Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 160183 dokumen yang sesuai dengan query
cover
Laksmana Putra Leuvinadrie
"Lapangan-X merupakan salah satu penyumbang gas terbesar di Jawa Barat, dimana
pelanggan gasnya merupakan perusahaan-perusahaan yang memberikan konstribusi
terhadap keberlangsungan perekonomian di pulau Jawa. Gas alam lapangan-X memiliki
kandungan CO2 dengan konsentrasi tinggi sebesar 23%, pengoperasian pemisahan CO2
removal dimaksudkan untuk mengurangi kandungan CO2 sehingga memiliki heating
value yang tinggi. Hal ini karena CO2 dengan kadar > 5% dapat mempengaruhi heating
value gas, toxicity dan sangat korosif khususnya pada pelanggan untuk memproses lebih
lanjut produknya. Pada proses pemurnian gas di lapangan-X, bejana tekan Absorber, LP
Flash Column dan Rich Solution heater memiliki peranan utama dalam proses absorbsi
CO2. Hasil analisa menunjukkan mekanisme kerusakan aktual bejana tekan dengan
standard amine treating pada API RP 571 memiliki perbedaan, khususnya mekanisme
kerusakan amine corrosion pada ketiga bejana tekan dan chloride stress corrsion cracking
pada LP Flash Column. Nilai corrosion rate tertinggi sebesar 0,604 mm/year pada tahun
2020 karena adanya peningkatan jumlah HCO3- dalam bentuk kondensasi asam (HSAS)
yang dapat bereaksi dengan Fe akibat perubahan temperatur proses melalui model
corrosion rate Y = -0,0556x + 4,6359 (head) dan Y = -0,0161x + 1,3682 (shell) pada
bejana tekan. Dari matriks kekritisan didapatkan 2 bejana tekan pada peringkat resiko
medium dan 1 bejana tekan medium high, sehingga respon inpeksi/maintenance yang
perlu dilakukan adalah bersifat corrective maintenance dengan interval setiap 6 tahun
sekali dan ruang lingkup inspeksi pada kategori medium. Model polynomial Y =
0,0007X2 – 0,0099X + 3,7452 (head) dan Y = 0,0005X2 – 0,0842X + 3,3876 (shell)
sebagai model prediksi amine corrosion rate pada temperatur rentang 40 s/d 1300C
menunjukkan perbedaan grafik antara aktual dan standard API RP 581, hal ini disebabkan
karena pada standard prediksi corrosion rate digunakan untuk amine treating pada sistem
H2S dan CO2 sedangkan pada grafik polynomial aktual digunakan untuk prediksi
corrosion rate untuk amine treating pada sistem CO2 tanpa adanya H2S.

Field-X is one of the largest gas contributors in West Java, where gas customers are
companies that contribute to the sustainability of the economy in Java. X-field natural
gas has a high CO2 content of 23%, the CO2 removal operation is intended to reduce the
CO2 content so that it has a high heating value. This is because CO2 with levels> 5% can
affect the heating value gas, toxicity and is very corrosive, especially for customers to
further process the product. In the gas purification process in field-X, the Absorber
pressure vessel, LP Flash Column and Rich Solution heater have a major role in the CO2
absorption process. The analysis results show that the actual damage mechanism of the
pressure vessel with the standard amine treating on API RP 571 has a difference,
especially the damage mechanism of amine corrosion in the three pressure vessels and
chloride stress corrosion cracking on the LP Flash Column. The highest corrosion rate value
is 0.604 mm / year in 2020 due to an increase in the amount of HCO3- in the form of acid
condensation (HSAS) which can react with Fe due to changes in process temperature
through the corrosion rate model Y = -0.0556x + 4,6359 (head) and
Y = -0.0161x + 1.3682 (shell) in the pressure vessel. From the criticality matrix, there
are 2 pressure vessels at the risk rating for medium and 1 pressure vessel for high medium,
so that the inspection / maintenance response that needs to be done is corrective
maintenance at intervals every 6 years and the scope of the inspection is in the medium
category. Polynomial model Y = 0.0007X2 - 0.0099X + 3,7452 (head) and
Y = 0.0005X2 - 0.0842X + 3,3876 (shell) as a prediction model for amine corrosion rate
at temperatures ranging from 40 to 1300C shows the difference in the graph between the
actual and the API RP 581 standard is because the prediction standard of corrosion rate
is used for amine treating in H2S and CO2 systems while the actual polynomial graph is
used for prediction of corrosion rate for amine treating in CO2 system without H2S.
"
Depok: Fakultas Teknik Universitas Indonesia, 2020
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Hendy Setiawan
"Sebuah perusahaan minyak dan gas di Subang, PT. X merupakan salah satu asset penting negara di Jawa Barat, dimana hasil produk dari perusahaan ini memberikan konstribusi terhadap perekonomian di pulau Jawa, khususnya di Jawa Barat. Input feed gas yang diperoleh PT. X ini memiliki konsentrasi CO2 cukup tinggi sebesar 23%, pemisahan CO2 removal dimaksudkan untuk mengurangi kandungan CO2 hingga kurang dari 5%. Hal ini karena CO2 dengan kadar > 5% sangat korosif tergantung pada tekanan (pressure) dan temperature. Proses pemurnian gas dilakukan oleh 2 unit identic CO2 removal, dimana sistem perpipaan menjadi penting untuk menyalurkan gas dari satu tempat ke tempat lain. Hasil analisa menunjukkan mekanisme kerusakan aktual pada pipa adala korosi CO2. Nilai laju korosi tertinggi sebesar 0,24 mm/year pada tahun 2020 karena adanya reaksi antara Fe dengan H2CO3 sebagai akibat dari perubahan temperature dan partial pressure CO2 model laju korosinya adalah Y = 0,0001x2 – 0,0297x + 1,5599 untuk pengaruh temperature dan Y = 9E-05x2 – 0,0228x + 1,5436 untuk pengaruh partial pressure CO2. Dari matriks kekritisan didapatkan 1-line number pada peringkat resiko medium high sehingga action yang perlu dilakukan adalah bersifat corrective maintenance dengan interval setiap 4 tahun sekali dan metode inspeksi nya adalah ultrasonic test. Hasil analisa kelayakan menunjukkan bahwa pipa yang diteliti masih layak beroperasi karena nilai MAWP masih di atas working pressure pipa tersebut. Model polynomial Y = 42,097x2 – 607,42x + 2724,8 sebagai model prediksi MAWP pada tahun 2025 mendatang dimana nilainya juga masih berada di atas working pressure sehingga masih layak digunakan sampai 2025.

An oil and gas company in Subang, PT. X is one of the important state assets in West Java, where the products of this company contribute to the economy on the Java, especially in West Java. Feed gas input obtained by PT. X has a high enough CO2 concentration up to 23%, the separation of CO2 removal us intended to reduce the CO2 content to less than 5%. This event is required due to CO2 concentration >5% is corrosive depending on pressure and temperature. The gas purification process is carried out by two identical CO2 removal unit, where the piping system is important to transfer gas from one place to another. The analysis result shows that the actual damage mechanism is CO2 corrosion. The highest corrosion rate value is 0,24mm/year in 2020, because of the reaction between Fe and H2CO3 as a result of changes in temperature and partial pressure CO2, the corrosion model is Y = 0,0001X2- 0,0297x + 1,5599 for the effect of themperature and Y = 9E-05X2 – 0,0228x + 1,5436 for the effect of CO2 partial pressure. From the critilically matrix, it is obtained one line number at the risk rating for medium high, so the action that need to be done is corrective maintenance at interval every 4 years and the inspection method is the ultrasonic test. The result of the feasibility analysis show that the pipe under study is still feasible to operate because the MAWP value still above the pipe’s working pressure. Polynomial model Y = 42,097x2 – 607,42x + 2724,8 as a prediction mode for MAWP in 2925 where the value also still above it it means the pipe still suitable for use until 2025."
Depok: Fakultas Teknik Universitas Indonesia, 2020
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Kurniawan Abadi
"Risk Based Inspection atau disingkat RBI merupakan sebuah metode untuk merencakan pemeriksaan peralatan statis yang berdasarkan risiko yang dimiliki oleh suatu peralatan produksi. Kegiatan inspeksi, pengamatan dan pemeriksaan diperlukan untuk memastikan kesiapan kondisi operasi. Hal ini adalah untuk memastikan keselamatan kerja, produktivitas dan keuntungan operasi menjadi tujuan perusahaan.
Penelitian kali ini di titik beratkan pada peralatan bejana tekan (Absorber, Separator dan Filter) pada fasilitas pra-pemrosesan gas. Hasil inspeksi dan perhitungan menunjukkan bahwa ketebalan sisa material masih cukup dan mengindikasikan korosi merata. Hasil perhitungan PoF dan CoF diperoleh bahwa Gas Absorber, Separator dan Filter memiliki risiko menengah ? tinggi yang memerlukan perhatian. Sedangkan Absorber memiliki tingkat resiko tertinggi disebabkan konsekuensi finansial.
Dari penilaian FFS API 579 ditemukan bahwa absorber masih dapat beroperasi hingga 55 tahun kedepan dihitung dari waktu studi. PV elite adalah alat bantu perencaan yg dapat digunakan untuk mengevaluasi keadaan sekarang dan sisa umur bejana tekan. Pada studi ini, Absorber memiliki sisa umur yang cukup panjang dan juga MAWP (Maximum Allowable Working Pressure) melibihi MAWP yang dibutuhkan.

Risk Based Ispection or known as RBI is one methodes to plan inspection on static equipment based on own risk in production facilities. Inspection activity, monitoring and assesmemt are required to ensuring operation readiness. This is also to ensure Safety, Productivity and Operational advantage are the Company Objectives.
This research focused on three pressure vessel at the Gas pre-treatment facilities named Absorber, Separator and Filter. These facilities are expoxed with high CO2 from raw gas. Inspection and calculation result show that the remaining thickness of these pressure vessel is still adequate and indicate uniform corrosion. The result calculation of PoF and CoF of the equipment was found that the Absorber, Separator and Filter have a medium-high level of risk that required special attention. While the Absorber has highest operation risk due to higher financial consequency.
From Fitness for Service API 579 assessment it is found that the absorber could be in service for next 55 year from day of study. PV elite is the design software that utilized to study pressure vessel design and also has capability to perform evaluating the current state and remaining life of existing vessels. In this study, the absorber has a good remaining life and also the MAWP (Maximum Allowable Working Pressure) exceeds required MAWP.
"
Depok: Fakultas Teknik Universitas Indonesia, 2016
T46593
UI - Tesis Membership  Universitas Indonesia Library
cover
James Sampurna
"Saat ini dunia sedang menghadapi krisis peningkatan emisi karbon hasil dari bertambahnya gas-gas rumah kaca di atmosfer yang menyebabkan energi panas dipantulkan kembali ke permukaan Bumi. Gas rumah kaca tersebut umumnya dihasilkan dari asap industri yang sedang mengalami perkembangan pesat belakangan ini. Maka dari hal inilah penghematan penggunaan energi harus digenjot. Industri pengolahan gas alam merupakan salah satu industri yang turut menyumbang emisi karbon ke atmosfer karena penggunaan energi yang sangat masif terutama dalam proses penyisihan gas asam. Proses Girbotol, yang menggunakan alat utama absorber dan regenerator, merupakan proses konvensional yang paling banyak digunakan dalam penyisihan gas asam. Akan tetapi, penggunaan energi yang terlampau tinggi dan rendahnya efisiensi selektivitas pemisahan merupakan kekurangan yang wajib untuk dibenahi. Oleh karena hal inilah kontaktor membran diusulkan sebagai alat regenerator alternatif karena memiliki efisiensi proses yang unggul dan berpotensi untuk mengurangi biaya modal dan biaya operasional. Substitusi proses penyisihan konvensional dengan proses hibrida berkonfigurasi absorber-kontaktor membran masih sangat jarang dilakukan dan komersialisasi sangat diperlukan. Skripsi ini akan dilakukan analisis tekno-ekonomi untuk mengevaluasi perbandingan kinerja absorber-regenerator konvensional dengan kinerja hibrida absorber-kontaktor membran dalam proses penyisihan gas CO2. Dengan model konvensional, maka dibutuhkan tambahan energi dan utilitas pada bagian alat regenerator agar dapat bekerja, sedangkan dengan menggunakan model hibrida, pemanfaatan tekanan yang sudah tinggi dari keluaran alat absorber dan tanpa pemanas tambahan sudah cukup untuk memisahkan kandungan gas CO2 dari pelarut. Maka dari hal ini tidak ada penambahan energi maupun utilitas serta berkurangnya beberapa alat seperti penukar kalor. Dari sisi ekonomi, dapat ditinjau bahwa biaya modal awal dan operasional tahunan model berkonfigurasi konvensional lebih tinggi 31.824% dan 34.0498% berturut-turut dibandingkan dengan model berkonfigurasi hibrida.

Currently, the world is facing a crisis of increasing carbon emissions resulting from the increase in greenhouse gases in the atmosphere which causes heat energy to be reflected to the Earth's surface. Greenhouse gases are produced from industrial fumes which are currently experiencing rapid development. Therefore, it is mandatory that saving energy use must be boosted. The natural gas processing industry is one of the industries that contributes to carbon emissions into the atmosphere due to the massive use of energy, especially in the process of removing acid gas. The Girbotol process, which uses an absorber and a regenerator as the main equipment, is the most widely used conventional process in acid gas removal. However, the exorbitant utilization of energy and the efficiency of the separation selectivity is low, which are shortcomings that must be addressed. For this reason, membrane contactors are proposed as alternative regenerators because they have superior process efficiency and have the potential to reduce capital and operational costs. Substitution of the conventional removal process with a hybrid process with absorber-membrane contactor configuration is still exceedingly rare and commercialization is urgently needed. In this thesis, a techno-economic analysis will be conducted to evaluate the comparison of the performance of conventional absorber-regenerator with the performance of hybrid membrane absorber-contactor in the CO2 gas removal process. With the conventional model, additional energy and utility are needed for the regenerator to work, while using the hybrid model, the utilization of the already high pressure from the output of the absorber and without additional heating is sufficient to separate the CO2 gas content from the solvent. So, from this there is no additional energy or utility as well as a reduction in tools such as heat exchangers. From the economic point of view, the initial capital and annual operating costs of the conventional configuration model are 31.824% and 34.0498% higher, respectively, compared to the hybrid configuration model.
"
Depok: Fakultas Teknik Universitas Indonesia, 2022
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
cover
Hermas Kornelius
Depok: Fakultas Matematika dan Ilmu Pengetahuan Alam Universitas Indonesia, 2005
T39764
UI - Tesis Membership  Universitas Indonesia Library
cover
Rovida Camalia Hartantrie
"ABSTRAK
Ketersediaan sumber energi terutama energi fosil semakin lama semakin berkurang. Sehingga, perlu adanya upaya efisiensi energi dengan mengembangkan Turbin Gas Mikro Bioenergi Proto X-3 dimana terdapat sistem turbin gas mikro dengan bahan bakar biogas untuk aplikasi pada zero energi green building. Bahan bakar biogas yang diperoleh dari limbah disimpan pada suatu bejana bertekanan. Penelitian ini dikhususkan pada analisa aliran biogas di dalam bejana bertekanan guna mendapatkan tebal dinding bejana optimal dari variasi perubahan suhu dan perubahan tekanan pada tabung gas. Metode yang digunakan dalam penelitian ini yaitu mensimulasikan aliran di dalam bejana bertekanan selama pengisian bahan bakar. Dari hasil simulasi didapatkan hasil perubahan tekanan selama pengisian adalah 117 Bar - 349 Bar, massa jenis bahan bakar 406.3 Kg/m3 - 689.2 Kg/m3 dan kecepatan bahan bakar selama pengisian 279m/s - 8.3 m/s.

ABSTRACT
Availability of energy resources, especially fossil energy increasingly reduced. Therefore need energy efficiency efforts by developing Micro Gas Turbines Bioenergy Proto X-3 where there system micro gas turbines with biogas fuel for applications in green building zero energy. Biogas fuel was derived from waste is stored in a pressurized vessel. This research is devoted to the analysis of the biogas stream in the pressure vessel in order to obtain optimal thickness of vessel based on variations of temperature change and pressure change in the gas cylinder. The method used in this research that simulates the flow inside the pressure vessels during refueling. From the simulation results showed changes in pressure during filling is 117 bar - 349 bar, the density of the fuel 406.3 Kg / m3 - 689.2 Kg / m3 and the speed of the fuel during filling 279m / s - 8.3 m / s."
2016
T45867
UI - Tesis Membership  Universitas Indonesia Library
cover
Hendra Oktawira
"ABSTRAK
Penerapan inspeksi berbasis resiko pada unit cracking heater merupakan
suatu langkah jitu dalam mencegah terjadinya kegagalan secara tiba-tiba akibat
korosi yang dapat menyebabkan kerugian. Hal ini dikarenakan unit cracking
heater merupakan unit yang sangat vital di dalam kegiatan operasional pada
industri petrokimia sehingga perlu dibuat skala resikonya.
Penelitian bertujuan untuk membuat suatu analisa probabilitas kegagalan
dan konsekuensi kegagalan dengan menggunakan sistem inspeksi berbasis resiko
(Risk-Based Inspection) dengan bantuan perangkat lunak pada unit cracking
heater, khususnya pada circuit piping yang menuju cracking heater pada pabrik
etilena yang telah beroperasi bertahun-tahun, sehingga dapat diperoleh peringkat
resikonya dan untuk dapat memberikan jadwal inspeksi dan metode inspeksi di
masa yang akan datang.
Risk-Based Inspection merupakan metode inspeksi yang menggunakan
resiko sebagai dasar untuk memprioritaskan dan mengatur kegiatan di dalam
program inspeksi. Resiko dapat didefinisikan sebagai kombinasi probabilitas dan
konsekuensi. Probabilitas adalah kemungkinan kegagalan untuk terjadi, dan
konsekuensi adalah ukuran kerusakan yang dapat terjadi sebagai hasil dari
kegagalan.
Hasil assessment terhadap circuit piping CL01A menunjukkan bahwa
mekanisme degradasi yang terjadi adalah aerated-water corrosion dan flowinduced
corrosion. Pipa tersebut memiliki tingkat probabilitas kegagalan medium.
Penilaian terhadap konsekuensi kegagalan yang mencakup beberapa tinjauan,
seperti kerugian ekonomi, efek terhadap kesehatan dan keselamatan dan dampak
terhadap lingkungan memberikan peringkat resiko medium. Peringkat resiko total
pada circuit piping CL01A adalah medium-high dan dengan tingkat kepercayaan
high, maka akan menghasilkan interval faktor sebesar 0,4. Interval inspeksi
maksimum atau maximum inspection interval (MII) yang merupakan hasil
perkalian antara sisa umur pakai (remnant life) dan interval faktor memberikan
nilai 5,16 tahun, sehingga jadwa inspeksi berikutnya adalah pada tahun 2016. Inspeksi dilakukan secara non instrusive dengan uji tidak merusak dengan
menggunakan teknik ultrasonic thickness (UT) dan visual pada titik eksternal
pipa. Selain itu, teknik inspeksi yang cukup aplikatif untuk memantau proses
penipisan adalah dengan radiografi (RT). Resiko dapat direduksi dengan
menggunakan sistem yang dapat menghilangkan atau mengurangi kandungan air,
yang bertujuan untuk mengurangi probabilitas kegagalan, sehingga nafta yang
masuk ke dalam aliran proses dapat diminimalisasi.

Abstract
Application of risk-based inspection in unit of cracking heater is a
recommended method to avoid sudden failure which may cause losses as the
result of corrosion process. Unit of cracking heater is a vital unit in petrochemical
industry so that it is required to determine its risk-rank.
The purpose of this study is to make probability of failure and
consequence of failure assessment by using risk-based inspection system
supported by software which is applied to the unit of cracking heater that focuses
on circuit piping located before entering the cracking heater in the ethylene plant
which has been operating for years so that risk-rank can be determined properly.
Furthermore, inspection schedule and inspection method can be fixed based on the
risk-rank. Evaluation to reduce risk is also established by applying system which
may be able to remove or reduce water content in the process flow.
Risk-based inspection is an inspection method which is applying risk as a
base to obtain priority scale in inspection activity. Risk can be defined as the
combination of probability failure and consequence of failure. Probability is a
measure of failure to occur, and consequence is desribed as the measure of
damage which may occur as the result of failure.
Assessment result of circuit piping CL01A shows that degradation
mechanism which may occur in CL01A piping is aerated-water corrosion and
flow-induced corrosion. Probability of failure assessment gives result medium.
Assessment of consequence of failure which is considering some aspect including
economic cost, health and safety effect and environment impact shows medium
risk-rank. Total risk-rank of circuit piping CL01A is medium-high and its
confidence rating is high so that the obtained interval factor is 0,4. Maximum
inspection interval (MII) as the result of multiplication of remnant life with
interval factor gives value 5,16 years. Based on the result, then, next inspection
date will be performed in 2016. Inspection is carried out intrusively by non
destructive test method using ultrasonic thickness test (UT) and visual test on the
eksternal location of the pipe. Radiography as the additional method is also be able to be applied to monitor thinning mechanism. Risk can be minimized by
applying system which may eliminate or reduce water content in the process
stream so that probability of failure can be reduced."
2011
T 29885
UI - Tesis Open  Universitas Indonesia Library
cover
Mario Muhammad
"ABSTRAK
Bejana tekan adalah wadah yang berfungsi untuk menyimpan fluida pada tekanan yang berbeda dari tekanan ambien. Dalam pengoperasiannya, bejana tekan mengalami beban tekanan internal yang menimbulkan tegangan pada dinding bejana tekan. Salah satu tegangan yang terjadi pada dinding bejana tekan adalah tegangan diskontinuitas. Tegangan ini muncul akibat perbedaan arah perbesaran dinding bejana tekan ketika terkena tekanan internal. Perbedaan arah perbesaran terjadi salah satunya akibat perubahan geometri dinding bejana tekan, contohnya pada dinding di sekitar sambungan shell dan head. Penelitian ini menghitung nilai tegangan diskontinuitas pada dinding di sekitar sambungan shell dan head bejana tekan horizontal V-1004 fasilitas pengolahan Minyak dan Gas Pondok Makmur. Metode yang digunakan adalah perhitungan numerik dengan metode elemen hingga menggunakan software ANSYS dan perhitungan analitik dengan teori tegangan membran. Perhitungan menunjukkan terdapat tegangan akibat diskontinuitas pada dinding di sekitar sambungan shell dan head bejana tekan V-1004 sehingga parameter ini harus dipertimbangkan dalam konstruksi bejana tekan.

ABSTRAK
Pressure vessel is a container that serves to keep the fluid at different pressure than ambient pressure. In operation, a pressure vessel suffered internal pressure loads that cause stress on the wall of the pressure vessel. One of the stress that occur in the wall of the pressure vessel is discontinuity stress. This stress arises due to the different directions of growth on the pressure vessel wall when subjected to internal pressure. This difference occurs due to the changes in the geometry of the pressure vessel wall, for example on the wall around the joint of shell and head. This study calculates the value of the discontinuity stress on the wall around joint of shell and head of horizontal vessel V-1004, located at oil and gas processing facilities Pondok Makmur. The method used is a numerical calculation by finite element method using ANSYS software and analytical calculations with the theory of membrane stress. Calculations show there is stress due to discontinuity in the wall around the joint of V-1004 pressure vessel shell and head so that these parameters should be considered in the construction of pressure vessel."
2016
S65055
UI - Skripsi Membership  Universitas Indonesia Library
cover
Deva Wirianugraha
"Pressure vessel atau bejana tekan yang dianalisa merupakan amine regenerator yang merupakan salah satu bagian penting pada unit purifikasi untuk meregenerasi rich activated MDEA atau rich aMDEA (mengandung banyak CO2) dan menghasilkan lean aMDEA (tanpa kandungan CO2) yang kemudian siap untuk menyerap CO2 pada feed gas. Bejana tekan beroperasi pada suhu dan tekanan tinggi, serta memproses media korosif. Oleh karena itu, terdapat beberapa potensi bahaya dan risiko keselamatan seperti ledakan, kebocoran, kebakaran, pencemaran lingkungan yang mungkin terjadi di kemudian hari. Penilaian yang digunakan adalah metode kuantitatif inspeksi berbasis risiko (RBI). Metode tersebut dapat digunakan sebagai alat untuk menjadwalkan inspeksi berdasarkan probabilitas kegagalan (POF) dan konsekuensi kegagalan (COF) yang terjadi dalam pengoperasian, baik dari sisi manusia maupun lingkungan. Hasil penilaian menunjukkan bahwa peralatan tersebut memiliki tingkat risiko yang tinggi, dengan nilai POF sebesar 0,03285, nilai COF (area-based) sebesar 1.684.287,9 m2, dan nilai COF (financial-based) sebesar 2.891.050.051,03 $/tahun. Tanggal pemeriksaan selanjutnya kemudian dihitung, yang memberikan hasil yaitu 10 tahun dari tanggal pemeriksaan saat ini. Pembahasan mengenai perbandingan dengan penelitian serupa juga dilakukan, yang mengungkapkan bahwa hasil perhitungan risiko ini terdapat kemungkinan dipengaruhi oleh faktor lain di luar fokus penilaian risiko dari bejana tekan itu sendiri. Beberapa rekomendasi diberikan berdasarkan hasil penilaian dan pembahasan penelitian ini.

The analyzed pressure vessel is an amine regenerator, which is one of the important part in the purification unit to regenerate rich activated MDEA or aMDEA (contain a lot of CO2) and produce lean aMDEA (without CO2 content) and ready for absorbing CO2 in feed gas. The pressure vessel operates at high temperatures and pressures, and it processes corrosive media. Therefore, there are several potential hazards and safety risks such as explosions, leaks, fires, environmental pollution that could possibly occurs in the future. An assessment using a quantitative method of risk based inspection (RBI) is being used. It is a method that can be used as a tool for designing inspection schedules based on the probability of failures (POF) and the consequences of failures (COF) that occur in operation, both for humans and the environment. The result of the assessment shows that the equipment has a high risk level, with the POF value of 0,03285, COF (area-based) value of 1.684.287,9 m2, and the COF (financial-based) value of 2.891.050.051,03 $/year. The next inspection date is being calculated, which results in 10 years from the current inspection date. A discussion regarding a comparison with other similar research is also being carried out, which reveals that the result of the risk assessment of this research might have been affected by other factors outside the focus of the risk assessment of the equipment by itself. Several recommendations are being made according to the result of the assessment and the discussion of this research."
Depok: Fakultas Teknik Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>