Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 6120 dokumen yang sesuai dengan query
cover
Matthias Guenther
"Renewable energy resources are increasingly being used to cover the demand in the electricity grids in many countries. A question that is currently for most grids rather theoretical, although interesting in introducing a long-term perspective, pertains to what an energy supply from exclusively renewable energy resources could look like. This question has to be answered individually for each grid. The objective of the present paper is to scrutinize the specific challenges that a 100% renewable energy scenario brings for the Java-Bali grid. This objective is achieved by designing power generation time series such that they match a given load time series. An important challenge for a 100% renewable energy supply is the very high dependency on solar energy, which generates an enormous primary power generation fluctuation on both a daily and an annual timescale. In particular the seasonal fluctuations come along with high storage demand, which is the greatest challenge involved in a 100% renewable energy supply. There are strategies that may be used to considerably reduce the storage demand: the installed photovoltaic (PV) capacity can be increased, bioenergy can be used for seasonal balancing, and special long-term storage can be added. These options are considered in the present paper."
Depok: Faculty of Engineering, Universitas Indonesia, 2018
UI-IJTECH 9:2 (2018)
Artikel Jurnal  Universitas Indonesia Library
cover
Andi Kurniawan
"Kebijakan energi terbarukan saat ini berperan dalam terhambatnya pengembangan dan pencapaian target bauran energi terbarukan yang telah ditetapkan. Permasalahan tersebut yaitu terkait regulasi sektoral yang inkonsisten, penetapan prioritas pemerintah dalam kebijakan energi, skema kerja sama, serta penetapan harga jual beli tenaga listrik. Penulis menggunakan desain penelitian yuridis-normatif. Penelitian dilakukan menggunakan data sekunder yang terdiri atas bahan hukum primer, sekunder dan tertier. Data tersebut disusun kualitatif, melalui uraian teks dan dianalisis dengan teknik analisis deskriptif dan kritis. Kesimpulan, pertama, regulasi pemanfaatan energi terbarukan untuk penyediaan tenaga listrik yang mengatur klausul-klausul kunci PJBL sangat dinamis mengalami perubahan dalam waktu yang singkat. Kedua, dalam penyusunan KEN, RUEN, dan RUPTL pemerintah masih memberikan prioritas utama untuk pemanfaatan energi fossil dibandingkan energi terbarukan. Beberapa hal yang menghambat investasi diantaranya: a) biaya investasi EBT yang tinggi; b) prioritas pengembangan PLTU Mulut Tambang; c) perubahan penentuan biaya pokok produksi; d) terbitnya Permen ESDM 10/2017 mengakibatkan minimnya kesempatan investor untuk Business-to-business dalam PJBL; e) inkonsistensi penerapan pola kerja sama; f) hambatan dalam penyediaan lahan dan hutan. Ketiga, upaya pemerintah dalam mendukung penyediaan energi terbarukan yaitu melalui skema penugasan, kerja sama antara pemerintah dan badan usaha, serta melalui pemberian jaminan kelayakan usaha kepada pengembang. Selain itu untuk memaksimalkan pengembangan energi terbarukan Pemerintah harus mampu mewujudkan: 1) Kepastian Hukum dari Segi Pengaturan Pemanfaatan energi Baru dan Terbarukan; 2) Optimalisasi Kesempatan Ekonomi (economic opportunity) Indonesia dalam Pengembangan Energi Baru dan Terbarukan; 3) Mengubah Paradigma Pemangku Kebijakan yang menganggap batubara sebagai sumber energi murah; dan 4) Mewujudkan Kebijakan Energi Baru dan Terbarukan yang Berkeadilan (fairness).

New and renewable energy utilization is one of the pillars for reaching national energy independence and security by maximizing the usage of renewable energy by considering the economic level. The current renewable energy policy inhibits the development and achievement of the established renewable energy mix target. This is due to inconsistent sectoral regulations, government priority in energy policy, cooperation scheme, and electricity buying and selling price setting. The author used judicial-normative research design. The present study used secondary data, which consisted of primary, secondary and tertiary legal materials. The data was prepared qualitatively through text description and analyzed using descriptive and critical analysis technique. The conclusions are, first, renewable energy utilization regulations for electricity supply that regulate the key clauses of PJBL are very dynamic and change within a brief period of time. Second, when preparing KEN, RUEN, and RUPTL, the government still prioritizes fossil energy utilization over renewable energy. Some obstacles for investment are: a) high cost of EBT investment; b) priority of PLTU Mulut Tambang development; c) change of cost of production setting; d) the issuance of the Regulation of the Minister of Energy and Mineral Resources 10/2017 that reduces investor's chance for Business-to-business in PJBL; e) inconsistency of cooperation pattern implementation; f) obstacle in land and forest provision. Third, government efforts to support renewable energy provision through assignment scheme, government cooperation with businesses, and provision of business viability guarantee for developer. Moreover, to maximize renewable energy development, the government must: 1) Create Legal Certainty in Terms of New and Renewable Energy Utilization Regulation; 2) Optimize Indonesia's Economic Opportunity in New and Renewable Energy Development; 3) Change the Paradigm of Policy Maker who think of coal as cheap source of energy; and 4) Create Fair New and Renewable Energy Policy (fairness)."
Depok: Universitas Indonesia, 2020
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Fadhel Muhammad
"ABSTRAK
Energi di Indonesia merupakan sektor yang sangat vital, semakin bertambah tahun kebutuhan energi semakin meningkat. Hal ini juga dipengaruhi oleh pertumbuhan ekonomi dan penduduk. Kondisi di dunia saat ini bahwa persediaan energi renewable semakin menipis, memicu pengembangan energi renewable. Indonesia menargetkan pengembangan energi renewable padaa tahun 2025 sebesar 23 bauran energi nasional. Penelitian ini memberikan alternatif proporsi bauran dan pemilihan lokasi EBT yang bertujuan untuk meminimumkan biaya total energi bauran. Hasil yang diperoleh dari metode MINLP yang digunakan dalam penelitian ini menghasilkan energi air dan panas bumi yang memiliki porsi pengembangan terbesar.

ABSTRACT
Energy in Indonesia is an important sector that electricity demand always increasing every year. This condition is also influenced by economic and population growth. In fact, non renewable energy is declining and will be vanished in several decades. This condition triggers development of renewable energy to replace it. Indonesia have made a development target of renewable energy become 23 of all energy mix. This paper give an alternative plan of development and site selection to reach minimum cost of all renewable energy mix in Indonesia. The result is hydro and geothermal are dominant in this energy mix."
2017
T47598
UI - Tesis Membership  Universitas Indonesia Library
cover
Miller, Rex, 1939-2004
Bloomington: Mcknight & Mcknigh, 1964
621.374 5 MIL e
Buku Teks  Universitas Indonesia Library
cover
Adi Setiya Dwi Grahito
"ABSTRAK
Studi ini menganalisa berbagai faktor-faktor yang terjadi akibat dari keputusan perusahaan dan industri untuk menggunakan pembangkit listrik mandiri dalam mengatasi masalah kebutuhan listrik untuk produksi. Dengan berfokus pada perbedaan karakteristik pulau dan sumber daya yang dimilikinya, masing-masing industri dari berbagai sektor memiliki berbagai pertimbangan yang tentu saja berbeda dalam kurun tiga periode waktu. Perhitungan empiris menunjukkan bahwa industri dengan pengeluaran dan pemasukan yang besar serta tenaga kerja yang sedikit cenderung memiliki probabilitas untuk menggunakan swa-listrik. Hasil pengolahan juga menunjukkan bahwa industri dari pulau Kalimantan dan kelompok pulau Papua/Nusa Tenggara/Maluku memiliki probabilitas menggunakan swa-listrik lebih tinggi yaitu masing-masing sebesar 24,7% dan 19,8%, jika dibandingkan pulau Jawa/Bali. Sektor pertanian dan perkebunan memiliki probabilitas menggunakan swa-listrik lebih tinggi jika dibanding kelompok lain. Efek dari periode tahun yang dihasilkan menunjukkan bahwa pada tahun 2009. Industri mengurangi penggunaan swa-listrik.

ABSTRACT
This study analyzes the factors that determine firms' decisions on electricity self-generation in Indonesia. Specifically, I explore the difference in firms' decisions making across Indonesian five major islands in the past ten years. The empirical investigation utilizes Indonesian's Large and Medium Firm dataset of the years 2004, 2009, and 2014. The empirical results show that industry with higher output, higher income, and less labor is positively associated with the probability of electricity self-generation. Moreover, for firms in Kalimantan and Papua/Nusa Tenggara/Maluku island, they have a higher probability (24.7% and 19.8%, in comparison with Jawa/Bali island) of the electricity self-generation. The agriculture sector is also more likely to self-generate electricity. The year effect on the study indicates that in 2009 the firms reduce the usage of self-generated electricity. All of these findings are robust across different model specifications."
2020
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Haris Munandar
"ABSTRAK
Penelitian ini mengkaji proyeksi besaran kebutuhan energi primer jangka panjang untuk sektor kelistrikan Jawa Bali dari tahun 2015 s.d tahun 2050 dengan menggunakan model LEAP. Beberapa skenario proyeksi diterapkan dalam simulasinya yaitu skenario Referensi, skenario dengan variasi PDRB, skenario Optimasi Supply Side dengan variasi pada reserve margin, perbaikan susut, perbaikan efisiensi pembangkit, serta perubahan peran pembangkit gas menjadi pemikul beban dasar, dan skenario Optimasi Least Cost-Lower GHG. Dari hasil penelitian ini, diketahui bahwa berdasarkan Skenario Referensi dengan kondisi PDRB sebesar 5,6% per tahun, susut di transmisi dan distribusi pada 9,45%, reserve margin 35%, tidak ada kenaikan efisiensi pada pembangkit baru untuk PLTU dan PLTGU, dan target bauran energi untuk gas dan EBT sesuai dengan target KEN, pada tahun 2050, kebutuhan energi listrik untuk Jawa Bali diproyeksikan mencapai 596,69 TWh, dimana untuk memenuhi kebutuhan energi listrik tersebut, produksi energi listrik yang perlu disediakan adalah sebesar 658,97 TWh dengan total kapasitas pembangkit listrik mencapai 136,90 GW. Untuk memenuhi operasional pembangkit tersebut, proyeksi total kebutuhan energi primer yang perlu disiapkan adalah sebesar 1.835,88 TWh (6,61 milyar GJ) dengan rincian: batubara sebesar 131,6 juta ton setara 3,86 milyar GJ, gas alam sebanyak 2.690,8 BBTUD setara 1,04 milyar GJ, panas bumi setara 0,84 milyar GJ, tenaga surya setara 0,47 milyar GJ, biomassa sebanyak 15,8 juta ton setara 0,25 milyar GJ, tenaga air setara 0,15 milyar GJ, dan BBM 0,006 milyar GJ setara 165,7 ribu kL. Emisi gas rumah kaca yang dihasilkan pada skenario ini secara kumulatif (100 Year-GWP) adalah sebesar 8,76 milyar ton CO2.


In this thesis, we will study the forecasting long-term primary energy demand for the Java Bali electricity sector from 2015 to 2050 using LEAP model. Some projection scenarios applied to the simulation are Reference Scenario, Scenarios with variations in GDP growth, Supply Side Optimization Scenarios with variations in reserve margin, losses improvement, and power plant efficiency, and changing the role of gas power plants to be baseload power plants, and Least Cost-Lower GHG Optimization Scenario. The results of this study found that based on Reference Scenario with following condition: GDP of 5.6% per year, a T&D losses of 9,45%, reserve margin of 35%, no efficiency improvement of additional coal-fired power plants and gas-fired power plants, and energy mix targets for gas and renewable energy in accordance with National Energy Policy (KEN) targets. In 2050, the electricity demand for Java Bali is projected to reach 596,69 TWh in, where to meet the electricity needs, the electricity production that should be provided is 658,97 TWh with a total power generation capacity reaching 136,90 GW. To fulfill the operation of the power plant, the primary energy forecasting that need to be prepared are 1.835,88 TWh (6,6 billion GJ) with details: 131,6 million tons of coal (3,86 billion GJ), 2.690,8 BBTUD of natural gas (1,04 billion GJ), 0,84 billion GJ of geothermal, 0,47 billion GJ of solar power, 15,8 million tons of biomass (0,25 billion GJ), 0,15 billion GJ of hydro-power, and 166 thousand kL of diesel oil (0,006 billion GJ). Cumulative greenhouse gas emissions (100 Years-GWP) of this scenario are 8,76 billion tons of CO2.

"
2019
T52289
UI - Tesis Membership  Universitas Indonesia Library
cover
Ikhsan Hernanda
"ABSTRAK
Indonesia sebagai negara yang terletak di garis khatulistiwa, memiliki potensi energi matahari sebesar 4,8 kWh/m2/hari, sudah saatnya energi terbarukan berbasis panel surya terus dikembangakan. Pengembangan potensi panel surya di Jawa Bali di rencanakan PLN sebesar 800 MW bedasarkan Rencana Usaha Penyediaan Tenaga Listrik RUPTL tahun 2018-2027. PLTS-PV Rooftop 2 kWp yang dirancang pada sektor rumah tangga Jawa Bali dibuat berdasarkan pendapatan perkapita, jumlah pelanggan, jumlah penjualan tenaga listrik, dan jumlah penduduk. Energi yang dihasilkan PLTS dapat menghemat pemakain bahan bakar batu bara pada tahun 2019 sebesar 1,07 triliyun rupiah dan hingga tahun 2027 dapat menghemat sekitar 11,08 triliyun rupiah. Skema Net Metering dengan adanya insentif 30 dapat diterapkan untuk pembangunan PLTS-PV Rooftop 2 kWp. Dengan pemasagan pada sektor rumah tangga di Jawa Bali dapat menghemat pembayaran listrik rumah tangga sebesar 37,9-41 .

ABSTRACT
Indonesia as a country located on the equator, has 4.8 kWh m2 day the potential of solar energy, it is time for expanded renewable energy based solar panels. The potential development of solar panels in Java Bali is planned to 800 MW based on Rencana Usaha Penyediaan Tenaga Listrik RUPTL year 2018 2027. PLTS PV rooftop 2 kWp designed on the Java Bali household sector is based on per capita income, number of customers, total electricity power sales, and number of population. The energy produced by PLTS can save the use of coal fuel in 2019 of 1.07 trillion rupiah and until 2027 can save about 11.08 trillion rupiah. The Net Metering scheme with a 30 incentive can be applied to PLTS PV Rooftop 2 kWp development. With installation in the household sector in Java Bali can save household electricity payment by 37.9 41 . "
2018
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Rifky Adriandra Hadis
"Ibu Kota Nusantara (IKN) memiliki tujuan untuk menjadi kota yang ramah lingkungan dan rendah emisi karbon. Prinsip yang menjadi dasar bagi IKN untuk mencapai tujuan tersebut adalah memanfaatkan energi terbarukan untuk memasok kebutuhan energi listrik. Untuk mewujudkan tujuan tersebut, maka pemenuhan kebutuhan energi listrik IKN perlu dilakukan dengan membangun sistem tenaga listrik berbasis grid-connected microgrid yang memanfaatkan energi terbarukan sebagai sumber energi untuk pembangkitan. Penelitian ini bertujuan untuk menentukan jenis dan kapasitas pembangkit listrik yang optimal dengan menggunakan perangkat lunak XENDEE. Optimasi yang dilakukan dengan menggunakan perangkat lunak XENDEE terdiri atas tiga opsi tujuan yang berbeda, yaitu menekan biaya, menekan emisi karbon, dan multi-tujuan untuk menekan biaya dan emisi karbon secara bersamaan. Hasil simulasi menunjukkan bahwa pada optimasi menekan biaya, total biaya energi tahunan dapat ditekan dengan meningkatkan bauran pembangkit konvensional. Di sisi lain, pada optimasi menekan emisi karbon, total emisi karbon dapat dikurangi dengan meningkatkan bauran energi terbarukan dan impor energi listrik. Hasil simulasi menunjukkan bahwa optimasi multi-tujuan memiliki total biaya energi tahunan yang tidak berbeda jauh dengan optimasi menekan biaya, sementara total emisi karbon yang dihasilkan tidak berbeda jauh dengan optimasi menekan emisi karbon.

Ibu Kota Nusantara (IKN) has a vision to become an environmentally friendly and low carbon emission city. The principle that becomes the basis for IKN to achieve this vision is to use renewable energy to supply the electrical energy needs. To realize the vision, IKN's electrical energy needs must be fulfilled by designing a grid-connected microgrid-based power system that utilizes renewable energy as a source of energy for generation. This research aims to determine the optimal type and capacity of power plants using XENDEE software. The optimization performed using XENDEE consists of three different objectives: reduce costs, reduce carbon emission, and multi-objective. The simulation results show that in the reduce cost optimization, the total annual energy cost can be reduced by increasing the conventional generation mix. On the other hand, in reduce carbon emission optimization, the total carbon emission can be reduced by increasing the renewable energy mix and importing electricity. The simulation results show that multi-objective optimization has a total annual energy cost that is not significantly different from reduce cost optimization, while the resulting total carbon emissions are not significantly different from reduce carbon emission optimization.
"
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Adrita
"Pengembangan energi panas bumi di Indonesia sebagai pembangkit energi listrik, sejak dijalankannya proyek PLTP Kamojang yang merupakan proyek gabungan antara PLN dan PERTAMINA. Energi panas bumi di Indonesia, memang sebagian besar digunakan untuk membangkitkan tenaga listrik, melalui Pembangkit Listrik Tenaga Panas Bumi (PLTP). Terkait dengan energi panas bumi ataupun energi listrik yang dihasilkan dari suatu PLTP, yang kemudian dijual kepada PERTAMINA selaku pemegang Kuasa Pengusahaan Panas Bumi, dan kemudian oleh PERTAMINA dijual kepada PLN selaku pemegang Kuasa Usaha Ketenagalistrikan, telah terjadi beberapa kasus di Indonesia yang sehubungan dengan adanya kontrak jual beli listrik panas bumi tersebut, yang mana yang menjadi pokok sengketa adalah klausula force majeure yang terdapat pada kontrak jual beli energi listrik tersebut. Penelitian ini berusaha memaparkan apakah klausula force majeure tersebut dapat dilaksanakan, dan perlindungan hukum apakah yang dapat diberikan kepada PLN dan PERTAMINA dalam hal dikeluarkannya Keputusan Presiden yang menangguhkan proyek PLTP terkait dengan suatu ESC.
Penelitian memaparkan ketentuan-ketentuan hukum dan peraturan perundang-undangan yang relevan terkait dengan ESC ini.Penelitian ini dari sudut jenisnya merupakan studi kepustakaan (Library Research) yang bersifat yuridis normatif, yaitu penelitian yang menekankan pada penggunaan data sekunder atau berupa norma hukum tertulis. Metode penelitian dilakukan secara kepustakaan yang bersifat yuridis normatif, dengan analisa data secara kualitatif, sehingga menghasilkan data yang bersifat evaluatif-analitis.

Geothermal energy development in Indonesia as electrical energy generation, since the executable Kamojang PLTP project which is a joint project between Pertamina and PLN. Geothermal energy in Indonesia, is mainly used to generate electricity, through a Geothermal Power Plant (PLTP). Associated with geothermal energy or electrical energy generated from a plant, which then was sold to Pertamina as a shareholder, Geothermal Power, and then by PERTAMINA is sold to PLN, as a shareholder Electricity Business Authority, there have been several cases in Indonesia in connection with the contract geothermal power purchase it, which is the subject of dispute is the force majeure clauses contained in the contract of sale of energy power plant.
The research is to explain whether the clauses of force majeure could be implemented, and whether legal protection can be provided to PLN and Pertamina in terms of suspending the issuance of Presidential Decree PLTP projects associated with the ESC key. The study describes the legal provisions and regulations of relevant legislation relating to ESC ini.Penelitian this from the point of its kind is the study of literature (Library Research) which is normative, that is research that emphasizes the use of secondary data or the form of written legal norms. Methods of research done in libraries that are normative, with the qualitative data analysis, resulting in data-analytical evaluative nature."
Depok: Fakultas Hukum Universitas Indonesia, 2011
T28186
UI - Tesis Open  Universitas Indonesia Library
cover
Sulthaanan Nashiiraa
"As global warming deteriorates and with the electricity and energy sector as the main producer of greenhouse gasses, the pressure is high in the electricity and energy sector to increase its efficiency and to increase the use of renewable source of energy. Many country has adopted the use of new and renewable energy as the source of electrical energy. A major challenge is hindering new and renewable energy from replacing fossil fuel completely. It is in the form of intermittency that has been the nature of energy source such as wind and solar. Many form of energy storage technology has been developed, such as pumped hydro and chemical battery. In this research the writer seek to implement an alternative storage technology that is more economical and has less environmental impact in the form of Compressed Air Energy
Storage (CAES). CAES utilizes compressed air stored in a compressed air container to store the energy generated from primary energy source. When needed, the air will be
discharged and move a turbine that drives a generator, thus generating electricity. In this experiment, the Writer and his colleges thrives to optimize CAES system to be implemented alongside a Floating Photovoltaic (FPV) plant. In this thesis the writer investigate the possibilities of utilizing Tesla turbine in the energy extraction process of CAES by analyzing the turbine’s performance.

Ketika pemanasan global memburuk dan dengan sektor listrik dan energi sebagai produsen utama gas rumah kaca, tekanan meningkat pada pelaku sektor listrik dan energi untuk meningkatkan efisiensinya dan untuk meningkatkan penggunaan sumber energi terbarukan.. Banyak negara telah mengadopsi penggunaan energi baru dan terbarukan sebagai sumber energi listrik. Tantangan utama menghambat energi baru dan terbarukan dari menggantikan bahan bakar fosil sepenuhnya. Itu adalah dalam bentuk intermittency yang telah menjadi sifat sumber energi seperti angin dan matahari. Banyak bentuk teknologi penyimpanan energi telah dikembangkan, seperti pompa hidro dan baterai kimia. Dalam penelitian ini penulis berusaha untuk menerapkan alternatif teknologi penyimpanan energi yang lebih ekonomis dan memiliki dampak lingkungan
kurang dalam bentuk Penyimpanan Energi Udara Terkompresi (CAES). CAES menggunakan udara terkompresi yang disimpan dalam wadah udara bertekanan untuk menyimpan energi yang dihasilkan dari sumber energi primer. Saat dibutuhkan, udara akan dibuang dan menggerakkan turbin yang menggerakkan generator, sehingga menghasilkan listrik. Dalam percobaan ini, Penulis dan koleganya berusaha untuk
mengoptimalkan sistem CAES untuk diimplementasikan bersama dengan pembangkit Floating Photovoltaic (FPV). Dalam skripsi ini, penulis menyelidiki kemungkinan
pemanfaatan turbin Tesla dalam proses ekstraksi energi CAES dengan menganalisis kinerja kerja turbin tersebut.
"
Depok: Fakultas Teknik Universitas Indonesia, 2021
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>