations for each relationship between variables.
Depok: Fakultas Teknik Universitas Indonesia, 2020
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Satra Dama
Depok: Fakultas Teknik Universitas Indonesia, 2003
T40629
UI - Tesis Membership  Universitas Indonesia Library
cover
cover
Vifi Hafifah
Abstrak :
ABSTRAK
Pada saat ini gedung bertingkat tinggi semakin banyak diminati karena jumlah lahan yang tersedia semakin terbatas. Salah satu bentuk denah gedung yang sering digunakan adalah denah gedung berbentuk huruf U. Denah berbentuk U ini sering digunakan pada gedung apartemen dan hotel karena dianggap efektif dalam menampung luas area bangunan yang diinginkan pada tanah yang tidak terlalu luas namun semua sisi ruang pada gedung tetap mendapatkan akses pemandangan ke arah luar. Gedung yang dianalisa pada tesis ini adalah gedung yang memiliki denah berbentuk U yang memiliki ketidakberaturan horizontalyang divariasikan terhadap perbandingan panjang dan lebar denah gedung serta juga terhadap ketinggiannya, yaitu H:D = 5:5, 4:5 dan 2,25:5 dengan ketinggian 20 dan 30 lantai. Variasi sudut dalam panjang dan lebar denah dibuat lebih dari 15% dari ukuran terbesar denah struktur gedung dalam arah sisi yang ditinjau. Pada SNI 03- 1726-2002 maupun SNI 1726:2012 terdapat penalti terhadap gedung yang memiliki ketidakberaturan horizontal. Pada SNI 03-1726-2002, gedung yang memiliki ketidakberaturan harus dianalisa berdasarkan analisa respons dinamik. Namun pada SNI 1726:2012, gedung yang memiliki ketidakberaturan horizontal harus memenuhi pasal - pasal yang direferensikan. Tujuan dari penelitian ini yaitu untuk mengetahui perbedaan hasil analisa dan desain akibat ketidakberaturan horizontal tersebut terhadap SNI 03-1726-2002 dan SNI 1726:2012 serta untuk mengetahui berat tulangan yang memiliki kenaikan berat tulangan yang paling kecil dari variasi yang ada. Dari hasil penelitian diketahui bahwa gaya gempa rencana SNI 1726:2012 lebih besar daripada SNI 03-1726-2002 dan menghasilkan kenaikan berat tulangan yang cukup signifikan akibat hal tersebut serta akibat dari penalti ketidakberaturan horizontal. Dari keenam variasi pemodelan, presentase kenaikan berat tulangan yang paling kecil adalah model H:D = 2,25:5 30 Lantai sebesar 5,6%.
ABSTRACT
Multistories building is now become popular since the available space of land is being limited. One type of shape are often used is U shapped plan.U shapped plan usually applied for apartement and hotel building that considered effective to accommodate required building are on limited land space without reducing access to obtain landscape for all room on building. Building that will be analyzed on this thesis has horizontal irregularities of U shapped plan which is varying in term of length and with of plan and building hight, that is H:D = 5:5, 4:5 and 2,25:5 and height of 20 and 30 floor.Variation of reentrant corner in term of length and width of plan is 15% of greather plan dimension of building on considered side.Both SNI 03-1726-2002 and SNI 1726:2012 give penalty to building that has horizontal irregularities. In accordance of SNI 03-1726-2002, dynamic response analysis should apply to irregular building. However, SNI 1726:2012 irregular building should comply with references section. Purpose of this research is to obtain comparison of analysis result of horizontally irregular building based on SNI 03-1726-2002 and SNI 1726:2012 and to obtain which model will resulting minimum increase of reinforcement weight. Analysis has shown that SNI 1726:2012 resulting higher seismic design force than SNI 03-1726-2002 and producting significant increase of reinforcement weight due to horizontlly irregular penalty. The minimum incrase of reinforcement weight in percentage is shown to model H:D = 2,25:5 with 30 floor is 5,6%.
2016
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Pelangi Tri Puteri
Abstrak :
ABSTRAK
Fasad memiliki peran sebagai selubung atau kulit yang membungkus bangunan, dengan pilihan material solid dan transparan. Material transparan yang umum digunakan ialah kaca clear, tinted, reflektif, low-e dan kaca ceramic fritted, digunakan pada fasad bertingkat tinggi. Berdasarkan pengamatan awal, dominasi penggunaan material kaca reflektif dan kaca low-e menjadikan Jakarta seolah sebagai hutan kaca. Antar bangunan saling memberikan pantulan energi panas yang membuat satu daerah tersebut sebagai tempat berkumpulnya energi panas

Kaca ceramic fritted memiliki daya pantul rendah, namun belum digunakan pada bangunan tinggi di Jakarta. Material kaca ceramic fritted diketahui dapat mengurangi transmisi energi panas matahari ke dalam ruang. Dengan hipotesis awal, penulis mengganggap bahwa ceramic ink pada pola fritted yang berfungsi dalam menyerap energi panas. Penelitian akan menggunakan metode kuantitatif dengan pendekatan survey cross sectional yang dilanjutkan dengan rancangan eksperimen menggunakan software simulasi dan perhitungan OTTV (overall thermal transfer value) pada bangunan.

Kantor yang dipilih dengan konsep ruang loft, dimana ukuran fasad transparan per unitnya cukup luas yang dapat memaksimalkan masuknya sinar dan energi panas matahari. Material fasad eksisting pada objek penelitian dengan kaca tinted grey 8mm mencapai kondisi termal yang tinggi secara pengukuran temperatur udara, kelembaban relatif dan perhitungan OTTV. Untuk itu, rekomendasi material fasad pengganti dengan kaca ceramic fritted pada orientasi utara dan selatan dilakukan dengan perhitungan OTTV dan simulasi software. Menghasilkan bahwa terjadi penurunan nilai beban pendinginan dan nilai OTTV tidak melebihi standar maksimum SNI dengan material rekomendasi tersebut
ABSTRACT
Building façade has the role to wraps the building, which has solid materials and transparent materials. Clear glass, tinted glass, reflective glass, lowe glass and ceramic fritted glass are the common transparent materials which have to use on highrise building façade. Based on the preliminary observation, domination uses of reflective glass and low-e glass make Jakarta as a glass forest. The heat reflection of buildings make that area as a place of heat gathering.

Ceramic fritted glass has the less heat reflectivity, but this kind of material has not been used on highrise building façade in Jakarta. Ceramic fritted glass is known to reduce solar heat transmission into the room. With the hypothesis is the author assuming that ceramic ink on fritted pattern could absorbs the solar heat. The research is using quantitative method with cross sectional survey approach followed by the experimental using software simulation and calculations of OTTV (Overall Thermal Transfer Value).

The selected office space has the loft concept, where the dimension of transparent façade per unit is wide enough to maximize solar light and solar heat into the room. The thermal condition of the room with 8mm grey tinted glass as existing material on research object has the high thermal value according to air temperature measurement, relative humidity measurement and calculation of OTTV. Therefore, the material recommendation with ceramic fritted glass on north side building facade and south side building façade have been completed through calculation of OTTV and software simulation. The results are the reduction in cooling load and OTTV does not exceed the maximum value of SNI
2016
T45977
UI - Tesis Membership  Universitas Indonesia Library
cover
Retna Kristiana
Abstrak :
Berdasarkan data statistik kebakaran di wilayah DKI Jakarta, proses pelaksanaan sistem keselamatan kebakaran bangunan gedung tinggi mixed used belum maksimal. Sehingga diperlukan suatu model risiko kebakaran melalui metode analisa risiko berbasis PMBOK 2013 yang selanjutnya diolah menggunakan SPSS 23. Analisis linier berganda menunjukkan pengaruh signifikan sebesar 75 dari 2 faktor risiko dominan terhadap keandalan bangunan dengan bentuk persamaan Y = 10,441 0,286 Struktur tahan api 0, 564 Re-design. Dari hasil tersebut, dapat dilakukan evaluasi sistem keselamatan kebakaran bangunan gedung tinggi mixed used dengan tindakan preventif dan korektif yang tepat dari risiko dominan yang terjadi untuk meningkatkan keandalan bangunan dalam mengantisipasi kerugian material dan korban jiwa. ......According to statistics of fire in Jakarta area , the process of implementation fire safety systems is not maximized. So we need a model of fire risk through risk analysis method based on PMBOK 2013, which subsequently processed using SPSS 23. Multiple linear analysis showed a significant effect of 75 of the 2 dominant risk factors of the reliability with the form of the equation Y 10.441 to 0.286 Structure of fireproof 0, 564 Re design. From these results, it can do evaluation of mixed used high rise building fire safety system with preventive and corrective action from dominant risk to improve reliability in anticipation of material losses and casualties.
Depok: Fakultas Teknik Universitas Indonesia, 2016
T47206
UI - Tesis Membership  Universitas Indonesia Library
cover
Nindyta Arih Kinanti
Abstrak :
Proses penyelamatan di gedung bertingkat yang kurang baik mengakibatkan banyaknya korban jiwa akibat terjadinya kebakaran. Tujuan dari rencana penyelamatan ialah memberikan panduan keselamatan gedung yang ditampilkan pada setiap area gedung. Tujuan dari penelitian ini untuk mengetahui faktor risiko dominan proses penyelamatan penghuni saat kebakaran di wilayah Jakarta Selatan menggunakan metode analisa risiko dan mengevaluasi sistem penyelamatan penghuni saat kebakaran yang tepat agar dapat menurunkan jumlah korban jiwa pada bangunan gedung tinggi hunian di wilayah Jakarta Selatan. Terdapat 13 high risk pada penelitian. Hasil evaluasi penelitian berupa perbaikan SOP eksisting. Dimana terdapat 1 tambahan sub-bab dan perbaikan 3 sub-bab terdahulu.Proses penyelamatan di gedung bertingkat yang kurang baik mengakibatkan banyaknya korban jiwa akibat terjadinya kebakaran. Tujuan dari rencana penyelamatan ialah memberikan panduan keselamatan gedung yang ditampilkan pada setiap area gedung. Tujuan dari penelitian ini untuk mengetahui faktor risiko dominan proses penyelamatan penghuni saat kebakaran di wilayah Jakarta Selatan menggunakan metode analisa risiko dan mengevaluasi sistem penyelamatan penghuni saat kebakaran yang tepat agar dapat menurunkan jumlah korban jiwa pada bangunan gedung tinggi hunian di wilayah Jakarta Selatan. Terdapat 13 high risk pada penelitian. Hasil evaluasi penelitian berupa perbaikan SOP eksisting. Dimana terdapat 1 tambahan sub-bab dan perbaikan 3 sub-bab terdahulu. ......The rescue process in defective buildings resulted in many victims due to fires. The purpose of the rescue plan is giving the safety guidelines of the building that may appear on any area of the building. The purpose of this study is to determine the dominant risk factor the process of saving the residents during a fire in South Jakarta using risk analysis method and evaluate the correct residents rescue system during a fire in order to reduce the number of victims in high rise building residences in South Jakarta. There are 13 high risks in this research. The evaluation results of this research in the improvement of existing SOP. Where there is one additional sub chapters and sub chapters 3 fixes earlier. The rescue process in defective buildings resulted in many victims due to fires. The purpose of the rescue plan is giving the safety guidelines of the building that may appear on any area of the building. The purpose of this study is to determine the dominant risk factor the process of saving the residents during a fire in South Jakarta using risk analysis method and evaluate the correct residents rescue system during a fire in order to reduce the number of victims in high rise building residences in South Jakarta. There are 13 high risks in this research. The evaluation results of this research in the improvement of existing SOP. Where there is one additional sub chapters and sub chapters 3 fixes earlier.
Depok: Fakultas Teknik Universitas Indonesia, 2017
T48713
UI - Tesis Membership  Universitas Indonesia Library
cover
Pratika Riris Putrianti
Abstrak :
ABSTRAK
Studi Perbandingan Analisa Riwayat Waktu Dan Respons Spektrum Untuk Bangunan Tinggi Dengan Denah Berbentuk U Berdasarkan SNI 1726-2012 Pada saat ini gedung bertingkat tinggi semakin banyak diminati karena jumlah lahan yang tersedia semakin terbatas. Salah satu bentuk denah gedung yang sering digunakan adalah denah gedung berbentuk huruf U. Denah berbentuk U ini sering digunakan pada gedung apartemen dan hotel karena dianggap efektif dalam menampung luas area bangunan yang diinginkan pada tanah yang tidak terlalu luas namun semua sisi ruang pada gedung tetap mendapatkan akses pemandangan ke arah luar. Gedung yang dianalisa pada tesis ini adalah gedung yang memiliki denah berbentuk U yang memiliki ketidakberaturan horizontal yang divariasikan terhadap perbandingan panjang dan lebar denah gedung serta juga terhadap ketinggiannya, yaitu H:D = 5:5, 4:5 dan 2,25:5 dengan ketinggian 20 dan 30 lantai. Variasi sudut dalam panjang dan lebar denah dibuat lebih dari 15 dari ukuran terbesar denah struktur gedung dalam arah sisi yang ditinjau. Evaluasi studi perbandingan bangunan tinggi dengan denah berbentuk U dengan metode analisa riwayat waktu dan analisa respons spektrum, dimana analisa riwayat waktu memberikan hasil yang lebih kecil dalam segi rasio penulangan dan presentase berat tulangan, story drift, story shears, base reaction, jika dibandingkan dengan analisa respons spektrum.Efek ketidakberaturan sudut yang terjadi akibat bentuk denah yang digunakan memberikan pengaruh terhadap elemen kord dan kolektor yang digunakan dalam analisa riwayat waktu yang lebih kecil daripada analisa respons spektrum. Bangunan yang dianalisa dengan analisa dinamik Time History menghasilkan berat tulangan yang lebih sedikit rata-rata hampir 10 dibandingkan dengan analisa dinamik Respons Spektrum pada semua model. Untuk berat tulangan shear wall pada analisa Time History kurang lebih hampir sama dengan berat tulangan pada analisa Respons Spektrum, hanya lebih kecil 3 dari analisa Respons Spektrum.
ABSTRACT
Study Comparison of Time History Analysis and Spectrum Responses Analysis to High Rise Building with a U Shaped Plan Based On SNI 1726 2012 Multistories building is now become popular since the available space of land is being limited. One type of shape are often used is U shapped plan.U shapped plan usually applied for apartement and hotel building that considered effective to accommodate required building are on limited land space without reducing access to obtain landscape for all room on building. Building that will be analyzed on this thesis has horizontal irregularities of U shapped plan which is varying in term of length and with of plan and building hight, that is H D 5 5, 4 5 and 2,25 5 and height of 20 and 30 floor.Variation of reentrant corner in term of length and width of plan is 15 of greather plan dimension of building on considered side. Evaluation of high rise comparative studies with U shaped plan with time history analysis and spectrum response analysis, where time history analysis gives smaller result in terms of repeatability ratio and weight percentage of reinforcement, story drift, story shears, base reaction, when compared with analysis response spectrum.The corner irregularity effect due to the shape of the floor plan used to influence the chord and collector elements used in the time history analysis is smaller than the spectrum response analysis. Buildings analyzed by Time History dynamic analysis resulted in fewer reinforcement weight averaging nearly 10 compared to dynamic analysis of Spectrum Response on all models. For shear wall weights in Time History analysis approximately equal to the reinforcement in Spectrum Response analysis, only less than 3 of Spectrum Response analysis.
2017
T49761
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7   >>