Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 156652 dokumen yang sesuai dengan query
cover
Rifqi Razaqi Rajab
"Penerapan manajemen risiko menjadi kunci dalam implementasi kesalamatan dan kesehatan kerja. PT.XYZ merupakan perusahaan kontraktor EPC dibidang konstruksi yang sudah menerapkan manajemen risiko dalam proses bisnisnya. Berdasarkan hasil evaluasi OHSE Objective PT.XYZ pada tahun 2023, terdapat 7 (tujuh) dari 20 (dua puluh) kriteria leading indicator yang tidak tercapai. Ketidaktercapaian parameter tersebut memberikan kesenjangan yang berkaitan erat dengan implementasi dari manajemen risiko yang telah dilakukan PT.XYZ. Penelitian ini bertujuan untuk melakukan analisis penerapan manajemen risiko keselamatan di PT.XYZ. Peneliti menggunakan desain penelitian secara deskriptif dengan melakukan wawancara mendalam dan telaah dokumen (dokumentasi) Peneliti bertindak sebagai alat pengumpul data utama. Metode kualitatif bertujuan untuk memperoleh gambaran serta menggali informasi lebih dalam tentang penerapan proses manajemen risiko keselamatan di PT.XYZ tahun 2024. Berdasarkan hasil wawancara terhadap 25 orang First-line Manager terhadap tahapan komunikasi dan konsultasi terdapat 32% informan yang menyatakan bahwa penerapan pada proses ini tidak diterapkan secara baik dan 68% lainnya menyatakan penerapannya sudah baik, lalu pada tahapan penetapan konteks risiko terdapat 52% informan yang menyatakan bahwa penerapan pada proses ini tidak diterapkan secara baik dan 48% menyatakan penerapannya sudah baik, pada tahapan identifikasi bahaya terdapat 60% informan yang menyatakan bahwa penerapan pada proses ini tidak diterapkan secara baik dan 40% informan lainnya menyatakan penerapannya sudah baik, pada tahapan penilaian dan pengendalian risiko terdapat 60% informan termasuk kedalam kelompok yang menyatakan bahwa penerapan pada proses ini tidak diterapkan secara baik dan 40% sisanya menyatakan penerapannya sudah baik, lalu pada tahapan pemantauan dan peninjauan terdapat 64% informan menyatakan bahwa penerapan pada proses ini tidak diterapkan secara baik dan 36% lainnya menayatakan proses ini sudah baik. Penerapan manajemen risiko pada beberapa proses seperti pada tahapan komunikasi dan konsultasi risiko, penetapan konteks risiko serta pemantauan dan peninjauan risiko belum dilakukan secara baik, namun untuk proses tahapan lainnya seperti identifikasi bahaya serta penilaian dan pengendalian risiko sudah sesuai dengan konsep esensial manajemen risiko.

The implementation of risk management is key in the implementation of occupational health and safety. PT.XYZ is an EPC contractor company in the construction sector that has implemented risk management in its business processes. Based on the evaluation results of PT.XYZ OHSE Objective in 2023, there are 7 (seven) out of 20 (twenty) leading indicator criteria that are not achieved. The non-achievement of these parameters is closely related to the implementation of risk management that has been carried out by PT.XYZ. This research aims to analyze the implementation of safety risk management at PT.XYZ. Researchers used a descriptive research design by conducting in-depth interviews and document review (documentation) Researchers acted as the main data collection tool. The qualitative method aims to obtain an overview and explore deeper information about the implementation of the safety risk management process at PT.XYZ in 2024. Based on the results of interviews with 25 first-line managers on the stages of communication and consultation, 32% of informants stated that the application of this process was not implemented properly and 68% stated that the application was good, then at the stage of determining the risk context there were 52% of informants who stated that the application of this process was not implemented properly and 48% stated that the application was good, At the stage of hazard identification, 60% of informants stated that the application of this process was not implemented properly and 40% of other informants stated that the application was good, at the stage of risk assessment and control, 60% of informants belonged to the group stating that the application of this process was not implemented properly and the remaining 40% stated that the application was good, then at the monitoring and review stage, 64% of informants stated that the application of this process was not implemented properly and the other 36% stated that this process was good. The application of risk management in several processes such as the stages of risk communication and consultation, determining the risk context and monitoring and reviewing risks has not been carried out properly, but for other stages of the process such as hazard identification and risk assessment and control are in accordance with the essential concepts of risk management."
Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2024
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Lumban Raja, Sarah Christine Mastiur
"Risiko terkait pekerjaan adalah masalah yang perlu dimitigasi untuk mencegah negatif dampak terhadap pekerja, tempat kerja, dan lingkungan kerja. Ini tujuannya penelitian adalah untuk mengidentifikasi tingkat bahaya dan risiko yang ada dalam kegiatan publik Fasilitas dan Utilitas Pekerja di Kelurahan Jatipadang, sehingga tindakan yang tepat dapat dilakukan direkomendasikan untuk mengurangi risiko yang ada.
Desain penelitian yang digunakan dalam penelitian ini adalah metode analisis deskriptif dengan studi observasional yang didasarkan pada struktur dari ISO 31000: 2018, dan selanjutnya dihitung dengan Rumus Matematika dari W. T. Baik (1971). Tahapan penelitian ini melibatkan identifikasi utama tugas dan potensi bahaya dari pekerjaan (Job Hazard Analysis), analisis risiko dengan mengalikan nilainya dari konsekuensi, probabilitas, dan paparan untuk menentukan nilai risiko total, dan kemudian bandingkan dengan tabel kriteria risiko.
Penelitian ini mengidentifikasi bahwa ada beragam risiko yang disebabkan oleh potensi bahaya fisik, kimia, biologi, dan ergonomis di aktivitas pekerja. Penelitian ini menunjukkan bahwa tingkat kesehatan dan keselamatan kerja risiko yang dikenakan kepada pekerja tinggi, oleh karena itu diperlukan seperangkat kontrol manajemen risiko langkah-langkah untuk mengurangi risiko yang ada.

Work-related risks are problems that need to be mitigated to prevent negative impacts on workers, the workplace and the work environment. The purpose of this research is to identify the level of hazards and risks that exist in the public activities of Workers' Facilities and Utilities in the Jatipadang Village, so that appropriate action can be taken recommended to reduce existing risks.
The research design used in this study is a descriptive analysis method with observational studies based on structure from ISO 31000: 2018, and subsequently calculated by the Mathematical Formula of W. T. Good (1971). The stages of this research involve the identification of the main tasks and potential hazards of the job (Job Hazard Analysis), risk analysis by multiplying the value from consequences, probabilities, and exposure to determine the total risk value, and then compare it to the risk criteria table.
This study identifies that there are a variety of risks caused by potential physical, chemical, biological, and ergonomic hazards in worker activities. This research shows that the level of occupational health and safety risks imposed on workers is high, therefore a set of risk management control measures are needed to reduce existing risks.
"
Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2019
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Hadiyan
"PT H sebagai perusahaan jasa pertambangan memiliki risiko dalam kegiatan operasionalnya. Risiko ini menjadi lebih besar dikarenakan aktivitas bisnis PT H yang berkaitan langsung dengan produksi dan pendistribusian batubara. Hal ini menjadikan manajemen risiko menjadi isu penting dalam upaya mengantisipasi kejadian atau kerugian yang mungkin muncul. Pada Tahun 2023 ini, sampai dengan bulan April, sudah 5 dari 10 parameter lagging indicator PT H tidak tercapai. Ketidaktercapaian parameter ini berkaitan erat dengan implementasi dari manajemen risiko yang telah dilakukan PT H. Tujuan umum dari penelitian ini adalah untuk melakukan analisis manajemen risiko keselamatan pertambangan dengan menggunakan Sistem Manajemen Keselamatan Pertambangan pada PT H. Peneliti menggunakan desain penelitian secara deskriptif dengan melakukan wawancara mendalam dan telaah dokumen (dokumentasi). Peneliti bertindak sebagai alat pengumpul data utama. Metode kualitatif bertujuan untuk memperoleh gambaran serta menggali informasi lebih dalam tentang pemahaman proses manajemen risiko keselamatan pertambangan di PT H tahun 2023. Berdasarkan hasil wawancara kepada 27 orang responden kunci pada penelitian ini berkaitan dengan komunikasi dan konsultasi, didapat sebanyak 7 orang menyatakan bahwa komunikasi dan konsultasi risiko telah dilaksanakan dengan seluruh para pemangku kepentingan, namun baru sebagian dari hasil dari komunikasi dan konsultasi risiko menjadi bahan pertimbangan dalam manajemen risiko. Didapat sebanyak 11 orang responden menyatakan bahwa penetapan konteks risiko telah dilakukan, yang telah mencakup sebagian faktor internal dan sebagian faktor eksternal (belum seluruhnya). Sebanyak 14 orang responden menyatakan bahwa identifikasi bahaya telah dilakukan dan seluruh bahaya telah diidentifikasi. sebanyak 23 orang responden menyatakan bahwa penilaian dan pengendalian risiko telah dilakukan sesuai dengan hirarki pengendalian, namun implementasi pengendaliannya belum memadai. Pemahaman mereka belum mencakup pelaksanaan komunikasi dan konsultasi risiko pada tahap awal. Prosedur yang telah dibuat PT H masih bersifat umum serta belum menjelaskan bahwa penetapan konteks seharusnya dilakukan pada tahap sebelum IBPR. Pemahaman proses identifikasi bahaya para middle manager masih ada yang bersifat normatif sehingga belum mampu menjelaskan kegiatan spesifik yang dilakukan untuk mengidentifikasi bahaya. Sebagian kecil middle manager di jobsite belum memahami konsep manajemen terhadap risiko yang dapat diterima dan tidak dapat diterima. Konsep pemantauan dan peninjauan risiko yang sudah dilakukan sudah dipahami oleh middle manager di lokasi kerja.

PT H as a mining service company has risks in its operational activities. This risk becomes bigger because PT H's business activities are directly related to the production and distribution of coal. This makes risk management an important issue in an effort to anticipate events or losses that may arise. In 2023, up to April, 5 out of 10 PT H lagging indicator parameters have not been reached. The failure to achieve this parameter is closely related to the implementation of risk management that has been carried out by PT H. The general objective of this research is to analyze mining safety risk management using the Mining Safety Management System at PT H. The researcher used a descriptive research design by conducting in-depth interviews and reviewing documents (documentation). The researcher acts as the main data collection tool. The qualitative method aims to obtain an overview and dig deeper information about the understanding of the mining safety risk management process at PT H in 2023. Based on the results of interviews with 27 key respondents in this study related to communication and consultation, it was found that 7 people stated that risk communication and consultation had been carried out with all stakeholders, but only part of the results from risk communication and consultation became material for consideration in risk management. It was found that 11 respondents stated that the determination of the risk context had been carried out, which included some internal factors and some external factors (not all). A total of 14 respondents stated that hazard identification had been carried out and all hazards had been identified. as many as 23 respondents stated that risk assessment and control had been carried out in accordance with the control hierarchy, but the implementation of the controls had not been adequate. Their understanding does not include the implementation of risk communication and consultation at an early stage. The procedures that have been made by PT H are still general in nature and have not explained that setting the context should have been carried out at the stage before IBPR. The middle managers' understanding of the hazard identification process is still normative, so they are unable to explain the specific activities carried out to identify hazards. A small number of middle managers in the jobsite do not understand the concept of acceptable and unacceptable risk management. The concept of risk monitoring and review that has been carried out has been understood by the middle manager at the work site."
Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2023
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Zulkifli Djunaidi
Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2024
PGB-pdf
UI - Pidato  Universitas Indonesia Library
cover
Christanto Ghiffari Halim
"Penelitian ini bertujuan untuk menganalisis implementasi dari Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) berdasarkan ISO 45001:2018 pada perusahaan PT. ICO Asiapacific Indonesia pada tahun 2024. Penelitian ini merupakan penelitian kuantitatif deskriptif menggunakan desain studi cross-sectional. Data penelitian diperoleh melalui kaji dokumen, wawancara dan observasi. Analisis dilakukan menggunakan gap analysis dengan sistem skoring 1-5 terhadap setiap klausul yang ada pada instrumen checklist ISO 45001:2018 yang dibandingkan dengan realita pemenuhan SMK3 pada perusahaan. Hasil analisis dari penelitian ini menunjukkan bahwa PT. ICO Asiapacific Indonesia telah memenuhi berbagai ketentuan sebagaimana standar ISO 45001:2018 sebesar 84,62% secara keseluruhan dan telah diterapkan secara konsisten pada 33,33% dari seluruh klausul. Namun, terdapat adanya inkonsistensi sebesar 56,41% dari total klausul serta tersedia dokumen yang dibutuhkan namun belum diterapkan pada 10,26% dari total klausul.

This research aims to analyze the implementation of the Occupational Safety and Health Management System (OHSMS) based on ISO 45001:2018 at the company PT. ICO Asiapacific Indonesia in 2024. This research is a descriptive quantitative study using a cross-sectional study design. Research data was obtained through document review, interviews and observation. The analysis was carried out using gap analysis with a 1-5 scoring system for each clause in the ISO 45001:2018 checklist instrument which was compared with the reality of OHSMS compliance in the company. The analysis results from this research show that PT. ICO Asiapacific Indonesia has fulfilled various provisions such as the ISO 45001:2018 standard 84.62% overall and has been implemented consistently in 33.33% of all clauses. However, there are inconsistencies in 56.41% of the total clauses and required documents are available but have not been implemented in 10.26% of the total clauses."
Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Meidiana Putri Hudalinas
"Proses produksi karkas sapi memiliki risiko keselamatan dan kesehatan yang dapat mengganggu produktivitas. Hal tersebut dapat dilihat pada rumah potong hewan Kota Bogor di mana ditemukan perilaku pekerja yang tidak aman. Kajian risiko perlu dilakukan untuk mencegah kerugian material maupun terganggunya proses produksi secara keseluruhan. Penelitian ini bersifat deskriptif dengan desain studi berupa survei. Penilaian risiko dilakukan berdasarkan pada standar AS/NZS 4360:2004 dengan metode semi kuantitatif dan Job Hazard Analysis JHA.
Hasil penelitian menunjukkan bahwa ditemukan level risiko very high, priority 1, substantial dan priority 3. Oleh karena itu, diberikan rekomendasi yang bersifat engineering, administratif serta penggunaan alat pelindung diri.

Cattle carcass production processes have safety and health risks that can interfere with productivity. This indication shown by Bogor slaughterhouses in which unsafe work conditions found. Risk assessment to prevent material losses and production disruptions needs to be done. This research employed descriptive methods with survey study design. Risk assessment based on standard AS NZS 4360 2004 with semi quantitative methods and Job Hazard Analysis JHA.
The results showed that level of risk were very high, priority 1, substantial and priority 3. Thus engineering, administrative, and the use of personal protective equipment was recommended to prevent further losses.
"
Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2017
S66786
UI - Skripsi Membership  Universitas Indonesia Library
cover
Fahzrin Perwita Sari
"Skripsi ini membahas tentang analisis risiko pada sepuluh tahapan proses yang terdapat pada bagian Low Pressure Die-Casting, PT X plant Onepack Cikarang. Penelitian ini menggunakan desain penelitian deskriptif yang mengacu pada Australian Standar/New Zealand Standard (AS/NZS) 4360 : 2004. Metode yang digunakan dalam analisis risiko adalah metode semi-kuantitatif formula matematika W.T.Fine. Tujuan penelitian adadalah mendapatkan tingkat risiko K3 pada proses kerja LPDC PT X Plant Onepack Cikarang. Hasil penelitian adalah jenis-jenis risiko dan tingkat risiko yang ditentukan dari nilai risiko yang dimiliki pada masing-masing dari sepuluh tahapan proses dibagian LPDC tersebut.
This final paper discusses about the risk analysis of ten flow procces in Low Pressure Die Casting PT X Plant Onepack Cikarang. This Research used descriptive research design that refer to Australian Standar/New Zealand Standard (AS/NZS) 4360 : 2004. The method which is used in this risk analysis is semi-quantitative method of W.T.Fine math formula. The Objective research is getting the level of occupational safety and health risk of work procces in LPDC PT X plant onepack Cikarang. The result of the research is kind of risks and risk level that determined based on risk values which are had by each risks of ten flow procces."
Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2016
S65014
UI - Skripsi Membership  Universitas Indonesia Library
cover
Rizka Hidayati
"Penelitian ini membahas tentang penilaian risiko keselamatan dan kesehatan kerja pada aktivitas finishing proyek pembangunan Pejaten Park Residence PT. PP Persero Tbk. tahun 2016. Penilaian risiko dilakukan untuk mendapatkan nilai risiko yang terdapat pada aktivitas finishing work di PT. PP Persero Tbk. Identifikasi bahaya dan risiko menggunakan Job Hazard Analysis (JHA). Analisis tingkat risiko menggunakan standar level risiko kualitatif AS/NZS 4360:2004. Penelitian ini menggunakan desain studi cross sectional dengan pendekatan observasi dan wawancara. Nilai risiko adalah hasil perkalian dari konsekuensi, dan kemungkinan. Hasil penelitian menyatakan bahwa terdapat 80 risiko yang ada pada proses finishing work.

This study discusses the occupational health safety risk assessment on finishing work activity in Pejaten Park Resoidence Project by PT. PP Persero Tbk on 2016. Risk assessment carried out to obtain the value of the risk inherent in the activity of finishing works in Pejaten Park Resoidence Project by PT. PP Persero Tbk. Hazard identification and risk using the Job Hazard Analysis (JHA). Analysis of the level of risk using the standard risk level qualitative AS/NZS 4360:2004. This study used a cross-sectional study design with observational approach. Value is the result of multiplying the risk of consequences and probabilities. The study states that there are 80 existing risk in the process of structural works."
Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2016
S63631
UI - Skripsi Membership  Universitas Indonesia Library
cover
Fatdriati Junita
"Penelitian yang dilakukan membahas mengenai proses manajemen risiko yang ada pada tempat cuci mobil FJM mulai dari tahapan identifikasi hazard dan risiko, analisis dan evaluasi risiko, penilaian risiko, upaya pengendalian, komunikasi dan konsultasi hingga pemantauan dan telaah ulang. Penelitian yang dilakukan menggunakan metode semi kuantitatif yang mengacu pada standar AS/NZS 4360:2004. Pada tahap identifikasi hazard dan risiko menggunakan tabel Job Hazard Analysis (JHA) yang mengacu pada OSHA 3071 Revised (2002). Kemudian untuk proses analisis risiko mengacu pada tabel ukuran semi- kuantitatif berdasarkan kriteria Fine.
Hasil penelitian menunjukkan bahwa ditemukan level of risk pada masing-masing tahapan proses pencucian mobil dari level of risk very high, priority 1, substantial, priority 3 hingga acceptable. Oleh karena itu dibutuhkan upaya pengendalian yang bersifat engineering, administrative, serta penggunaaan alat pelindung diri (APD).

This research was conducted in order to examine the process of risk management that happened at FJM Car Wash process, started from the hazard and risk identification stages, analysis and the evaluation of risk, risk assessment, risk controlling, communication and consultation up to monitoring and review. This research was done by using semi-quantitative risks analysis that refers to the AS/NZS 4360:2004 standards. Hazard and risk identification stage was done by using the table of Job Hazard Analysis (JHA) refers to the OSHA 3071 Revised (2002). For the process of risks analysis, it refers to the table of semi-quantitative measure based on fine criteria.
The result of this research showed that the level of risk has been found on each stage in the car wash process ranging from the very high level, priority 1, substantial, priority 3 up to acceptable. Therefore, the necessary control efforts are including the engineering, administrative and also the use of personal protective equipment (PPE).
"
Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2013
S43948
UI - Skripsi Membership  Universitas Indonesia Library
cover
Fani Handayani
"Tidak adanya pelindung (guarding) pada mesin dan peralatan kerja, jarangnya pemeliharaan mesin dan peralatan kerja, cara bekerja yang tidak mementingkan keselamatan, serta pengakuan pekerja yang sering mengalami cedera menandakan bahwa di Indah Jati Furniture memiliki risiko keselamatan dari bahaya mekanik yang terjadi akibat penggunaan mesin dan peralatan kerja. Tujuan dari penelitian adalah untuk melakukan penilaian risiko keselamatan dari bahaya mekanik.
Job Hazard Analysis (JHA) digunakan untuk mengidentifikasi bahaya, sedangkan matriks risiko semi kuantitatif dari Fine digunakan untuk menilai risiko, nilai risiko didapat dari hasil perkalian antara probability, exposure, dan consequences. Hasil penelitian menunjukkan terdapat total enam belas jenis bahaya mekanik yang teridentifikasi pada enam proses pekerjaan dengan berbagai skenario.

Machines and work equipments that have no protection (guarding), lack of maintenance, working without concerned about safety, and workers who frequently having occupational injury indicate that in Indah Jati Furniture has safety risk of mechanical hazards arising the use of machinery and work equipment. The purpose of the study is to assess the safety risk of mechanical hazards.
Job Hazard Analysis (JHA) is used to identify hazards, while the semi-quantitative risk matrix from Fine used to assess risk, the risk values obtained from the multiplication of probability, exposure, and cconsequences. The results showed there were a total of sixteen mechanical hazards identified in six work processes with various scenarios.
"
Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2013
S52647
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>