"PLTGU Tanjung Batu merupakan salah satu andalan kelistrikan di Kaltim. PLTGU Tanjung Batu di bawah PT Z Wilayah Kaltimra menerima pasokan gas dari SKK Migas sebesar 40 MMSCFD secara kontinyu. Pipa gas yang digunakan untuk menyalurkan sumber gas didesain berlebih sebesar 80 MMSCFD. Namun, saat ini terdapat perubahan pasokan gas bumi ke PLTGU Tanjung Batu dari 40 MMSCFD turun menjadi 15 MMSCFD. Perubahan pasokan gas perlu dikaji untuk mengetahui kelayakan proyek pembangunan pipa gas tersebut. Penelitian ini bertujuan untuk melakukan evaluasi teknis dan keekonomian proyek tersebut. Evaluasi teknis yang dikaji meliputi pola aliran, evaluasi penggunaan knock out drum sebelum flash stack, condensate drum dan slug cacther yang digunakan. Evaluasi pola aliran menunjukkan bahwa adanya ketidakstabilan pola aliran di sepanjang pipa dikarenakan kondisi topografi yang berubah-ubah. Hasil pola aliran stratified flow yang didapat pada pipa dengan kilometer 40-55 km menunjukkan bahwa pola aliran tidak menyebabkan perubahan massa liquid secara tiba-tiba pada peralatan Receiving Facility (RF). Desain peralatan RF yang digunakan tidak berbeda jauh dengan hasil perhitungan, dimana berdasarkan hasil perhitungan, desain slug catcher dan knock out drum adalah 48 in/12,5 feet dan 39,4 in/8,2 feet. Hasil evaluasi condensate drum menunjukkan bahwa pada kondisi pigging, dibutuhkan 3 truk tangki berkapasitas 25.000 liter dan pada kondisi operasi normal dibutuhkan 1 buah truk tangki berkapasitas 10.000 liter dengan tangki penampung tambahan berkapasitas 13.000 liter dengan waktu pengambilan setiap 1 minggu sekali. Evaluasi keekonomian proyek yang dikaji pada penelitian ini adalah nilai parameter Net Present Value (NPV), Internal Rate of Return (IRR), dan Payback Period (PBP). Nilai parameter ekonomi yang didapat adalah NPV sebesar USD 7.868.080, IRR 10,47%, dan PBP 8,3 tahun dengan nilai toll fee pada laju alir pasokan gas 15, 40, 80 MMSCFD berturut-turut adalah 2,06 USD/MMBTU, 0,77 USD/MMBTU, 0,39 USD/MMBTU. Hasil sensitivity analysis menunjukkan bahwa toll fee merupakan variabel yang paling sensitif terhadap kelayakan ekonomi. Nilai laju alir ship or pay yang digunakan pada proyek ini adalah 48 MMSCFD dengan nilai toll fee 0,66 USD/MMBTU.

Tanjung Batu PLTGU is one of the mainstays of electricity in East Kalimantan. The Tanjung Batu PLTGU under the Z company of the East Kalimantan Region receives a continuous supply of gas from SKK Migas for 40 MMSCFD. The gas pipe used to transport the gas source is designed to be excess of 80 MMSCFD. However, currently there is a change in the supply of natural gas to the Tanjung Batu PLTGU from 40 MMSCFD down to 15 MMSCFD. Changes in gas supply need to be assessed to determine the feasibility of the gas pipeline construction project. This study aims to conduct a technical and economic evaluation of the project. The technical evaluations examined included flow patterns, evaluations of the use of knock out drums before the flash stack, the condensate drum and the slug cacther used. Evaluation of flow patterns shows that there is instability of flow patterns along the pipe due to changing topographic conditions. The results of stratified flow patterns obtained in the 40-55 km pipeline indicate that the flow patterns do not cause sudden changes in liquid mass on the Receiving Facility (RF) equipment. The design of the RF equipment used does not differ greatly from the calculation results, where based on the calculation results, the design of the slug catcher and knock out drum is 48 in/12,5 feet and 39,4 in/8,2 feet. The results of the condensate drum evaluation show that under the required pigging, it needs 3 tank truck with a capacity of 25.000 liters and under normal operating conditions, it needs 1 tank truck with a capacity of 10.000 liters with an additional holding tank with a capacity of 13.000 liters takes one time every week. The project economic evaluations examined in this study are the Net Present Value (NPV) parameter, the Internal Rate of Return (IRR), and the Payback Period (PBP). The economic parameter values obtained were NPV of USD 7.868.080, IRR of 10,47%, and PBP of 8,3 years with the toll fee on the gas supply flow rate of 15, 40, 80 MMSCFD respectively 2,06 USD/MMBTU, 0,77 USD/MMBTU, 0,39 USD/MMBTU. The sensitivity analysis results show that toll fee is the variable that is most sensitive to economic viability. The value of the ship or pay flow rate used in this project is 48 MMSCFD with a toll fee of 0,66 USD/MMBTU."
Depok: Fakultas Teknik Universitas Indonesia, 2020
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Muhammad Risyad Taufik
"Jaringan pipa transmisi dibutuhkan untuk mentransportasikan gas dengan volume besar. Pada proses perancangan didapatkan nilai diameter pipa adalah sebesar 30.022 inch untuk mengalirkan gas sebesar 203 MMSCFD bertekanan gas inlet 600 Psia dan tekanan outlet 375 Psia dengan kecepatan fluida 17.932 ft/s dibawah nilai kecepatan erosional sehingga pipa tidak akan terjadi vibrasi. Pemilihan diameter pipa harus optimal karena apabila semakin besar diameter pipa tekanan dan temperatur akan menurun dari kondisi awal inlet, sehingga fluida membentuk hydrat, wax dan asphaltene. Diameter pipa terlalu kecil mengakibatkan tekanan dan temperatur yang diterima end point sangat besar yang mempengaruhi keandalan material pipa sehingga dinding pipa cepat terkikis serta akan terjadi thermal expansion ditambah pada operasinya fraksi mol Hydrogen Sulfide dan Carbon Dioxide memiliki konsentrasi hingga 25 dari fluida yang dialirkan. Material pipa Seamless Steel API 5L X65 dengan ketebalan 0.361 inch. Berat total pipa 5071.66 N/m dan resultan gaya hidrodinamis sebesar 1591.1 N/m membuktikan bahwa pipa dalam keadaan stabil. Headloss yang ditimbulkan akibat dari Valve dan Fittings adalah 8035.61 ft dan terjadi penurunan tekanan Pressure Drop sebesar 283 Psia yang dipengaruhi oleh kecepatan spesifik serta panjang dari pipa tersebut. Jari-jari radius overbend yang ditumpu oleh stinger harus lebih besar dari 21 m agar tidak terjadi buckling atau propagasi pada pipa. Unit Pipelay Vessel menggunakan kapal dengan spesifikasi DWT 11300 berkapasitas angkut pipa seberat 4000 ton.

Transmission pipelines are needed to transport large volumes of gas. In the design process, the diameter of the pipe is 30.022 inch for gas flow of 203 MMSCFD, with inlet pressure of 600 Psia and outlet pressure of 375 Psia so the fluid velocity of 17,932 ft s below the point of erosional velocity, so the pipe will not generate vibration. The choice of pipe diameter should be optimal because as the diameter gets bigger, the pressure and the temperature of the pipe will decrease from its inlet initial condition. That will cause the fluid to form hydrate, wax and asphaltenes. If the diameter of the pipe is too small, it rsquo s going to cause a huge pressure and high level of temperature that will be received by the end point. It will affect the reliability of the pipe material, causing the pipe wall to erode quickly. In addition, there will be a thermal expansion in addition the operation of the mole fraction Hydrogen Sulfide and Carbon Dioxide has a concentration up to 25 of the fluid flowed. Material of Seamless Steel pipe API 5L X65 with thickness of 0.361 inch. With a total weight of 5071.66 N m and the resultant hydrodynamic force of 1591.1 N m, it proves that the pipe is stable. The headloss caused by Valve and Fittings is 8035.61 ft and there is a pressure drop of 283 Psia that is influenced by a specific speed of fluids. The radius overbend supported by the stinger must be greater than 21 m in order to avoid buckling or propagation on the pipe. Pipelay Vessel Unit uses ship with specification of DWT 11300 that has the capacity of carrying 4000 ton of pipe."
Depok: Fakultas Teknik Universitas Indonesia, 2018
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Michael Chang Kurniawan
"Pipa transmisi Dumai-Sei Mangkei dibangun sepanjang 421 km dengan tujuan untuk mengalirkan gas alam mencapai 300 MMSCFD baik ke arah Sumatra Selatan dan juga Pulau Jawa, maupun ke arah Sumatra Utara untuk menambahkan pasokan gas alam yang dialirkan pipa transmisi ruas Arun-Belawan. Dalam kajian ini bertujuan untuk mengetahui kelayakan pipa tersebut berdasarkan evaluasi teknis dan ekonomi. Desain teknis meliputi desain sistem pipa transmisi. Perhitungan dari simulasi memberikan hasil desain pipa baja API 5L X42 dengan diameter 28 inci. Desain peralatan meliputi kompresor yang terletak di Dumai dan Sei-Mangkei, berupa kompresor dua tahap dengan masing-masing tahap berkekuatan 7537 hp dan 7353 hp, desain slug catcher yaitu diameter 2,24 meter dan panjang 4,88 meter, desain knock-out drum yaitu diameter 2,07 meter dan tinggi 4,88 meter, serta desain scrubber yaitu diameter 1,1 meter dan tinggi 3,3 meter. Hasil perhitungan nilai parameter keekonomian yang didapatkan adalah NPV sebesar USD 121.878.245, IRR 10,08%, dan PBP setelah 9,75 tahun dengan toll fee sebesar USD 8,37/MMBTU
The Dumai-Sei Mangkei transmission pipeline is built for 421 km to transport 300 MMSCFD of natural gas both ways towards South Sumatra and Java Island, and towards North Sumatra as an additional supply to the Arun-Belawan section pipeline. This study is made to determine the feasibility of the pipe based on its technical and economical evaluations. Technical evaluations include the design of the transmission pipeline system. Based on the calculations of a simulation, the pipe is designed with steel API 5L X42 as its material with a diameter of 28 inches. Equipment designs include compressors which are in both Dumai and Sei-Mangkei, each with two stages, and each stage has a power of 7537 hp and 7353 hp respectively, the design of a slug catcher with a diameter of 2,11 meter and length of 6,33 meter, the design of a knock-out drum with a diameter of 2,18 meter and height of 6,55 meter, and a scrubber with a diameter of 1,1 meter and height of 3,3 meter. The results of economic parameter calculations is a NPV of USD 121.878.245, IRR 10,08%, and PBP after 9,75 years with a toll fee of USD 8,37/MMBTU."
Depok: Fakultas Teknik Universitas Indonesia, 2022
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Mangasi Broman Febrianus
"Keseimbangan antara pasokan dengan kebutuhan gas bumi saat ini menunjukkan kondisi yang timpang. Sistem jaringan distribusi yang belum merata dan kondisi infrastruktur yang kurang memadai, menyebabkan masih terdapat kelebihan kapasitas gas yang belum teralirkan. Oleh karena itu pada keseempatan ini penulis menetapkan Kabupaten Purwakarta sebagai daerah yang akan dikaji dalam rencana pengembangan jaringan pipa gas bumi pada daerah tersebut. Proyeksi permintaan gas bumi untuk elektrifikasi bagi sektor industri dan gas rumah tangga masing-masing sebesar 30,5 MMSCF/D dan 1,3 MMSCF/D, sehingga total gas flow untuk keduanya adalah sebesar 31,8 MMSCF/D. Volume suplai gas flow sebesar 31,8 MSCFD dengan average temperature 519,7 R dan inlet pressure operasi 142 psig. Ukuran diameter dan spesifikasi pipa yang akan digunakan yaitu pipa carbon steel API-5L X52 berdiameter 14 inch, dengan tebal dinding pipa 0,2 inch sesuai dengan pedoman ASME B36.10 serta ketersediaan spesifikasi pipa dan nominal pipe size (NPS) yang terdapat di pasaran. Nilai investasi proyek sebesar USD 12.919.000 untuk SKENARIO 1 sedangkan untuk SKENARIO 2 dan 2A adalah sebesar USD 11.787.630 dengan umur proyek 20 tahun. SKENARIO 2A merupakan skenario yang paling menarik dan layak untuk dijalankan karena dengan penetapan tarif toll fee yang wajar berdasarkan kondisi pasar yaitu sebesar 0,55 USD/MSCF, menghasilkan nilai NPV sebesar 4.177.854 USD, target nilai IRR 13,75%, PBP selama 12,9 tahun, dengan angka B/C Ratio 1,71. Skema pendanaan adalah full equity dengan rencana penyerapan investasi sebesar 50% pada tahun pertama dan 50% pada tahun kedua.

The equilibrium between the supply of natural gas and demand is currently showing an unbalanced condition. Uneven network distribution system and infrastructure conditions are inadequate, there is still excess capacity causing gas that has not been undrained. Therefore, at this pleased moment authors set Purwakarta District as an area that will be studied in the development plans of natural gas pipelines in the area. Projected demand for natural gas for the electrification of the industrial sector and household gas respectively by 30.5 MMSCFD and 1.3 MMSCFD, so that the total gas flow for both is of 31.8 MMSCFD. Gas flow supply volume of 31.8 MSCFD with average temperatures at 519.7 R and with inlet operating pressure at 142 psig. Size of diameters and pipe specification to be used is carbon steel pipe API-5L X52 with 14 inch diameter, pipe thickness 0.2 inch in accordance with the guidelines of ASME B36.10 and the availability of pipeline specification and nominal pipe size (NPS) which easy to find on the market , The investment value of the project amounted to 12.919.000 USD for SKENARIO 1, while for SKENARIO 2 and 2A amounted to 11.787.630 USD for the project lifetimes of 20 years. SKENARIO 2A has been chosen to be the most attractive scenario and seens feasible for the determination of reasonable toll fee rates based on market conditions in the amount of 0,55 USD/MSCF, resulting NPV of 4.177.854 USD, the target IRR of 13,75%, PBP during 12,9 years, with B/C Ratio of 1,71. The applied scheme of funding is with full equity plan investment, and absorption planned by 50% on the first year and another 50% on the second year"
Depok: Universitas Indonesia, 2016
T45801
UI - Tesis Membership  Universitas Indonesia Library
cover
Eni Juliana
"PT X merupakan salah satu perusahaan niaga swasta berfasilitas yang bergerak dalam bidang penyaluran gas alam di wilayah Kabupaten Tangerang. Jaringan pipa distribusi gas yang dimiliki pipa mainline berukuran diameter 8 dan 6 inch, pipa konsumen berukuran 4 inch, dengan total panjang 39,5 km. Pada tahun 2014, PT X diakuisisi oleh PT Y dan menjadi anak PT Y dengan kepemilikan 100% saham. Untuk mengetahui potensi teknis dan keekonomian dari pengembangan aset jaringan pipa yang ada saat ini dalam periode sepuluh tahun mendatang, maka penelitian ini dilakukan. Penelitian dilakukan dengan cara melakukan evaluasi kinerja terhadap jaringan pipa yang ada saat ini, pemetaan sebaran industri di wilayah Kabupaten Tangerang, pembuatan desain teknis pengembangan jaringan pipa gas distribusi dengan menggunakan simulasi proses dan perhitungan keekonomian pengembangan jaringan pipa dengan asumsi semua dana berasal dari ekuitas. Kapasitas laju alir yang dioperasikan saat ini sebanyak 8,1 sampai dengan 9,72 MMSCFD dengan tekanan operasi 120 psig. Nilai keekonomian jaringan pipa existing adalah is NPV = 218.490,92 USD dan PI=1,15. Berdasarkan hasil simulasi proses, jaringan pipa yang ada saat ini memiliki kapasitas maksimum pipa sebesar 28,2 MMSCFD pada tekanan 210 psig. Untuk skenario pengembangan pipa hingga 80% dari kapasitas maksimum (22,6 MMSCFD), maka posisi dan desain pipa pengembangan yang memungkinkan antara lain: 1 km pipa Ø6? dan 3 km pipa Ø4? ke Jalan Industri III dan IV; 2 km pipa Ø4? ke Jalan Telesonik, Jalan Veteran, dan Jalan Jatake; 2 km pipa Ø4? ke Jalan Manis; dan 2 km pipa Ø4? ke Jalan Bhumimas. Total panjang pipa pengembangan adalah 10 km, dengan total biaya investasi sebesar USD 1.326.655,27. Tarif toll fee pipa distribusi ke ruas pipa pengembangan adalah 0,3081 USD/MSCF. Nilai keekonomian jaringan pipa distribusi keseluruhan existing dan pengembangan: NPV= 2.035.313,02 USD and PI=1,49.

PT X is a private commercial company fully engaged in distribution of natural gas business in Kabupaten Tangerang area. The natural gas existing pipelines owned by PT X have 8 and 6 inches in diameter for mainline, and 4 inch for delivery pipeline with total length 39,5 km. In 2014, PT X was acquired by PT Y and became a subsidiary of PT Y with 100% ownership share. In order to know the technical and economic potential of pipeline development for ten years, the research was conducted. Research was done by evaluating the performance of the existing pipelines, mapping the industrial area in Kabupaten Tangerang, created technical design for pipeline development using process simulation software, and calculated the economic value for developing pipeline made, which the source of investments is from equity. The existing capacity used in operation is 8,1 to 9,72 MMSCFD with 120 psig operation pressure. The economic value for existing pipeline is NPV = 218.490,92 USD and PI=1,15. The maximum pipeline capacity is 28,2 MMSCFD in condition 210 psig operating pressure. To optimize the utilities of existing pipeline up to 80% of maximum pipeline capacity (22,6 MMSCFD), the potential position and pipeline design that fit for development are 1 km of Ø6 and 3 km of Ø4? pipe to Jalan Industri III&IV; 2 km of Ø4? pipeline diameter to Jalan Telesonik, Jalan Veteran and Jalan Jatake; 2 km of Ø4? pipeline to Jalan Manis, and 2 km of Ø4? pipeline to Jalan Bhumimas. The total length for pipeline development is 10 km, with USD 1.326.655,27 in total cost. The toll fee tariff for on development pipeline section is 0,3081 USD/MSCF. The economic value for overall existing pipeline and development: NPV= 2.035.313,02 USD and PI=1,49"
Depok: Fakultas Teknik Universitas Indonesia, 2016
T46745
UI - Tesis Membership  Universitas Indonesia Library
cover
Fristy Rizcky Nurzaenal
"

Sensitivitas merupakan efek perubahan dari setiap variabel yang merubah hasil resiko. Metodologi Risk Assessment yang paling umum digunakan di indonesia adalah Muhlbauer, Modified Muhlbauer dan Risk Based Inspection. Pada penelitian ini enam sample segmen jaringan pipa dievaluasi. Secara umum terdapat dua tujuan, yang pertama adalah membandingkan hasil resiko antara metodologi Risk Assessment. yang kedua adalah membandingkan sensitivitas. Metodologi Risk Assessment diterjemahkan kedalam persamaan model matematis dan dihitung dalam software berdasarkan simulasi Montecarlo. Hasil nilai resiko pada segmen high dan medium risk dinilai valid dengan rentang deviasi 24% dan 13%. Hasil analisis sensitivitas menunjukkan bahwa Metodologi Muhlbauer dan Modifikasi Muhlbauer sensitif terhadap kegiatan pihak ketiga. Risk Based Inspection sensitif terhadap damage mechanism intrinsik. Data sensitivitas ini dapat digunakan untuk menghasilkan Metodologi Risk Assessment Pipa Gas yang lebih sensitif dimasa yang akan datang.  

 


Sensitivity is the effect of changes in any variables that changes the risk results. The most common  Risk Assessment Methodology in Indonesia is Muhlbauer, Modified Muhlbauer & Risk Based Inspection. In this study, six natural gas distribution pipeline segment sample was evaluated. In general there are two objectives, firstly comparing the risk result between Risk Assessment Mehodology. Second objectives is to compare the sensitivity. The Risk Assessments methodology is translated into mathematic model and computed in Monte Carlo based simulation software. The risk value result show that in high risk & medium risk pipeline segment, all methodology is valid with 24% and 13% deviation respectively. The sensitivity analysis result show that Muhlbauer & Modified Muhlbauer methodology is sensitive to third party activity. Risk Based Inspection is sensitive to intrinsic damage mechanism. This sensitivity data can be adopted to develop more sensitive Gas Pipeline Risk Assessment Methodology in the future.

"
2019
T53527
UI - Tesis Membership  Universitas Indonesia Library
cover
Juni Nugrahani
"ABSTRAK
PT Y yang berada di lokasi jaringan pipa dedicated hilir ruas Stasiun Gas PGN
Bojonegara-Krakatau Daya Listrik milik PT X mendapatkan alokasi gas bumi dari
kegiatan usaha hulu Migas. Dalam rangka efisiensi dan mengoptimalkan
pemanfaatan dan pemenuhan kebutuhan gas bumi dalam negeri, pengangkutan
gas bumi milik PT Y tersebut sebaiknya dilakukan melalui pipa dedicated hilir
milik PT X.
Dalam penelitian ini dilakukan analisis terhadap pipa yang meliputi analisis
jaringan pipa dan analisis teknis melalui perhitungan initial fill pipa, line pack
pipa dan pipeline uncertainty. Analisis keekonomian dilakukan melalui
perhitungan tarif pengangkutan gas bumi melalui pipa sedangkan analisis
sensitivitas dilakukan untuk mengetahui sensitivitas suatu parameter terhadap
nilai tarif pengangkutan gas bumi melalui pipa yaitu pada volume gas yang
dialirkan dan struktur pendanaan modal.
Dari hasil analisis jaringan pipa didapatkan masih kecilnya tingkat pemanfaatan
pipa eksisting saat ini (23.7%) sehingga masih terdapat lebih kapasitas untuk
pengaliran gas milik PT Y sebesar 20 MMscfd. Jumlah initial fill yang wajib
disediakan oleh Transporter dalam hal ini adalah PT X ke dalam sistem pipa
mula-mula adalah sebesar 1,708.705 Mscf atau 1.71 MMscf. Pipeline uncertainty
didapatkan sebesar 0.11%. Sedangkan tarif pengangkutan gas bumi melalui pipa
yang harus dibayarkan oleh PT Y selaku Shipper kepada PT X selaku Transporter
yaitu sebesar 0.045 USD/Mscf dengan IRR yang ditetapkan sama dengan WACC
yaitu sebesar 13.5%. Dari hasil analisis sensitivitas diketahui bahwa bahwa
semakin kecil volume yang dialirkan akan menaikkan nilai tarif dan sebaliknya.
Sedangkan semakin besar komposisi debt funding dalam struktur pendanaan
modal akan menurunkan nilai WACC sehingga nilai tarif menjadi lebih kecil.

ABSTRACT
PT Y is located near the downstream dedicated pipeline for segment Gas Station
PGN Bojonegara-Krakatau Daya Listrik owned by PT X. PT Y get the gas
allocation from upstream oil and gas business activities. In order to optimize the
efficiency and utilization and meet the needs of domestic natural gas, the
transportation of gas owned by PT Y is preferably done through a downstream
dedicated pipeline of PT X.
This study conducted by analysis that includes analysis of pipelines and technical
analysis through the calculation of pipeline initial fill, pipeline line pack and
pipeline uncertainty. Economic analysis is performed by calculating the natural
gas transport rates while sensitivity analysis is performed to determine the
sensitivity of gas volume flow and capital financing structures on the natural gas
transport rates.
This study results that the pipeline utilization of existing pipe is 23.7% so that
there is more pipeline capacity for transporting 20 MMscfd gas of PT Y. The
pipeline Initial fill that must be provided by the Transporter (PT X) into the
pipeline system is 1,708.705 Mscf or 1.71 MMscf. The pipeline uncertainty is
0.11%. The natural gas transport rates should be paid by PT Y as the Shipper to
PT X as the Transporter is $ 0.045/Mscf with IRR are set equal to WACC
(13.5%). From the results of sensitivity analysis is known that that the smaller
volume of flow rate will increase the natural gas transport rates and vice versa.
While the composition of the debt funding in capital funding structure will
decrease WACC, so that the natural gas transport rates becomes smaller."
Fakultas Teknik Universitas Indonesia, 2013
T35774
UI - Tesis Membership  Universitas Indonesia Library
cover
Resi Aseanto
"ABSTRAK
Pada proyek pembangunan pipa gas sering terjadi di PT. XYZ sering terjadi cost overrun dan time overrun salah satunya dikarenakan oleh Stakeholder Manajemen yang belum dilakukan dengan baik, stakeholder sebagai pihak yang berkepentingan erat dengan pembangunan pipa gas merupakan elemen yang penting yang perlu dikelola. Penelitian ini telah diidentifikasi kepentingan masing-masing stakeholder internal dan eksternal serta dilakukan survey untuk mengidentifikasi kepentingan dari tiap-tiap stakeholder yang berpengaruh dalam rangka peningkatan kinerja waktu dan biaya pada pembangunan pipa gas, dari hasil survey tersebut dilakukan identifikasi dan analisis terhadap stakeholder tersebut menggunakan software structural equation modelling (SmartPLS 3.0) kemudian disusun strategi dan pengelolaan hubungan termasuk didalamnya pola komunikasi antara para stakeholder sehingga dapat meningkatkan kinerja waktu dan biaya proyek yang berbasis PMBOK.

ABSTRACT
In the gas pipeline construction project at PT. XYZ often occur time overrun and cost overrun because of Stakeholder Management who haven’t done well, stakeholders closely with the construction of the gas pipeline is an important element that needs to be managed. This study has identified the interests of each stakeholder internal and external and conducted a survey to identify the interests of each stakeholder influence in order to improve the performance of the time and cost of the construction of a gas pipeline, from the result of the survey conduct stakeholder identification and analysis using structural equation modelling software (SmartPLS 3.0), then prepared a strategy and relationship management including communication patterns among stakeholders so as to improve the performance of the time and cost of project based PMBOK."
Fakultas Teknik Universitas Indonesia, 2014
T43081
UI - Tesis Membership  Universitas Indonesia Library
cover
Novio Valentino
"Gas alam memiliki peranan sangat penting dalam menyediakan energi yang bersih lingkungan. Sehingga, permintaan gas sebagai sumber energi terus meningkat dan relatif lebih tinggi dibandingkan minyak . Pemerintah akan mengoptimalkan pemanfaatan gas bumi sebagai bahan bakar melalu program Jaringan Gas Kota. Pemerintah pada tahun 2010 telah membangun jaringan gas kota, yaitu di antaranya di Kota Depok. Jaringan di bangun di Kelurahan Beji dan Beji Timur dengan jumlah Sambungan Rumah mencapai 4.000 sambungan. Oleh karena itu, maka dilakukan penelitian tentang pengembangan jaringan pipa distribusi gas di rumah tangga. Simulasi dilakukan menggunakan perangkat lunak sistem perpipaan. Hasil studi ini menghasilkan desain basis proses untuk jaringan pipa distribusi gas bumi dan dimensi pipa yang dibutuhkan untuk pengembangan jaringan pipa distribusi gas bumi.

Natural gas has a very important role in providing a clean energy environment. Thus, demand for gas as an energy source continues to increase and the relatively higher compared to oil. The government will optimize the utilization of natural gas as a fuel through the City Gas Network program. Government in 2010 has built a network of city gas, which is among the city of Depok. Network built in East Beji and Beji with the number of house connections reach 4000 connections. Therefore, it conducted research on the development of gas distribution pipelines in the household. Simulations performed using the software pipeline system. The results of this study resulted in the design basis for the natural gas distribution pipelines and pipeline dimensions required for the development of gas distribution pipelines."
Depok: Fakultas Teknik Universitas Indonesia, 2012
S43358
UI - Skripsi Open  Universitas Indonesia Library
cover
Dedi Armansyah
"Laporan Praktik Keinsinyuran ini membahas telaah terhadap pemanfaatan gas bumi melalui pipa di wilayah Kalimantan. Telaah dilakukan terhadap aspek teknis, dan ekonomi yang terdiri atas identifikasi potensi pasokan gas bumi, identifikasi kebutuhan gas bumi, analisa pasokan dan kebutuhan gas bumi, perhitungan biaya pengangkutan, dan perhitungan biaya Niaga gas bumi melalui pipa, analisa harga jual gas bumi, perbandingan biaya keekonomian antara gas bumi melalui pipa dengan moda LNG. Berdasarkan analisa pasokan dan kebutuhan gas bumi serta analisa teknis dan ekonomi terhadap upaya peningkatan pemanfaatan gas bumi melalui pipa di wilayah Kalimantan maka diperoleh kesimpulan bahwa pemenuhan gas bumi untuk memenuhi kebutuhan pengembangan hanya memenuhi kebutuhan untuk skenario paling rendah dimana ketersediaan pasokan gas bumi yang tersedia pada periode 2020 s.d 2030 yang bisa dimanfaatkan untuk pengembangan wilayah Kalimantan hanya dapat mencukupi untuk skenario kebutuhan gas bumi rendah (low scenario). Walau demikian diperkirakan dapat terjadi kekurangan pasokan pada tahun 2024 sebesar -13,51 MMSCFD, tahun 2025 sebesar -43,82 MMSCFD dan tahun 2030 sebesar -130,90 MMSCFD. Sedangkan untuk perhitungan simulasi biaya pengangkutan dan niaga gas bumi melalui pipa di tiap provinsi di Kalimantan lebih ekonomis pada skenario paling tinggi, dimana diperoleh perhitungan harga jual gas bumi terendah untuk skema gas pipa yaitu dengan harga jual US$ 7,28 di Kalimantan Utara, dan harga jual tertinggi sebesar US$19,67 di Kalimantan Barat. Sedangkan untuk skema LNG dengan harga terendah dengan harga jual US$7,14 di Kalimantan Selatan dan harga jual tertinggi dengan dengan harga jual US$9,21 di Kalimantan Tengah. Dengan demikian harga jual gas bumi dengan skema pengangkutan LNG lebih rendah bila dibandingkan harga jual gas bumi dengan skema pengangkutan gas bumi melalui pipa. Dengan belum bertumbuhnya kebutuhan gas bumi melalui pipa maka untuk memenuhi kebutuhan gas bumi di wilayah Kalimantan Barat dan Kalimantan Tengah agar menggunakan moda pengangkutan LNG.

This Engineering Practice Report discusses an analysis of the utilization of natural gas pipelines in the Kalimantan region. The study encompassed technical and economic aspects consisting of the identification of natural gas potential supplies, identification of natural gas demand, analysis of natural gas supply and demand, calculation of transportation costs, calculation of trading costs for natural gas pipeline, analysis of natural gas selling prices, cost comparisons between using natural gas pipeline and LNG mode. Based on the analysis of natural gas supply and demand as well as technical and economic analysis of efforts to increase the utilization of natural gas pipelines in the Kalimantan region, it is concluded that the fulfilment of natural gas demand development can only fulfil the demand for the lowest scenario where the available natural gas supply from period 2020 to 2030 which can be used for the development of the Kalimantan region can only be sufficient for a low natural gas demand scenario (low scenario). However, it is estimated that there could be a supply shortage in 2024 of -13.51 MMSCFD, in 2025 of -43.82 MMSCFD and in 2030 of -130.90 MMSCFD. Meanwhile, for the simulation calculation of the costs of transporting and trading natural gas via pipeline in each province in Kalimantan, it is more economical in the highest scenario, where the lowest natural gas selling price calculation for the pipeline gas scheme is obtained, namely with a selling price of US$ 7.28 in North Kalimantan, and The highest selling price was US$19.67 in West Kalimantan. Meanwhile, for the LNG scheme, the lowest selling price is US$7.14 in South Kalimantan and the highest selling price is US$9.21 in Central Kalimantan. Thus, the selling price of natural gas using the LNG transportation scheme is lower compared to the selling price of natural gas using the natural gas transportation scheme via pipeline. With the demand for natural gas through pipes not yet growing and to fulfill the demand for natural gas in the West Kalimantan and Central Kalimantan regions could use LNG as a transportation mode."
Depok: Fakultas Teknik Universitas Indonesia, 2023
PR-pdf
UI - Tugas Akhir  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>