Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 169172 dokumen yang sesuai dengan query
cover
Endiq Yogana
"Pemeriksaan persyaratan peraturan proyek konstruksi di DKI Jakarta masih dilakukan secara konvensional (paper and CAD based) yang membutuhkan waktu yang lama, sumber daya yang intensif, perbedaan interpretasi terhadap peraturan, proses revisi berulang, proses pelacakan persyaratan yang sulit, tidak akurat dan tidak transparan, serta berimplikasi waktu dan biaya yang signifikan. Pemeriksaan persyaratan secara konvensional menyebabkan masih banyak bangunan gedung di DKI Jakarta yang belum memenuhi persyaratan teknis yang berdampak pada kegagalan bangunan dan ketidakpuasan masyarakat.  Pemeriksaan persyaratan secara otomatis dimungkinkan ketika representasi komputer dari model data produk (Product Data Model (PDM)) diintegrasikan dengan model pengetahuan hukum (Legal Knowledge Model (LKM)) sebagai input bagi sistem/mesin pengolah data dengan prosedur algoritma (Compliant Design Processes (CDP)) untuk menghasilkan laporan pemeriksaan peraturan otomatis yang akurat. Model Bangunan yang dikembangkan dalam Building Information Modelling (BIM) berfungsi sebagai representasi bangunan. Lingkup persyaratan teknis bangunan berbasis BIM dikelola secara dinamis dengan menggunakan Work Breakdown Structure (WBS) dalam satu database yang divalidasi oleh Pemerintah dan dapat diaplikasikan oleh perencana pada setiap tahapan perencanaan. Penelitian ini mengusung integrasi antara ruang lingkup persyaratan peraturan ke dalam tahapan pengembangan model BIM. Penelitian ini bertujuan mengembangkan Sistem Informasi berbasis WBS dengan aplikasi BIM untuk meningkatkan pemenuhan persyaratan teknis bangunan gedung.

Examination of the requirements for construction project regulations in DKI Jakarta is still conducted conventionally (paper and CAD based) which requires a long time, resource intensive, different interpretations of the regulations, the process of revised repetitive, the process of tracking difficult requirements, inaccurate and not transparent, and has significant time and cost implications. Conventional examination of requirements causes that there are still many buildings in DKI Jakarta that have not yet met the technical requirements which have an impact on building failures and public dissatisfaction. Automatic requirements checking is possible when the computer representation of the product data model (Product Data Model (PDM)) is integrated with the Legal Knowledge Model (LKM) as input for data processing systems/machines with algorithmic procedures (Compliant Design Processes (CDP) )) to produce an accurate automatic regulatory check report. The Building Model developed in Building Information Modeling (BIM) functions as a building representation. The scope of BIM-based building technical requirements is managed dynamically using Work Breakdown Structure (WBS) in one database validated by the Government and can be applied by planners at each planning stage. This research carries the integration of the scope of regulatory requirements into the stages of developing the BIM model. This study aims to develop a WBS-based Information System with a BIM application to improve compliance with the technical requirements of buildings."
Depok: Fakultas Teknik Universitas Indonesia, 2019
T55091
UI - Tesis Membership  Universitas Indonesia Library
cover
Watchson, Deka
"Penelitian ini bertujuan melihat pengaruh interaksi multi aktor dari perspektif komunitas usaha kecil menengah (UKM) yang membangun platform ko-kreasi nilai untuk inovasi pemasaran. Platform ko-kreasi nilai dibangun melalui interaksi di luar (collaborative networks) dan di dalam komunitas (dynamic interaction) yang menghasilkan integrasi sumberdaya kolektif. Integrasi sumberdaya meningkatkan kapasitas aktor dalam komunitas UKM untuk menghasilkan inovasi pemasaran.
Interaksi multi aktor pada komunitas UKM menghadirkan kebaruan pemahaman dalam ko-kreasi nilai, karena aktor menunjukkan multi peran dalam interaksinya dengan aktor lain. Hal ini berbeda dengan ko-kreasi nilai yang terjadi di perusahaan besar dimana aktor berperan spesifik dalam berinteraksi dengan aktor lainnya. Penelitian sebelumnya banyak dilakukan di perusahaan besar, komunitas brand atau komunitas konsumen, sedangkan penelitian ini menawarkan platform ko-kreasi nilai dan dimensi inovasi pemasaran dalam komunitas UKM.
Penelitian ini memberikan kebaruan pada teori utama SDL yang merupakan dasar bagi pembangunan model penelitian. SDL digunakan untuk menyusun konstruk ko-kreasi nilai dan Consumer Culture Theory (CCT) untuk menjelaskan peranan komunitas UKM melalui market-mediated networks, sedangkan dimensi inovasi pemasaran diturunkan dari definisi yang dipublikasikan oleh Organisation for Economic Cooperation and Development (OECD).
Penelitian ini menggunakan beberapa metode riset kualitatif dan kuantitatif melalui studi eksploratori konfirmatif, observasi, dan survey kuantitatif. Pemilihan responden dilakukan dengan teknik purposive non-probability sampling yang menghasilkan 200 set data yang berasal dari anggota Komunitas Organik Indonesia dan Komunitas Tangan Di Atas. Responden adalah pemilik, manajer puncak, atau pengambil keputusan dalam UKM yang melakukan multi peran dalam berinteraksi dalam ekosistem komunitas UKM tersebut.
Hasil penelitian menunjukkan adanya pengaruh positif timbal balik antara interaksi eksternal (collaborative networks) dan interaksi internal (dynamic interaction) dan pengaruh positif kedua interaksi tersebut terhadap integrasi sumberdaya yang menghasilkan inovasi pemasaran.
Penelitian ini memberikan kontribusi akademik dengan menghasilkan model penelitian bagi konsep ko-kreasi nilai dan dimensi inovasi pemasaran pada komunitas UKM. Platform ko-kreasi nilai tersebut dapat digunakan untuk pengukuran performa bisnis dan dapat diterapkan pada berbagai topik penelitian multi-displin ilmu. Secara praktis, hasil penelitian ini dapat digunakan para pengambil kebijakan sebagai strategi alternatif pengembangan dan inovasi UKM melalui komunitas yang dapat membangun ketahanan ekonomi.

This study aims to analyze multi-actor interactions from the perspective of small-medium enterprise (SME) community. It offers a platform of value co-creation for marketing innovation. Value co-creation platform is formed by interactions outside and within community to integrate collective resources. It increases the capacity of actors in SME community to perform marketing innovation.
Multi-actor interactions in SME community present novel understanding in value co-creation, since an actor can act multi roles. It differs from that in big company where an actor acts specific role in the interaction with others. The previous studies are mostly dominated by research on individual or large company, brand community, or consumer community while this study offers a new framework for value co-creation and dimensions of marketing innovation in SME community.
This study extends Service-Dominant Logic (SDL) as a main theory from which the research model is constructed. SDL justifies the concept of value co-creation and Consumer Culture Theory (CCT) supports it by explaining the roles of SME community through market-mediated networks. The construct of marketing innovation is derived from Organisation for Economic Cooperation and Development (OECD).
Mix methods were applied in this research by conducting confirmative exploratory, observation, and quantitative survey. The units of observation were chosen by purposive non-probability sampling technique involving 200 respondents. The respondents are members of Komunitas Organik Indonesia and Komunitas Tangan Di Atas, including the owner, top management, decision maker, or business head of the enterprises who act multi roles in the service ecosystem of the community.
The research findings demonstrate the interaction between the members of small-medium enterprise (SME) community with external actors through collaborative networks and with other actors inside community through dynamic interaction. Those interactions show reciprocal influence and lead to resource integration that produces marketing innovation in SME community ecosystem.
In academic view, this research develop SDL theory by providing open platform of value co-creation and defining dimensions of marketing innovation in SME community. The framework offers not only a measurement of business performance, but also a compatible model for various research in multi-discipline areas. Practically, the framework can be adopted by policy makers to build alternative developing strategy for SME through community that also support economic resilience.
"
Depok: Fakultas Teknik Universitas Indonesia, 2019
T54407
UI - Tesis Membership  Universitas Indonesia Library
cover
Anita Handayaniputri
"Government building is one of the country's assets that has a very strategic and urgent function for the interests of public services. In order to realize sustainable development, it is necessary to carry out government buildings that implement the integration of technical, economic, social and environmental aspects effectively through green buildings. Green buildings have measurable performance in saving energy, water and other resources. Green buildings of government buildings require effective and efficient maintenance and maintenance management to maintain the reliability of buildings and their facilities and infrastructure so that they are always worthy of functions both in terms of safety, health, comfort and convenience. The development of technology and information systems has led to the concept of e-maintenance which combines the principles of maintenance, web services and the principles of modern electronic collaboration. E-maintenance combined with Work Breakdown Structure (WBS) and integrated with Building Information Modeling (BIM) will improve the building maintenance and maintenance process that is precise, accurate, fast and easy. This study uses primary and secondary data from the literature and is validated by experts through questionnaires and through Focus Group Discussion (FGD).

Gedung pemerintah merupakan salah satu aset negara yang memiliki fungsi sangat strategis dan urgen bagi kepentingan layanan publik. Dalam rangka mewujudkan pembangunan berkelanjutan, diperlukan penyelenggaraan bangunan gedung pemerintah yang menerapkan keterpaduan aspek teknis, ekonomi, sosial dan lingkungan secara efektif melalui bangunan hijau. Bangunan hijau memiliki kinerja terukur dalam penghematan energi, air dan sumber daya lainnya. Bangunan hijau gedung pemerintah memerlukan manajemen pemeliharaan dan perawatan yang efektif dan efisien untuk menjaga keandalan bangunan gedung beserta sarana dan prasarananya agar selalu laik fungsi baik dari segi keselamatan, kesehatan, kenyamanan dan kemudahan. Perkembangan teknologi dan sistem informasi telah memunculkan konsep e-maintenance yang menggabungkan prinsip pemeliharaan, layanan web dan prinsip kolaborasi elektronik modern. E-maintenance yang dipadukan dengan Work Breakdown Structure (WBS) dan diintegrasikan dengan Building Information Modeling (BIM) akan meningkatkan proses pemeliharaan dan perawatan gedung yang tepat, akurat, cepat serta mudah. Penelitian ini menggunakan data primer dan sekunder dari literatur dan divalidasi oleh pakar melalui kuesioner serta melalui Focus Group Discussion (FGD)."
Depok: Fakultas Teknik Universitas Indonesia, 2020
D2779
UI - Disertasi Membership  Universitas Indonesia Library
cover
Dinda Syafryn Aurellina
"Tingkat kecelakaan kerja di sektor konstruksi Indonesia masih sangat tinggi. Salah satu penyebab utamanya adalah adanya aktivitas pekerjaan yang tidak terawasi dan kerusakan pada komponen arsitektur bangunan yang tidak memenuhi standar kinerja pemeliharaan. Hal ini menyebabkan pengendalian risiko pada aktivitas pekerjaan tersebut terabaikan. Oleh karena itu, penting untuk merencanakan keselamatan konstruksi dengan menggunakan Work Breakdown Structure (WBS) agar semua aktivitas berisiko dapat terawasi. Selain itu, kemajuan teknologi seperti Building Information Modelling (BIM) juga dapat meningkatkan efektivitas dan efisiensi perencanaan keselamatan konstruksi. Penelitian ini bertujuan untuk mengembangkan perencanaan keselamatan konstruksi menggunakan WBS berbasis BIM khususnya untuk pekerjaan arsitektur bangunan gedung. Metode kualitatif akan digunakan dalam penelitian ini untuk menganalisis risiko kecelakaan kerja menggunakan WBS pada pekerjaan arsitektur gedung, dengan studi kasus pada Gedung Kantor Kejaksaan Tinggi Provinsi DKI Jakarta. Penelitian ini menghasilkan strategi manajemen keselamatan konstruksi yang efektif dan dapat meningkatkan kinerja keselamatan konstruksi (K2), terutama pada aktivitas pemeliharaan dan perawatan pada proyek konstruksi bangunan gedung di Indonesia.

The rate of workplace accidents in the construction sector in Indonesia remains alarmingly high. One of the main causes in the lack of supervision over work activities and the presence of damaged architectural components in buildings that do not meet maintenance performance standards, leading to neglected risk control measures for these work activites. Therefore, it is crucial to plan construction safety using Work Breakdown Structure (WBS) to ensure that all high-risk activites are properly supervised. Additionaly, with the rapid advancement of technology, utilizing Building Information Modelling (BIM) systems in construction project can greatly enhance the effectiveness and efficiency of safety planning. This research aims to develop WBS-based BIM construction safety planning specifically for architectural work in building construction. The research methodology employed will be quantitative, focusing on analysing work accident risks using WBS for architectural work in the case study of the High Prosecutor’s Office Building in DKI Jakarta Province. The expected outcomes of this research include effective construction safety management strategies that can improve overall safety performance (K2), particularly in maintenance and upkeep activities for building construction projects in Indonesia."
Depok: Fakultas Teknik Universitas Indonesia, 2023
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Sheba Bilqis
"Cagar Budaya adalah warisan budaya bersifat kebendaan yang berupa benda, bangunan , struktur, situs, dan kawasan  di darat dan/atau di air yang perlu dilestarikan keberadaannya karena memiliki nilai penting bagi sejarah, ilmu pengetahuan, pendidikan, agama, dan/atau kebudayaan melalui proses penetapan. Kementerian Sekretariat Negara RI saat ini mengelola 6 Istana yang tersebar di Indonesia, yaitu Istana Negara, Istana Merdeka, Istana Kepresidenan Bogor, Istana Kepresidenan Cipanas, Istana Kepresidenan Yogyakarta serta Istana Kepresidenan Tampaksiring. Istana-istana tersebut menjadi tempat penting bagi presiden beserta wakil presiden dalam menjalankan roda pemerintahan baik dimasa lampau maupun dimasa sekarang. Saat ini keenam Istana Kepresidenan yang dimaksud telah ditetapkan sebagai Bangunan Gedung Cagar Budaya (BGCB) dan keberadaannya menjadi nilai penting dalam upaya pelestarian cagar budaya yang sudah diatur dalam Permen PU Nomor 19 Tahun 2021 tentang Pedoman Teknis Penyelenggaraan Bangunan Gedung yang dilestarikan. Atas dasar tersebut keandalan bangunan perlu didukung dengan sistem pemeliharaan yang baik, tepat dan benar  terhadap  bangunan gedung cagar budaya. Penelitian ini bertujuan mengembangkan e-maintenance berbasis (1) Work Breakdown Structure (WBS), sebagai dasar awal perencanaan pemeliharaan bangunan gedung cagar budaya, yang nantinya aktivitas kegiatana di urai menjadi suatu pedoman pelaksanaan pemeliharaan BGCB, selanjutnya diintegrasikan pada (2) Building Information Modeling (BIM) yang memuat informasi, pedoman, dan data historis pemeliharaan bangunan. Model ini kemudian dimasukkan dalam (3) Sistem Informasi, untuk mendukung kemudahan akses yang dapat mempercepat proses pemeliharaan bangunan gedung cagar budaya. Pengembangan e-maintenance ini akan meningkatkan kinerja pemeliharaan bangunan cagar budaya dan diharapkan dapat diadopsi untuk bangunan historis lainnya. Metodologi penelitian yang digunakan berupa validasi pakar, wawancara, studi literatur dan studi kasus. Hasil validasi kemudian diintegrasikan ke dalam BIM dan dikembangkan dalam sebuah sistem informasi yang diuji coba terhadap obyek penelitian bangunan gedung cagar budaya berupa bangunan gedung Istana Kepresidenan Bogor.

Cultural Heritage is material in the form of objects, buildings, structures, sites, and areas on land and / or in water that need to be preserved because they have important values for history, science, education, religion, and/or culture through the determination process. The Ministry of State Secretariat of the Republic of Indonesia currently manages 6 palaces spread across Indonesia: the State Palace, Merdeka Palace, Bogor Presidential Palace, Cipanas Presidential Palace, Yogyakarta Presidential Palace, and Tampaksiring Presidential Palace. These palaces are important places for the president and vice president in running the wheels of government both in the past and present. Currently, the six Presidential Palaces in question have been designated as Cultural Heritage Buildings, and their existence is an important value in efforts to preserve cultural Heritage, which has been regulated in The Ministry of Public Works Regulation Number 19 of 2021 concerning Technical Guidelines for the Implementation of Preserved Buildings. On this basis, building reliability must be supported by a good, precise, and correct maintenance system for cultural heritage buildings. This study aims to develop e-maintenance based on (1) Work Breakdown Structure (WBS) as the initial basis for planning the maintenance of cultural heritage buildings, which later the activities will be broken down into a guideline for the implementation of BGCB maintenance, then integrated into (2) Building Information Modeling (BIM) which contains information, guidelines, and historical data on building maintenance. This model is then included in (3) Information Systems to support ease of access that can speed up the maintenance process of cultural heritage buildings. The development of this e-maintenance will improve the maintenance performance of cultural heritage buildings and is expected to be adopted for other historical buildings. The research methodology used is in the form of expert validation, interviews, literature studies and case studies. The validation results were then integrated into BIM and developed in an information system tested on the object of research on cultural heritage buildings in the form of the Bogor Presidential Palace building."
Depok: Fakultas Teknik Universitas Indonesia, 2023
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Taffi Hensan Kurniawan
"Pertumbuhan populasi yang pesat di Indonesia telah meningkatkan permintaan akan infrastruktur yang aman dan efisien, termasuk gedung bertingkat. Tingginya angka kecelakaan kerja di sektor konstruksi menjadi perhatian utama, dengan lebih dari 370.000 kasus tercatat pada tahun 2023. Untuk mengatasi permasalahan ini, penelitian ini mengembangkan sistem informasi proses audit yang mengintegrasikan BIM (Building Information Modeling) dengan WBS (Work Breakdown Structure). Penelitian ini bertujuan untuk mengidentifikasi dan mengembangkan standar WBS dan RKK (Rencana Keselamatan Konstruksi) untuk proyek rancang bangun gedung bertingkat, serta mengembangkan sistem informasi audit keselamatan berbasis BIM yang terintegrasi dengan WBS. Metodologi yang digunakan dalam penelitian ini meliputi pendekatan studi kasus, analisis arsip, dan validasi dari para ahli. Data dikumpulkan melalui survei dan wawancara dengan pakar keselamatan konstruksi, serta analisis dokumen-dokumen terkait seperti Peraturan Menteri PUPR No. 10 Tahun 2021. Hasil penelitian menunjukkan bahwa pengembangan sistem informasi proses audit yang mengintegrasikan BIM dengan WBS dapat secara signifikan meningkatkan kinerja keselamatan konstruksi. Sistem ini memastikan setiap tahap proyek berjalan sesuai dengan standar keselamatan yang ditetapkan, mengurangi risiko kecelakaan kerja, dan meningkatkan efisiensi serta efektivitas manajemen proyek.

The rapid population growth in Indonesia has increased the demand for safe and efficient infrastructure, including high-rise buildings. The high number of workplace accidents in the construction sector, with more than 370,000 cases recorded in 2023, is a major concern. To address these issues, this study develops an audit process information system that integrates BIM (Building Information Modeling) with WBS (Work Breakdown Structure). The study aims to identify and develop standards for WBS and RKK (Construction Safety Plan) for high-rise building design projects, and to develop a BIM-based safety audit information system integrated with WBS. The methodology used in this study includes a case study approach, archival analysis, and expert validation. Data were collected through surveys and interviews with construction safety experts, as well as analysis of relevant documents such as the Minister of PUPR Regulation No. 10 of 2021. The findings indicate that the development of an audit process information system integrating BIM with WBS can significantly improve construction safety performance. This system ensures that each project stage complies with established safety standards, reduces the risk of workplace accidents, and enhances the efficiency and effectiveness of project management."
Depok: Fakultas Teknik Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Ruth Deborah
"Pemeliharaan dan perawatan jembatan bertujuan untuk mengoptimalkan keandalan jembatan dari segi fungsional, struktural, dan estetika. Di Indonesia, jembatan tidak terlepas dari masalah pemeliharaan dan perawatan, dibuktikan dengan banyaknya jembatan dengan kondisi rusak hingga runtuh yang berdampak buruk dalam meningkatkan biaya pemeliharaan dan perawatan jembatan. Penelitian ini akan mengembangkan sistem pemeliharaan dan perawatan jembatan beton berbasis Building Information Modeling (BIM) dan Work Breakdown Structure (WBS). WBS membantu mengelola lingkup pekerjaan pemeliharaan dan perawatan secara detail, sementara BIM memfasilitasi manajemen data dan visualisasi selama fase pemeliharaan. Kedua hal ini akan diintegrasikan pada sebuah sistem informasi pemeliharaan and perawatan jembatan dengan tujuan akhir adalah untuk meningkatkan kinerja pemeliharaan dan perawatan jembatan. Metodologi penelitian ini bersifat kualitatif dengan studi kasus Jembatan Bukit Indah pada Jalan Tol Cinere-Serpong. Data pada penelitian  ini diperoleh melalui studi literatur, analisis arsip, serta studi kasus. Data kemudian divalidasi oleh pakar bidang pemeliharaan dan perawatan jalan dan jembatan serta pakar pada bidang BIM. Selanjutnya, dilakukan analisis untuk mendapatkan model hubungan penggunaan BIM berbasis WBS dengan kinerja pemeliharaan dan perawatan jembatan beton. Hasil penelitian ini adalah sistem informasi yang menyediakan data WBS dan BIM pada jembatan yang terintegrasi dalam rangka meningkatkan kinerja pemeliharaan dan perawatan jembatan.

The maintenance of a bridge aim to optimize its reliability in terms of functionality, structure, and aesthetics. In Indonesia, bridges are unavoidably entangled with maintenance issues, as evidenced by the massive number of damaged or collapsed bridges, which adversely impact maintenance and care costs. This research will develop a maintenance system for concrete bridges based on Building Information Modeling (BIM) and Work Breakdown Structure (WBS). WBS manages the scope of maintenance tasks in detail, while BIM facilitates data management and visualization during the maintenance phase. Both of these aspects will be integrated into a bridge maintenance information system, ultimately aimed at enhancing bridge maintenance performance. This qualitative research uses the Bukit Indah Bridge on the Cinere-Serpong Toll Road as a case study. Datas for this study were obtained through literature review, archive analysis, and case study. The data were then validated by experts in road and bridge maintenance, as well as experts in the field of BIM. Subsequently, an analysis will be conducted to establish a model of the relationship between BIM-based WBS usage and the performance of concrete bridge maintenance. The result of this research is an information system providing WBS and BIM data for bridges integrated to enhance bridge maintenance performance."
Depok: Fakultas Teknik Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Putu Ananta Kusuma Wijaya
"Penelitian ini bertujuan untuk mengembangkan safety plan pekerjaan saluran irigasi berbasis Work Breakdown Structure (WBS) dengan menggunakan teknologi Building Information Modelling (BIM) guna meningkatkan kinerja keselamatan konstruksi. Latar belakang penelitian ini didasari oleh tingginya angka kecelakaan kerja di sektor konstruksi di Indonesia, khususnya pada pekerjaan saluran irigasi, yang mengakibatkan kerugian dari segi biaya, waktu, dan produktivitas. Metodologi penelitian mencakup pembuatan standar WBS, identifikasi aktivitas berisiko, dan tingkat risiko keselamatan konstruksi berbasis WBS, serta pengembangan safety plan yang terintegrasi dengan sistem BIM. Hasil penelitian menunjukkan bahwa integrasi WBS dengan BIM mampu mengidentifikasi risiko keselamatan secara lebih efektif, memungkinkan tindakan mitigasi risiko sejak tahap perencanaan. Selain itu, safety plan yang dikembangkan berdasarkan pendekatan ini mengacu pada Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat No. 10 Tahun 2021 dan menunjukkan peningkatan signifikan dalam keefektifan pelaksanaan keselamatan konstruksi. Studi kasus yang diambil pada proyek Rehabilitasi dan Modernisasi D.I. Saddang Sub Unit Langnga memperkuat validitas dari pendekatan yang digunakan. Penelitian ini memberikan kontribusi penting dalam manajemen proyek konstruksi, khususnya dalam pengembangan safety plan berbasis teknologi BIM untuk pekerjaan saluran irigasi.

This study aims to develop a safety plan for irrigation canal works based on the Work Breakdown Structure (WBS) using Building Information Modelling (BIM) technology to enhance construction safety performance. The research is motivated by the high rate of workplace accidents in Indonesia's construction sector, particularly in irrigation projects, which result in financial, time, and productivity losses. The research methodology includes developing a standardized WBS, identifying risky activities and levels of construction safety risks based on WBS, and creating a safety plan integrated with the BIM system. The findings indicate that integrating WBS with BIM effectively identifies safety risks and enables risk mitigation actions from the planning stage. Additionally, the safety plan developed under this approach, aligned with the Ministry of Public Works and Housing Regulation No. 10 of 2021, demonstrates significant improvements in construction safety implementation. A case study on the Rehabilitation and Modernization Project of D.I. Saddang Sub Unit Langnga further validates the approach's effectiveness. This research provides a crucial contribution to construction project management, particularly in developing BIM-based safety plans for irrigation canal works."
Jakarta: Fakultas Teknik Universitas Indonesia, 2025
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Nazla Khalda Khairunisya
"Penelitian ini ditujukan untuk mengembangkan sistem informasi yang terintegrasi Building Information Modelling (BIM) dan Work Breakdown Structure (WBS) sebagai alat pendukung pemeliharaan dan perawatan gedung sekolah Near Zero Energi Building (NZEB) di Jakarta dengan studi kasus adalah SMAN 96 Jakarta. WBS mampu menjabarkan lingkup pekerjaan hingga bagian terkecil, BIM mampu menunjang penggambaran visualisasi pekerjaan, sementara sistem informasi mampu mengintegrasikan kedua hal tersebut sehingga pekerjaan pemeliharaan dan perawatan menjadi lebih efisien dan efektif. Penelitian dilakukan dengan metode kualitatif, dengan analisa arsip dan studi literatur akan studi kasus sebagai metode pengumpulan datanya. Data primer akan dikumpulkan melalui pengembangan model dan kuesioner yang akan divalidasi oleh pakar/tenaga ahli. Penelitian ini akan menghasilkan sistem informasi yang terintegrasi dengan BIM berbasis WBS untuk meningkatkan kinerja pemeliharaan dan perawatan gedung sekolah NZEB yang diproyeksikan agar dapat menyelesaikan kesulitan terkait pekerjaan pemeliharaan dan perawatan gedung sekolah NZEB di Indonesia sehingga mampu mendorong keberlanjutan pendidikan.

This research aims to develop an integrated information system of Building Information Modeling (BIM) and Work Breakdown Structure (WBS) as a tool to support the maintenance and management of Near Zero Energy Building (NZEB) school buildings in Jakarta, with a case study on SMAN 96 Jakarta. WBS breaks down the scope of work into detailed components, BIM facilitates visualization, and the information system integrates these elements to make maintenance and management tasks more efficient and effective. The research employs a qualitative method, including archival analysis and literature review of the case study as data collection methods. Primary data will be collected through model development and questionnaires validated by experts. This research will produce a BIM-WBS-based integrated information system to enhance the performance of NZEB school building maintenance and management that are expected to address challenges related to NZEB school building maintenance in Indonesia, thereby promoting sustainable education. "
Depok: Fakultas Teknik Universitas Indonesia, 2025
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Hafidah Ajeng Litasari
"Banyak proyek konstruksi yang menimbulkan limbah konstruksi yang berdampak pada lingkungan proyek akibat perencanaan sumber daya yang tidak akurat. Penelitian ini bertujuan untuk meningkatkan akurasi penggunaan sumber daya dengan mengembangkan sebuah sistem perencanaan sumber daya yang dapat mengatasi permasalahan tersebut melalui integrasi kamus Work Breakdown Structure (WBS) dan Building Information Modeling (BIM). Dalam kamus WBS, terdapat deskripsi atau penjelasan yang rinci tentang setiap komponen dalam WBS. Deskripsi yang detail ini dapat membantu dalam mengidentifikasi kebutuhan sumber daya dengan lebih akurat, seperti tenaga kerja, material, dan peralatan yang diperlukan untuk setiap pekerjaan yang ada dalam struktur proyek. Dengan menggunakan BIM, pengelolaan data dan informasi dapat dilakukan secara efisien juga mempermudah visualisasi dalam tahap perencanaan. Pada penelitian ini sistem dirancang dengan menggunakan sistem informasi berbasis website yang menggabungkan Work Breakdown Structure (WBS), kamus WBS, checklist WBS dengan Building Information Modeling (BIM) terkait data perencanaan sumber daya jembatan beton precast. Metodelogi penelitian ini bersifat kualitatif dengan studi kasus yang digunakan yaitu Jembatan Bukit Indah pada Jalan Tol Cinere-Serpong. Hasil penelitian ini adalah Work Breakdown Structure (WBS), kamus WBS, checklist WBS, Building Information Modeling (BIM) dan pengembangan sistem informasi perencanaan sumber daya yang dapat meningkatkan akurasi penggunaan sumber daya seperti tenaga kerja, material, dan peralatan pada proyek jembatan beton precast komponen struktur atas.
Many construction projects generate construction waste that impacts the project environment due to inaccurate resource planning. This research aims to improve the accuracy of resource utilization by developing a resource planning system that addresses these issues through the integration of a Work Breakdown Structure (WBS) dictionary and Building Information Modeling (BIM). In the WBS dictionary, there are detailed descriptions or explanations of each component within the WBS. These detailed descriptions can help in accurately identifying resource needs, such as labor, materials, and equipment required for each task within the project structure. By using BIM, data and information management can be conducted efficiently, also facilitating visualization during the planning stage. In this study, the system is designed using a web-based information system that combines Work Breakdown Structure (WBS), WBS dictionary, WBS checklist with Building Information Modeling (BIM) related to resource planning data for precast concrete bridges. This research methodology is qualitative with the case study used, namely the Bukit Indah Bridge on the Cinere-Serpong Toll Road. The results of this study indicate that the Work Breakdown Structure (WBS), WBS dictionary, WBS checklist, Building Information Modeling (BIM), and the development of a resource planning information system can enhance the accuracy of resource utilization such as labor, materials, and equipment in precast concrete bridge projects for upper structure components. "
Depok: Fakultas Teknik Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>