Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 72662 dokumen yang sesuai dengan query
cover
A. Sutjipto
"Krisis ekonomi yang telah melanda Indonesia sejak pertengahan tahun 1997 telah menimbulkan dampak yang sangat berat dan bahkan sampai merusak sendi-sendi perekonomian nasional.
Berbagai usaha pemerintah telah dilakukan untuk pemulihan ekonomi, khususnya untuk menggerakkan sektor rill yang secara langsung menyangkut kehidupan orang banyak. Diantara berbagai sektor, Sektor Konstruksi merupakan sektor yang paling dinamis, selain merupakan industri yang padat karya, Industri Jasa Konstruksi melibatkan berbagai kegiatan usaha baik dalam industrinya sendiri maupun industri lainnya, yaitu Industri Bahan Bangunan, Industri Peralatan bangunan, Industri Peralatan Konstruksi, Lembaga-lembaga Keuangan, Perbankan dan Asuransi.
Banyaknya industri yang terlibat dalam kegiatan Industri Konstruksi telah menjadikan sektor Konstruksi sebagai penggerak perekonomian karena sektor Konstruksi dapat menimbulkan dampak pengganda atau "multiplier effect" yang sangat berguna dalam pertumbuhan ekonomi nasional.
Melalui simulasi dalam penelitian ini, dampak pengganda tersebut dapat dibuktikan bahwa pada simulasi I (SI) dengan peningkatan investasi sebesar Rp 125 triliun telah menciptakan output dalam perekonomian nasional sebesar Rp 197 triliun (11,1%) dan Nilai Tambah Bruto Rp 89 triliun (8,6%) serta Peningkatan Tenaga Kerja sebanyak 6,213 juta orang. Sedangkan pada simulasi II (S2) dengan peningkatan investasi sebesar Rp 214 triliun telah menciptakan output sebesar Rp 337 triliun (19%) dan Nilai Tambah Bruto sebesar Rp 152 triliun (14,8%) serta Peningkatan Tenaga Kerja sebanyak 10,650 juta orang.
Dengan kemampuan seperti tersebut diatas dan pertumbuhan kontribusi Industri Konstruksi dalam Produk Domestik Bruto yang tinggi (12%) sebelum terjadinya krisis ekonomi, telah menjadi bukti bahwa industri memang telah berperan menjadi penggerak ekonomi atau "engine of growth" dalam perekonomian nasional. Hasil temuan dalam penelitian akan dapat menjadi masukan yang sangat berguna bagi penentu kebijakan investasi pemerintah dalam pemulihan ekonomi nasional."
Depok: Universitas Indonesia, 2001
T7552
UI - Tesis Membership  Universitas Indonesia Library
cover
Hari Gumuruh Soeparto
"ABSTRAK
Dengan telah ditandatanganinya perjanjian perdagangan bebas dan telah diratifikasi oleh Dewan Perwakilan Rakyat, industri konstruksi nasional Indonesia akan semakin terancam, apabila tidak segera melakukan perbaikan-perbaikan yang mendasar. Pada saat ini Industri Konstruksi Nasional masih belum benar-benar siap dalam menghadapi perdagangan bebas dan globalisasi, karena masih rendahnya daya saing, yang ditunjukkan oleh masih rendahnya produktifitas Industri Konstruksi. Melihat kenyataan ini dirasa perlu untuk mencari sebab-sebab mengapa produktifitas industri konstruksi tersebut masih rendah, kemudian dicarikan jalan agar produktifitas tersebut dapat meningkat. Untuk mencari jawaban atas pertanyaan tersebut maka dilakukan penelitian ini. Definisi masalah dilakukan dengan penelitian exploratory menggunakan sarana-sarana wawancara naratif dan statistik deskriptif serta statistik interferensi. Pada penelitian kedua pemodelan dilakukan dengan menggunakan Soft System Dynamic Methodology dan untuk mengestimasi parameter digunakan metoda Structural Equation Modeling, yang juga digunakan untuk melakukan confirmatory factor analysis. Dari hasil penelitian dapat disimpulkan bahwa sebuah hasil produksi berasal dari sarana produksi yang terdiri dari: ketersediaan teknologi, sumber daya manusia, tenaga kerja dan peralatan. Unsur-unsur ini terpadu dan bekerja sama untuk menghasilkan hasil produksi. Pertanyaan berikutnya adalah dari mana sebenarnya datangnya sarana produksi tersebut, hal tersebut ditentukan oleh arah investasi yang dilakukan oleh para pelaku industri, dan bagaimana pelaku industri menentukan keputusan investasi tersebut, hal ini akan tercermin pada rencana strategis masing-masing perusahaan. Apakah ia akan cenderung untuk lebih meningkatkan kemampuan dalam bidang pemasaran atau lebih meningkatkan kemampuan dalam pelaksanaan pekerjaan atau lebih meningkatkan kemampuan dalam bidang keahlian teknis tertentu atau lebih kepada penyediaan peralatan konstruksi. Dalam penentuan strategi ini para pelaku akan mempertimbangkan kondisi lingkungan industri, kondisi persaingan, besarnya pasar, kemudahan masuk ke dalam industri dan biaya transaksi ekonomi didalam industri tersebut. Biaya transaksi ekonomi dan kemudahan masuk industri disebabkan oleh kondisi sosial dan politik serta kondisi ekonomi dan tingkat penerapan ekonomi pengetahuan serta kinerja ekonomi dimana industri tersebut berada. Penelitian ini dilakukan dalam dua tahap penelitian yakni: pertama penelitian untuk menetapkan definisi masalah dan kedua penelitian untuk membangun model. Akar masalah sebenarnya ada pada kurang efektifnya kontribusi tenaga ahli dan managerial, produksi konstruksi lebih dominan dihasilkan oleh tenaga kerja langsung dan peralatan konstruksi. Para pelaku sendiri dalam menginterpretasikan usaha industri konstruksi ternyata lebih mementingkan manfaat jangka pendek dari pada jangka panjang. Penelitian ini menunjukkan bahwa mementingkan manfaat jangka pendek kurang menguntungkan bagi peningkatan produktifitas industri konstruksi nasional berkesinambungan, dibandingkan dengan memperhatikan manfaat jangka panjang.

ABSTRACT
ndonesia has become a member of World Trade Organization since 1996, this membership has been ratified by the parliament. Indigenous Indonesian Construction Industry will face a problem if they are not prepared to face this new situation. Due to its low competitiveness, to enable the indigenous construction industry, it is necessary to address the root of the cause. This research therefore was conducted to find the solution for this prolem and to indicate what were the root cause of the problem and to attack them as sson as possible. According to M. Porter the source of competitiveness is productivity. Productivity of construction industry can be calculated from production volume divided by the number of total construction workforce. The research were conducted in two steps, the purpose of the first step is to determine the problem of the Indonesian construction industry, within the context, the purpose of the second research is to build a soft system dynamics model, where parameters were calculated using structural equation modeling in order to simulate the construction aggregate productivity. Secondary data were collected from various sources such as World Bank Institute, Freedom House, International Corruption Watch, UNDP, Indonesian Bureau of Statistics and Bank Indonesia. Primary data were collected from Indonesian Construction Industry Players through a series of surveys. The findings of the study is that the production of construction industry can be calculated from the production function coined by Cobb Douglass, wherein parameters of the workforce and capital, that were appropriated from value shared for each of the variables. The parameter of available workforce and construction capital were determined by the investment strategy intention of industry players. Investment decision is determined during the course of strategic planning. The decision making choices were to invest in human resource for marketing and engineering, project management or in skill labour or in construction equipment. Which will be determined or at least influenced by the business environment like governance. As defined by the World Bank Institute the determining factors were: voices and accountability, political stability, effectiveness of the government, rules of laws, quality of rules, and control of coruption. Beside those factors, the industry players should also consider their perception on market size, the time horizon in which they will consider for strategic planning horizon, and severity of competition which will be determined by entry regulation, and transaction cost economy. Final results of the study are : Higher Educated Human Resources in construction industry are not effectively supporting the productivity of the industry, Indonesian Construction Industry Players tend to consider short term benefit than long term sustainability and growth, strategic planning time horizon contribute significantly in long term productivity, it is indicated that Indonesian Contractors are more involve in simple construction activities than the sophisticated ones. Therefore it is suggested that to improve productivity of Indonesian construction industry, There are several step to be taken: Orientation toward long term growth and planning horizon, marketing orientation toward more spohisticated project, empowerment of institution for collaboration in construction industry should be initiated, effective utilization of educated and skilled construction workers.."
2007
D1187
UI - Disertasi Membership  Universitas Indonesia Library
cover
Sitanggang, Axcel Dahlan
"Pertumbuhan ekonomi suatu negara selalu bersifat dinamis. Salah satu faktor yang berpengaruh dalam pertumbuhan ekonomi suatu bangsa adalah faktor industri konstruksi. Di dalam faktor industri konstruksi tersebut terdapat aspek tenaga kerja, dimana tujuan penelitian ini dilakukan untuk mengetahui sejauh mana pengaruh pendapatan tenaga kerja yang terdapat pada sektor industri konstruksi terhadap pertumbuhan ekonomi. Infrastruktur dalam industri konstruksi pada tesis ini dibagi kedalam empat (4) kategori sub-sektor industri konstruksi, yakni sub-sektor communication system (komunikasi), sub-sektor power supply (tenaga listrik), sub-sektor transportation system (transportasi) dan sub-sektor water supply (pengairan). Data yang diambil dari BPS (Biro Pusat Statistik), dikompilasi ke dalam empat kelompok sub-sektor industri konstruksi, dan dihitung nilai konstan dari setiap data yang diperoleh, kemudian diolah dengan paket program statistik (SAS/ETS system), dimana data-data dikelompokkan dalam beberapa variabel. Dalam proses perhitungan forecasting, dilakukan banyak pengulangan-pengulangan untuk memperoleh model yang akurat dan logis. Hasil yang diperoleh memberikan gambaran bahwa relatif kecil pengaruh kontribusi pertumbuhan ekonomi akibat perubahan pendapatan (upah) tenaga kerja pada setiap sub-sektor industri konstruksi. Terbukti bahwa industri konstruksi bersifat cyclical (siklus) dengan adanya gambaran bahwa sektor industri konstruksi diprediksi akan mengalami puncak kegiatan antara tahun 2007 sampai tahun 2011, untuk kurun waktu penelitian dari tahun 2001 sampai tahun 2013. Dari segi besarnya konsumsi, maka urutan sub-sektor kontruksi yang memiliki nilai paling besar adalah sub-sektor transportation system (transportasi), kemudian sub-sektor water supply (pengairan), selanjutnya sub-sektor power supply (tenaga listrik) dan yang terakhir adalah sub-sektor communication system (komunikasi). Dari segi rata-rata besarnya pertumbuhan, maka urutan sub-sektor yang paling besar adalah sub-sektor transportasi (- 12%), kemudian sub-sektor pengairan (± 8 %), selanjutnya sub-sektor komunikasi (± 5%), dan terakhir sub-sektor tenaga listrik (± 1 %). Bagi pelaku bisnis dalam industri konstruksi, temuan ini dapat menjadi informasi untuk mempersiapkan keterampilan tenaga kerjanya dalam mengantisipasi kondisi industri konstruksi antara tahun 2003 sampai 2013. Bagi ilmu manajemen konstruksi, dengan penelitian ini dapat memberikan wawasan dan gambaran tentang kondisi industri konstruksi dilihat dari segi ekonomi makro, dan menyadari peranan serta kontribusi ilmu ekonomi dalam perkembangan bidang ilmu manajemen konstruksi."
Depok: Fakultas Teknik Universitas Indonesia, 2001
T7551
UI - Tesis Membership  Universitas Indonesia Library
cover
Hari Gumuruh Soeparto
"Dengan telah ditandatanganinya perjanjian perdagangan bebas dan telah diratifikasi oleh Dewan Perwakilan Rakyat, industri konstruksi nasional Indonesia akan semakin terancam, apabila tidak segera melakukan perbaikan-perbaikan yang mendasar. Pada saat ini Industri Konstruksi Nasional masih belum benar-benar siap dalam menghadapi perdagangan bebas dan globalisasi, karena masih rendahnya daya saing, yang ditunjukkan oleh masih rendahnya produktifitas Industri Konstruksi. Melihat kenyataan ini dirasa perlu untuk mencari sebab-sebab mengapa produktifitas industri konstruksi tersebut masih rendah, kemudian dicarikan jalan agar produktifitas tersebut dapat meningkat. Untuk mencari jawaban atas pertanyaan tersebut maka dilakukan penelitian ini. Definisi masalah dilakukan dengan penelitian exploratory menggunakan sarana-sarana wawancara naratif dan statistik deskriptif serta statistik interferensi. Pada penelitian kedua pemodelan dilakukan dengan menggunakan Soft System Dynamic Methodology dan untuk mengestimasi parameter digunakan metoda Structural Equation Modeling, yang juga digunakan untuk melakukan confirmatory factor analysis. Dari hasil penelitian dapat disimpulkan bahwa sebuah hasil produksi berasal dari sarana produksi yang terdiri dari: ketersediaan teknologi, sumber daya manusia, tenaga kerja dan peralatan. Unsur-unsur ini terpadu dan bekerja sama untuk menghasilkan hasil produksi. Pertanyaan berikutnya adalah dari mana sebenarnya datangnya sarana produksi tersebut, hal tersebut ditentukan oleh arah investasi yang dilakukan oleh para pelaku industri, dan bagaimana pelaku industri menentukan keputusan investasi tersebut, hal ini akan tercermin pada rencana strategis masing-masing perusahaan. Apakah ia akan cenderung untuk lebih meningkatkan kemampuandalam bidang pemasaran atau lebih meningkatkan kemampuan dalam pelaksanaan pekerjaan atau lebih meningkatkan kemampuan dalam bidang keahlian teknis tertentu atau lebih kepada penyediaan peralatan konstruksi. Dalam penentuan strategi ini para pelaku akan mempertimbangkan kondisi lingkungan industri, kondisi persaingan, besarnya pasar, kemudahan masuk ke dalam industri dan biaya transaksi ekonomi didalam industri tersebut. Biaya transaksi ekonomi dan kemudahan masuk industri disebabkan oleh kondisi sosial dan politik serta kondisi ekonomi dan tingkat penerapan ekonomi pengetahuan serta kinerja ekonomi dimana industri tersebut berada. Penelitian ini dilakukan dalam dua tahap penelitian yakni: pertama penelitian untuk menetapkan definisi masalah dan kedua penelitian untuk membangun model. Akar masalah sebenarnya ada pada kurang efektifnya kontribusi tenaga ahli dan managerial, produksi konstruksi lebih dominan dihasilkan oleh tenaga kerja langsung dan peralatan konstruksi. Para pelaku sendiri dalam menginterpretasikan usaha industri konstruksi ternyata lebih mementingkan manfaat jangka pendek dari pada jangka panjang. Penelitian ini menunjukkan bahwa mementingkan manfaat jangka pendek kurang menguntungkan bagi peningkatan produktifitas industri konstruksi nasional berkesinambungan, dibandingkan dengan memperhatikan manfaat jangka panjang.

Indonesia has become a member of World Trade Organization since 1996, this membership has been ratified by the parliament. Indigenous Indonesian Construction Industry will face a problem if they are not prepared to face this new situation. Due to its low competitiveness, to enable the indigenous construction industry, it is necessary to address the root of the cause. This research therefore was conducted to find the solution for this prolem and to indicate what were theroot cause of the problem and to attack them as sson as possible. According to M. Porter the source of competitiveness is productivity. Productivity of construction industry can be calculated from production volume divided by the number of total construction workforce. The research were conducted in two steps, the purpose of the first step is to determine the problem of the Indonesian construction industry, within the context, the purpose of the second research is to build a soft system dynamics model, where parameters were calculated using structural equation modeling in order to simulate the construction aggregate productivity. Secondary data were collected from various sources such as World Bank Institute, Freedom House, International Corruption Watch, UNDP, Indonesian Bureau of Statistics and Bank Indonesia. Primary data were collected from Indonesian Construction Industry Players through a series of surveys. The findings of the study is that the production of construction industry can be calculated from the production function coined by Cobb Douglass, wherein parameters of the workforce and capital, that were appropriated from value shared for each of the variables. The parameter of available workforce and construction capital were determined by the investment strategy intention of industry players. Investment decision is determined during the course of strategic planning. The decision making choices were to invest in human resource for marketing and engineering, project management or in skill labour or in construction equipment. Which will be determined or at least influenced by the business environment like governance. As defined by the World Bank Institute the determining factors were: voices and accountability, political stability, effectiveness of the government, rules of laws, quality of rules, and control of coruption. Beside those factors, the industry players should also consider their perception on market size, the time horizon in which they will consider for strategic planning horizon, and severity of competition which will be determined by entry regulation, and transaction cost economy. Final results of the study are : Higher Educated Human Resources in construction industry are not effectively supporting the productivity of the industry, Indonesian Construction Industry Players tend to consider short term benefit than long term sustainability and growth, strategic planning time horizon contribute significantly in long term productivity, it is indicated that Indonesian Contractors are more involve in simple construction activities than the sophisticated ones. Therefore it is suggested that to improve productivity of Indonesian construction industry, There are several step to be taken: Orientation toward long term growth and planning horizon, marketing orientation toward more spohisticated project, empowerment of institution for collaboration in construction industry should be initiated, effective utilization of educated and skilled construction workers and high standard of governance should be established and maintained."
Depok: Universitas Indonesia, 2007
D854
UI - Disertasi Membership  Universitas Indonesia Library
cover
Muhammad Ikhsan Setiawan
"The Role of Construction Personnel in the Phase of Conceptual Planning in Increasing Construction Project Cost Performance in IndonesiaModern construction has been characterized as a complex and fragmented process. These conditions have been known to lower the quality and cost efficiency of projects. It has been proven that this problem can be partially overcome by implementing constructability, which is based on the integration of construction knowledge into the early stages of planning and design process. Prior research has found a lack of application of constructability by participants in the construction industry, especially general contractors. Because builders can play an important role in implementing constructability, this thesis has addressed constructability as practiced by the general contractors in Indonesia
Constructability since 1986 has been defined as the optimum use of construction knowledge and experience in planning, design, procurement, and field operations to achieve overall project objectives. The effective integration of design and construction offers important benefits and opportunities to achieve project objectives. In order to create maximum benefits, the construction input or constructability, has to be introduced at the earliest stages of the project.
This investigation describes the constructability improvement related to three key issues derived from literature study; developing the project plan, laying out the site, and selecting major construction methods. Project data for analysis were obtained by distributing questionnaires to corporations in the Jabotabek areas and in project locations in Indonesia which were acting as contractors. The sample questionnaires were also directed to a population of contractors categorized by the characteristics of the organization, the type of work performed, and the type of contractual arrangement.
The variables in the questionnaires that were related to constructability and cost performance were assigned scores by the contractor population in the research. The data was then processed for carrying-out correlation and multiple regression modeling analysis. The research proceeded to establish through regressions analysis a non-linear model relating cost performance to two significant constructability variables. Firstly the improvement of construction personnel knowledge and experience for the scheduling preparation, cost estimations and budget. Secondly the improvement of construction personnel knowledge and experience for pre-construction planning as a basic input in the design phase.
These findings then provided the basis for deriving conclusions and various recommendations on practical applications to improve constructability during the conceptual planning phase for increasing the cost performance of a project."
Depok: Fakultas Teknik Universitas Indonesia, 2000
T8982
UI - Tesis Membership  Universitas Indonesia Library
cover
Fransiska Maria Farida
"Keberhasilan penyelenggaraan proyek konstruksi ditentukan oleh kemampuan para pelaku utamanya (tim proyek pemilik, kontraktor dan konsultan. dan tersedianya perangkat yang lengkap dan berkualitas. Pada zaman dahulu kontraktor mengerjakan hampir sebagian besar pekerjaan konstruksi. Pada saat ini pada tahap konstruksi kira. kira 80. pekerjaan diserahkan ke subkontraktor. Akibatnya subkontraktor memainkan peranan penting dalam industri konstruksi dimana proyek bangunan gedung bertingkat tinggi kira-kira 80-90. pekerjaan dikerjakan oleh subkontraktor. Sehingga pengelolaan subkontraktor oleh kontraktor utama sangat diperlukan. Berdasarkan pada hal ini, maka dilakukan penelitian mengenai pengelolaan subkontraktor dengan menyebarkan kuesioner yang berisi. hal yaitu. pemilihan subkontraktor, perjanjian dengan subkontraktor, persiapan pekerjaan subkontraktor dan penyelesaian pekerjaan subkontraktor. Data yang didapat dari hasil penyebaran ini kemudian diolah secara statistik dengan program SPSS 9.01 untuk mendapatkan variabel. variabel yang menentukan. Dari hasil pengolahan SPSS9.01 didapat variabel penentu adalah pengawasan pekerjaan. X34. dan penempatan pengawas yang sesuai dengan kemampuannya. X33 ). Variabel lain diluar. variabel penentu ini dicari dengan menggunakan dummy, didapat variabel pengaturan change orders sejak kontrak awal. X30 ). Akibat dari sampel yang didapat kecil (18 sampel ), maka perlu untuk diuji kembali apakah hasil yang didapat dapat mewakili populasi yang sedemikian besar tersebut. Pengujian dilakukan dengan menggunakan simulasi Monte Carlo. Berdasarkan hasil simulasi tersebut didapat bahwa pada saat 68. data ke. 3 variabel penentu memiliki mean/rata. rata pada skala penilaian =3. biasa dilakukan tapi tidak rutin ), artinya pada skala penilaian 3( biasa dilakukan tapi tidak rutin. sangat berpengaruh. terhadap pengelolaan subkontraktor, persamaan tidak berlaku pada skala penilaian. ( sama sekali tidak pernah dilakukan ), persamaan berlaku pada skala penilaian antara. ( dilakukan sesekali saja. sampai. ( merupakan prosedur standar yang selalu dilakukan ), Apabila tidak ada pengawasan, tidak ada penempatan pengawas sesuai kemampuan dan tidak ada pengaturan change orders dikontrak awal, maka sangat berpengaruh. pengaruh sebesar 100. ) dan apabila selalu ada pengawasan setiap saat, pengawas selalu ditempatkan sesuai kemampuannya dan ada pengaturan secara detail change orders dikontrak awal, maka tidak berpengaruh terhadap kinerja waktu subkontraktor. berpengaruh. % ).

The success of handle construction project depends on the ability from owner's project team, contractor and consultant. In the traditional day, contractor handles almost all of construction work. In modern days, contractor gives about 80% from all the construction work to subcontractor. The consequence from this trend is make subcontractor play an important part in construction industry, which subcontractor handle about 80% from all of high rise building project work. From all of this, it's very important for contractor to manage its subcontractor. With this review, the writers do research about managing subcontractor with spreading the questioner. There are five important things in the questioner. All of them are about choosing subcontractor, the dealing with subcontractor, the preparing, finishing step and the payment. We use SPSS 9.01 to handle all of data to get some determinant variables. There are three determinant variables that we got. There are controlling, using the right controller and change order. We just have little sample (eighteenth samples), so we need to check whether the sample can explain the population. We use Monte Carlo simulation to do this and we get that three variables can explain the population.
"
Depok: Fakultas Teknik Universitas Indonesia, 2001
T1904
UI - Tesis Membership  Universitas Indonesia Library
cover
Yusuf Latief
"Six sigma (6-sigma) adalah salah satu metode yang saat ini sedang berkembang di dunia. Pada industri manufaktur, penerapan 6-sigma diharapkan dapat mengurangi kegagalan dalam pencapaian sasaran mutu yang diinginkan pada proyek konstruksi. Penelitian ini dimaksudkan untuk mengetahui kondisi eksisting pengelolaan manajemen mutu dan penerapan pendekatan metode 6-sigma dalam penjagaan kualitas di dalam proyek konstruksi. Metode yang digunakan ialah dengan wawancara terstruktur dengan para pakar yang memiliki pengalaman dalam bidang konstruksi dan direkomendasikan oleh perusahaan mereka. Metode analisis yang digunakan adalah analisis non parametrik dengan prosedur distribusi frekuensi. Hasil wawancara terstruktur dengan para pakar, menunjukkan bahwa kondisi eksisting manajemen mutu pada proyek konstruksi di Indonesia telah menerapkan pendekatan metode 6-sigma, hanya saja perlu diperhatikan kesiapannya baik dari kondisi internal maupun ekternal proyek tersebut.

Six sigma (6-sigma) is a method that widely developed in the world, especially in manufacturing industry to decrease failures in achieving good quality in construction projects. The objective of this research is to explore the existing condition of quality management and the aplication of 6-sigma method in maintaining quality of construction projects. Structured interviews to experienced experts and people who were recommended by their companies were conducted. Non-parametric analysis using frequencies distribution procedures were used for analysis. The result shows that existing condition in quality management of construction project in Indonesia have been implemented 6-sigma method approach, that concern with is how to adapt with either from internal or external condition of that project."
Depok: Direktorat Riset dan Pengabdian Masyarakat Universitas Indonesia, 2009
AJ-Pdf
Artikel Jurnal  Universitas Indonesia Library
cover
Irawan Saptoargo
"The Impact of Contractor's Role in Improving the Constructability of the Design-Construct ProjectIn 1982 The Business Roundtable's Construction Industry Cost Effectiveness (LICE) identify one important aspect is that construction too often is relegated to operate as production function separated from financial planning, scheduling, and engineering or architectural design. The involvement of construction experts is delayed until the design is so far along that changes would be so disruptive as to increase cost. The traditional construction contracting method made this division even further. The construction contractor would only be engaged in the project after the designer completed their design.
By separate design and construction, opportunities to reduce project costs and schedules by using existing and new construction technology are lost. Significant savings in both the costs and time required to complete the project can be accrued from integration of construction expertise into all phases of project. The Construction Industry Institute's (CII) Task Force defines this term as Constructability, which is the optimum integration of construction knowledge and experience in planning, engineering, procurement, and field operations to achieve overall project objectives.
This thesis study the role of contractor's in improving the constructability of the design-construct project which leads to an improving project cost performance of construction project in Indonesia. A questionnaire survey was distributed to projects contractor's in Jakarta area. The data obtained was analyzed quantitatively to find the correlation and to make a regression between the role contractor's in improving the constructability of the design-construct project and the performance of construction project's cost.
The result of this research show a positive, linear correlation between the interface of contractor's in improving the constructability of the design-construct and cost performance of the project. The main variables are: pro-actively involved in developing project plans and plan the sequence of field task to improve productivity.
"
Depok: Fakultas Teknik Universitas Indonesia, 2001
T8981
UI - Tesis Membership  Universitas Indonesia Library
cover
Lutfi
"Faktor eksternal perusahaan merupakan salah satu faktor yang sangat penting terhadap kesuksesan perusahaan. Pengaruh faktor eksternal terhadap kesuksesan suatu perusahaan khususnya perusahaan jasa konstruksi didominasi oleh ekonomi makro, politik hukum dan regulasi, sosio/kultural, teknologi dan inovasi, lingkungan, segmen global, lingkungan industri dan pesaing. Penelitian ini bertujuan untuk mengidentifikasi dan menganalisa pengaruh yang terjadi pada faktor eksternal perusahaan jasa konstruksi yang menyebabkan menurunnya sustainability perusahaan. Penelitian ini menggunakan analisis statistik untuk dapat mengetahui faktor eksternal yang mempengaruhi sustainability penusahaan dan analisis simulasi Monte Carlo untuk mengetahui probabilitas variabel penentu. Dari hasil pengolahan data didapat kekuatan tawar-menawar pembeli dan ancaman dan peserta bisnis baru merupakan faktor eksternal yang paling dominan terhadap peningkatan sustainability perusahaan.

The company external factor is one of the most important factors to the success of a company, especially the construction service company, is dominated by the macro economic, regulation, sosio/cultural, technology and innovation, environment, global segment, competitive environment. Identifying and analyzing the influence that happen in the construction service company external factor which cause descend of a company sustainability is the right approach to increase the effort of the construction service company. This research use statistic analysis in order to know the external factor which influence the company sustainability and montecarlo stimulation analysis in order to know the determine variable probability. From the data manufacture research we can see that there are bargaining position of buyer and threat from new participant in construction business which or the most dominant external factor of the company sustainability increase."
Depok: Universitas Indonesia, 2006
T16080
UI - Tesis Membership  Universitas Indonesia Library
cover
Era Islami
"Construction industry is one of the most important sectors in Indonesia. Nowadays, this sector still gets several problems that require improvement to achieve sustainability in globalization world. To fix internal factor deviation is a required initial step, because the internal factor is formed from company itself and could be controlled by company organization, such as management, human resources, financial and machine. The better approach to increase the performance in Construction Company is to identify and analyze the influence of internal factors to sustainability. Company sustainability is one of important indicators for company success.
The objective of this research is to identify internal factors, which could influence the performance of company sustainability. From field survey or questionnaire distribution and statistics analysis, to be found the most important internal factor in successful of sustainability. This research shows that the management and human resources factors are the important internal factor in sustainability. Therefore, good controlling in the internal factors will increase company successful in sustainability."
Depok: Fakultas Teknik Universitas Indonesia, 2006
T16079
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>