cover
Irawan Saptoargo
"The Impact of Contractor's Role in Improving the Constructability of the Design-Construct ProjectIn 1982 The Business Roundtable's Construction Industry Cost Effectiveness (LICE) identify one important aspect is that construction too often is relegated to operate as production function separated from financial planning, scheduling, and engineering or architectural design. The involvement of construction experts is delayed until the design is so far along that changes would be so disruptive as to increase cost. The traditional construction contracting method made this division even further. The construction contractor would only be engaged in the project after the designer completed their design.
By separate design and construction, opportunities to reduce project costs and schedules by using existing and new construction technology are lost. Significant savings in both the costs and time required to complete the project can be accrued from integration of construction expertise into all phases of project. The Construction Industry Institute's (CII) Task Force defines this term as Constructability, which is the optimum integration of construction knowledge and experience in planning, engineering, procurement, and field operations to achieve overall project objectives.
This thesis study the role of contractor's in improving the constructability of the design-construct project which leads to an improving project cost performance of construction project in Indonesia. A questionnaire survey was distributed to projects contractor's in Jakarta area. The data obtained was analyzed quantitatively to find the correlation and to make a regression between the role contractor's in improving the constructability of the design-construct project and the performance of construction project's cost.
The result of this research show a positive, linear correlation between the interface of contractor's in improving the constructability of the design-construct and cost performance of the project. The main variables are: pro-actively involved in developing project plans and plan the sequence of field task to improve productivity.
"
Depok: Fakultas Teknik Universitas Indonesia, 2001
T8981
UI - Tesis Membership  Universitas Indonesia Library
cover
Sugih Pranoto Aji
"In order to increase the quality of Project implementation much research will need to be carried out in Indonesia and abroad. In 1960 the Government of UK identified many construction projects that were not able to increase the communication and coordination between the design and construction phase. The concept of build ability arose in 1979 in order to enhance the design process by inputting the construction method during the design phase. The Construction Industry Research Information Association (CIRIA) has defined build ability as follows: "the extent to which the design of a building facilitates ease of construction, subject to overall requirements for the completed building?.
Project (CICE) researched into the increasing of quality, efficiency, productivity and cost effectiveness in the construction projects. The research estimates that constructability improvements saved at least 10-20 times the cost of the constructability effort. The Construction Industry Institute, Austin, USA in 1986 defined constructability as ?the optimum use of construction knowledge and experience in planning, engineering, procurement and field operations to achieve overall project objectives?.
The research, which is a partial requirement for a Master degree in construction management at the University of Indonesia, was aimed at understanding the coordinating position and influence of the owner of projects for improving constructability during conceptual planning phase.
The research proceeded to study into the impact of owner contribution for improving constructability during conceptual planning phase. In order to further understand such owner contribution, its impact on project construction cost performance was measured and quantified.
Data of projects constructed in Indonesia were then obtained through questionnaires from official owner representatives of companies hi Jakarta. Variables in the questionnaire which represented owner quality contribution were then correlated to the same project cost performance variable.
In depth analysis of the correlation were then carried out to build regression models of the relationship between quality of owner contribution during conceptual planning phase to project cost performance.
The statistical including validation test needs were also carried out in order to provide the guidelines for increasing knowledge in constructability for future projects in Indonesia.
"
Depok: Fakultas Teknik Universitas Indonesia, 2000
T666
UI - Tesis Membership  Universitas Indonesia Library
cover
Simanjuntak, Sheba Hartaty
"Bangunan konstruksi dapat menghasilkan rancangan yang baik, bila awalnya telah dipikirkan bagaimana cara membangunnya. Kegagalan konsultan perencana memperkirakan bagaimana suatu rancangan dibangun oleh kontraktor dapat menyebabkan permasalahan yang menimbulkan kenaikan biaya dan keterlambatan jadwal pelaksanaan konstruksi. Permasalahan tersebut dapat diselesaikan dengan constructability yaitu dengan melibatkan tenaga ahli konstruksi yang berpengetahuan dan berpengalaman untuk ikut serta dan memberi masukan pada tahap perancangan. Hal ini lebih menjamin agar rancangan disusun dengan menggunakan metode dan teknologi yang dapat diterapkan oleh kontraktor.
Penelitian ini dilakukan dengan mengirimkan kuesioner ke berbagai perusahaan konsultan perencana yang berada di wilayah Jabotabek. Dan hasil penyebaran kuesioner diperoleh 30 kuesioner dan 50 kuesioner yang diterima kembali untuk dianalisis dengan menggunakan program SPSS.
Hasil analisis dengan model regresi berganda dapat menggambarkan adanya hubungan korelasi positif yang sangat kuat antara variabel-variabel peningkatan constructability pada perancangan oleh konsultan perencana dengan kinerja biaya. Model regresi berganda terdiri dari 3 (tiga) variabel penentu yang mempengaruhi kinerja biaya berdasarkan penilaian terhadap sampel dan koordinator proyek dari perusahaan konsultan perencana, yaitu :
1. Menyesuaikan pendekatan rancangan dengan metode konstruksi,
2. Mendefinisikan secara jelas batasan kontraktor dalam dokumen perancangan, dan
3. Secara aktif meminta masukan dari personil konstruksi pada setiap tahapan dan proses perancangan.
Dan hasil penelitian ini, peningkatan constructability pada perancangan dapat digunakan untuk menghasilkan kualitas rancangan yang dapat meningkatkan kinerja biaya pada pelaksanaan proyek-proyek konstruksi di Indonesia di masa mendatang.

Influence of Constructability Improvement in Design Phase to Project Cost Performance of Construction Projects in IndonesiaConstruction building could to products a good design, if the early to think how in manner to be constructed. Failure of designer to consider how the design should be implemented by contractor can result in scheduling problems and delays during the construction process. That problems could be solved with constructability namely by the construction expert involved who had knowledge and experience to joint and seek construction input in design. This has more to warrant in order that design to arrange by using technology and method that could apply of contractor.
This research has done in the designer companies with sent some questionnaires to several of designer companies in Jabotabek. From questionnaires spread result 30 from 50 questionnaires received to be viable analysis with used SP SS program.
The result of multiple regression analysis model shows that influence constructability improvement in design of designer will improving project cost performance. Multiple regression models has 3 of key variables influencing in cost performance carried out by estimates from persons of construction expert or project coordinator in designer's firm are:
(1) Integrate design approach with construction method,
(2) Clearly define contractor interface in the design document, and
(3) Actively seek construction input to all stages of the design process.
From these research resulted, construction improvement in design can be used to obtain the quality of design result that cost performance can be improvement in operation of projects construction in the future of Indonesia construction project.
"
Depok: Fakultas Teknik Universitas Indonesia, 2000
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Erman Surya Bakti
"Meningkatnya persaingan dan tuntutan efisiensi pada industri konstruksi menuntut adanya pengendalian mutu yang dikombinasikan dengan aspek ekonomis dan jadwal proyek. Hal ini memotivasi berbagai penelitian yang menghasilkan teknik-teknik peningkatan mutu dan efisiensi/efektifitas dari sebuah proyek seperti total quality management, value engineering, designability, contractability, constructability, operability, maintainability dan sebagainya. Penelitian ini bertujuan untuk mengetahui dan menganalisa salah satu peningkatan mutu proyek konstruksi yaitu penerapan peningkatan constructability pada tahap perencanaan dan perancangan proyek. Pendekatan ini dilakukan karena besarnya pengaruh perencanaan dan perancangan terhadap kualitas, biaya dan waktu pelaksanaan proyek secara keseluruhan. Pelaksanaan penelitian studi kasus ini dilakukan pada sebuah perusahaan nasional yang bergerak di bidang industri konstruksi dengan pola design and build dimana penelitian difokuskan pada pemahaman, pelaksanaan, keuntungan, dan hambatan constructability di perusahaan tersebut dan dua buah proyek yang dijadikan studi kasus. Jenis penerapan constructability secara informal yang didapat pada studi kasus ini diindikasikan oleh tidak adanya prosedur tertulis tentang constructability, rendahnya tingkat lesson learned, tidak adanya koordinator constructability yang ditunjuk secara resmi, masih banyaknya hambatan pelaksanaan dan tidak adanya pencatatan kinerja constructability. Walaupun demikian pada pelaksanaan constructability secara informal ini, bahwa penerapan constructability pada tahap perencanaan dan perancangan terbukti meningkatkan kinerja proyek konstruksi, dengan variabel yang paling berpengaruh adalah penjadwalan berdasarkan construction sensitive dan fasilitas desain dalam mengefisienkan konstruksi."
Depok: Fakultas Teknik Universitas Indonesia, 2002
T1106
UI - Tesis Membership  Universitas Indonesia Library
cover
Waldy Rahman Ziliwu
"Pelaksanaan pekerjaan dalam industri konstruksi dipengaruhi oleh berbagai faktor, diantaranya yaitu biaya, waktu dan kualitas. Keefektifan dan efisiensi dalam pelaksanaan merupakan masalah yang sering dihadapi kontraktor dalam melaksanakan suatu proyek konstruksi. Seberapa baikpun perencanaan yang telah dilakukan, pada tahap pelaksanaan selalu terjadi perubahan yang mengakibatkan keterlambatan dalam penyelesaian. Untuk menghindari atau mengurangi kemungkinan kesalahan dan rework dalam proses konstruksi maka keterlibatan kontraktor pada semua tahapan konstruksi sangat diperlukan. Keterlibatan personel konstruksi pada tahap perencanaan dan perancangan dapat memberi masukan dan pengalaman untuk dapat diimplimentasikan pada tahap pelaksanaan konstruksi. Dengan keterlibatan personel konstruksi pada semua tahapan konstruksi, kontraktor diharapkan dapat mengendalikan pelaksanaan proyek yang berhubungan dengan biaya, waktu dan kualitas tersebut.
Penelitian ini bertujuan untuk mengidentifikasi untuk mengidentifikasi faktor-faktor yang berkaitan dengan peran kontraktor dalam meningkatkan constructability terutama pada tahap pelaksanaan konstruksi serta pengaruhnya terhadap kinerja proyek.
Dalam penelitian ini, metode yang digunakan adalah metode studi kasus, dimana dilakukan peninjauan langsung terhadap suatu proyek dengan mengumpulkan data dan informasi yang mempengaruhi peningkatan constructability pada proyek konstruksi tersebut. Konsep constructability merupakan konsep yang memungkinkan keterlibatan personel konstruksi dalam semua tahapan konstruksi. Penerapan konsep ini memungkinkan peningkatan produktivitas dan kinerja proyek secara keseluruhan.

Construction process influenced by various factor, among others that are cost, quality and time. Effectiveness and efficiency in construction process are problems often faced by contractor. No matter how good the planning was, changes that resulted in delay in finishing always occur in the process phase. To avoid or lessen the possibilities of mistake and rework in the course of construction process, hence involvement of contractor are needed in every construction step. Involvement of construction personnel at planning and design phase can give experience and input to be further implemented in the process phase of the construction. With the involvement of construction personnel at all construction steps, contractor is expected to control the project execution which is related to cost, quality and time.
This research aims to identify the factors related to the role of contractor in improving constructability especially in process phase of construction and also its influence to project performance.
In this research, the method used is the case study method, where a project is directly evaluated by collecting information and data which influence the improvement of constructability in the construction project. The constructability concept is a concept that enables the involvement of construction personnel in every construction step. Application of this concept can increase the performance and productivity of a project as a whole.
"
Depok: Fakultas Teknik Universitas Indonesia, 2006
S35264
UI - Skripsi Membership  Universitas Indonesia Library
cover
Dwi Handaya
"Pendahuluan: Kecelakaan di industri sebagian besar terjadi pada pegawai kontraktor. Perusahaan X berusaha rnenangani kecelakaan kerja kontraktor dengan cara mengeluarkan program CSMS (Contractor Saftty Managemem System). Empat tahun program berjalan masih memberik:an prosentase kecelakaan terbesar pada kontraktor, sehingga menimbulkan pertanyaan sejauh mana komitmen kontraktor dalam menjalankan program ini.
Metode: Penelitian deskriptif analitik untuk mcrtgetahui tingkat komitmen kontraktor dengan variable identitikasi, keterllbatan dan loyalitas. Alat yang di gunakan dengan quisioner dan wawancara,
Hasil: 20C.4 kontraktor bemda pada komitmen tinggi, 40% komitmen moderat dan 40% komitmen rendah. Kontraktor yang mempunyai jenis kontrak jangka panjang mempunyai tingkat komitmen yang lebih tinggi, Standar K3 di perusahaan kontraktor belum terbentuk, laporan klnerja K3 jarang di buat, belum ada sistem audit pada program K3 kontraktor, sedikit kontraktor yang terlibat dalam even K3 di perusahaan X. Keterbatasan SDM di kontraktor harus di bantu oleh manajemen perusahaan X. Kontraktor jangka pendek harus di perlakukan dan di drive dengan lebih ketar oleh mannjemen X."
Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2007
T21025
UI - Tesis Membership  Universitas Indonesia Library
cover
Fransiska Maria Farida
"Keberhasilan penyelenggaraan proyek konstruksi ditentukan oleh kemampuan para pelaku utamanya (tim proyek pemilik, kontraktor dan konsultan. dan tersedianya perangkat yang lengkap dan berkualitas. Pada zaman dahulu kontraktor mengerjakan hampir sebagian besar pekerjaan konstruksi. Pada saat ini pada tahap konstruksi kira. kira 80. pekerjaan diserahkan ke subkontraktor. Akibatnya subkontraktor memainkan peranan penting dalam industri konstruksi dimana proyek bangunan gedung bertingkat tinggi kira-kira 80-90. pekerjaan dikerjakan oleh subkontraktor. Sehingga pengelolaan subkontraktor oleh kontraktor utama sangat diperlukan. Berdasarkan pada hal ini, maka dilakukan penelitian mengenai pengelolaan subkontraktor dengan menyebarkan kuesioner yang berisi. hal yaitu. pemilihan subkontraktor, perjanjian dengan subkontraktor, persiapan pekerjaan subkontraktor dan penyelesaian pekerjaan subkontraktor. Data yang didapat dari hasil penyebaran ini kemudian diolah secara statistik dengan program SPSS 9.01 untuk mendapatkan variabel. variabel yang menentukan. Dari hasil pengolahan SPSS9.01 didapat variabel penentu adalah pengawasan pekerjaan. X34. dan penempatan pengawas yang sesuai dengan kemampuannya. X33 ). Variabel lain diluar. variabel penentu ini dicari dengan menggunakan dummy, didapat variabel pengaturan change orders sejak kontrak awal. X30 ). Akibat dari sampel yang didapat kecil (18 sampel ), maka perlu untuk diuji kembali apakah hasil yang didapat dapat mewakili populasi yang sedemikian besar tersebut. Pengujian dilakukan dengan menggunakan simulasi Monte Carlo. Berdasarkan hasil simulasi tersebut didapat bahwa pada saat 68. data ke. 3 variabel penentu memiliki mean/rata. rata pada skala penilaian =3. biasa dilakukan tapi tidak rutin ), artinya pada skala penilaian 3( biasa dilakukan tapi tidak rutin. sangat berpengaruh. terhadap pengelolaan subkontraktor, persamaan tidak berlaku pada skala penilaian. ( sama sekali tidak pernah dilakukan ), persamaan berlaku pada skala penilaian antara. ( dilakukan sesekali saja. sampai. ( merupakan prosedur standar yang selalu dilakukan ), Apabila tidak ada pengawasan, tidak ada penempatan pengawas sesuai kemampuan dan tidak ada pengaturan change orders dikontrak awal, maka sangat berpengaruh. pengaruh sebesar 100. ) dan apabila selalu ada pengawasan setiap saat, pengawas selalu ditempatkan sesuai kemampuannya dan ada pengaturan secara detail change orders dikontrak awal, maka tidak berpengaruh terhadap kinerja waktu subkontraktor. berpengaruh. % ).

The success of handle construction project depends on the ability from owner's project team, contractor and consultant. In the traditional day, contractor handles almost all of construction work. In modern days, contractor gives about 80% from all the construction work to subcontractor. The consequence from this trend is make subcontractor play an important part in construction industry, which subcontractor handle about 80% from all of high rise building project work. From all of this, it's very important for contractor to manage its subcontractor. With this review, the writers do research about managing subcontractor with spreading the questioner. There are five important things in the questioner. All of them are about choosing subcontractor, the dealing with subcontractor, the preparing, finishing step and the payment. We use SPSS 9.01 to handle all of data to get some determinant variables. There are three determinant variables that we got. There are controlling, using the right controller and change order. We just have little sample (eighteenth samples), so we need to check whether the sample can explain the population. We use Monte Carlo simulation to do this and we get that three variables can explain the population.
"
Depok: Fakultas Teknik Universitas Indonesia, 2001
T1904
UI - Tesis Membership  Universitas Indonesia Library
cover
Ahmad Wanhar
"Pada tahun 1990, berbagai perusahaan industri konstruksi mulai menyadari bahwa manajemen proyek adalah bukan sebuah pilihan melainkan sebuah kebutuhan. Oleh karena itu perlu dilakukan analisis faktor risiko dalam aspek manajemen proyek. Referensi utama manajemen proyek pada skripsi ini adalah PMBOK (Project Management Body of Knowledge). Penelitian kali ini dilakukan dengan penyebaran kuisioner yang dilanjutkan dengan analisis menggunakan metode AHP dan SNI risiko. Setelah analisis selesai maka dilakukan pembahasan mengenai penyebab, dampak, respon preventif dan korektif. Hasil penelitian ini menunjukkan bahwa faktor risiko yang paling berpengaruh terhadap cost overrun terletak pada kelompok proses manajemen perencanaan. Apabila perencanaan dilakukan dengan baik dan matang maka eksekusi, pengawasan, dan penutupan akan berjalan dengan baik sehingga kinerja biaya proyek akan baik. Keberhasilan kinerja proyek 60% tergantung pada perencanan.

In 1990, companies began to realize that the construction industry project management is not an option but a necessity. Therefore it is necessary to analyze the risk factors in the project management aspects. The main reference for project management of this final report is the PMBOK (Project Management Body of Knowledge). The research was conducted by distributing questionnaires, followed by analysis using AHP and SNI risk. Once the analysis is completed, then continued with discussions for the causes, effects, preventive and corrective response. Results of this study showed that the risk factors that most affect the cost overrun is planning management process group. If planning did well and properly, the execution, monitoring, and closure will run well so that the performance of the project cost would be good. The successful performance of the project 60% depending on the planning."
Depok: Fakultas Teknik Universitas Indonesia, 2013
S47148
UI - Skripsi Membership  Universitas Indonesia Library
cover
A. Sutjipto
"Krisis ekonomi yang telah melanda Indonesia sejak pertengahan tahun 1997 telah menimbulkan dampak yang sangat berat dan bahkan sampai merusak sendi-sendi perekonomian nasional.
Berbagai usaha pemerintah telah dilakukan untuk pemulihan ekonomi, khususnya untuk menggerakkan sektor rill yang secara langsung menyangkut kehidupan orang banyak. Diantara berbagai sektor, Sektor Konstruksi merupakan sektor yang paling dinamis, selain merupakan industri yang padat karya, Industri Jasa Konstruksi melibatkan berbagai kegiatan usaha baik dalam industrinya sendiri maupun industri lainnya, yaitu Industri Bahan Bangunan, Industri Peralatan bangunan, Industri Peralatan Konstruksi, Lembaga-lembaga Keuangan, Perbankan dan Asuransi.
Banyaknya industri yang terlibat dalam kegiatan Industri Konstruksi telah menjadikan sektor Konstruksi sebagai penggerak perekonomian karena sektor Konstruksi dapat menimbulkan dampak pengganda atau "multiplier effect" yang sangat berguna dalam pertumbuhan ekonomi nasional.
Melalui simulasi dalam penelitian ini, dampak pengganda tersebut dapat dibuktikan bahwa pada simulasi I (SI) dengan peningkatan investasi sebesar Rp 125 triliun telah menciptakan output dalam perekonomian nasional sebesar Rp 197 triliun (11,1%) dan Nilai Tambah Bruto Rp 89 triliun (8,6%) serta Peningkatan Tenaga Kerja sebanyak 6,213 juta orang. Sedangkan pada simulasi II (S2) dengan peningkatan investasi sebesar Rp 214 triliun telah menciptakan output sebesar Rp 337 triliun (19%) dan Nilai Tambah Bruto sebesar Rp 152 triliun (14,8%) serta Peningkatan Tenaga Kerja sebanyak 10,650 juta orang.
Dengan kemampuan seperti tersebut diatas dan pertumbuhan kontribusi Industri Konstruksi dalam Produk Domestik Bruto yang tinggi (12%) sebelum terjadinya krisis ekonomi, telah menjadi bukti bahwa industri memang telah berperan menjadi penggerak ekonomi atau "engine of growth" dalam perekonomian nasional. Hasil temuan dalam penelitian akan dapat menjadi masukan yang sangat berguna bagi penentu kebijakan investasi pemerintah dalam pemulihan ekonomi nasional."
Depok: Universitas Indonesia, 2001
T7552
UI - Tesis Membership  Universitas Indonesia Library
cover
Mohamad Wafi
"Dalam pengembangan UKM sektor konstruksi kita akan dihadapkan pada faktor-faktor yang selalu menjadi hambatan bagi UKM untuk mencapai kinerja yang maksimal. Faktor-faktor tersebut meliputi faktor internal, faktor eksternal makro dan mikro (pasar). Penerapan capacity building pada UKM sektor konstruksi di wilayah DKI Jakarta diharapkan dapat membangun sinergi positif antara masyarakat konstruksi dengan pemerintah yang menjadi basis bagi pengembangan jasa konstruksi sebagai sektor strategis yang dijadikan instrumen agar lebih berperan daiam penentuan arah pembangunan nasional dan didaerah dimasa yang akan datang.
Penelitian ini bertujuan untuk mengetahui resiko-resiko yang mempengaruhi kinerja dan penerapan capacity building pada UKM sektor konstruksi di Propinsi DKI Jakarta. Pengujian yang dipergunakan adalah untuk mengetahui faktor-faktor yang paling berpengaruh pada UKM sektor konstruksi yang menjadi dasar untuk penerapan capacity building dengan analisa deskriptif yang berasal dari perhitungan statistik basil kuisioner terhadap responden. Dari hasil analisis didapatkan 12 faktor yang berpengaruh pada kinerja UKM sektor konstruksi di Propinsi DKI Jakarta."
Depok: Fakultas Teknik Universitas Indonesia, 2006
T16081