Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 3 dokumen yang sesuai dengan query
cover
Fitrah Akbar
Abstrak :
Telah dibuat sebuah pengendali PID digital, dengan menggunakan Software VB ( Visual Basic) sebagai bahasa pemrogramannya. PI digital ini digunakan untuk mengontrol sebuah simulator plant Berupa level cairan pada tangki. Ada terdapat dua plant yang dipakai yaitu model plant 1 tangki dan model plant 2 tangki. Metode tuning sistem kendali dilakukan dengan menggunakan metode tuning Ziegler-Nichols ¼ decay ratio dan no overshoot agar didapat hasil pengendalian yang baik . Hasil parameter yang didapat dengan menggunakan metode Ziegler - Nichols ini yaitu untuk PI untuk ¼ decay ratio sebesar Kc = 8.5 , Ti = 20.83 dan no overshoot sebesar Kc=3.8, Ti = 20.83 untuk plant 1 tangki . sedangkan untuk plant 2 tangki didapat parameter yaitu untuk PI untuk ¼ decay ratio sebesar Kc = 4.5 , Ti = 12 dan no overshoot sebesar Kc = 2, Ti = 12 .Dengan simulasi software VB ini nantinya diharapkan dapat mengurangi kerusakan hardware pada plant sebenarnya. ......Simulator control system software of digital PID has been build by using Software VB ( Visual Basic) as program language. This Digital PI used to control a simulator plant. There are two plant that we used there are, model plant 1 tank and model plant 2 tank. Method of Tuning of control system conducted by using method of tuning Ziegler-Nichols ¼ decay ratio and no overshoot in order to got result of good operation. Result of parameter which got by using method Ziegler - Nichols, that is for PI for ¼ decay ratio we get the value of Kc = 8.5 and TI = 20.83 and for no overshoot we get the value of Kc = 3.8 and Ti = 20.83 for plant 1 tank. while for plant 2 tank we get the parameter that is for PI for ¼ decay ratio we get the value Kc = 4.5 and Ti = 12 and no overshoot we get the value of Kc = 2 and Ti = 12 . With this simulation software VB in later we expected can lessen damage of hardware plant in fact.
Depok: Fakultas Matematika dan Ilmu Pengetahuan Alam Universitas Indonesia, 2006
S29253
UI - Skripsi Membership  Universitas Indonesia Library
cover
Ahmad Agus Fitrah Akbar
Abstrak :
Kegiatan konstruksi adalah suatu kegiatan dengan ciri tertentu, salah satunya adalah kegiatan tersebut memiliki batasan-batasan tertentu, yakni batasan mengenai waktu, mutu produk, dan biaya. Dengan adanya batasan tersebut dalam pelaksanaan kegiatan konstruksi dibutuhkan adanya suatu manajemen yang tepat. Manajemen dimaksud adalah suatu proses perencanaan, mengorganisir, memimpin, dan mengendalikan kegiatan anggota serta sumber daya yang lain untuk mencapai sasaran organisasi. Dalam proyek konstruksi, salah satu metode pengelolaan yang dapat diterapkan adalah manajemen konstruksi. Manajemen Konstruksi (MK) sendiri dapat diartikan sebagai metode untuk mengelola proyek, dimana tahapan-tahapan dalam proses pembangunan, yaitu : tahap pengembangan konsep (concept development phase), tahap perencanaan (design phase), tahap pelelangan (lender phase), tahap pelaksanaan (construction phase) dan tahap pemeliharaan & pengoperasian (maintenance & operation phase) diperlakukan sebagai satu sistem yang menyeluruh dan terpadu (integrated), dengan tujuan untuk mencapai hasil yang optimal dalam aspek biaya, mutu dan waktu. Pelaku dari Manajemen Konstruksi dalam pembahasan ini adalah Manajer Konstruksi. Manajer Konstruksi disini dalam menjalankan peran dan tugasnya tersebut sebaiknya memiliki pemahaman yang baik atau lebih baik jika memiliki penguasaan terhadap satu atau lebih Area Knowledge yang ada dalam CM-BOK Dengan penguasaan yang tepat akan Area Knowledge yang ada maka akan tercipta peningkatan kinerja pada suatu proyek yakni, dalam segi waktu, mutu, dan biaya. Manajemen resiko dan keselamatan kerja adalah dua hal yang seringkali dirasakan sebagai fungsi yang saling berhubungan. Manajeman yang efektif dalam perbandingan antara produktivitas dan keselamatan kerja adalah suatu tantangan dalam banyak industri yang mengoperasikan sistem engineering yang dinilai kritis, seperti nuclear power plants atau offshore oil platforms. Pada penelitian ini akan dianalisa mengenai keterkaitan antara area knowledge dengan kinerja pelaksanaan proyek. Dengan penguasaan yang tepat terhadap area knowledge Risk & Safety Management diharapkan dapat dikembangkan suatu upaya untuk meningkatkan produktifitas I kinerja selama masa pelaksanaan proyek. Tujuan dari penelitian ini adalah untuk menganalisa pengaruh dari tingkat pemahaman Area Knowledge Risk & Safety Management oleh manajer konstruksi pada tahap pelaksanaan kegiatan konstruksi terhadap kinerja waktu dan biaya. Pada penelitian ini metode yang digunakan adalah metode survey langsung ke lapangan. Survey dimaksud adalah merupakan studi yang bersifat kuantitatif yang digunakan untuk meneliti gejala atau perilaku status kelompok. Survey ini dilakukan dengan cara menyebar kuisioner atau dengan cara wawancara iangsung dengan para ahli yang berkompeten mengenai masalah yang dibahas dalam penelitian. Tahapan selanjutnya adalah menganalisa apakah ada hubungan keterkaitan antara Risk dan Safety Management baik itu dari segi pemahamannya maupun dari segi pelaksanaannya dengan kinerja pada suatu proyek. Hal ini dapat diperoleh dengan cara melakukan analisis terhadap data yang didapat dari hasil survey. Dari analisa korelasi yang terjadi dapat disimpulkan bahwa dalam pelaksanaan proyek Konstruksi, terjadi keterkaitan (hubungan antar ilmu pengetahuan) aspek dari knowledge area (risk management dan Safety management), yang harus diaplikasikan dalam tahap Pelaksanaan Proyek, dan harus dikuasai/dipahami oleh Manajer Konstruksi, untuk meningkatkan kinerja proyek, dalam hal ini adalah kinerja biaya dan kinerja waktu.
Construction activity is an activity with certain characteristic, one of them is that activity have some certain parameter, there are; time, quality, and cost. According to that parameter, the implementation of construction activity need the right management. Management is a process to making a plan, organizing, leading, and controlling activity of every team member including other resources in order to achieving organization objectives. In project construction, one of the management method that can be implemented is construction management. construction management is a method to manage the project, which every phase in development process, are; concept development phase, design phase, tender phase, construction phase and maintenance & operation phase, treating as one whole and integrated system, in objective to raise an optimal result of time, quality, and cost. Subject of construction management in this research is construction manager. construction manager, while conduct it's role and function, better if they had good comprehension or much better if they had mastery of one or more area knowledge in CM-BOK. With the right mastery of area knowledge, so that will be produced increasing of performance in the project, that is time, quality, and cost. Risk management and safety is two things which is often feel as a relationship function. An effective management in comparison with productivity and safety is a challenge in may industry, while operating engineering system which is critical, such as nuclear ower plant and offshore oil platform. In this research, will be analyze about correlations between area knowledge risk and safety management and performance of project implementation. With the right mastery of risk and safety management, hopefully that could be developed some way to increase productivity / performance as long as project be implemented. Research objective is to analyze the effect of comprehension level area knowledge risk & safety management By Construction Manager To Increase Performance Of Project Implementation Time & Cost. Survey method is used in this research. Survey is quantitative study for analyze symptom or behavior of group status. This survey is conducted by disseminate questionnaire or by direct interview with the expert in this research. The next step is analyze if there any relation between risk & safety management from the comprehension or implementation to project performance. It can be obtained by conduct data analysis from the survey. From the correlations analysis, concluded that in the implementation of construction project, there is a relation between aspect from area knowledge (risk and safety management) that should be applicated in the project implementation, and should be mastered I comprehended by construction manager, in order to increase project performance, in this case is cost and time performance.
Depok: Universitas Indonesia, 2006
T16861
UI - Tesis Membership  Universitas Indonesia Library
cover
Ahmad Agus Fitrah Akbar
Abstrak :
Pada era globalisasi saat ini baik negara maju maupun negara berkembang tidak henti-hentinya mengadakan pembangunaan di segala bidang. Pembangunaan yang dilakukan ini dasarnya adalah untuk memfasilitasi penduduk dari negara tersebut. Pembangunaan yang dapat kita lihat hasilnya nyatanya secara fisik adalah pembangunaan dibidang ilmu sipil, seperti pembangunaan gedung-gedumg bertingkat, jalan layangdan pelabuhan, dimana pada dasarnya semua pembangunaan tersebut bertujuan untuk menunjang kehidupan manusia. Suatu proyek pada umumnya terdiri dari beberapa kegiatan, dimana kegiatan tersebut berkaitan satu sama lain, mulai dari kegiatan persiapan hingga kegiatan penyelesaian (finishing). Semua kegiatan tersebut memiliki penanganan yang berbeda pada waktu tertentu, serta biaya yang bervariasi antara kegiatan yang yang satu dengan kegiatan yang lainnya. Umumnya pada beberapa elemen yang mengakibatkan mahalnya biaya suatu proyek, diantaranya adalah : Kondisi proyek yang komplek Besarnya volume pekerjaan pada suatu proyek Penggunaan material yang dinilai kritis Biaya pemeliharan dan biaya operasi yang tinggi Perencanaan dan manajemen yang kurang baik. Pada saat tahapan desain suatu proyek seringkali juga terjadi biya-biaya yang tidak perlu (unnecessary cost), sehingga mengakibatkan biaya proyek menjadi besar. Unnecessary cost ini terjadi karena banyak faktor, diantaranya yang sering terjadi adalah : Kekuramgan waktu Kurangnya informasi Kurangnya ide. Dari berbagai hal diatas yang menyababkan mahalnya suatu biaya proyek bukanlah tidak mungkin untuk diantisipasi. Dengan perencanaan yang matang biaya yang sudah selesai dibangun dengan biaya yang cukup mahal, nanti dapat dilakukan suatu identifikasi penghematan biaya, sehingga terlihat jelas bahwa sebenarbya pada proyek tersebut ada kegiatan-kegiatan yang biaya dapat dihemat. Dari hasil identifikasi yang diperoleh nantinya akan dapat digunakan sebagai bahan masukan dalam kegiatan proyek selanjutnya. Penelitian ini bertujuan untukmelakukan potensial saving pada proyek bangunaan gedung. khususnya gedung di lingkungan Universitas Indonesia depok dengan menggunakan analisa Pareto-Law. Dari penelitian kali ini diperoleh komponen pekerjaan yang berpotensial untuk dihemat, yakni : pekerjaan struktur, atap dan finishing, Disamping itu pada penelitian ini dadapat pula bahwa hukum pareto todaklah secara tepat menyatakan bahwa 20% komponen pekerjaan akan menghasilkan 80% biaya, namun 20% komponen pekerjaan manghasilkan persentase biaya yang bervariasi mulai dari 42% sampai dengan 62%. ......At globalization era in this time, developed countries and also developing countries do not desist to perform development in all area. Development conducted by, basically is to facility the resident from the state. Development we which can see result of its reality in the physical form is development in civil science area, like high rise building, port and overpass, where basically all the development aim to support human life. A project is generally consisted of some activity, where the activity interconnected one another, start from activity of preparation till activity of finishing. All the activity own different handling periodically, and also the expense which vary between activity which is one with the other activity. Generally there are some element resulting its costly expense of a project, among other things are: Complex project condition Level of work volume at one particular project Material use which critical assessed High expense of maintenance and operating Unfavourable management and planning At me time of phase design of a project oftentimes is also happened the costs which need not (unnecessary cost), so that result project cost overrun. This Unnecessary Cost is happened because a lot of factor, among other things which often happened are: A Lacking Of Time Lack Of In formation Lack of Idea From above matters causing its costly expense of a project is not impossible to be anticipated. With matured planning, expense released at one particular project will be able to more efficient. As for a project have been builded with expense which costly enough, later can be conducted by an identifying the cost-saving, stand-out so that in fact at the project there is activity which its expense can be economized. From result identify obtained later will be able to be used as substance of input in activity of project hereinafter This research aim to identify potential of saving at building project, specially building in environment of University of Indonesia, depok, by using Pareto-Law analysis. From obtained by this research of work component which have the potency to be economized, namely : structure, roof and finishing. Beside that, this research got also that pareto law is not precisely express that 20% work component will yield 80% expense, but 20% work component yield expense percentage which vary start from 42% up to 62%.
Depok: Fakultas Teknik Universitas Indonesia, 2003
S34739
UI - Skripsi Membership  Universitas Indonesia Library