Mufty Putratama Sumarto
"Untuk mengatasi isu lingkungan hidup, Indonesia menargetkan bagian energi terbarukan pada bauran energi primer sebesar 23% pada 2025 dan 31% pada 2050. Berdasarkan Rencana Umum Energi Nasional (RUEN), target kapasitas terpasang dari energi tenaga surya adalah 6,5 GW pada tahun 2025 dan 45 GW pada tahun 2050. Salah satu negara tetangga Indonesia, Malaysia, memiliki pertumbuhan energi tenaga surya yang signifikan karena kerangka kebijakan, peran perusahaan listrik nasional-nya, dan kondisi industri PV. Oleh karena itu, skripsi ini akan memprojeksikan ketercapaian Indonesia pada target tenaga surya di RUEN menggunakan strategi Malaysia & inisiatif Tenaga Nasional Berhad (TNB) dan strategi Business as Usual (BAU), dan hasilnya menunjukan bahwa ketercapaian pada target RUEN masih di bawah 22% untuk kedua strategi.

To address environmental issues, Indonesia aims to achieve a 23% renewable energy share by 2025 and 31% by 2050. According to National Energy Plan (RUEN), the target for solar energy installed capacity is 6.5 GW by 2025 and 45 GW by 2050. Looking at one of Indonesia neighbouring country, Malaysia, have a significant growth on solar energy as a result from their policy framework, role of national electricity company, and the PV industry condition. Therefore, this thesis will be projecting Indonesia's progress on solar energy target in RUEN using Malaysia's approach & Tenaga Nasional Berhad (TNB) initiatives and using Business as Usual (BAU) scheme, in which the result shows that achievement on RUEN target still below 22% for both schemes.
"
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
JUNEDY PANDAPOTAN
"Saat ini sistem kelistrikan Kota Ambon didominasi pembangkit listrik tenaga diesel (PLTD) mengakibatkan Biaya Pokok Produksi (BPP) menjadi tinggi. Pemanfaatan energi terbarukan utamanya energi surya sebagai pembangkit listrik merupakan salah satu solusi untuk memperkecil BPP serta menurunkan emisi karbon pada sektor pembangkit listrik. Penelitian ini menggunakan metode analisis teknis dan ekonomi dalam melakukan perencanaan pembangunan PLTS on grid di Kota Ambon. Besarnya kapasitas PLTS direncanakan sebesar maksimal 20% dari beban puncak sistem Kota Ambon demi menjaga stabilitas sistem. Hasil analisis didapat hasil COE PLTS sebesar Rp. 789/kWh. Harga energi PLTS lebih kecil dari harga energi PLTD yang sebesar Rp. 5.536/kWh. Hasil analisis kelayakan didapatkan nilai NPV positif sebesar Rp 14.847.818.693, nilai Profitability Index sebesar 1,06 dimana hasil ini melebihi 1 sebagai acuan, nilai IRR sebesar 9,24% dan waktu pengembalian investasi pada tahun ke 22 umur proyek sehingga secara ekonomis investasi perencanaan pembangunan PLTS on grid di Kota Ambon layak dilaksanakan.

Ambon electricity system is dominated by diesel powerplant resulting in high production cost. The utilization of renewable energy,  especially solar energy as a powerplant, is one solution to minimize production cost and reduce carbon emissions in the power generation sector. This research uses technical and economic analysis methods to plan the development of on-grid solar powerplant in Ambon. The amount of solar powerplant capacity is planned at a maximum of 20% of the peak load of the Ambon system in order to maintain system stability. The results of the analysis showed that the COE of solar powerplant was IDR 789/kWh. The energy price of solar powerplant is smaller than the energy price of diesel powerplant which is IDR 5.536/kWh. The results of the feasibility analysis obtained a positive Net Present Value (NPV) value of IDR 14.847.818.693, a Profitability Index value of 1,06 where this result is greater than 1, an Internal Rate of Return (IRR) value of 9,24% and an investment payback time in the 22nd year of the project life so that economically the investment planning for the construction of solar powerplant on-grid in Ambon is feasible.
"
Depok: Fakultas Teknik Universitas Indonesia, 2023
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Ubaedi Susanto
"Peningkatan jumlah penduduk telah mendorong peningkatan kebutuhan energi, terutama untuk transportasi dan listrik. Sementara itu, produksi energi fosil yang terus menurun memaksa pemerintah mengimpor minyak bumi untuk memenuhi kebutuhan dalam negeri. Untuk mengantisipasi cadangan energi fosil nasional yang semakin terbatas dan kebutuhan energi masyarakat yang semakin meningkat, pemerintah menggalakkan penggunaan energi terbarukan. Salah satu upayanya adalah dengan co-firing biomassa di pembangkit listrik berbahan bakar batu bara. Di PLTU Indramayu, biomassa yang dipilih adalah sekam padi yang telah mengalami perlakuan pemadatan dan pemanasan, untuk mendapatkan biomassa dengan densitas dan nilai kalor yang lebih baik dari bentuk fisik sekam padi. Batubara sebagai bahan bakar di PLTU Indramayu memiliki nilai kalori rata-rata 4200 kCal/kg, sedangkan pelet sekam padi memiliki nilai kalori rata-rata 3400 kCal/kg. Uji bakar untuk co-firing perlu dilakukan untuk mengetahui kinerja operasi peralatan unit pembangkit. Uji co-firing pada penelitian ini masih terbatas pada komposisi 1% biomassa dan 3% biomassa yang membutuhkan pelet sekam padi sebanyak 43,2 ton dan batubara sebanyak 3196,8 ton. Sebelum dilakukan uji pembakaran boiler, juga dilakukan simulasi numerik Computational Fluid Dynamics (CFD) untuk mendapatkan gambaran awal. Hasil simulasi dan pengujian bahan bakar dengan komposisi sampai 3% biomassa menunjukkan bahwa parameter operasi berada dalam batas normal. Daya output masih bisa mencapai 300 MW, temperatur FEGT 908 oC, fuel flow di pulverizer berkisar 34 – 37 ton/jam, arus pulverizer 33 A. Emisi yang dihasilkan masih di bawah baku mutu sesuai Peraturan Menteri Lingkungan Hidup Nomor 15 Tahun 2019, yaitu emisi SO2 51,46 mg/Nm3 dan NO2 37,19 mg/Nm3. Ditinjau dari keekonomiannya, harga pelet sekam padi Rp 551.558,00 / ton, masih di bawah Harga Patokan Tertinggi di PLTU Indramayu yaitu Rp 552.129,00 / ton.

The increase in population has driven increased demand for energy, especially for transportation and electricity. Meanwhile, fossil energy production continues to decline, forcing the government to import petroleum to meet domestic needs. In order to anticipate the increasingly limited national fossil energy reserves and the increasing public energy needs, the government is promoting the use of renewable energy. One of the efforts is by co-firing biomass in coal-fired power plants. At PLTU Indramayu, the selected biomass is rice husk which has undergone pelletization treatment, compaction, and heating, to obtain biomass with a high density and calorific value better than the physical form of rice husk. Coal as fuel in PLTU Indramayu has an average calorific value of 4200 kCal/kg, while rice husk pellets have an average calorific value of 3500 kCal/kg. Combustion tests for co-firing need to be carried out to determine the operating performance of generating unit equipment. Co-firing tests in this study were still limited to a composition of 1% biomass and 3% biomass which required a total of 43.2 tonnes of rice husk pellets and 3196.8 tonnes of coal. Before the boiler combustion test, computational fluid dynamics (CFD) numerical simulations were also carried out to get an initial description. The results of the simulation and fuel tests show that the operating parameters are in normal limits. The output power is 300 MW, FEGT temperature is 908 oC, fuel flow in the pulverizer ranges from 34 – 37 tons/hour, pulverizer current is 33 A. The emissions are produced below the quality standards according to the Minister of Environment Regulation Number 15 of 2019, which is SO2 emissions 51.46 mg/Nm3 and NO2 37.19 mg/Nm3. From an economic perspective, the price of rice husk pellets is IDR 551,558.00 / ton, still below the highest benchmark price at PLTU Indramayu, which is IDR 552,129.00 / ton.
"
Jakarta: Fakultas Teknik Universitas Indonesia, 2023
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
cover
Yuli Fitrianingrum
"Upaya besar-besaran di berbagai dunia telah dilakukan untuk mengurangi emisi CO2 dari penggunaan bahan bakar fosil dengan mencari alternatif bahan bakar pengganti bahan bakar fosil pada pembangkit sekaligus mengurangi dampak terhadap lingkungan. termasuk didalamnya mendorong pemanfaatan biomassa sampah. dalam sektor energi dengan teknologi co-firing. Pemerintah Indonesia saat ini telah mengeluarkan SNI 8966:2021 guna mempercepat pemanfaatan limbah biomassa sampah sebagai bahan baku pembuatan bahan bakar jumputan padat atau RDF di pembangkit listrik (BSN, 2021. BBJP sampah yang memiliki nilai kalori 1800 dilakukan uji co-firing di PLTU Indramayu yang memakai batubara bernilai kalor 4100kcal/kg dengan perbandingan massa 1% BJPP dan 99% Batubara. Penelitian ini bertujuan untuk menganalisa kelayakan secara  tekno ekonomi, operasional dan dari segi lingkugan jika dilakukan uji co-firing dengan BBJP  sampah di PLTU. Pengolahan BBJP dari sampah menggunakan konsep kerjasama dengan DLH Kabupaten Indramayu. Tempat pengolahan BBJP dilakukan di Pusat Daur Ulang Indramayu dengan metode peuyeumisasi. Dalam kurun waktu 11 hari didapatkan produksi BBJP sebesar 14ton yang akan disuplai sebagai bahan bakar campuran co-firing di PLTU Indramayu. Pengamatan operasi di PLTU Indramayu selama proses co-firing BBJP 1% menunjukkan parameter yang masih dalam batas aman operasional, namun terjadi peningkatan emisi SO2 dan NOx yang masih di bawah baku mutu emisi KLHK.  Hasil Analisa tekno ekonomi menunjukkan jika terdapatkan kenaikan LCOE sebesar 0,16-rupiah pada pengujian co-firing dengan BBJP 1%, sedangkan untuk parameter Net Present Value (NPV) didapatkan nilai Rp.40.437.359, parameter Internal rate return (IRR) sebesar 8,25%, parameter Profitability index (PI) sebesar 1,011 dan yang terakhir payback periode (PBP) sebesar 6,63 tahun menunjukkan kelayakan untuk investasi proyek pengolahan BBJP. Dari segi keekonomian dari masyarakat sekitar memberikan peluang penyerapan tenaga kerja dan penyediaan bisnis material konsumable untuk proyek pengolaan BBJP.

Massive efforts have been made to reduce CO2 emissions around the world from the used of fossil fuels by seeking alternative fossil fuels in power plants. The utilization of waste in the energy sector with co-firing technology is one way to reduce the impact on the environment. The Indonesian government is currently issuing SNI 8966:2021 to take advantage by using of biomass waste as raw material for making Refused Derived Fuel or RDF in power plants (BSN, 2021. RDF which has a calorific value of 1800 kcal/kg will be tested in PLTU Indramayu which the coal has caloric value 4100 kcal/kg. The mass ratio for blending is 1% RDF and 99% Coal. This study aims to analyze the feasibility of economical, operational, and environmental if co-firing test carried out with waste RDF at PLTU. RDF is processed from waste using the concept of collaboration with DLH Indramayu. RDF processing site is carried out at PDU Indramayu using the peuyeumization method. Within 11 days, the plant produced RDF 14 tons which will be supplied as mixed fuel for co-firing PLTU Indramayu. Operational observations at the Indramayu PLTU during the 1% BBJP co-firing process showed parameters that were still within operational safe limits, but there was an increase in SO2 and NOx emissions which were still below the KLHK emission standards. The results of the techno-economic analysis show that if there is an increase in LCOE of 0.16-rupiah in the co-firing test with 1% BBJP, while for the Net Present Value (NPV) parameter a value of Rp.40,437,359 is obtained, the Internal rate return (IRR) parameter is 8.25%, the Profitability index (PI) parameter is 1.011 and the last payback period (PBP) is 6.63 years indicating the feasibility of investing in the BBJP processing project. From an economic point of view, the surrounding community provides opportunities for employment and business provision of consumable materials for RDF processing projects.
"
Depok: Fakultas Teknik Universitas Indonesia, 2023
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Candra Agung Prasetya
"PLTS Atap dengan sistem On-Grid ini secara langsung berdampak pada utilitas jaringan listrik karena sifat Intermitensinya yang dapat mempengaruhi kinerja operasi jaringan distribusi meliputi tegangan layanan, faktor daya, susut jaringan, tingkat harmonisa. Pertumbuhan PLTS Atap terbesar adalah residensial. Evaluasi pada penetrasi PLTS Atap di jaringan residensial, dilakukan dengan metode monte carlo yaitu dengan mengujikan kondisi tingkat pembebanan dan pembangkitan secara acak sampai dengan 300 iterasi pada simulator ETAP 19.01. Kemudian hasilnya diplot dan dilakukan evaluasi dengan hasil bahwa pada penetrasi di atas 45.76 % terhadap kapasitas trafo 400 kVA secara umum telah melampaui batasan treshold. Sehingga besarnya hosting capacity untuk jaringan tersebut ialah 183,042 Watt apabila menggunakan metode monte carlo yang memberikan hasil lebih akurat dari pada dengan pendekatan metode matematis.

The PV rooftop on grid system directly impact on low-voltage grid as it's Intermittency characteristic which can affect the performance of distribution network operations such as voltage violation, power factor, network losses, and harmonic levels. The highest growth of PV Rooftop is residential consumer segmentation. Evaluation of the penetration of PV Rooftop in residential networks was carried out using the monte carlo method.  A random loading and generation conditions simulated up to 300 iterations in the Software ETAP 19.01. The outputs simulation that four performance indicators were plotted and evaluated.  The result is that penetration above 45.76 % of the transformer capacity of 400 kVA generally exceeded the threshold limit. Finally, the amount hosting capacity for the network is 183,042 Watts using monte carlo method, which is more accurate than using mathematical method.
"
Depok: Fakultas Teknik Universitas Indonesia, 2023
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Nji Raden Poespawati
Jakarta: UI-Press, 2007
PGB0412
UI - Pidato  Universitas Indonesia Library
cover
Wahyu NIrbito
2000
LP-pdf
UI - Laporan Penelitian  Universitas Indonesia Library
cover
Sa`dan Mubarok
"Skripsi ini membahas Ketahanan migas dalam perspektif kebijakan energi dan strategi NOC periode 1970-2010 melalui studi perbandingan Indonesia dan Malaysia. Penelitian ini adalah penelitian eksplanatif yang menggunakan metode kualitatif. Dengan menggunakan teori developmental state, konsep ketahanan energi (energy security), konsep desentralisasi, dan konsep paradigma kebijakan energi, hasil analisis dari penelitian ini menunjukkan bahwa ketahanan migas di Malaysia lebih baik dibandingkan Indonesia.
Hasil tersebut didasarkan atas kebijakan energi Malaysia yang mampu merespon dengan baik faktor karakteristik cadangan migas, karakteristik supply-demand migas, relasi pemerintah pusat dan daerah dalam pengelolaan sumber migas, dan relasi NOC dengan Pemerintah yang berperan terhadap ketahanan migas nasional. Selain itu, Petronas lebih unggul dalam jumlah kepemilikian cadangan migas baik di dalam negeri maupun luar negeri yang terlihat dari tingkat produksi migas yang mencapai dua juta barel setara minyak setiap hari. Keunggulan dari kebijakan energi dan strategi NOC Malaysia tidak terlepas dari perencanaan kebijakan energi yang lebih terkoordinasi, paradigma kebijakan energi supply demand dengan pendekatan demand side management yang mengkonstruksi kebijakan energi berdasarkan kondisi cadangan migas, dan model relasi pembagian tanggung jawab antara Petronas dengan Pemerintah Malaysia.

This thesis discusses oil and gas security in perspective of energy policy and NOC?s strategies period 1970-2010 through comparative study in Indonesia and Malaysia. this is an explanative research using a qualitative method. In this research, the writer used the developmental state theory, the concept of energy security, decentralization concept, and the paradigm of energy policy concept, where the result of the analysis showed that oil and gas security in Malaysia is better compared to Indonesia.
That result is based on Malaysia?s energy security policy that responds better to the following factors: characteristics of oil and gas reserves, characteristics of oil and gas supply-demand, the relationaship between central government and regional government, and the relationship between NOC and the government that contributed to national oil and gas security. Beside that, Petronas is superior in oil and gas ownership, both within and outside country. This is proven by their oil and gas production, which reaches two million boepd (barrel oil equivalent per day). The superior of Malaysia?s energy policy and NOC strategies cannot be separated from their more coordinated energy policy planning, a supply-demand energy policy paradigm using a demand side management approach that construct energy policy based on the condition of oil and gas reserves, and a relationship of shared responsibilities between Petronas and the Malaysian Government."
Depok: Fakultas Ilmu Sosial dan Ilmu Politik Universitas Indonesia, 2013
S47678
UI - Skripsi Membership  Universitas Indonesia Library
cover
Fery Permadi
"Penelitian ini bertujuan untuk melakukan perbandingan 4 skenario jenis teknologi solar photovoltaic system serta pemilihan skenario solar photovoltaic system berdasarkan nilai optimasi manfaatnya menggunakan metode linier programming pada segmen industri di Indonesia selama 25 tahun operasional. Penelitian dilakukan dengan melakukan studi kasus pada dua fasilitas pabrik perusahaan minuman di Indonesia di 2 lokasi yang berbeda. Studi kasus pertama berada di Kabupaten Bekasi, penelitian dilakukan dengan melakukan analisis energi ekonomi lingkungan serta mengoptimasi nilai manfaat PLTS atap yang sudah beroperasi sejak 2020. Studi kasus kedua berada di Kabupaten Semarang, penelitian dilakukan pada fasilitas pabrik yang belum dibangun PLTS atap, yakni dengan merencanakan pembangunan PLTS atap seluas 80% dari total luas atap yang dapat dipasang panel surya. Hasil penelitian menujukkan bahwa skenario 2 solar photovoltaic system dapat menghasilkan jumlah energi listrik dan CO2 yang dapat dikurangi lebih banyak dibanding skenario lainnya pada kedua studi kasus. Sedangkan skenario 4 solar photovoltaic system merupakan skenario dengan nilai ekonomi yang lebih baik dari skenario lainnya pada kedua studi kasus. Hasil optimasi penggunaan 80% luas atap pada studi kasus Bekasi 1 menunjukkan bahwa skenario 4 mampu memberikan nilai manfaat yang optimum yakni Rp 20,247,839,358 serta mampu meningkatkan jumlah energi listrik dan CO2 yang dapat dikurangi meningkat sebanyak 82%. Terakhir, hasil optimasi skenario 4 mampu meningkatkan jumlah persentase listrik PLTS atap terhadap total konsumsi listrik PLN menjadi 33%. Penggunaan skenario 4 solar photovoltaic sytem sebanyak 80% luas atap yang tersedia dapat mengurangi penggunaan listrik PLN (energi fossil) sebanyak 33% pada studi kasus Bekasi 1 dan 28% pada studi kasus Semarang.

This study aims to compare 4 scenarios of solar photovoltaic system technology and the selection of solar photovoltaic system scenarios based on the optimization value of their benefits using the linear programming method in the industrial segment in Indonesia for 25 years of operation. The research was conducted by conducting a case study on two manufacturing facilities of a beverage company in Indonesia in 2 different locations. The first case study is in Bekasi Regency, the research is carried out by conducting an energy economic environmental analysis and optimizing the value of the benefits of solar rooftop photovoltaic system which has been operating since 2020. The second case study is in Semarang Regency, the research is carried out on factory facilities that have not built solar rooftop photovolatic system, namely by planning construction of solar roofotop photovolatic system covering an area of ​​80% of the total roof area that can be installed solar panels. The results of the study show that scenario 2 solar photovoltaic system can produce more electrical energy and CO2 that can be reduced than the other scenarios in the two case studies. While scenario 4 solar photovoltaic system is a scenario with better economic value than the other scenarios in the two case studies. The results of optimizing the use of 80% of the roof area in the Bekasi 1 case study show that scenario 4 is able to provide an optimum benefit value of Rp. 20,247,839,358 and is able to increase the amount of electrical energy and CO2 that can be reduced by 82%. Finally, the optimization results of scenario 4 are able to increase the percentage of electricity that generated by solar roofotop photovoltaic system to the total electricity consumption of PLN to 33%. The use of scenario 4 solar photovoltaic system as much as 80% of the available roof area can reduce the use of PLN electricity (fossil energy) by 33% in the Bekasi 1 case study and 28% in the Semarang case study"
Depok: Fakultas Teknik Universitas Indonesia, 2022