Hanindito Titah Prameswara
"Salah satu contoh penerapan energi baru terbarukan EBT yang sedang berkembang adalah Pembangkit Listrik Tenaga Surya PLTS. Berdasarkan data Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) PT PLN (Persero) 2019-2028 disebutkan bahwa potensi energi matahari (surya) di Indonesia sebesar 207.898 MW (4,80 kWh/m2/hari) dan hanya sebesar 78,5 MW kapasitas terpasang di Indonesia. Pada penelitian ini dilakukan studi interkoneksi PLTS 5 MWp dengan jaringan tegangan menengah 20 kV Daerah X sebagai salah satu penerapan energi baru terbarukan di Indonesia. Studi interkoneksi mencakup analisis aliran daya dan analisis gangguan hubung singkat tiga fasa. Pada analisis aliran daya diperoleh hasil bahwa sistem PLTS mampu menyuplai kebutuhan beban pada sistem sebesar 5.000 kW daya aktif. Didapatkan juga bahwa interkoneksi PLTS dengan sistem mengakibatkan kenaikan level tegangan dari setiap bus pada sistem sebesar 0,08-1,41%, serta membuat perubahan persentase pembebanan komponen sebesar 0,01% hingga 93,01%. Hasil analisis gangguan hubung singkat tiga fasa menunjukkan bahwa interkoneksi PLTS dengan sistem memiliki besar nilai arus gangguan hubung singkat sebesar 5,70-7,01 kA, sehingga nilai arus gangguan untuk seluruh bus masih jauh di bawah nilai kapasitas pemutusan arus hubung singkat sistem proteksi yang bernilai 25 kA. Hasil studi interkoneksi yang diperoleh menujukkan bahwa interkoneksi sistem PLTS 5 MWp dengan jaringan tegangan menengah 20 kV Daerah X dapat dilakukan.

One example of the application of new renewable energy that is currently developing is solar power plant. Based on data from Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) PT PLN (Persero) 2019-2028, it is stated that the potential of solar energy in Indonesia is 207,898 MW (4.80 kWh/m2/ day) and only 78.5 MW of capacity installed in Indonesia. In this study, a 5 MWp solar power plant was interconnected with a 20 kV medium-voltage network of Area X as one of the renewable energy applications in Indonesia. Interconnection studies include power flow analysis and three phase short circuit fault analysis. In the analysis of the power flow results obtained that the Solar Power Plant system is capable of supplying the load requirements to the system of 5,000 kW active power. It was also found that interconnection of solar power plant with the system resulted in an increase in the voltage level of each bus in the system by 0.08 to 1.41%, as well as changing the percentage of component loading by 0.01% -93.01%. The results of the three-phase short circuit fault analysis show that the interconnection of the solar power plant system has a short circuit fault current value of 5.70-7.01 kA, so the fault current value for the whole bus is still far below the value of the short circuit current capacity of the protection systems short circuit worth 25 kA. The results of the interconnection study showed that interconnection of a 5 MWp solar power plant system with a 20 kV medium voltage network Area X can be carried out."
Depok: Fakultas Teknik Universitas Indonesia, 2020
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Nadyanti Larasati
"Saat ini energi baru dan terbarukan sedang dalam masa pengkajian agar penggunaannya dapat lebih meluas di waktu yang akan datang. Salah satu sumber energi baru dan terbarukan yang umum digunakan adalah energi surya melalui teknologi sel surya yang dapat mengonversikan energi surya menjadi energi listrik dan kemudian menjadi salah satu komponen yang menyusun Pembangkit Listrik Tenaga Surya (PLTS). Penggunaan PLTS dapat diinterkoneksikan dengan jaringan distribusi pada sistem tenaga listrik, baik itu jaringan tegangan menengah maupun jaringan tegangan rendah. Pada skripsi ini dilakukan studi interkoneksi PLTS kapasitas 3 MWp dengan sistem jaringan tegangan menengah (JTM) 20 kV Kota X. Studi interkoneksi yang dilakukan terdiri dari studi aliran daya dan studi gangguan hubung singkat menggunakan perangkat lunak ETAP 12.6.0. Hasil dari studi aliran daya menunjukkan level tegangan tiap bus mengalami kenaikan sebesar 0,293%-0,926% setelah dilakukan interkoneksi dengan sistem PLTS, dengan nilai yang masih sesuai standar SPLN 1:1978 yaitu sebesar 90% hingga 105%. Selain itu, hasil dari studi gangguan hubung singkat menunjukkan nilai arus gangguan hubung singkat tiga fasa mengalami perubahan nilai yang tidak terlalu signifikan, yaitu kenaikan dengan nilai 1-37 A dan penurunan 1-5 A, dengan nilai yang masih sesuai standar pengenal komponen proteksi sebesar 25 kA.

Currently, renewable energy is under review so that its use can be more widespread in the future. One of the renewable energy sources that are commonly used is solar energy through solar cell technology that can convert solar energy into electrical energy and then becomes one of the components that makes up the solar power plant. The use of solar power plant can be interconnected with distribution networks in electric power systems, both medium voltage networks and low voltage networks. In this study a 3 MWp capacity of solar power plant was conducted with the medium voltage network system of X City. This interconnection study consisted of power flow and short circuit studies using ETAP 12.6.0 software. The results of the power flow study show the voltage level of each bus has increased by 0.293%-0.926% after interconnection with solar power plant system, with a value that still matches the SPLN 1:1978 standard of 90% to 105%. In addition, the results of short circuit study show the value of the three phase short circuit fault current experienced a change in value that is not too significant, with an increase of 1-37 A and a decrease of 1-5 A, with a value that is still according to the protection component rating standard of 25 kA."
Depok: Fakultas Teknik Universitas Indonesia, 2020
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Ghozi Fawwaz Imtiyaazi Labiiba
"Pembangkit Listrik Tenaga Surya (PLTS) 5 MWp akan dipasang pada jaringan tegangan menengah 20 kV di Kawasan Ekonomi Khusus (KEK) Sei Mangkei, Sumatera Utara. PLTS 5 MWp ini terbagi menjadi dua lokasi, yaitu PLTS 4 MWp pada Bus Stasiun dan PLTS 1 MWp pada Gardu Hubung 1. Studi interkoneksi PLTS ini mencakup tiga analisis, yaitu analisis aliran daya, analisis hubung singkat, dan analisis stabilitas."
Depok: Fakultas Teknik Universitas Indonesia, 2020
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Robby Julian
"Daerah X merupakan salah satu daerah di Indonesia dengan rasio elektrifikasi yang belum mencapai 100 (seratus) persen. Pertumbuhan penduduk dan peningkatan produk domestik bruto pada daerah X juga akan memacu pertumbuhan beban. Penyambungan Pembangkit Listrik Tenaga Surya (PLTS) dapat membantu menyelesaikan permasalahan tersebut dengan memberikan suplai tenaga listrik tambahan guna meningkatkan performa pelayanan sistem tenaga listrik daerah X. Pada penelitian ini sistem tenaga listrik daerah X dievaluasi perbandingan arus hubung singkatnya, serta tegangan dan pembebanan pada bus dengan analisis loadflow sebelum dan sesudah penyambungan PLTS dengan melakukan simulasi aliran beban dan hubung singkat. Dari hasil simulasi ditemukan bahwa penyambungan PLTS pada sistem tenaga listrik daerah X menghasilkan peningkatan nilai tegangan pada setiap bus dalam rentang yang masih sesuai dengan standard SPLN 1:1978 yaitu lebih dari 90% dan dibawah 105% nilai tegangan nominal bus, di mana nilai tegangan tertinggi terdapat pada bus 2 sebesar 67,759 kV (96,8% tegangan nominal bus) sementara nilai tegangan terendah terdapat pada bus 3 sebesar 18,253 kV (91,27% tegangan nominal bus) serta meningkatkan arus hubung singkat pada 7, 9, dan 29 dengan peningkatan tertinggi terdapat pada bus 9 sebesar 1,85% dan peningkatan terendah pada bus 29 sebesar 0,48%

Area X is one of many in Indonesia that has not yet reached 100 (a hundred) percent electrification ratio. Increment in population and gross domestic product of area X will also spur load growth rate. Connecting Solar Power Plant (PLTS in Indonesian) can help solve those setbacks by providing additional electrical power supply to enhance the performance of service in area X power system. In this study, area X power system will be evaluated in the difference it experiences before and after PLTS connection in terms of short circuit and bus voltage level as well as loading percentage using loadflow simulation. It is found from the simulation that a connection of PLTS to Area X power system causes an increase in voltage on every bus within range of tolerance of SPLN 1:1978 which is more than 90% and less than 105% of bus nominal voltage, where the highest bu voltage is on bus 2 with 67,759 kV (96,8% of bus nominal voltage) while the lowest bus voltage is on bus 3 with 18,263 kV (91,27% of bus nominal voltage), as well as increases the short circuit current on bus 7,9 dan 29 with the highest increase on bus 9 by 1,85% and the lowest increase on bus 29 by 0,48%"
Depok: Fakultas Teknik Universitas Indonesia, 2019
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Nadya Gistriagung
"Penggunaan sistem hibrid yang terdiri dari PLTS terhubung ke jaringan PLN 20 kV(On-grid), didukung dengan penggunaan dan penambahan sistem BESS, memungkinkan memiliki stabilitas yang terjaga serta dapat menjadi alternatif dalam mempertahankan kehandalan serta efisiensi ekonomi dalam penyaluran energi listrik. Oleh karena itu, penelitian ini bertujuan untuk menganalisa kinerja sistem berdasarkan Analisa aliran daya serta kestabilan tegangan dan respon frekuensi sistem pada sistem kelistrikan Gedung Energi PUSPITEK,Serpong. Pengolahan data tersedia dan analisis dilakukan dengan membuat simulasi menggunakan bantuan perangkat lunak DigSILENT PowerFactory. Hasil secara menyeluruh simulasi dan analisis terhadap analisa aliran daya dan kestabilan sistem kelistrikan akibat variasi sumber daya dan variasi skenario gangguan yang terjadi, dengan rata-rata perubahan tegangan dan frekuensi yang relatif kosntan dalam kondisi yang sesuai dengan standar aturan sistem tenaga listrik.

The use of a hybrid system consisting of PLTS connected to the 20 kV (On-grid) PLN network, supported by the use and addition of the BESS system, allows for maintained stability and can be an alternative in maintaining reliability and economic efficiency in the distribution of electrical energy. Therefore, this study aims to analyze the performance of the system based on the analysis of power flow and the stability of the voltage and frequency response of the system on the electrical system of the Gedung Energi PUSPITEK, Serpong, The available data processing and analysis is carried out by making simulations using the DigSILENT PowerFactory software. The results of the overall simulation and analysis of the analysis of power flow and stability of the electrical system due to variations in power sources and variations in fault scenarios that occur, with an average change in voltage and frequency that are relatively constant in conditions that comply with the standard rules of the electric power system."
Depok: Fakultas Teknik Universitas Indonesia, 2022
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Fabian Aji Wibowo
"Berdasarkan Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) PT. PLN (Persero) tahun 2019 – 2028, rencana pemanfaatan energi surya pada provinsi Papua tahun 2019-2028 hanya mencapai nilai 2,545 MW. Tingkat pemanfaatan ini dirasa masih sangat kurang karena provinsi Papua memiliki potensi energi surya sebesar 2.035 MW. Oleh karena itu, pada skripsi ini akan dilakukan simulasi pemanfaatan energi surya pada provinsi Papua, lebih tepatnya pada kabupaten Merauke. Hasil analisis aliran daya menunjukkan bahwa dalam proses interkoneksi PLTS 3 MW dengan sistem kelistrikan Merauke, Papua, PLTS dengan kapasitas 3 MW dapat menggantikan penggunaan beberapa PLTD yang ada pada sistem kelistrikan Merauke, serta nilai tegangan hasil interkoneksi masih berada dalam batas toleransi aturan jaringan sebesar ±10%. Hasil analisis hubung singkat menunjukkan bahwa interkoneksi PLTS 3 MW dengan sistem kelistrikan Merauke, Papua tidak menyebabkan nilai arus hubung singkat berubah dan nilai arus hubung singkat pada seluruh bus dan busbar yang ada pada sistem masih dapat di atasi oleh PMT dengan kapasitas 20 kA. Hasil analisis stabilitas menunjukkan bahwa interkoneksi PLTS 3 MW dengan sistem kelistrikan Merauke, Papua tidak akan mengganggu stabilitas sistem yang ditunjukkan oleh hasil skenario 3A yaitu saat daya PLTS 3 MW berkurang sebesar 50% secara langsung, 3B yaitu saat daya PLTS 3 MW berkurang sebesar 100% secara langsung, 3C yaitu saat daya PLTS 3 MW berkurang secara bertahap hingga mencapai 0%, 3D yaitu saat daya PLTS 3 MW bertambah secara bertahap hingga mencapai 100% , dan 3F yaitu saat daya PLTS 6,87 MW berkurang sebesar 100% secara langsung yang menggambarkan pengaruh penyinaran matahari terhadap sistem dan 3E saat terjadi gangguan hubung singkat tiga fasa. Hasil seluruh skenario stabilitas berada dalam batas nilai tegangan ±10% dan nilai frekuensi tidak melebihi 47,0-52,0 Hz.

Based on the Electricity Supply Business Plan (RUPTL) PT. PLN (Persero) in 2019-2028, the plan to use solar energy in Papua province in 2019-2028 only reaches a value of 2.545 MW. This level of utilization is still considered very lacking because Papua province has a solar energy potential of 2,035 MW. Therefore, in this thesis, a simulation of the use of solar energy in Papua province, more precisely in Merauke district, will be carried out. The results of the power flow analysis show that in the process of interconnecting 3 MW PLTS with the Merauke, Papua electricity system, PLTS with a capacity of 3 MW can replace the use of several existing PLTDs in the Merauke electricity system, and the voltage value of the interconnection results is still within the tolerance limit of the network rules of ± 10%. The results of the short circuit analysis show that the interconnection of the 3 MW PLTS with the Merauke, Papua electricity system does not cause the value of the short circuit current to change and the value of the short circuit current on all buses and busbars in the system can still be handled by the PMT with a capacity of 20 kA. The results of the stability analysis show that the interconnection of 3 MW PLTS with the Merauke, Papua electricity system will not disrupt the stability of the system as indicated by the results of scenario 3A, namely when the power of 3 MW PLTS is reduced by 50% directly, 3B, namely when the power of 3 MW PLTS is reduced by 100% directly, 3C, which is when the power of 3 MW PLTS gradually decreases until it reaches 0%, 3D, which is when the power of 3 MW PLTS increases gradually until it reaches 100%, and 3F, which is when the power of 6.87 MW PLTS decreases by 100% directly which describes the effect of solar radiation on the system and 3E when a three-phase short circuit occurs. The results of all stability scenarios are within the limit of ±10% voltage value and frequency value does not exceed 47.0-52.0 Hz."
Depok: Fakultas Teknik Universitas Indonesia, 2021
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Kevin Geovany
"Energi fosil yang semakin menipis mendorong perkembangan energi baru terbarukan untuk menggantikannya. Pembangkit Listrik Tenaga Surya (PLTS) merupakan salah satu jenis pembangkit ramah lingkungan dengan sumber tak terbatas dan untuk mengetahui kelayakan pemasangannya perlu dilakukan perhitungan dan analisis. Pada penelitian ini dilakukan analisis pada studi optimasi PLTS pada jaringan tegangan menengah 20 kV Sanana, Maluku Utara untuk memastikan kelayakan interkoneksi PLTS secara teknis dengan bantuan perangkat lunak DIgSILENT PowerFactor. Hasil analisis optimasi menunjukkan bahwa nilai optimal kapasitas PLTS adalah sebesar 800 kWp. Hasil simulasi aliran daya menunjukkan bahwa pemasangan PLTS mampu menambah kapasitas pembangkitan dan dapat menggantikan penggunaan generator PLTD, serta kondisi tegangan bus masih dalam kondisi aman dalam batasan -10% dan +5%. Pada simulasi hubung singkat didapatkan hasil yang menunjukkan bahwa interkoneksi PLTS dapat mengurangi nilai arus hubung singkat bila dibandingkan saat PLTS belum terinterkoneksi dengan sistem. Pada simulasi kestabilan saat salah satu generator padam, didapatkan bahwa saat PLTS belum terhubung dan saat PLTS sudah terhubung didapat nilai tegangan berada dalam batas tegangan -10% hingga +5% dan nilai frekuensi dalam rentang 49,5 – 50,5 Hz sesuai dengan aturan distribusi Indonesia sehingga interkoneksi PLTS tidak mengganggu kestabilan sistem saat generator padam. Simulasi kestabilan saat PLTS padam dan saat kondisi cuaca hujan disertai gelap, didapat hasil yang menunjukkan bahwa untuk mencegah terjadinya gangguan tersebut, minimal harus ada satu generator yang berperan sebagai penyuplai daya cadangan untuk menjaga kestabilan sistem.

The depletion of fossil energy encourages the development of renewable energy to replace it. Solar Power Plant is one of many renewable power plant with unlimited sources and to determine the feasibility of its installation it is necessary to do calculations and analyzes. In this study, an analysis is carried out on the solar power plant optimization study on the 20 kV medium voltage network in Sanana, North Maluku to ensure the technical feasibility of PV interconnection by using DIgSILENT PowerFactory software. The results of the optimization analysis show that the optimal value of solar power plant capacity is 800 kWp. The results of the load flow simulation show that the installation of solar power plant adds generating capacity and can replace the use of diesel generator, and the bus voltage condition is still in a safe condition within the limits of -10% and +5%. In the short-circuit simulation, the results show that the interconnection of solar power plant can reduce the value of short-circuit current when compared to when solar power plant has not been connected to the system. In the stability simulastion whe one of the generators outages, it is found that when the solar power plant is not connected and when the solar power plant is connected, the voltage value is within the voltage limit of -10% to +5% and the frequency value is in the range of 49.5 – 50.5 Hz according to the rules distribution in Indonesia so that the solar power plant interconnection does not disturb the stability of the system when the generator outages. Simulation of stability when the solar power plant outages and when weather condition is dark rainy, the results show that to prevent these disturbances, there must be at least one generator that acts as a backup power plant to maintain system stability."
Depok: Fakultas Teknik Universitas Indonesia, 2022
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Pieter
"Penggunaan bahan bakar fosil memiliki dampak yang berbahaya bagi lingkungan seperti emisi gas rumah kaca. Oleh karena itu, dibutuhkan sebuah energi alternatif yang digunakan sebagai sumber bahan bakar pembangkit listrik yang lebih ramah lingkungan. Pada studi kali ini membahas perancangan interkoneksi yang efisien dalam sistem pembangkit listrik tenaga surya fotovoltaik (PLTS) on-grid dalam jaringan tegangan menengah di Wilayah X. Studi ini menggunakan software seperti DIgSILENT Power Factory, untuk menyelidiki dampak interkoneksi terhadap stabilitas frekuensi dan tegangan. Pada percobaan ini dilakukan beberapa variasi kapasitas PLTS ketika terjadi pemadaman PLTS pada detik ke-5, yang mana kapasitas 2 MW merupakan kapasitas yang optimal. Hal ini dibuktikan dengan nilai frekuensi sebesar 50 Hz dan nilai tegangan sebesar 0.998 pu ketika mencapai kondisi stabil. Selain itu, melalui hasil simulasi dapat disimpulkan jika interkoneksi PLTS dapat mengurangi gangguan arus hubung singkat. Selanjutnya, pada simulasi kestabilan, dengan kondisi salah satu generator padam pada detik ke-5 diperoleh jika sistem sebelum dan sesudah interkoneksi PLTS masih stabil. Percobaan selanjutnya, dengan asumsi pemadaman pada PLTS dan kondisi eksternal (hujan, berawan, mendung, dan gelap) diperoleh jika penggunaan generator cadangan sangat penting untuk menyuplai daya agar memperoleh sistem yang stabil. Kestabilan diperoleh ketika frekuensi berada pada rentang yang berlaku 49.5 Hz - 50.5 Hz dan tegangan berada pada rentang kerja yang sesuai yaitu -10% dan +5%.

The use of fossil fuels has dangerous impacts on the environment such as greenhouse gas emissions. Therefore, an alternative energy is needed that is used as a fuel source for power plants that is more environmentally friendly. This study discusses the design of efficient interconnections in on-grid solar photovoltaic power generation systems (PLTS) in the medium voltage network in Region X. This study uses software such as DIgSILENT Power Factory, to investigate the impact of interconnections on frequency and voltage stability. In this experiment, several variations in PLTS capacity were carried out when the PLTS outage occurred at the 5th second, where a capacity of 2 MW was the optimal capacity. This is proven by a frequency value of 50 Hz and a voltage value of 0.998 pu when it reaches a stable condition. Apart from that, through the simulation results it can be concluded that PLTS interconnection can reduce short circuit current disturbances. Furthermore, in the stability simulation, with the condition that one of the generators goes out at the 5th second, it is found that the system before and after the PLTS interconnection is still stable. The next experiment, assuming a blackout at the PLTS and external conditions (rainy, cloudy, cloudy and dark), showed that the use of a backup generator was very important to supply power to obtain a stable system. Stability is obtained when the frequency is in the applicable range of 49.5 Hz - 50.5 Hz and the voltage is in the appropriate working range, namely -10% and +5%."
Depok: Fakultas Teknik Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Karkati Mustika Andary
"Untuk mendorong pertumbuhan ekonomi masyarakat, pada daerah terisolir seperti daerah kepulauan Nusa Tenggara Timur, saat ini terjadi peningkatan kebutuhan energi listrik. Menurut RUPTL 2021-2030, di beberapa kabupaten Nusa Tenggara Timur memiliki rasio elektrifikasi dibawah 90%, dan pembangkitan listriknya masih mengandalkan energi fosil (crude oil) dengan penggunaan pembangkit diesel. Potensi energi baru terbarukan dapat dimanfaatkan di wilayah tersebut, khususnya energi surya dikarenakan cukup tingginya iradiasi matahari. Dari potensi tersebut dapat dimanfaatkan dengan pembangunan PLTS dan BESS yang terinterkoneksi dengan sistem tenaga listrik eksisting di pulau tersebut sehingga terjadinya sistem hibrida. Dalam pembangunan dan penerapaannya, perlu dilakukan optimasi untuk penentuan lokasinya interkoneksi. Nilai kestabilan tegangan dan frekuensi dari sistem hibrida sebelum dan sesudah terjadinya gangguan perlu ditinjau agar sistem tenaga listrik dapat beroperasi dengan stabil. Berdasarkan studi dan simulasi yang dilakukan, didapatkan kondisi optimum interkoneksi pada skenario alternatif 1, dimana interkoneksi PLTS dan BESS terhubung melalui saluran dengan Bus PLTD X / 20 kV. Hal ini mempertimbangkan operasi PLTD lebih dari 30% daya terpasang generator dengan PLTD beroperasi pada 0,772 MW saat beban pucak siang hari dan 0,658 MW saat beban puncak malam hari. Hasil dengan tegangan pada setiap bus setelah mengalami gangguan di atas nilai rata-rata 0,90 p.u. mengacu pada grid code wilayah NTMP pada variasi tegangan ± 10 %.

To encourage community economic growth, in isolated areas such as the islands of East Nusa Tenggara, currently there is an increase in the need for electrical energy. According to the 2021-2030 RUPTL, several districts of East Nusa Tenggara have electrification ratios below 90%, and electricity generation still relies on fossil energy (crude oil) with the use of diesel generators. The potential for new and renewable energy can be utilized in the area, especially solar energy due to the high solar irradiation. From this potential, it can be utilized by the construction of PLTS and BESS which are interconnected with the existing electric power system on the island so that a hybrid system occurs. In its development and implementation, it is necessary to optimize the location for interconnection. The value of voltage and frequency stability of the hybrid system before and after the disturbance needs to be reviewed so that the electric power system can operate stably. Based on the studies and simulations carried out, the optimum interconnection conditions were obtained in alternative scenario 1, where the PLTS and BESS interconnections are connected through a channel with the PLTD X / 20 kV Bus. This takes into account the PLTD operation of more than 30% of the installed power of the generator with the PLTD operating at 0.772 MW at peak load during the day and 0.658 MW at peak load at night. The results with the voltage on each bus after experiencing a disturbance above the average value of 0.90 p.u. refers to the grid code of the NTMP region at a voltage variation of ± 10%."
Depok: Fakultas Teknik Universitas Indonesia, 2022
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Dawud Shibghotulloh
"Energi listrik merupakan sumber energi yang penting bagi kehidupan manusia. Hampir semua sektor kehidupan membutuhkan energi listrik. Saat ini permintaan tenaga listrik terus meningkat disaat yang sama juga masalah baru muncul, yaitu perluasan pembangkit tenaga listrik dan pembangunan saluran transmisi yang sangat terbatas. Oleh karena itu, terjadi pola pembebanan yang dipaksakan pada pembangkit tenaga listrik dan transmisi yang terlampau berat. Pada sistem tegangan yang jauh dari pembangkit cenderung akan mengalami jatuh tegangan yang paling besar.
Pada skripsi ini lokasi studi kasusnya di daerah Serpong - Lengkong dikarenakan jarak Transmisi 150 kV ke beban dari pembangkit yang cukup jauh sehingga mengakibatkan jatuh tegangan yang cukup besar. Oleh karenanya, untuk mengatasi jatuh tegangan pada sistem transmisi, dipasang teknologi Flexible AC Transmission System berupa Static Synchronous Compenstor (STATCOM). Ketika dipasang STATCOM di serpong dan lengkong (kapasitas masing-masing peralatan 50 MVA) dengan nilai injeksi sebesar 5 Mvar. Tegangan sistem dari yang sebelumnya 133.18 kV dan 133.98 kV naik menjadi 142.25 kV dan 142.59 kV.

Electric power is an important energy source for human life. Almost all sectors of life need electrical energy. The current demand for electricity continues to increase while the same issue recently emerged, namely the expansion of power plants and transmission line construction are very limited. Therefore, there is a pattern of loading imposed on power plants and transmission of outrageously heavy. On the system voltage away from the plant are likely to be experiencing the greatest voltage falls.
In this thesis the location study his case in the area of Serpong-Lengkong due to the distance to the 150 kV Transmission load from plants far enough so that the resulting fall in voltage. Therefore, to cope with the falling voltage on the transmission system, installed the technology of Flexible AC Transmission System in the form of Static Synchronous Compenstor (STATCOM). When installed in serpong STATCOM and lengkong (capacity of each piece of equipment 50 MVA) with a value of 5 Mvar injection. Voltage system from the previous 133.18 kV and 133.98 kV up to 142.25 kV and 142.59 kV.
"
Depok: Fakultas Teknik Universitas Indonesia, 2016
S64512