Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 32543 dokumen yang sesuai dengan query
cover
Hendri D.S. Budiono
"Product manufacturing cost estimation in the early stages of the design process is useful for accelerating product time to market, reducing costs, and increasing quality in order to obtain products with a high level of competitiveness in the free market. Complexity and machining cost are important variables to estimate the final cost of the product. However, current cost estimation models only consider their calculations based on the design which has been determined beforehand, so that it is difficult to apply a cost estimation model early on in the design process because of minimal information. Therefore, in this research, a new method to produce a cost estimation model during the early stage of the design process is proposed. The new model was developed by correlating the cost calculation with the complexity of the machining process based on product features. By using this model, the designers are able to put through design changes quickly by modifying revisions at the manufacturing stage. In this paper, the development and implementation of the proposed cost estimation model which involves the milling process is known as the SPMF (Single Product Multi-Features) Product model is explained in detail. The proposed method shows that the SPMF Product model can be used to produce a manufacturing cost estimation based on process complexity."
Depok: Faculty of Engineering, Universitas Indonesia, 2014
UI-IJTECH 5:2 (2014)
Artikel Jurnal  Universitas Indonesia Library
cover
cover
M. Fachri Delithama Mahendra
"Komponen mendasar yang berfungsi untuk menciptakan ruang dari sebuah bangunan adalah dinding. Menggunakan cara tradisional untuk membangun dinding telah menjadi praktik yang tersebar luas. Studi ini membandingkan beton ringan dan dinding beton pracetak untuk mengidentifikasi dan mengevaluasi bahan yang lebih efektif untuk konstruksi dinding di perumahan perumahan Indonesia. Semua informasi yang dibutuhkan untuk penelitian ini dikumpulkan dari berbagai sumber. Data yang perlu diolah untuk menganalisis topik penelitian ini adalah panjang dinding keliling dan volume dinding bersih. Penulis menganalisis biaya prefabrikasi, ereksi, dan peralatan untuk konstruksi dinding beton pracetak. Penulis juga menganalisis biaya pemasangan, plesteran dan penyelesaian, serta peralatan untuk konstruksi dinding bata beton ringan. Hasil dari kedua metode tersebut kemudian dibandingkan dalam bentuk tabel dan grafik. Hasil pertama yang didapatkan adalah secara total harga bata beton ringan lebih rendah, dengan harga Rp 4.380.830,78 dibandingkan dengan dinding beton pracetak, Rp 4.558.123.752,63. Lantai rendah memiliki biaya penggunaan bata beton ringan lebih murah. Sebaliknya, lantai yang lebih tinggi memiliki biaya penggunaan dinding beton pracetak lebih murah. Temuan dalam makalah penelitian ini dapat meningkatkan sisi teknologi dan ekonomi pembangunan rumah di Indonesia.

A fundamental component that works to create or demarcate spaces from a building is walls. Using traditional means to construct walls has been a widespread practice. With the aid of columns, bricks are arranged in this manner. This study compares lightweight concrete and precast concrete walls to identify and evaluate more effective materials for wall construction in Indonesian residential housing. All the information needed for this study was gathered from numerous sources. The data needs to be processed to analyse this research topic: perimeter wall lengths and clear wall volume. The author analyses the cost of prefabrication, erection, and equipment for the precast concrete wall construction. The author analyses the cost of installation, plastering and finishing, and equipment for the lightweight concrete brick wall construction. The results from the two methods are then compared in a table and graph. There are several results obtained from this research. First, the used price of lightweight concrete bricks is lower, with a total price of IDR 4,380,830.78 compared to precast concrete walls, IDR 4,558,123,752.63 when compared in total. Lower floors have reduced prices for lightweight concrete bricks compared to a per-floor basis. In contrast, higher floors have a lower total price for using precast concrete walls. The finding produced in this research paper may improve the technological and economic sides of housebuilding in Indonesia.
"
Depok: Fakultas Teknik Universitas Indonesia, 2022
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Heri Surya Nugraha
"ABSTRAK
Estimasi biaya bertujuan untuk mengetahui besarnya dana yang harus disediakan pada proyek. Ketidaktepatan akurasi estimasi tahap desain mengakibatkan tingginya resiko kegagalan proyek pada tahap pelaksanaan. Penelitian ini bertujuan untuk menganalisis faktor risiko yang berpengaruh dalam proses estimasi biaya tahap desain pada Proyek Pembangunan Jalan Layang Non Tol dan mendapatkan tindakan korektif agar kinerja biaya meningkat. Hasil penelitian didapatkan tiga variabel yang mempunyai hubungan linier dengan tingkat korelasi kinerja estimasi biaya yaitu : Perubahan Kebijakan Pemerintah, Perubahan Spesifikasi Teknis dari Owner, Kenaikan Nilai Tukar Uang. Setelah mengetahui variabel yang paling berpengaruh maka diharapkan adanya pengelolaan risiko sehingga akurasi estimasi dapat tercapai.

ABSTRAK
Estimated costs aimed to determine the amount of funds that must be provided to the project. Inaccuracy design phase estimation accuracy results in a high risk of project failure in the implementation phase. This study aims to analyze the risk factors that affect the cost estimation process at the design stage of the Project Development Non-Toll Road Flyover and get the corrective actions in order to increase cost performance. The results showed that the three variables have a linear relationship with the level of performance correlation estimated costs are: Changes in Government Policies, Changes in Technical Specification of the Owner, Increase in Exchange Rate. After learning the most influential variable it is expected that the presence of risk management so that the accuracy of estimation can be achieved."
Jakarta: Fakultas Teknik Universitas Indonesia, 2014
T42824
UI - Tesis Membership  Universitas Indonesia Library
cover
Hendri Dwi Saptioratri Budiono
"Estimasi biaya produk manufaktur pada early phase of design process berguna dalam mempercepat waktu produk ke pasar, mengurangi biaya, dan meningkatkan kualitas untuk menghasilkan produk dengan tingkat daya saing yang tinggi di pasar bebas. Model estimasi biaya yang saat ini ada masih mendasarkan perhitungannya pada suatu disain yang sudah diputuskan sehingga sulit untuk diterapkan pada tahap awal proses design karena minimnya informasi.
Kecepatan dan keakurasian perkiraan biaya didapat dengan terlebih dahulu dikembangkan persamaan umum untuk menghitung besar kompleksitas proses pemesinan, ypcx = a*ln(xvol)+b dan persamaan umum untuk menghitung waktu pemesinan, ytime = c*{a*ln(xvol)+b}+d yang didasarkan atas feature produk yang bervariasi. Besar biaya didapat dengan memanfaatkan waktu pemesinan yang didapat untuk menghitung biaya langsung dan biaya tak langsung dari suatu produk. Hasil implementasi model pada rancangan produk SPMF menghasilkan perbedaan waktu pemesinan total sebesar 28,9 menit, sedangkan perhitungan Siemens-Nx menghasilkan total waktu pemesinan sebesar 25,9 menit atau turun (berbeda) sebesar 10%.
Hasil uji klarifikasi terhadap perkiraan harga dari beberapa industri pemesinan memperlihatkan bahwa model dapat menghasilkan perkiraan harga dibawah perkiraan terendah yang dilakukan oleh industri sebesar 6%. Selain uji klarifikasi juga menghasilkan suatu template struktur biaya yang akan memudahkan industri dalam melaksanakan proses estimasi biaya.

Product manufacturing cost estimation in the early stages of the design process is useful for accelerating product time to market, reducing costs, and increasing quality in order to obtain products with high level of competitiveness in the free market. Complexity and machining cost are important things to estimate final cost of the product. However, the current cost estimation model only considers its calculation based on design which has been determined before, so that it is difficult to apply in early design process because of minimum information.
The speed and accuracy of cost estimates obtained by first developed a general equation for calculating the complexity of machining processes, ypcx = a * ln (xvol) + b and a general equation for calculating the machining time, ytime = c * {a * ln (xvol) + b } + d that developed from variations of product features. Estimated cost is calculated by utilizing the machining time obtained to calculate the cost of direct and indirect costs of a product. Implementation of the model on the product SPMF produce differences in total machining time of 28.9 minutes, while the Siemens-Nx calculation resulted in a total machining time of 25.9 minutes or decrese by 10%.
The result of a clarification test done with some of the machinery industry about cost estimation show that the model can produce estimates of a price below the lowest estimate made by the industry amounted to 6%. In addition to clarifying the test also produced a template cost structure that will allow the industry to implement cost estimation process.
"
Depok: Fakultas Teknik Universitas Indonesia, 2014
D2153
UI - Disertasi Membership  Universitas Indonesia Library
cover
Harridi Ilman Tovid
"ABSTRAK
Pembuatan estimasi biaya yang efektif dipengaruhi oleh dua faktor; aplikasi
hitung yang digunakan dan estimator itu sendiri. Seorang estimator yang mahir
akan menentukan akurasi estimasi biaya dan aplikasi hitung yang efektif akan
meningkatkan kecepatan pembuatannya serta akurasi perhitungannya akan semakin
baik. Di sisi lain, menurut Data Statistik Lembaga Pengembangan Jasa Konstruksi,
sekitar 88% kontraktor Indonesia adalah kontraktor kecil. Dengan perdagangan
bebas Masyarakat Ekonomi Asean yang telah diberlakukan, tantangan bagi
kontraktor kecil Indonesia untuk bersaing akan semakin besar.
Dengan kedua alasan tersebut, penulis merancang Breakdown untuk
meningkatkan daya saing kontraktor kecil Indonesia sebagai aplikasi pembuatan
estimasi biaya penawaran. Breakdown dirancang dengan memperhatikan faktor
pembuatan estimasi biaya, kebutuhan kontraktor kecil dan aplikasi yang sudah ada.
Aplikasi ini dibangun berbasis Javascript dengan framework Webix. Metode
Hallway Testing telah dilakukan untuk menguji coba purwarupa aplikasi ini dan
didapatkan kesimpulan bahwa aplikasi ini sesuai dengan tujuannya dan mudah
digunakan.

ABSTRACT
There are two factors in order to achieve an effective cost estimation;
calculation application that being used and also by the estimator itself. A capable
estimator will determine the accuracy of a cost estimation and a good calculation
application will increase the speed and further calculation accuracy. On the other
side, according to statistical data from Lembaga Pengembangan Jasa Konstruksi
(Institution of Construction Services), about 88% of Indonesian contractors are
small contractors. In accordance of Asean Economic Community program applied,
Indonesian small contractors are faced with bigger challenge.
With those reasons in mind, the writer designed the Breakdown to increase
Indonesian small contractors? competitiveness as a bidding cost estimation
application. Breakdown is designed with consideration from cost estimation factors,
small contractors? needs and other application that was already available. This
application is built based on Javasript and Webix framework. Hallway Testing
method has been applied to test the prototype of the application which result a
conclusion that this application has achieved its purposes and easy to use.;"
2016
S65577
UI - Skripsi Membership  Universitas Indonesia Library
cover
Gultom, Iwan Daniel
"ABSTRAK
Pada proyek EPC Migas sering mengalami pembengkakan biaya yang diakibatkan tidak tepatnya perhitungan biaya kontingensi yang didasarkan kepada persentase
terhadap total biaya/estimasi proyek secara keseluruhan. Penelitian ini
menentukan pemodelan bagi estimasi biaya kontingensi dengan kombinasi range
estimating dan fuzzy logic untuk menentukan risiko terbesar dalam pengaruh dan
hubungannya terhadap besar nilai kontingensi pada proyek EPC berdasarkan risk
register (daftar yang berisikan risiko, mitigasi risiko,dampak serta frekuensi risiko
yang kemungkinan akan terjadi pada suatu proyek EPC) pada suatu pelaksanaan
proyek migas berdasarkan pengalaman yang telah dilaksanakan sebelumnya
oleh perusahaan R agar dapat menjadi referensi dalam penentuan besaran cot
contingency. Penentuan biaya kontingensi ini dengan range estimate dan
dilanjutkan dengan fuzzy logic dengan Matlab 2015a. Cost Contingency yang
didapat diaplikasikan dengan proyek yang diteliti dan sesuai dengan aktual
dengan penyimpangan yang cukup minim dengan asumsi risiko terbesar adalah
asumsi yang berubah, rework serta kompetensi yang kurang di dalam team proyek

ABSTRACT
EPC Oil & gas project always have cost overrun since the imprecise cost
contingency estimation which based on the percentage of the project total cost. In
the Oil & Gas EPC projects often experience cost overruns due to inaccurate
calculations contingency fee based on the percentage of the total cost / estimated
overall project. This study determines the modeling for the estimated costs of
contingency with a combination of range Estimating and fuzzy logic to determine
the greatest risk in influence and its relation to the great value of contingency on
EPC projects based on risk register (register containing risk, risk mitigation,
impact and frequency of risk that is likely to happen on a project EPC) at an oil
and gas project implementation based on the experience that has been carried out
previously by the company in order to be implemented as reference for
estimating cost contingency. Determining the cost of this contingency with a
range estimate and continued with fuzzy logic with Matlab 2015a. Cost
Contingency obtained was applied to projects studied and correspond to actual
deviations are quite minimal with bigger risks are changing of engineering
asumptions, re-work & lack of competence in project team"
2016
T46212
UI - Tesis Membership  Universitas Indonesia Library
cover
Chalos, Peter
Englewood Cliffs, New Jersey: Prentice-Hall, 1992
658.1552 CHA m
Buku Teks  Universitas Indonesia Library
cover
Boston: Massachusetts Harvard Business School Press, 1988
658.155 COS (1)
Buku Teks  Universitas Indonesia Library
cover
Jennyvera
"Estimasi biaya konseptual merupakan hal yang fundamental dalam suatu proyek konstruksi. Estimasi ini menentukan kelayakan, evaluasi desain dan pendanaan proyek. Namun, kurangnya informasi dan gambar desain yang belum lengkap pada tahapan konseptual, membuat estimasi ini sulit untuk dilakukan. Penelitian ini mencoba membuat suatu permodelan estimasi biaya konseptual pada proyek rusunawa dengan mengintegrasikan metode Case-based reasoning (CBR) dan Analytical Hierarchy Process (AHP). Penelitian ini menggunakan 55 data historis proyek rusunawa yang tersebar di 19 kota di Indonesia pada tahun 2008 sampai 2011. Hasill penelitian ini menunjukkan bahwa metode CBR-AHP dapat menghasilkan permodelan estimasi biaya konseptual yang memiliki keakurasian yang baik dengan tingkat error rata-rata sebesar 2,88% dan dapat digunakan untuk mengestimasi biaya proyek rusunawa di masa mendatang.

Conceptual cost estimation plays an important role in the construction projects. This estimation will determine the project‟s feasibility, design evaluation and preliminary budget for a projects. However, due to the lack of information and incomplete construction drawings during the conceptual phase, the cost estimation becomes difficult task to do. This research aims to develop a conceptual cost estimation modeling in the low-cost housing projects using integrated method of Case-based reasoning (CBR) and Analytical Hierarchy Process (AHP). This study is conducted using 55 low-cost housing projects in 19 cities throughout Indonesia in year 2008 to 2011. The result shows CBR-AHP method can produce accurate model result with average testing error rates of 2,88% which can be used to predict low-cost housing projects cost later on.
"
Depok: Fakultas Teknik Universitas Indonesia, 2013
T45387
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>