Ditemukan 11 dokumen yang sesuai dengan query
cover
Toni Alam
Abstrak :
Waktu pelaksanaan pekerjaan yang cepat merupakan alasan mengapa proyek design and build digunakan pada PT. XYZ. Dalam pelaksanaannya masih selalu terjadi keterlambatan pekerjaan. Tesis ini membahas faktor-faktor risiko yang berpengaruh terhadap kinerja waktu pelaksanaan proyek design and build. Penyusunan variabel dari data sekunder dan studi literatur, validasi pakar, pilot survey, penyebaran kuesioner kepada responden, kemudian dievaluasi dengan analisa komparatif, deskriptif, uji validitas dan reliabilitas, korelasi, analisa faktor dan regresi linier, akhirnya diperoleh tiga faktor risiko yang paling signifikan yaitu : kurangnya pengalaman tim desain dan project manager dalam menyusun jadwal pelaksanaan serta menangani kompleksitas TOR dan lingkup pekerjaan ; kurangnya kompetensi pelaksana pekerjaan dalam merealisasikan pekerjaan design and build ; serta kelalaian dan keterlambatan dari sub kontraktor. Dari persamaan regresi, terlihat faktor risiko berkorelasi dengan kinerja waktu dan faktor risiko menurunkan kinerja waktu. ......Fast timing of the task is reason why design and build project are used in PT. XYZ. In its implementation is still always a delay of work. This thesis discussed risk factors that affect time performance of design and build project. Preparation of variables from secondary data and literature studies, expert validation, pilot surveys, distributing questionnaires to the respondents, then evaluated by comparative, descriptive, validity and reliability test, correlation, factor analysis and regression, eventually acquired three of the most significant risk factors, that is : the adequacy of design team and project manager experience in preparing the implementation schedule, as well as handling the complexity of TOR and scope of work ; the adequacy of builder competency in finishing design and build project ; the negligence and delay of sub contractor. From the regression equation, found that risk factors correlate with time performance and risk factors decrease time performance.
Depok: Fakultas Teknik Universitas Indonesia, 2011
T30228
UI - Tesis Open  Universitas Indonesia Library
cover
Christy Frisca Rambi
Abstrak :
Proyek Terminal Bandara XYZ dibangun untuk mengatasi kelebihan kapasitas pada bandara tersebut. Proyek ini menggunakan kontrak Design and Build yang umumnya dipilih untuk efisiensi dan efektivitas pekerjaan proyek, tetapi dalam pekerjaannya masih didapati adanya klaim yang terjadi. Penelitian ini bertujuan untuk mengidentifikasi faktor-faktor yang menyebabkan klaim konstruksi pada proyek Design and Build dan mengembangkan sistem manajemen klaim untuk meningkatkan kinerja waktu dan biaya pada proyek tersebut. Penelitian dilakukan dengan mengumpulkan data melalui survei kuesioner dan wawancara terkait proyek Design and Build. Hasil penelitian menunjukkan faktor-faktor penyebab klaim yang dominan dan ditolak oleh owner serta tindakan korektif berupa sistem manajemen klaim untuk meminimalisir klaim pada proyek konstruksi. ......Project Terminal of XYZ Airport built to cope with the excess capacity at the airport. This project uses a Design and Build contract are generally chosen for the efficiency and effectiveness of project work, but during the operation there still found the claims which occurs in the process. This study aims to identify the factors that led to the claim construction on the project Design and Build and develop a claims management system to improve the performance of the time and cost of the project. The study was conducted by collecting data via survey questionnaires and interviews related to Design and Build projects. Results shows the factors that cause the dominant claims and rejected by the owner as well as corrective measures in the form of claim management system to minimize claims on construction projects.
Depok: Fakultas Teknik Universitas Indonesia, 2016
T46655
UI - Tesis Membership  Universitas Indonesia Library
cover
Eridani Sindoro Soekarno
Abstrak :
Sebaik-baiknya proyek direncanakan, pada prakteknya dalam penyelenggaraan suatu proyek masalah dan konflik tidak dapat dihindari. Dengan begitu banyaknya pihak dengan latar belakang dan kepentingan berbeda yang terlibat, ilmu pengelolaan komunikasi dan konflik sangat dibutuhkan demi keberhasilan kolaborasi para pihak untuk mencapai tujuan proyek tersebut. Dalam penelitian ini penulis berhipotesa bahwa faktor komunikasi dan konflik sangat mempengaruhi keberhasilan kolaborasi tim proyek tersebut. Dengan metode kuesioner dengan melibatkan 127 responden yang terbagi dari proyek bangunan gedung dan infrastruktur, penulis menghimpun data yang selanjutnya di analisa menggunakan SPSS dan SEM PLS 3.0. Dari analisa data tersebut dihasilkan temuan bahwa (1) indikator mencari kesepakatan (variabel konflik) dan (2) indikator perencanaan komunikasi (variabel komunikasi) terbukti berpengaruh secara langsung dan signifikan terhadap keberhasilan kolaborasi, dan perlu dilakukan pengelolaan yang baik demi meningkatkan keberhasilan kolaborasi pada tim rancang bangun. Hasil penelitian ini ditujukan untuk membantu proyek lain dalam mengembangkan pengelolaan komunikasi dan konflik demi keberhasilan pada kolaborasi tim proyek mereka. ......Even the project is well planned, problems & conflict are inevitable during the process. With so many parties in different backgrounds and interests are involved, knowledge about communication and conflict management is needed for support the success of stakeholder collaboration to achieve projects goals. In this study the authors hypothesize that communication and conflict factors are significantly affect the success of the project team collaboration.With questionaire method involving 127 respondents who are divided from buildings and infrastructures projects, data collected and analyzed using SPSS and SEMPLS 3.0. From the data analyzed, it is found that (1) agremeent finding indicator (variable conflict) and (2) Communication planning (variable communication) proven to be directly and significant affecting the succes of collaboration, and need to be managed in order to improve the succes rate of design and build collaboration team. The result of this research are aimed to assist other projects in developing communication and conflict management for success on their project team collaboration.
Depok: Fakultas Teknik Universitas Indonesia, 2017
T47965
UI - Tesis Membership  Universitas Indonesia Library
cover
Filbert Reginald
Abstrak :
ABSTRAK
Rancang bangun adalah salah satu metode penyelesaian proyek yang banyak menerimaperistiwa risiko akibat terintegrasinya berbagai aktivitas mulai dari aktivitas designsampai dengan aktivitas build. Dalam 5 tahun, terdapat 63 dari 72 proyek industridengan kontrak rancang bangun mengalami penyimpangan biaya. Salah satu strategimanajemen risiko adalah memasukan biaya kontingensi dalam estimasi biaya. Penelitianini bertujuan untuk membuat suatu model perhitungan biaya kontingensi berbasis risikodari setiap aktivitas yang terjadi pada 7 proses bisnis kontraktor rancang bangun mulaidari proses bisnis design, procurement, finance, controlling, build, safety dan contractcontrolling. Metode yang digunakan pada penelitian ini adalah simulasi monte carlo.Hasil penelitian ini adalah suatu model persentase biaya kontingensi sebesar 4,46 4,91 dengan tingkat kepercayaan 95 . Dimana didapatkan 7 proses bisnis, 145aktivitas, 31 output dan 10 peristiwa risiko tertinggi yang berpengaruh signifikantterhadap kinerja biaya proyek.
ABSTRACT
Design build is one method of project completion that accepts many risks due to theintegration of various activities start from design activities until build activities. Within 5years, 63 from 72 industrial projects with design build contract is experiencing costoverrun. One of the risk management strategies due to uncertainty is to include acontingency cost amount in the estimated cost. This study aims to make model calculationof risk based contingency costs from each activity in 7 business process contractor designbuild, start from design, procurement, finance, controlling, build, safety and contractcontrolling. The method used in this research is monte carlo simulation. The result of thisresearch is a contingency cost percentage model of 4.46 4.91 with 95 confidencelevel. Which has 7 business processes, 145 activities, 31 outputs and 10 highest riskevents that have a significant effect on project cost performance.
Jakarta: Fakultas Teknik Universitas Indonesia, 2018
T50195
UI - Tesis Membership  Universitas Indonesia Library
cover
Kemala Hayati
Abstrak :
Sebagai bagian dari perencanaan dan pembangunan suatu negara, tingkat perkembangan infrastruktur sepanjang tahun cenderung meningkat. Industri konstruksi merupakan suatu sektor yang berfungsi dalam memenuhi kebutuhan tersebut, sementara industri konstruksi merupakan sektor yang sangat rentan terhadap perubahan dalam pelaksanaannya, dimana sebagian besar mengarah pada timbulnya klaim. Saat hal ini terjadi, kemampuan para pihak yang terlibat dalam proyek dalam mengelola klaim secara tepat menjadi sangat penting agar tidak menjadi sengketa yang akan berpengaruh pada proyek (time and cost overrun). Penelitian ini bertujuan mengembangkan suatu sistem manajemen klaim yang terintegrasi dan terinovasi berbasis sistem informasi yang dapat di gunakan oleh praktisi guna menjalankan fungsi dalam manajemen klaim. Pengembangan sistem ini diawali dengan melakukan beberapa penelitian (reseacrh question) yang terdiri dari identifikasi risiko dan tindakan preventif, strategi manajemen kontrak, administrasi dan dokumentasi klaim, serta proses resolusi ditingkat arbitrase dan litigasi. Metode yang digunakan dalam peneltian ini adalah metode analisa uji homogenitas, uji validitas, uji reliabilitas, analisa deskriptif, chi square, analisa relative importance index (RII), dan analisa ISM (Interpretative Struktural Model) dengan hasil berupa SOP, instruksi kerja dan checklist. Hasil penelitian kemudian dikembangkan menjadi suatu sistem informasi berbasis Web dengan jenis EIS (executive information system) dengan menggunakan metode Rapid Applications Development (RAD), pemograman menggunakan HTML dan PHP serta MySQL sebagai database servernya. Prototipe yang telah siap kemudian diuji kinerjanya dari aspek fungsional, efisiensi, kompatibilitas, usability dan security. Sistem informasi manajemen klaim berbasis Web ini dapat digunakan oleh para pelaku industri konstruksi khususnya pada kontrak design build sebagai suatu mekanisme informasi dan guidance untuk mengambil keputusan dalam melaksanakan manajemen klaim dari sebelum terjadinya klaim, saat terjadinya sampai sudah menjadi sengketa konstruksi. ......As part of a country development plan, the rate of need for physical infrastructures of the country is increasing throughout the year. In this regard, construction industry is the sector that serves, hence feeds the need. Whilst, the industry itself is a service sector with probability of changes in its implementation considered soaring that mostly led to claims. At this point, capability of the parties involved in a project to properly manage the claims is compromised. Fails to settle the claims mean disputes to occur, thus jeopardize the project implementation such in costs and time overrun. This research aims to develop an innovative and integrated management of claims with its guideline that is based on information system on the web. The study started with questions leading to identification of risks and its preventive actions, contract management strategies, administration and claim documentation models, and resolution processes at the arbitration and litigation level. Various methods and analysis applied in this research in order to test the findings, i.e. homogeneity test analysis, validity and reliability tests, descriptive analysis, chi square, Relative Importance Index analysis (RII), Interpretive Structural Modeling (ISM) that is framing the Standard Operating Procedure (SOP), and task instructions and its checklist. Moreover, the results exercised with Rapid Applications Development (RAD) method in order to configure a web-based Executive Information System (EIS). In developing the system, HTML and PHP programming were deployed, whereas MySQL engaged as its server database. Furthermore, the system prototype is tested for its performance, thus to be fitted with such aspects of its functionality, efficiency, compatibility, usability, and security. The developed Web-based Claim Management System is hence strongly suggested to be used in the construction industry, especially for projects with design-build contract. The system shall serve as guidance in an advance mechanism for decision making, hence improving the whole management cycle of claims; even when it turns to dispute.
Depok: Fakultas Teknik Universitas Indonesia, 2019
D2607
UI - Disertasi Membership  Universitas Indonesia Library
cover
Prakas Rifki Maulana
Abstrak :
Pembangunan Infrastruktur jalan tol sedang meningkat saat ini. Dengan masifnya pembangunan infrastruktur khususnya jalan tol, pemerintah melakukan alternatif kontrak konstruksi berupa kontrak konstruksi rancang bangun (design build). Kontrak design build digunakan karena memiliki efektivitas dari segi waktu dan biaya. kontrak design build dihadapi oleh banyak masalah ketidakpastian dan risiko yang mungkin terjadi. Dampak tersebut berpengaruh terhadap kinerja waktu dan biaya proyek. Untuk menangani berbagai risiko tersebut diperlukan manajemen risiko yang baik dan benar. Yang dilakukan dari tahap identifikasi risiko, analisis risiko, dan pengendalian risiko. Oleh karena itu dalam penelitian ini melakukan analisis risiko pada proyek design build khusunya jalan tol. Dari hasil penelitian didapat 7 variabel berupa tahap pelaksanaan, tahap persiapan tender, tahap tender, tahap evaluasi tender, tahap desain, tahap konstruksi, tahap monitoring dan controling serta tahap penyelesaian pekerjaan. Selanjutnya didapatkan 29 indikator dan 60 faktor risiko proyek design build jalan tol dan dari analisis kualitatif risiko hingga didapat 30 faktor risiko dengan kategori ekstrem sebagai faktor risiko dominan penelitian. selanjutnya dianalisis rekomendasi solusi berupa tindakan preventif dan korektif terhadap faktor risiko dominan. Metode yang digunakan dalam penelitian berupa metode bow tie, untuk memberikan gambaran yang ringkas dan jelas mengenai penyebab, dampak, tindakan preventif dan korektif terhadap faktor risiko dominan. ......The construction of toll road infrastructure is increasing. With massive infrastructure development, especially toll roads, the government is undertaking an alternative construction contract in the form of a design build contract. The design build contract is used because it has effectiveness in terms of time and cost. Design build contracts are faced with many problems of uncertainty and possible risks. These impacts affect the time and cost performance of the project. To handle these various risks, good and correct risk management is needed. Which is carried out from the stages of risk identification, risk analysis, and risk control. Therefore, in this study, we conduct a risk analysis on design build projects, especially toll roads. From the research results obtained 7 variables in the form of implementation stage, tender preparation stage, tender stage, tender evaluation stage, design stage, construction stage, monitoring and controlling stage and work completion stage. Furthermore, 29 indicators and 60 risk factors for the toll road design build project were obtained and from a qualitative risk analysis, 30 risk factors were obtained with the extreme category as the dominant risk factor for the study. then analyzed the recommended solutions in the form of preventive and corrective actions against the dominant risk factors. The method used in this research is the bow tie method, to provide a concise and clear description of the causes, impacts, preventive and corrective actions against dominant risk factors.
Depok: Fakultas Teknik Universitas Indonesia, 2022
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Achmad Oktafiono
Abstrak :
Kompleksitas pembangunan proyek stadion dengan penggunaan kontrak rancang-bangun atau design-build (DB) di Indonesia cenderung menimbulkan masalah yang memicu perselisihan. Salah satunya mengenai ketidakakuratan pengukuran volume pekerjaan mekanikal dan elektrikal (ME) karena adanya perbedaan cara pandang dari pihak-pihak yang terlibat dalam proses pengukuran. Oleh karena itu, pengembangan suatu standar pengukuran sangat diperlukan untuk memberikan acuan yang seragam. Penelitian ini bertujuan untuk mengembangkan SMM berbasis WBS untuk pekerjaan ME bangunan utama stadion dalam kontrak DB di Indonesia. Penelitian diawali dengan studi literatur mengenai dokumen proyek stadion berupa BQ, rincian anggaran biaya (RAB), rencana kerja & syarat-syarat (RKS), dan Peraturan Menteri (PerMen) PUPR No 28 2016 untuk menyusun WBS Pekerjaan ME Bangunan Utama Stadion. WBS yang disusun kemudian divalidasi oleh pakar melalui kuesioner dan wawancara dan dilakukan analisis Delphi. WBS yang telah divalidasi digunakan untuk mengembangkan SMM pekerjaan ME Bangunan Utama Stadion dengan mengacu pada SMM Indonesia dan luar negeri. SMM yang dikembangkan kemudian juga divalidasi oleh pakar melalui kuesioner dan wawancara dan dilakukan analisis Delphi. Selain itu, dilakukan juga pemodelan hubungan variabel untuk mengetahui korelasi pengembangan SMM berbasis WBS terhadap akurasi pengukuran volume pekerjaan menggunakan Structural Equation Modeling (SEM). Dalam pemodelan hubungan variabel WBS, SMM, dan Akurasi Perhitungan Volume Pekerjaan, proses penelitian yang dilakukan adalah studi literatur untuk menyusun konstruk dan indikator variabel, validasi konstruk & indikator variabel, pilot survey, survei responden. Hasil survei responden dilakukan analisis homegenitas, validitas & reliabilitas, kecukupan data, dan uji struktur model. Hasil penelitian ini menunjukkan SMM berbasis WBS Pekerjaan ME Bangunan Utama Stadion mampu mengurangi permasalahan perselisihan mengenai ketidakakuratan pengukuran volume pekerjaan ME Bangunan Utama Stadion yang menggunakan kontrak DB. ......The construction complexity of stadium projects with the use of design-build (DB) contracts in Indonesia tends to cause problems triggering disputes. One of which is regarding the inaccuracy of mechanical and electrical (ME) works volume measurements due to different perspectives of the involved parties on how to measure. Therefore, developing a measurement standard is necessary to provide a uniform reference. This research aims to develop a WBS-based SMM for the ME works of stadium main building in Indonesian DB contract. The research begins with literature study on stadium project documents in the form of BQ, detailed budget, work plan & requirements, and Ministry of Public Works and Housing Regulation No. 28/PRT/ M/2016 to compile ME works WBS of stadium main building. The WBS was then validated by experts through interviews questionnaires and a Delphi analysis was carried out. The validated WBS is used to develop SMM for ME works of stadium main building with reference to the Indonesian and overseas SMM. The developed SMM was then also validated by experts through interviews questionnaires and a Delphi analysis was also carried out. In addition, variable relationship modeling was carried out to determine the correlation of WBS-based SMM development toward the accuracy of work volume measurement using Structural Equation Modeling (SEM). In modeling the relationship between WBS, SMM, and work volume measurement accuracy, the research process carried out was literature study to develop constructs and variable indicators, variable constructs and indicators validation, pilot surveys, and respondent survey. The results of the respondent survey was analyzed for homogeneity, validity & reliability, data adequacy, and model structure testing. The results of this study indicate that the WBS-based SMM for the ME Works of stadium main building is able to reduce the dispute problem regarding the inaccuracy of ME work volume measurement in stadium main building with the use of DB contract.
Depok: Fakultas Teknik Universitas Indonesia, 2021
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Afrizal Nursin
Abstrak :
ABSTRAK
Kolaborasi para pihak pada proyek konstruksi rancang bangun di Indonesia merupakan masalah yang serius. Indikator keberhasilan kolaborasi para pihak, dapat diukur secara tepat berkaitan dengan kemampuannya mengurangi Construction Waste CW . Dari penelitian yang dilakukan pada tiga tahun terakhir, pada beberapa proyek konstruksi terlihat kecenderungan CW meningkat secara signifikan. Tujuan penelitian ini adalah untuk menemukenali model kolaborasi para pihak pada proyek konstruksi rancang bangun yang dapat mengurangi CW. Metode yang digunakan dalam penelitian ini adalah metode Survey, dimana data yang diperoleh diolah dengan menggunakan SEM-PLS 3.0, sehingga hasil penelitian ini dapat menemukan solusi dari permasalahan CW dan menguranginya dengan meningkatkan kolaborasi antar pihak. Melalui model kolaborasi antar pihak yang diterapkan dengan mengelola para pihak, memahami budaya, meminimalisasi konflik dan meningkatkan komunikasi, sehingga dapat mengurangi CW fokus pada non-physical time overrun construction waste pada proyek konstruksi Rancang Bangun.
ABSTRACT
The collaboration of the parties to the construction design project in Indonesia is a serious problem. Indicators of the successful collaboration of the parties can be accurately measured concerning its ability to reduce Construction Waste CW . From research conducted in the last three years, on some construction projects seen a tendency CW increased significantly. The purpose of this study is to identify the collaborative model of the parties to a construction design project that can reduce CW. The method used in this research is Survey method, where the data obtained is processed by using SEM-PLS 3.0, so that the results of this research can find a solution of CW problem and reduce it by increasing collaboration between parties. Through a collaborative model between parties implemented by managing the parties, understanding the culture, minimizing conflict and improving communication, to reduce the CW of non-physical time overrun construction waste on the construction project Design and Build
Depok: Fakultas Teknik Universitas Indonesia, 2018
D2528
UI - Disertasi Membership  Universitas Indonesia Library
cover
Dita Ayuningtyas
Abstrak :
Metode rancang bangun merupakan metode pengadaan yang semakin populer saat ini di Indonesia. Metode ini berbeda dengan konvensional karena desain dan konstruksi menjadi satu entitas. Seluruh tanggung jawab proyek dipikul oleh kontraktor sehingga diharapkan hasil dari proyek menjadi lebih komprehensif. Salah satu faktor keberhasilan untuk proyek rancang bangun adalah mutu proyek memenuhi persyaratan pengguna dan berfungsi dengan baik. Rancang bangun menggunakan sistem dengan jalur cepat. Dengan percepatan pekerjaan yang dilakukan selama konstruksi, hal ini dapat menimbulkan risiko terhadap hasil pekerjaan yaitu kinerja mutu. Penerapan manajemen risiko yang dilaksanakan, diharapkan dapat secara signifikan mengurangi dampak terhadap kinerja mutu proyek. Tujuan penelitian ini adalah untuk menganalisis risiko (frekuensi dan dampak) dengan mengidentifikasi faktor-faktor yang mempengaruhi kesuksesan percepatan pekerjaan sehingga dapat mengembangkan strategi peercepatan pekerjaan pada proyek rancang bangun untuk meningkatkan mutu berbasis risiko. Penelitian ini bersifat kualitatif dengan tinjauan literatur terkait faktor risiko yang mempengaruhi kinerja mutu dan kuesioner dengan pakar dan responden yang berpengalaman dalam pengadaan rancang bangun. Faktor risiko yang dianalisis dalam penelitian ini adalah kompetensi pemilik proyek, team leader, dan manajer proyek, kemampuan perencanaan dan pelaksanaan, proses pengadaan, lingkup dan sifat proyek, hubungan kerja antara tim proyek, informasi pemilik proyek, faktor fisik dan lingkungan sosial ekonomi. Durasi waktu pengurusan perijinan yang tidak dapat diperkirakan merupakan faktor risiko paling dominan pada penelitian ini. Percepatan pekerjaan seperti fast track atau crashing dapat menjadi solusi atau risiko. Perlu disesuaikan dengan pengembangan daftar kegiatan sampai durasi dan urutan pekerjaan pada setiap aktivitas dilakukan super imposed dengan master schedule sehingga dapat dianalisis perbandingan schedule dengan respon risiko dan tidak menggunakan respon risiko. Selain itu perlu dilakukan monitoring terhadap respon risiko secara rutin. Pengembangan strategi ini diharapkan dapat meningkatkan mutu berbasis risiko pada proyek rancang bangun. ......Design-build method has become a more popular procurement method in Indonesia. This method differs from other conventional procurement methods because the design and construction is one entity. All responsibilities are taken over by contractors so that the project outcome expected becomes more comprehensive. Design-build applies fast-track system. The work acceleration implemented during the construction will potentially generate risks on the performance, in this case quality performance. The implementation of risk management is expected to significantly reduce the impact of the risk on the quality performance of a project. The objective of this study is to analyze risks (the frequency and the impact) by identifying factors affecting the success of work acceleration, and thus work acceleration strategy can be developed for design-build project in order to improve risk based quality. This study is a qualitative research with literature study on factors of risks affecting quality performance and questioners given to experts and respondents who are experienced in design-build procurement. Risk factors analyzed in this study are competence of project owner, team leader, and project manager, planning and execution ability, procurement process, scope and nature of the project, work relationship among project teams, project owner's information, physical factors, and social economy environment. The result of this study is work acceleration strategy on design-build project in order to improve risk based quality performance. The unpredictable duration of permit issuance has become the most dominant risk factor in this study. Fast track in design work, permit and construction can be done to improve quality of design and build project. Crashing can be done during the construction. However, it is necessary to consider the interface with other jobs and the conformity of the number of human resources, equipment, and material. This result can become a strategy of developing risk based work acceleration in order to improve work quality in design and build project.
Depok: Fakultas Teknik Universitas Indonesia, 2020
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Rizki Yunita Sari
Abstrak :
Bandara XYZ merupakan salah satu proyek konstruksi dengan sistem kontrak Design and Build yang pada umumnya dipilih untuk efisiensi dan efektifitas pekerjaan proyek. Namun dalam pelaksanaan dalam proyek Bandara XYZ masih terjadi construction waste yang salah satunya disebabkan oleh banyaknya keterlibatan stakeholder. Penelitian ini telah diidentifikasi kepentingan masing-masing stakeholder internal dan eksternal serta dilakukan survey untuk mengidentifikasi kepentingan dari tiap- tiap stakeholder yang berpengaruh dalam construction waste, dari hasil survey dilakukan identifikasi dan analisis terhadap stakeholder menggunakan software Partial Least Square kemudian disusun strategi dan pengelolaan hubungan termasuk di dalamnya pola komunikasi antara para stakeholder sehingga dapat mengurangi construction waste yang berbasis PMBOK. Berdasarkan hasil penelitian terdapat bahwa stakeholder eksternal sangat mempengaruhi construction waste pada proyek Bandara XYZ. ......XYZ airport is one of the construction project contract system Design and Build are generally chosen for the efficiency and effectiveness of project work. However, in the implementation of the project is on XYZ airport of construction waste and this is due to the many stakeholder involvement. This research has identified the interests of each internal and external stakeholders and conducted a survey to identify the interests of each stakeholder in the construction waste, from a survey conducted stakeholder identification and analysis of the use of software Partial Least Square then organized strategy and managing relationships including in which the pattern of communication among stakeholders so as to reduce construction waste based on PMBOK. Based on the results of the study are that the influence of external stakeholders on the project of construction waste at XYZ airport.
Depok: Fakultas Teknik Universitas Indonesia, 2016
T46198
UI - Tesis Membership  Universitas Indonesia Library