Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 4055 dokumen yang sesuai dengan query
cover
Putnam, Lawrence H.
New Jersey: Prentice-Hall, 1992
005.1 PUT m
Buku Teks SO  Universitas Indonesia Library
cover
Bennatan, E.M. (Edwin M.)
New York, N.Y.: John Wiley & Sons, 1995
005.106 8 BEN o
Buku Teks SO  Universitas Indonesia Library
cover
London: McGraw-Hill, 1993
005.14 SOF
Buku Teks SO  Universitas Indonesia Library
cover
Auslander, David M.
Englewood Cliffs, NJ: Prentice-Hall, 1990
629.895 AUS r
Buku Teks  Universitas Indonesia Library
cover
Boston: Harvard Business School Press, 2004
658.404 MAN
Buku Teks  Universitas Indonesia Library
cover
Anditya Wibawa
"ABSTRACT
ABC Hotel has existed as budget hotel for approximately 20 years, upheaval
of tight competition in the budget hotels affect to ABC Hotel in the future. Today,
ABC hotel is facing a lot of challenges to survive in the competition. Navigate the
company to create more customer values is a road to competitiveness to survive
within the industry. ABC Hotel can create more portfolios of competitive action
conforms of its competitor to gather brand equity and loyalty. Those portfolio
actions mixed with strategy pursuing value innovation. Value innovation can be
reach by identifying guests? needs with new superior value for mass buyers and
affordable price"
2012
T32232
UI - Tesis Open  Universitas Indonesia Library
cover
cover
Nokes, Sebastian
New York : Pearson Education, 2007
658.404 NOK d
Buku Teks  Universitas Indonesia Library
cover
Rosen, Anita
"Organizing a team to get IT projects done on time and on budget requires more than just the usual project management know-how. Using a proven approach that examines the project life cycle and works in conjunction with the methods recommended by the Project Management Institute, "Effective IT Project Management" provides readers with a system that keeps the big picture in view while dividing tasks into manageable chunks. Taking readers step-by-step through the entire project, "Effective IT Project Management" is a complete blueprint for using teamwork to achieve IT project success."
New York: American Management Association, 2004
e20438513
eBooks  Universitas Indonesia Library
cover
"Short Time Period Water Budget (SPWB) and Catchment Water Balance (CWB) methods were used for estimating evapotranspiration (ET) rates in oil palm catchments in Johor, Malaysia. Three catchments of different oil palm ages were established, namely C1 (2 years), C2 (5 years) and C3 (9 years). Eight months data of rainfall and runoff were used in the analysis. By adopting no rainfall conditions (Pse=0) at the start and end days of analysis, we obtained water budget periods of 209 days for C1, 111 days for C2, and 158 days for C3. A higher Pse of 2 mm, has prolonged the water budget periods to 218, 206 and 195 days for C1, C2 and C3, respectively. The larger Pse (2mm) also increased the number of samples for analysis. The SPWB method showed more consistent monthly ET compared to the WBC method. The projected rates of annual ET show remarkable variations between catchments, from 927 to 1405 mm/yr for the SPWB method and 1098 to 1365 mm/yr for the CWB method. Although the annual ET rates from C1 (1405 mm/yr for SPWB and 1365 mm/yr for CWB) are reasonable, the ET values in C2 and C3 seemed to be grossly underestimated. Both methods have weaknesses in dealing with distinct dry and wet conditions, most likely due to rapid fluctuation in the soil moisture. This problem is more obvious in the smallest catchment, C2"
620 MJCE 20:2 (2008)
Artikel Jurnal  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>