Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 42 dokumen yang sesuai dengan query
cover
Artono Arismunandar
Jakarta: Pradnya Paramita, 1982
621.3 ART b
Buku Teks SO  Universitas Indonesia Library
cover
Artono Arismunandar
Jakarta: Pradnya Paramita, 1975
621.3 ART b II
Buku Teks SO  Universitas Indonesia Library
cover
Artono Arismunandar
Jakarta: Pradnya Paramita, 1979
621.3 ART b II
Buku Teks SO  Universitas Indonesia Library
cover
Artono Arismunandar
Jakarta: Pradnya Paramita, 1974
621.3 ART b I
Buku Teks SO  Universitas Indonesia Library
cover
Artono Arismunandar
Jakarta: Pradnya Paramita, 1982
621.3 ART b
Buku Teks SO  Universitas Indonesia Library
cover
Ramage, Janet, 1932-
Oxford: Oxford University Press, 1983
531.6 RAM e (1)
Buku Teks SO  Universitas Indonesia Library
cover
Amir Erlangga
"Dalam aplikasi enjinering baik dalam bidang industri atau lainnya, kadang kala ditemukan bahwa kebutuhan akan daya listrik, pendinginan dan pemanasan diperlukan secara bersamaan. Salah satu contohnya adalah dalam bidang perhotelan yang membutuhkan daya listrik, pendinginan untuk ruangan dan pemanasan baik untuk ruangan atau air hangat. Sistem combined cooling, heating and power generation (CCHP) atau disebut juga trigeneration adalah sistem yang terdiri dari power system, mesin pendingin absorpsi dan sebuah penukar kalor.
Untuk aplikasi dan perancangan CCHP, sebelumnya dibuat sebuah model sistem dan dilakukan perhitungan biaya energi (bahan bakar) berdasarkan pada kesetimbangan energi hingga biaya investasi dan payback period sehingga dapat diputuskan selanjutnya apakah sistem ini dan konfigurasi seperti apa yang dapat diaplikasikan. Pilihan konfigurasi sistem CCHP yang digunakan adalah dengan menggunakan diesel engine, gas engine dan turbin gas pada power system nya.
Dari hasil perhitungan ketiga konfigurasi sistem CCHP yang coba diaplikasikan pada perhotelan diperoleh bahwa untuk konfigurasi dengan diesel engine dan turbin gas tidak dapat digunakan karena dari sisi biaya energi lebih besar dibandingkan tanpa menggunakan sistem CCHP dan saving cost yang terlalu rendah sehingga mengakibatkan payback period yang lama. Untuk konfigurasi dengan gas engine diperoleh biaya energi hotel dapat ditekan maksimum sebesar Rp. 180.590.337,31, dengan biaya investasi total sebesar Rp. 7.510.550.179,3 dan payback period selama 6,57 tahun.

Engineering application in industrial or etc sometimes found there is a simultaneous need for electricity, cooling and heating. For example is in hotel business, we can found that it need of electricity, cooling for rooms and heating to heat water. Combined cooling, heating and power generation (CCHP) or called trigeneration is a system consists of power system, absorption cooling system and heat exchanger for heating system.
For application and planning, we make a model and calculate the energy cost (fuel cost) based on energy balance, investment, and payback period so later can be decided the feasibility and what configuration of the system can be applied. The configurations of CCHP that chosen is use Diesel engine, gas engine and gas turbine as a power system.
The results of three configurations applied to hotel business that used; show that configuration using Diesel engine and gas turbine couldn?t be applied because energy cost (fuel cost) is more expensive compared to energy cost without CCHP system and saving cost is too small so it affected to too long payback period. By using gas engine, the energy cost for hotel can be reduced maximum at Rp. 180,590,337.31; investment cost estimated is Rp. 7,510,550,179.3 with payback period is 6.57 years."
Depok: Fakultas Teknik Universitas Indonesia, 2008
T25322
UI - Tesis Open  Universitas Indonesia Library
cover
Toni Handoko
"PLTU Suralaya adalah pembangkit listrik terbesar di Indonesia, yang menjadi penyuplai utama kebutuhan listrik di Jawa dan Bali dengan kapasims 3400 MW. Oleh karena itu, PLTU Suralaya memiliki peranan sangat penting di dalam dunia kelistrikan di indonesia. Dalam pengoperasian suatu pembangkit, efisiensi suatu pembangkit adalah sesuatu yang sangat panting sebagai suatu barometer unjuk kerja dari sebuah pembangkit. Nilai efisiensi pembangkit yang tinggi menunjukkan unjuk kerja yang baik. Etisiensi PLTU sangat dipengaruhi oleh unjuk kerja dari prime mover-nya."
Depok: Fakultas Teknik Universitas Indonesia, 2005
S40039
UI - Skripsi Membership  Universitas Indonesia Library
cover
Vanek, Francis M.
New York: McGraw-Hill, 2012
621.4 VAN e
Buku Teks SO  Universitas Indonesia Library
cover
Vanek, Francis M.
New York: McGraw-Hill, 2008
621.4 VAN e
Buku Teks SO  Universitas Indonesia Library
<<   1 2 3 4 5   >>