"Classifying accident information into a specific categories provides inspectors with data needed for accident analysis and subsequent decision-making. This research proposes development of a database for accident analysis prevention. It will also presents a template and accident database focusing on fatal electrocutions and falls in the construction industry. Data has been stored in MySQL database, and a program editor has been employed to customize the program for accident analysis. An accident analysis form connected to the database has been developed, along with an accident report in qualitative format and meaningful categories to provide analyzable data. The program can be used as soon as an inspector finishes preparing an accident report; accessing the database minimizes the lead time for translating qualitative reports into analyzable data, so that the Council for Labor Affairs, corporate personel, and inspectors can have real time information about accident trends and patterns for the prevention of repetitive accidents."
Depok: Faculty of Engineering, Universitas Indonesia, 2012
UI-IJTECH 3:1 (2012)
Artikel Jurnal  Universitas Indonesia Library
cover
Emmidia Djonaedi
"Classifying accident information into a specific categories provides inspectors with data needed for accident analysis and subsequent decision-making. This research proposes development of a database for accident analysis prevention. It will also presents a template and accident database focusing on fatal electrocutions and falls in the construction industry. Data has been stored in MySQL database, and a program editor has been employed to customize the program for accident analysis. An accident analysis form connected to the database has been developed, along with an accident report in qualitative format and meaningful categories to provide analyzable data. The program can be used as soon as an inspector finishes preparing an accident report; accessing the database minimizes the lead time for translating qualitative reports into analyzable data, so that the Council for Labor Affairs, corporate personel, and inspectors can have real time information about accident trends and patterns for the prevention of repetitive accidents."
Depok: Faculty of Engineering, Universitas Indonesia, 2012
UI-IJTECH 3:1 (2012)
Artikel Jurnal  Universitas Indonesia Library
cover
Ferry Firmawan
"The development of the construction industry in Indonesia has been substantially contributing to the enhancement of the social and economic development of the people. However, its expansion has also become an issue, as the development might be implicated in the abuse of environmental sustainability when the practices of conducting the construction project abandon the rules and regulations of sustainable green construction concepts. Therefore, this study attempted to introduce a quantitative assessment tool called the Green Construction Site Index (GCSI) to evaluate the performance of an ongoing project to meet the sustainable green construction concept. The aim of this study was to investigate the effectiveness of GCSI as a quantitative assessment tool to measure the implementation of the green construction concept conducted by ongoing projects. Data were collected by onsite direct observation, interviews with key personnel, and project documentation review. Data were organized and analyzed using descriptive elaboration. The results showed that three aspects, the Efficiency Index (IE), Productivity Index (IP), and Awareness Index (IA), were effective in assessing 10 ongoing construction projects, categorized as Non-Commercial Non-Residential Building, Commercial Residential Building, and Commercial Non-Residential Building. The index generated using GCSI, upon assessing 10 buildings, was 3.39 and fell into the Good category with IE = 3.51, IP = of 2.86, and IA = 3.84. Another finding shows that the Project Organizational Commitment Index (POCI) to the indicator of the GCSI was 3.31 (Good category) with IPOL = 3.36, IPRO = 3.49, and IPRAC = 2.75. The capability of the GCSI to identify three aspects within a construction project simultaneously and comprehensively suggests the importance of its function as an effective tool that gives benefits to not only the contactors, but also to the authorities that control the green construction–related performance. Therefore, the GCSI is expected to be applied as a standardized reference by both the construction industries and regulating authorities. Despite its satisfactory findings, the GCSI needs to be furthered to achieve its reliability and validity to be adopted internationally."
Depok: Faculty of Engineering, Universitas Indonesia, 2016
UI-IJTECH 7:4 (2016)
Artikel Jurnal  Universitas Indonesia Library
cover
Emmidia Djonaedi
"Informasi kecelakaan kerja seharusnya diklasifikasikan kedalam kategori yang lebih spesifik, sehingga bisa digunakan untuk analisa kecelakaan kerja dan menjadi referensi inspector untuk memberi keputusan apa yang harus dilakukan untuk mengurangi kecelakaan kerja. Penelitian ini bertujuan untuk mengembangkan database dan program untuk nalasia kecelakaan kerja dan pencegahannya. Tesis ini akan memperlihatkan sebuah tapilan dan database kecelakaan yang focus pada tersengat listrik dan jatuh pada industry konstruksi. Database kecelakaan kerja akan diinput dan disimpan dalam MTSQL dan Dreamweaver 8 akan digunakan sebagai program editor untuk membuat program.
Hasil dari program ini adalah form analisa kecelakaan kerja yang terhubungkan dengan database, sehingga laporan kecelakaan kerja dalam format data kualitatif akan dikodekan menjadi lebih bernilai dan data yang bisa dianalisa segera setelah inspector selesai mempersiapkan laporan kecelakaan. Database akan meminimisasi waktu untuk mengartikan laporan kualitatif menjadi data yang bisa dianalisa, sehingga departemen tenaga kerja dan inspector mempunyai informasi baru pada tren kecelakaan kerja dan modelnya untuk mencegah berulang kembalinya kecelakaan kerja.

Accident information should be classified into specific categories thus it can be used for accident analysis and referred to an inspector for a decision on what action to take. This research purposed to develop a database and program for possible accident analysis and prevention. This thesis will present a template and accident database focus on fatal electrocution and fatal falls in construction Industries. Database of accident will be input and stored in My SQL and Dreamweaver 8 will be used as an editor to customize the program for accident analysis.
Result of this program is accident analysis form which connect to database, thus accident report in qualitative format is coded into meaningful categories and analyzable data as soon as an inspector finish preparing the accident report. The database can minimize the lead time for translating qualitative report into analyzable data so that council of labor affair and inspectors can have real time information on the accident trend and patterns for the prevention of repetitive accident.
"
Depok: Fakultas Teknik Universitas Indonesia, 2010
T27824
UI - Tesis Open  Universitas Indonesia Library
cover
Cretu, Ovidiu
"This text provides a balance of theory, technique and facilitation. The emphasis is on providing a practical and proven framework for risk management on real projects with a clear, concise description of the complex topic of risk for professionals. Written by two experts in the field, it offers a practical, proven means of quantifying and minimizing risk, to inform business decisions in the design and construction field. Case studies and examples on the proper application of software and principles help make this book an important reference to the field"-- Provided by publisher.
"The book presents an integrated approach to cost and schedule for qualitative risk analysis. This approach recognizes the value of considering the project schedule when cost is estimated. The approach was created and developed at the Washington State Department of Transportation (WSDOT). The authors have expanded the scope of the process to cover any type of construction, and have provided two case studies developed throughout the book presenting the process in use on an instutional construction project and a heavy civil construction job"
Hoboken : John Wiley & Sons, 2011
690.22 CRE r
Buku Teks SO  Universitas Indonesia Library
cover
Mohammed Ali Berawi
"The construction industry has a vast impact on the environment and the economy. Construction project performance requires a focus on increasing the resource efficiency and reducing the impact on the environment during the construction lifecycle. This on-going research is addressed towards the need of improving construction project performance by creating added-value for building projects using quality management (QM) and value management (VM) approaches. This research employs a quantitative approach through a questionnaire survey distributed to construction industry stakeholders. The questionnaire consists of three parts of discussion including identification of critical success factors and barriers that exist typically at each construction stage in building projects, plus identification of additional functions in building projects, and total investment cost for building projects. As the significant findings indicate, this research evaluates how the understanding of quality and its perceived processes plus how the identification of additional functions can be applied to deliver efficiency and more added-value in building construction projects e.g. Energy Efficient Buildings."
Depok: Faculty of Engineering, Universitas Indonesia, 2013
UI-IJTECH 4:1 (2013)
Artikel Jurnal  Universitas Indonesia Library
cover
Rossy Armyn Machfudiyanto
"Industri Konstruksi memiliki kontribusi besar dalam perekonomian. Permasalahan yang sering terjadi bahwa industri konstruksi memiliki catatan kecelakaan yang buruk dibandingkan industri yang lain. Penelitian ini bertujuan melakukan improvement kebijakan dan kelembagaan untuk meningkatkan tingkat kematangan dan kinerja keselamatan pada Industri Konstruksi di Indonesia.
Metode Penelitian menggunakan data primer dan sekunder dari hasil literatur yang divalidasi pakar serta melakukan survei kuesioner responden yang dianalisa menggunakan Metode SEM-PLS.
Hasil Penelitian menjelaskan bahwa kebijakan keselamatan, pembiayaan, reward dan punishment merupakan faktor yang dominan yang diintegrasi dengan lembaga yang terlibat dalam K3 untuk memperbaiki budaya keselamatan ditinjau dari elemen tingkat kematangan dalam meningkatkan kinerja keselamatan dan kinerja proyek konstruksi di Indonesia.

The Construction Industry has a huge contribution in the economy. The frequent problem is that the construction industry has a poor record of accidents compared to other industries. This study aims at improving the policies and institutions to improve the level of maturity, safety performance and project performance in the Construction Industry in Indonesia.
Methods The study used primary and secondary data from the literature that validated the expert and conducted a questionnaire survey of respondents who analyzed using the SEM-PLS Method.
The results of the study explain that the safety, financing, reward and punishment policies are the dominant factors that are integrated with the institutions involved in OSH to improve safety culture in terms of the elements of maturity level in improving the safety performance and performance of construction projects in Indonesia.
"
Depok: Fakultas Teknik Universitas Indonesia, 2019
D2644
UI - Disertasi Membership  Universitas Indonesia Library
cover
Hegar Adrian
"Seiring dengan pertumbuhan ekonomi Indonesia yang semakin meningkat sehingga banyak diselengarakan proyek konstruksi dengan skala besar, semakin besar suatu proyek maka akan semakin komplek pekerjaannya. Proyek konstruksi sangat erat dengan berbagai risiko perubahan yang memungkinan untuk terjadinya konflik. Untuk menghindari sengketa atas konflik yang terjadi karena adanya perubahan, sangat penting bagi kontraktor untuk mengajukan klaim dengan langkah-langkah yang ditentukan sesuai dengan kondisi kontrak. Proses improvisasi pelaksanaan klaim pada penelitian ini disini berupa pengembangan sistem administrasi dan dokumentasi klaim pada proyek konstruksi.
Metode yang digunakan pada penelitian ini berupa studi kasus penanganan klaim proyek konstruksi di PT X dengan menganalisa faktor-faktor dominan pada klaim proyek konstruksi yang didapatkan dari penelitian terdahulu serta jurnal-jurnal internasional. Faktor-faktor tersebut dianalisa lebih lanjut dengan metode Interpretive Structural Modeling (ISM) yang bertujuan untuk mendapatkan hubungan antara masing-masing faktor sehingga didapatkan suatu model proses setiap indikator klaim, hasil dari analisa ISM berupa diagram hubungan antara masing-masing variabel dari setiap indikator, antara lain: identifikasi klaim, perencanaan klaim, penyajian klaim, administrasi klaim dan dokumentasi klaim, yang dikembangkan menjadi Standar Operasional Prosedur (SOP) Klaim di PT X yang berguna untuk membantu kontraktor/penyedia jasa dalam pengajuan klaim, agar klaim yang mereka ajukan bisa diterima oleh pengguna jasa/owner.

Along with Indonesia's economic growth increased in line which held by largescale construction projects , the bigger of scale of the project will increase the complexity of work, with the result of project construction loaded with a variety of risk changes that allow for conflict, to avoid disputes over the conflict because the change, it is important for contractors to make a claim under the measures determined in accordance with the conditions of the contract. The improvement claims process in this research is the development of administrative systems and documentations claim in construction project.
The method used is a case study of handling claims on construction projects at PT X by analyze domain factors claim on construction project which got from previous research and international journals. The factors will be analyzed using Interpretive Structural Modeling (ISM) method to obtain the relationship between these factors, so the result is a proces model every claim indicator the results of the analysis ISM in the form of a flowchart between each of the variables of each indicator, among others: identification of claims, claims planning, presentation of claims, claims administration and claims documentation, developed into Standard Operating Procedure (SOP) Claims in PT X that help contractors in claims submission,in other their claim can be accepted by owner.
"
Depok: Fakultas Teknik Universitas Indonesia, 2017
T48908
UI - Tesis Membership  Universitas Indonesia Library
cover
Berlin: Ruby Press, 2010
624 REI
Buku Teks  Universitas Indonesia Library
cover
"ABSTRAK
Four large-scale reinforced concrete beams were constructed and tested to investigate the effectiveness of external poststrenghening with prestressed fiber reinforced polymer (FRP) sheets. "
Reston: American Society of Civil Engineers, 2018
693 JCC
Majalah, Jurnal, Buletin  Universitas Indonesia Library