Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 192588 dokumen yang sesuai dengan query
cover
Farkhandi Aridha
"Penelitian pada Cekungan Sumatera Utara telah dilakukan dengan tujuan untuk mengevaluasi efektivitas metode Pseudo 3D Seismik menggunakan algoritma Simulasi Gaussian Sekuensial (SGS) dalam mendelineasi geometri zona karbonat Formasi Tampur. Hal ini dikarenakan keterbatasan kemampuan data 2D dalam mendeleniasikan batasanbatasan fasies yang menyusun carbonate buildup. Peneliti menggunakan 38 lintasan seismik 2D PSTM yang tersebar pada area studi ini. Peneliti membangun volume pseudo 3D melalui proses gridding, injeksi amplitudo, dan interpolasi berbasis model peta struktur pada domain waktu. Peneliti menganalisis volume pseudo 3D menggunakan atribut seismik RMS Amplitude dan edge detection untuk mengidentifikasi batas fasies karbonat. Hasil interpretasi menunjukkan bahwa metode SGS mampu memetakan reef core dan reef margin yang menyusun dari carbonate buildup. Peneliti juga mengidentifikasi komponen sistem petroleum (batuan induk, reservoir, dan penutup) berdasarkan hasil interpretasi spasial dari volume pseudo 3D. Hasil penelitian membuktikan bahwa metode SGS efektif untuk membangun model spasial bawah permukaan pada wilayah studi di lepas pantai Cekungan Sumatera Utara.

Research in the North Sumatra Basin was carried out with the aim of evaluating the effectiveness of the Pseudo 3D Seismic method using the Sequential Gaussian Simulation (SGS) algorithm in delineating the geometry of the carbonate zone of the Tampur Formation, this is due to the limited ability of 2D data in delineating the facies boundaries that make up the carbonate buildup. Researchers used 38 2D PSTM seismic trajectories spread across this study area. Researchers built pseudo 3D volumes through a process of gridding, amplitude injection, and model-based interpolation of structure maps in the time domain. Researchers analyzed the 3D pseudo volume using the RMS Amplitude and edge detection seismic attributes to identify carbonate facies boundaries. The interpretation results show that the SGS method is able to map the reef core and reef margin that make up the carbonate buildup. Researchers also identified the components of the petroleum system (source rock, reservoir and cover) based on the results of spatial interpretation of the 3D pseudo volume. The research results prove that the SGS method is effective for building subsurface spatial models in the study area off the coast of the North Sumatra Basin."
Depok: Fakultas Matematika dan Ilmu Pengetahuan Alam Universitas Indonesia, 2025
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Farkhandi Aridha
"Penelitian pada Cekungan Sumatera Utara telah dilakukan dengan tujuan untuk mengevaluasi efektivitas metode Pseudo 3D Seismik menggunakan algoritma Simulasi Gaussian Sekuensial (SGS) dalam mendelineasi geometri zona karbonat Formasi Tampur. Hal ini dikarenakan keterbatasan kemampuan data 2D dalam mendeleniasikan batasanbatasan fasies yang menyusun carbonate buildup. Peneliti menggunakan 38 lintasan seismik 2D PSTM yang tersebar pada area studi ini. Peneliti membangun volume pseudo 3D melalui proses gridding, injeksi amplitudo, dan interpolasi berbasis model peta struktur pada domain waktu. Peneliti menganalisis volume pseudo 3D menggunakan atribut seismik RMS Amplitude dan edge detection untuk mengidentifikasi batas fasies karbonat. Hasil interpretasi menunjukkan bahwa metode SGS mampu memetakan reef core dan reef margin yang menyusun dari carbonate buildup. Peneliti juga mengidentifikasi komponen sistem petroleum (batuan induk, reservoir, dan penutup) berdasarkan hasil interpretasi spasial dari volume pseudo 3D. Hasil penelitian membuktikan bahwa metode SGS efektif untuk membangun model spasial bawah permukaan pada wilayah studi di lepas pantai Cekungan Sumatera Utara.

Research in the North Sumatra Basin was carried out with the aim of evaluating the effectiveness of the Pseudo 3D Seismic method using the Sequential Gaussian Simulation (SGS) algorithm in delineating the geometry of the carbonate zone of the Tampur Formation, this is due to the limited ability of 2D data in delineating the facies boundaries that make up the carbonate buildup. Researchers used 38 2D PSTM seismic trajectories spread across this study area. Researchers built pseudo 3D volumes through a process of gridding, amplitude injection, and model-based interpolation of structure maps in the time domain. Researchers analyzed the 3D pseudo volume using the RMS Amplitude and edge detection seismic attributes to identify carbonate facies boundaries. The interpretation results show that the SGS method is able to map the reef core and reef margin that make up the carbonate buildup. Researchers also identified the components of the petroleum system (source rock, reservoir and cover) based on the results of spatial interpretation of the 3D pseudo volume. The research results prove that the SGS method is effective for building subsurface spatial models in the study area off the coast of the North Sumatra Basin."
Depok: Fakultas Matematika dan Ilmu Pengetahuan Alam Universitas Indonesia, 2025
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Yudha Pandu Dewanata
"Berdasarkan RUPTL 2017-2026, kebutuhan pasokan gas bumi untuk Pusat Pembangkit Listrik milik PLN semakin meningkat dari tahun ke tahun, termasuk untuk Pusat Pembangkit Listrik di Jawa Bagian Timur yang berlokasi di Gresik, Perak, Grati (Pasuruan) dan Madura (Sumenep). Sayangnya peningkatan kebutuhan pasokan gas bumi ini tidak diimbangi dengan ketersediaan pasokan gas pipa dari sumber-sumber gas bumi di sekitar Jawa Timur, sehingga diperlukan tambahan pasokan gas bumi dalam bentuk LNG dari luar area Jawa Timur dan sekitarnya. Pada penelitian ini dilakukan optimasi rantai pasokan gas bumi, dalam bentuk gas pipa dan LNG, sehingga didapatkan biaya penyediaan gas bumi terendah di plant gate Pusat Pembangkit Listrik Gresik, Perak, Grati dan Madura. Untuk pola logistik pasokan LNG disimulasikan menggunakan 2 (dua) skenario pasokan, yaitu tanpa Hub LNG dan dengan menggunakan Hub LNG di Gesik. Dari hasil optimasi yang dilakukan menggunakan aplikasi LINGO didapatkan model rantai pasokan gas yang paling optimal dengan skema distribusi LNG tanpa menggunakan Hub serta menggunakan kapal pengangkut LNG berukuran 35.000 m3, 55.000 m3 dan 65.000 m3. Biaya Penyediaan bahan bakar gas terendah untuk periode 2020-2027 adalah 8.022 Juta US$ dengan rata-rata harga gas di plant gate Pembangkit sebesar 8,50 US$/MMBTU.

Based on RUPTL 2017-2026, the need of natural gas supply for PLNs Power Station will increase from year to year, including for Power Station in Eastern Java located in Gresik, Perak, Grati (Pasuruan) and Madura (Sumenep). Unfortunately, the increasing demand is not followed by the availability of nearby pipeline gas supply sources, so that additional natural gas supply in the form of LNG from outside the area is needed. In this research, natural gas supply chain, both in the form of pipeline gas and LNG will be optimized, so as to obtain the lowest gas supply plant gate cost at Gresik, Perak, Grati and Madura Power Station. LNG supply logistics scheme it is simulated by using 2 (two) supply scenarios, without LNG Hub scenario and using LNG Hub scenario which located at Gresik.  Based on LINGOs optimization result, the most optimal supply chain model obtained by implementing the without LNG Hub scenario using 35.000 m3, 55.000 m3 dan 65.000 m3 LNG vessels. The lowest fuel gas supply cost during 2020-2027 is 8.022 million US$ with an average plantgate gas price at 8,50 US$/MMBTU."
Depok: Fakultas Teknik Universitas Indonesia, 2019
T52340
UI - Tesis Membership  Universitas Indonesia Library
cover
Kriska Setyawati
"Ketersediaan dan kemudahan akses energi di daerah remote Indonesia masih belum cukup baik, hal ini merupakan suatu permasalahan yang serius. Oleh karena itu perlu adanya sistem terintegrasi yang menghasilkan multi utilitas dalam menghasilkan energi untuk memenuhi kebutuhan lokal. Sistem poligenerasi merupakan salah satu jawaban dari tantangan tersebut yang dibahas dalam penelitian ini.
Dalam penelitian ini dilakukan perbandingan antara efisiensi energi pada sistem pembangkit listrik berbahan bakar gas yang beroperasi secara standalone dibandingkan dengan menggunakan sistem poligenerasi yang dapat menghasilkan multi utilitas berdasarkan analisis teknis dan ekonomi. Utilitas yang dihasilkan berupa energi listrik, pendingin dan pemanas. Sistem poligenerasi ini disimulasikan dengan perangkat lunak Unisim Design R390.1 dan dianalisis secara tekno-ekonomi.
Hasil yang diperolah menunjukkan bahwa sistem poligenerasi dapat meningkatkan efisiensi sistem pembangkit listrik sebesar 26,89% dari efisiensi pembangkit listrik standalone  32,9% menjadi 59,7% setelah mengimplementasikan sistem poligenerasi serta menurunkan tarif listrik pembangkit standalone dibandingkan dengan skema bisnis Special Purpose Company dengan Insentif Finansial dan Insentif Fiskal (SPC IFN IFC) sebesar 36,2%.

The availability and easy of energy access in Indonesias remote areas are still not good enough, this is a serious problem. Therefore it is necessary to have an integrated system that produces multi-utility in producing energy to meet local needs. The polygeneration system is one of the answers to the challenges discussed in this study.
In this study a comparison between energy efficiency in a gas-fired power plant system that operates in a standalone operation compared to a polygeneration system that can produce multi-utility based on technical and economic analysis. The output utilities are electricity, cooling and heating. This polygeneration system is simulated with Unisim Design R390.1 software and analyzed technically and economically.
The results showed that the polygeneration system could increase the efficiency of the power generation system by 26.89% from the efficiency of the standalone power plant 32.9% to 59.7% after implementing the polygeneration system as well as reducing the standalone generator electricity tariff compared to the Special Purpose Company scheme with Financial Incentives and Fiscal Incentives (SPC IFN IFC) of 36.2%.
"
Depok: Fakultas Teknik Universitas Indonesia, 2019
T52382
UI - Tesis Membership  Universitas Indonesia Library
cover
Selley, Richard C.
San Diego: Academic Press, 1998
553.28 2 SEL e
Buku Teks  Universitas Indonesia Library
cover
Brian Christiantoro
"Laporan Praktik Keinsinyuran ini menggambarkan desain sumur eksplorasi migas di Lapangan "A" di Indonesia. Fokus utama adalah pada eksplorasi sumber daya migas yang terdapat dalam formasi batuan. Karena target eksplorasi berada dalam kondisi High Pressure & High Temperature (HPHT) dan pada kedalaman yang signifikan, desain sumur menjadi krusial untuk menjamin keberhasilan dan keselamatan operasi pengeboran. Proses desain dimulai dengan penetapan well trajectory dimana metode Minimum Curvature digunakan untuk menentukan lintasan pengeboran berbentuk 'S' dari permukaan ke target. Desain ini memungkinkan pencapaian target vertikal meski terdapat keterbatasan koordinat permukaan, mengakomodasi isu pembebasan lahan. Selanjutnya, ukuran lubang dan casing sumur ditetapkan. Desain ini didasarkan pada kebutuhan akuisisi data, metode coring, dan wireline logging. Diagram hole and casing size selector membantu menentukan ukuran yang paling sesuai untuk setiap trayek sumur. Pertimbangan efisiensi biaya mengarah pada pemilihan liner daripada casing penuh untuk tahap tertentu, terutama di trayek terakhir yang memerlukan hydraulic fracturing. Penentuan casing setting depth dilakukan dengan menggunakan data gradien tekanan pori dan tekanan rekah formasi batuan, dengan mempertimbangkan safety factor dan hasil analisis sumur offset di lapangan. Proses ini menetapkan kedalaman kaki casing yang optimal untuk setiap trayek sumur, dengan mempertimbangkan aspek perlindungan sumber air bawah tanah dan pengaturan peralatan pengeboran. Desain casing dan pemilihan spesifikasi casing dilakukan berdasarkan standar internasional API. Aspek teknis seperti burst, collapse, axial, dan triaxial stress diperhitungkan untuk memastikan integritas struktural sumur. Secara keseluruhan, laporan ini menyajikan metodologi desain sumur eksplorasi migas di Lapangan "A", menyoroti tantangan dan solusi dalam eksplorasi migas di lingkungan HPHT. Pendekatan ini diarahkan untuk mencapai pengeboran yang efisien dan aman, esensial dalam industri migas.

This Engineering Practice Report describes the design of oil and gas exploration wells in "A" Field in Indonesia. The primary focus is on the exploration of hydrocarbon resources found in rock formations. Given that the exploration target is in a High Pressure & High Temperature (HPHT) environment and at significant depth, the well design is crucial for ensuring the success and safety of drilling operations. The design process begins with the determination of the well trajectory, using the Minimum Curvature method to define an 'S'-shaped drilling path from the surface to the target. This design allows for the achievement of vertical targets despite limitations in surface coordinates, accommodating land acquisition issues. Next, the sizes of the wellbore and casing are established. This design is based on data acquisition needs, coring methods, and wireline logging. The hole and casing size selector diagram aids in determining the most suitable sizes for each well trajectory. Cost efficiency considerations lead to the selection of liners over full casing for certain stages, particularly in the final trajectory requiring hydraulic fracturing.

The determination of casing setting depth is conducted using data on pore pressure gradients and formation fracture pressures, considering a safety factor and results from the analysis of offset wells in the field. This process sets the optimal casing shoe depth for each well trajectory, considering aspects such as protection of underground water sources and the arrangement of drilling equipment. The design and selection of casing specifications are based on international API standards. Technical aspects such as burst, collapse, axial, and triaxial stress are considered to ensure the structural integrity of the well. Overall, this report presents a methodology for designing hydrocarbon exploration wells in "A" Field, highlighting the challenges and solutions in hydrocarbon exploration in HPHT environments. This approach is aimed at achieving efficient and safe drilling, essential in the oil and gas industry."

Depok: Fakultas Teknik Universitas Indonesia, 2023
PR-pdf
UI - Tugas Akhir  Universitas Indonesia Library
cover
Rhindani Jaya Wardhani
"Produksi gross existing Lapangan X sekitar 4500 bpd (barrel per day). Rencana jangka panjang Lapangan X adalah infill drilling, work over, serta optimasi lifting minyak dan gas dengan target produksi gross 9000 bpd. Karena kapasitas maksimum dari fasilitas yang telah terpasang tidak mampu memenuhi target produksi jangka panjang, maka diperlukan penelitian penambahan peralatan produksi. Tujuan dari penelitian ini adalah untuk mengetahui alat-alat yang perlu ditambahkan serta kapasitasnya dengan memperhatikan sisi keekonomiannya. Pada penelitian ini dilakukan simulasi produksi dengan variasi laju produksi. Penelitian dilakukan dengan menggunakan 3 skenario, Skenario I dengan laju produksi 15 MMscfd; Skenario II dengan laju produksi 20 MMscfd; Skenario III dengan laju produksi 25 MMscfd. Penambahan kapasitas fasilitas produksi dilakukan jika kenaikan laju produksi mencapai 30%. Hasil yang diperoleh menunjukkan bahwa skenario terbaik ialah Skenario III. Peralatan yang perlu ditambahkan pada Skenario III adalah separator HP, separator LP, scrubber HP dan kompresor. Dari Analisis keekonomian yang dilakukan pada skenario III menunjukkan bahwa nilai IRR sebesar 44%, NPV pada 12%DF sebesar MUS$ 5.852,94 dan payout time 3,2 tahun.

Gross existing production of Field X is around 4500 bpd (barrel per day). The long-term plan of Field X are infill drilling, work-over, as well as optimization of oil and gas lifting with gross production target of 9000 bpd. Because the capacity of the existing facilities are unable to fullfill production target, then a research to investigate the addition of facilities is needed. This research will be carried out by doing simulation with varying production rate. Three scenarios have been investigated, i.e. Scenario I with production rate of 15 MMscfd; Scenario II of 20 MMscfd; Scenario III of 25 MMscfd. Capacity production facility is uprated if the increase in the rate of production reaches 30%. The results show that the best scenario is Scenario III. Equipment to be added in the Scenario III are HP separator, LP separator, scrubber HP and compressor. The economic analysis show that Scenario III is attributed to IRR of 44%, NPV of MUS $ 5,852.94 at 12% DF and the payout time of 3.2 years.
"
Depok: Fakultas Teknik Universitas Indonesia, 2015
T43812
UI - Tesis Membership  Universitas Indonesia Library
cover
Doli Hasyda Bragoba
"Pemanfaatan gas di lapangan plant X menjadi LPG akan dilakukan analisis teknologi dan ekonomi karena kontrak distribusi gas ke PT.B akan berakhir di tahun 2014. Dalam rangka meningkatkan nilai tambah pada pemanfaatan gas pada plant X, untuk itu perlu analisis tekno-ekonomi ekstraksi gas LPG yaitu pertama dengan evaluasi teknologi metode proses Isopressure open refrigerant (IPOR), Cascaded refrigerant dan Cryogenic turbo expander refrigerat. Kedua dengan skenario atau skema bisnis yang meliputi membangun investasi fasilitas proses LPG, menyewa fasilitas proses LPG dan memperpanjang kontrak (jual putus).
Dari 3 simulasi teknologi NGL recovery yang mempunyai produksi LPG terbanyak, efisiensi recovery propane & butane tertinggi dan CAPEX & OPEX rendah yaitu pada simulasi Isopressure open refrigerant (IPOR) dengan hasil produksi LPG sebesar 384.1 ton/day, efisiensi LPG recovery sebesar 99.99%, CAPEX sebesar U$ 97,141,680.10 dan OPEX sebesar U$ 13,409,703.93. Untuk analisis keekonomian yang skema dengan NPV tertinggi yaitu skema kontrak jual putus karena komposisi propane dan butane pada gas umpan rendah 4.4% mol. Sedangkan analisis sensitivitas menunjukan pasokan gas umpan, gas komposisi dan harga LPG yang paling berpengaruh terhadap terjadinya perubahan IRR dan NPV.

Gas utilization at field plant X becomes LPG product need to review technology and economic analysis because of the contract will be end flow to PT.B in 2014. In order to increase the value added in the gas utilization plant X, it is necessary techno-economic analysis of LPG gas extraction are first, evaluation technologies process method Isopressure open refrigeration (IPOR), Cascaded refrigeration and Cryogenic turbo expander refrigeration. Second, scenarios or business scheme includes building a process facility LPG, hire LPG processing facility and extend the contract.
The results from 3 simulations NGL recovery is IPOR simulation with LPG production with 384.1 ton/day, high efficiency LPG recovery with 99.99%, CAPEX with U$ 97,141,680.10 and OPEX with U$ 13,409,703.93. For the economic analysis of the scheme highest NPV is extend contract because of the lowest propane and butane on feed gas with 4.4% mol. Meanwhile sensitivity analysis economic are showing of the supply feed gas, composition gas and LPG prices that involved impact to IRR and NPV values.
"
Depok: Fakultas Teknik Universitas Indonesia, 2014
T38715
UI - Tesis Membership  Universitas Indonesia Library
cover
Andriany Nirmalakrisna
"Permasalahan industri gas domestik di Indonesia saat ini adalah ketidakpastian alokasi pasokan gas domestik, minimnya infrastruktur, serta permasalahan harga jual gas. Untuk meningkatkan alokasi gas industri, harga gas domestik seharusnya dinaikkan, sehingga disparitasnya tidak terlalu jauh dengan harga gas ekspor. Di sisi lain, adanya monopoli akses transportasi jalur pengangkutan gas di Indonesia menyebabkan industri harus membayar harga gas lebih mahal dari yang sewajarnya.
Pada penelitian ini dilakukan simulasi untuk mendapatkan harga gas yang layak dalam rangka membantu Pemerintah dalam menetapkan harga gas agar tidak selalu terpaku pada harga gas yang ditetapkan oleh pedagang gas (trader) dan pengangkut gas (transporter).
Metode yang digunakan dalam penentuan harga gas ini adalah metode Netback Value (NBV). Pengolahan data dalam penelitian ini menggunakan analisis ketidakpastian untuk mendapatkan validasi ketidakpastian dengan simulasi Monte Carlo menggunakan piranti lunak Crystal Ball.
Berdasarkan penelitian, didapatkan rasio pembiayaan antara sektor hulu dan hilir untuk harga jual gas rekalkulasi dengan kondisi ideal (biaya transmisi jalur pipa Pertagas serta prediksi biaya distribusi didasarkan informasi laporan tahunan PGN) sebesar lebih dari satu atau mendekati satu. Hal ini masih wajar mengingat sektor hulu memiliki nilai investasi lebih tinggi untuk melakukan aktivitas ekplorasi dan produksi, dibandingkan dengan sektor hilir.
Sementara itu, jika dibandingkan dengan harga jual gas bumi PGN baik untuk sektor listrik dan sektor industri non pupuk, terdapat perbedaan yang sangat signifikan sehingga menyebabkan rasio pembiayaan sektor hulu dan hilir tidak realistis.

Domestic gas industry?s problems in Indonesia are uncertain allocation for domestic gas supply, lack of infrastructure, and also gas price issue. To improve the gas allocation for domestic industrial sector, domestic gas prices should be raised, so that the disparity between domestic gas price and export gas price is not too far away. On the other hand, the existence of monopoly of gas trader and transporter in Indonesia caused the industry has to pay the price of gas more expensive than normal.
In this study conducted a simulation to get decent gas prices in order to give recommendation to the Government in determining the price of gas that does not always get hung up on the price of gas that is determined by gas traders and transporters.
The method used in determining the gas price is the Netback Value method (NBV). The data in this study is processed using uncertainty analysis to with Monte Carlo simulation using Crystal Ball software.
Based on the study, the cost ratio between the upstream and downstream sectors for gas price recalculation with ideal conditions (using Pertagas pipeline transmission costs and distribution cost based on annual report of PGN) is more than one or close to one. It is still reasonable considering the upstream sector has a higher investment value for exploration and production activities than the downstream sector.
Meanwhile, when compared with the gas price from PGN, there are very significant differences that cause the cost ratio of the upstream and downstream sector is not realistic."
Depok: Fakultas Teknik Universitas Indonesia, 2014
T42106
UI - Tesis Membership  Universitas Indonesia Library
cover
Setyawan Widodo
"ABSTRAK
Berdasarkan data Pertamina, lapangan gas X yang terletak di Kalimantan Timur memiliki cadangan gas terbukti 89 BSCF. Terbatasnya infrastruktur gas bumi di Kalimantan Timur dan tidak terdapatnya konsumen disekitar lapangan mengakibatkan lapangan gas X belum dapat diproduksi. Pembangkit Listrik Tenaga Gas Tanjung Batu yang berjarak 400 km dari lapangan gas memerlukan pasokan gas sebesar 11 MMSCFD untuk melakukan program konversi dari bahan bakar minyak ke bahan bakar gas. Mencairkan gas menjadi LNG adalah salah satu metode yang paling banyak dipakai untuk mentransportasikan gas dari produsen ke konsumen.Pada studi ini dilakukan analisis pemilihan mini LNG unit yang paling menguntungkan serta cocok untuk kilang mini LNG X dengan menggunakan metode Analytical Hierarchy Process AHP . Analisis keekonomian dilakukan untuk menilai kelayakan dari pengembangan Lapangan Gas X dengan skema mini LNG. Produksi LNG dari Lapangan X diperkirakan 83.404 TPA selama 20 tahun. Berdasarkan Simulasi dengan Analytical Hierarchy Process AHP didapat bahwa Mini LNG Unit PRICO dari Black Veatch lebih unggul dibandingkan dengan LIMUM dari Linde. Analisis parameter keekonomian menunjukan dengan biaya CAPEX US 177.787.380 untuk mini LNG unit dan Regasification Plant Tanjung Batu dengan IRR 14 didapatkan harga gas di plant gate Tanjung Batu adalah US 16,49 /MMBTU dengan nilai NPV sebesar US 65.96.509.87 dan payback period selama 12,2 tahun. Analisis sensitivitas terhadap proyek ini menunjukkan bahwa parameter yang paling berpengaruh adalah harga jual dan volume Gas.

ABSTRACT
Based on data from Pertamina, X gas field located in East Kalimantan has proven 89 BSCF gas reserves. Limited gas infrastructure in East Kalimantan and the absence of consumers around the field resulted in the X gas field being unable to be produced. Tanjung Batu Gas Power Plant which is 400 km away from gas field requires gas supply of 11 MMSCFD to convert from fuel to gas. Liquefying gas into LNG is one of the most widely used methods to transport gas from producer to consumer.In this study conducted an analysis of the technical and economical ways to assess the feasibility Analytical Hierarchy Process AHP was used to get the most profitable and suitable X mini LNG unit. Economic analysis was conducted to assess the feasibility of developing X gas field with LNG mini scheme. LNG production from X Field is estimated at 83,404 TPA for 20 years. Based on Simulation with Analytical Hierarchy Process AHP it is found that Mini LNG Unit PRICO from Black Veatch is superior compared to LIMUM from Linde.Economic parameters analysis shows CAPEX cost about US 177,787,380 for mini LNG unit and Regasification Plant Tanjung Batu with IRR 14 obtained gas price at plant gate of Tanjung Batu is US 16.49 MMBTU with value of NPV equal to US 65,96,509,87 And payback period for 12.2 years. The sensitivity analysis of this project shows that the most influential parameters are gas selling price and volume.Keywords Economic Study, Analytical Hierarchy Process AHP , Regasification Plant"
2017
T47903
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>