Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 33 dokumen yang sesuai dengan query
cover
Reid, J. Gary
New York: McGraw-Hill, 1983
621.319 2 REI l
Buku Teks SO  Universitas Indonesia Library
cover
Habiger, Ernst
Berlin: VEB Verlag Technik , [1973]
629.832 HAB t
Buku Teks SO  Universitas Indonesia Library
cover
Burton, T.D.
New York: McGraw-Hill, 1994
620 BUR i
Buku Teks SO  Universitas Indonesia Library
cover
Everson, Rolan
"Suatu hal yang baru untuk balikkan (invers) matrik [A] berorder (nxn) yang nonsingular, asinetris, dan diturunkan dalarn tulisan ini. Invers dari [A] ditulis dengan [A]-1 = [L][D][U], dimana [L] adalah matrik segitiga bawah, [D] adalah matrik diagonal, dan [U] adalah matrik segitiga atas. Dengan menggunakan metode ini, solusi dari tgl [A]{x} = {B} menjadi lebih mudah dan perhitungan komputernya menjadi lebih effisien, yaitu dengan menggunakan perkalian matrik dengan vektor sebagai {X} = [L][D][U] {B}. Tehnik ini memungkinkan jumlah memori komputer yang digunakan seminimal mungkin, dan dapat dengan mudah diterapkan pada proses paralel."
Depok: Fakultas Matematika dan Ilmu Pengetahuan Alam Universitas Indonesia, 1994
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Alhaji Akbar Bachtiar
Depok: Fakultas Matematika dan Ilmu Pengetahuan Alam Universitas Indonesia, 1997
S27314
UI - Skripsi Membership  Universitas Indonesia Library
cover
Ledi Khalidannisa
"Pada proyek konstruksi breakwater sebagai komponen pembangunan di Pelabuhan Kalibaru metode penjadwalannya masih konvensional, yaitu dengan menggunakan kurva-S. Sementara, metode yang sesuai untuk pekerjaan repetitive seperti breakwater ini adalah linear scheduling. Dalam perkembangannya, linear scheduling method diteliti dengan berbagai pendekatan, salah satunya adalah pendekatan varying production rates (LSMVPR). Metode LSMVPR ini merupakan metode linear scheduling dengan mengembangkan kerangka untuk mengaplikasikan production rates dari sebuah pekerjaan. Pada penelitian ini ditemukan terdapat 9 faktor dominan dalam membuat model persamaan produktivitas breakwater di Pelabuhan Kalibaru. Sehingga dari model tersebut, kita dapat mengetahui kapan dan dimana variasi produktivitas tersebut terjadi, agar dapat lebih akurat dalam memprediksi jadwal kedepannya.

The scheduling method which is used for breakwater construction project as a buliding component in Port of Kalibaru is still convensional which is use S-Curve. While the relevan scheduling method for repetitive work such as breakwater is linier scheduling. Furthermore, liniear scheduling is researched by many approach. One of them is varying production rates (LSMVPR). This LSMVPR is scheduling method of liniear sheduling that developing framework to implement production rates from any work activity, so that LSMVPR to be a method that could be defining a productivity variation of a scheduling. In this research has found 9 dominant factor that we can develop productivity model at breakwater construction project in Port of kalibaru. So, using the model, we can know that when and where the variance in production rates has accoured, in order to more accurate predicted the schedule.
"
Depok: Fakultas Teknik Universitas Indonesia, 2014
S54905
UI - Skripsi Membership  Universitas Indonesia Library
cover
Ipsen, Ilse C.F.
"This self-contained textbook presents matrix analysis in the context of numerical computation with numerical conditioning of problems and numerical stability of algorithms at the forefront. Using a unique combination of numerical insight and mathematical rigor, it advances readers understanding of two phenomena: sensitivity of linear systems and least squares problems, and numerical stability of algorithms."
Philadelphia: Society for Industrial and Applied Mathematics, 2009
e20450973
eBooks  Universitas Indonesia Library
cover
Saberi, Ali
"Unifying two decades of research, this book is the first to establish a comprehensive foundation for systematic analysis and design of linear systems with general state and input constraints. Covers stability, controller design, and satisfactory performance. "
New York: [, Springer], 2012
e20418958
eBooks  Universitas Indonesia Library
cover
Guoxiang, Gu
"Discrete-time linear systems : theory and design with applications combines system theory and design in order to show the importance of system theory and its role in system design. The book focuses on system theory (including optimal state feedback and optimal state estimation) and system design (with applications to feedback control systems and wireless transceivers, plus system identification and channel estimation)."
New York: Springer, 2012
e20420348
eBooks  Universitas Indonesia Library
cover
Gabel, Robert A.
Jakarta: Erlangga, 1996
621.381 042 GAB st (1)
Buku Teks SO  Universitas Indonesia Library
<<   1 2 3 4   >>