Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 35836 dokumen yang sesuai dengan query
cover
Muhammad Risyad Taufik
"Jaringan pipa transmisi dibutuhkan untuk mentransportasikan gas dengan volume besar. Pada proses perancangan didapatkan nilai diameter pipa adalah sebesar 30.022 inch untuk mengalirkan gas sebesar 203 MMSCFD bertekanan gas inlet 600 Psia dan tekanan outlet 375 Psia dengan kecepatan fluida 17.932 ft/s dibawah nilai kecepatan erosional sehingga pipa tidak akan terjadi vibrasi. Pemilihan diameter pipa harus optimal karena apabila semakin besar diameter pipa tekanan dan temperatur akan menurun dari kondisi awal inlet, sehingga fluida membentuk hydrat, wax dan asphaltene. Diameter pipa terlalu kecil mengakibatkan tekanan dan temperatur yang diterima end point sangat besar yang mempengaruhi keandalan material pipa sehingga dinding pipa cepat terkikis serta akan terjadi thermal expansion ditambah pada operasinya fraksi mol Hydrogen Sulfide dan Carbon Dioxide memiliki konsentrasi hingga 25 dari fluida yang dialirkan. Material pipa Seamless Steel API 5L X65 dengan ketebalan 0.361 inch. Berat total pipa 5071.66 N/m dan resultan gaya hidrodinamis sebesar 1591.1 N/m membuktikan bahwa pipa dalam keadaan stabil. Headloss yang ditimbulkan akibat dari Valve dan Fittings adalah 8035.61 ft dan terjadi penurunan tekanan Pressure Drop sebesar 283 Psia yang dipengaruhi oleh kecepatan spesifik serta panjang dari pipa tersebut. Jari-jari radius overbend yang ditumpu oleh stinger harus lebih besar dari 21 m agar tidak terjadi buckling atau propagasi pada pipa. Unit Pipelay Vessel menggunakan kapal dengan spesifikasi DWT 11300 berkapasitas angkut pipa seberat 4000 ton.

Transmission pipelines are needed to transport large volumes of gas. In the design process, the diameter of the pipe is 30.022 inch for gas flow of 203 MMSCFD, with inlet pressure of 600 Psia and outlet pressure of 375 Psia so the fluid velocity of 17,932 ft s below the point of erosional velocity, so the pipe will not generate vibration. The choice of pipe diameter should be optimal because as the diameter gets bigger, the pressure and the temperature of the pipe will decrease from its inlet initial condition. That will cause the fluid to form hydrate, wax and asphaltenes. If the diameter of the pipe is too small, it rsquo s going to cause a huge pressure and high level of temperature that will be received by the end point. It will affect the reliability of the pipe material, causing the pipe wall to erode quickly. In addition, there will be a thermal expansion in addition the operation of the mole fraction Hydrogen Sulfide and Carbon Dioxide has a concentration up to 25 of the fluid flowed. Material of Seamless Steel pipe API 5L X65 with thickness of 0.361 inch. With a total weight of 5071.66 N m and the resultant hydrodynamic force of 1591.1 N m, it proves that the pipe is stable. The headloss caused by Valve and Fittings is 8035.61 ft and there is a pressure drop of 283 Psia that is influenced by a specific speed of fluids. The radius overbend supported by the stinger must be greater than 21 m in order to avoid buckling or propagation on the pipe. Pipelay Vessel Unit uses ship with specification of DWT 11300 that has the capacity of carrying 4000 ton of pipe."
Depok: Fakultas Teknik Universitas Indonesia, 2018
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Ardiansyah
"PT. PLN unit pembangkit Muara Tawar akan melakukan penggantian bahan baker dari Bahan Bakar Minyak menjadi gas bumi sebagai salah satu bentuk penghematan dan konservasi energi. Titik supplai terdekat yang dapat memenuhi kebutuhan gas yang dibutuhkan berada dilokasi Muara Bekasi, yang merupakan bagian dari jalur pipa transmisi utama Sumatera Selatan - Jawa Barat atau yang dikenal dengan SSWJ. Oleh karena itu dibutuhkan pipa yang dapat menghubungkan kedua titik tersebut. Tujuan penyusunan studi ini adalah untuk menghasilkan suatu rancangan system perpipaan transmisi gas dari titik suplai gas dari tapping point Muara bekasi ke PT. PLN Pembangkit Muara Tawar melalui jalur lepas pantai (offshore). Perancangan sistem perpipaan transmisi gas ini dimulai dengan pengumpulan data teknis dan data suplai-permintaan gas PT.PLN Pembangkit Muara Tawar, dilanjutkan dengan analisis data, pembuatan rute serta hasil kondisi teknis design. Standar desain yang digunakan dalam perancangan sistem perpipaan transmisi gas ini adalah DnV 2000. Kebutuhan gas PT. PLN Pembangkit Muara Tawar adalah 400 MMSCFD. Dari data sekunder, diperoleh panjang total rute alternatif 3,7 km. Diameter pipa Carbon Steel yang digunakan memiliki diameter nominal 22 inch. Tekanan suplai gas adalah 350 psig dengan tekanan di titik demand ditetapkan sebesar 500 psig sehingga dibutuhkan kompresor. Pada sistem perpipaan yang dirancang, diperoleh tekanan di titik akhir sebelum masuk kompresor adalah 321,7 psig Pada perancangan ini faktor kestabilan pipa pada dasar laut menjadi faktor penentu. Sehingga untuk mendapatkan kestabilan pada pipa berat pipa harus lebih besar dari berat minimum yang telah ditentukan, dari hasil yang diperoleh berat minimum pipa yaitu 793,16 ton, sedangkan hasil rancangan sebesar 932,6 ton. Sehingga dari hasil rancangan dapat disimpulkan pipa akan stabil pada dasar laut. Pembangunan sistem perpipaan dilakukan 2 tahap (2008-2010) dengan masa operasi selama 15 tahun (2008-2023). Daya kompresor yang digunakan adalah 7.000 HP untuk tahap I dan 7.000 HP untuk tahap II dengan efisiensi 0,75 dan rasio Pout/Pin sebesar 1,55. Total pembiayaan yaitu US$ 10.329.901, dengan IRR 67,79 %, B/C 10,4 dan tingkat pengembalian modal 8,16 bulan.

PLN Muara Tawar will substitute the need of oil fuel to gas as form of economizing and energy conservation. The nearest supply point to fulfill natural gas needed on Muara Bekasi, from main network pipe transmission South Sumatra-West Java or SSWJ. So that PLN needed to develop gas pipeline infrastructure to joining the point. The purpose of this study is to create a system of gas transmission pipeline from gas supply point at Muara Bekasi to PT. PLN Pembangkit Muara Tawar trough to offshore area. Design of gas transmission pipeline is started with technical data collection and supply-demand analyzing, continued with data analysis, rute construction and result of condition operation. The standard design which had been used in gas transmission pipeline system is DnV 2000. Gas demand in PT. PLN Pembangkit Muara Tawar is 400 MMSCFD. From seconder data had been obtained total length of alternative route 3,7 km. Carbon Steel pipe diemeter which had been used 22 inch nominal diameter. Gas supply pressure is 350 psig with pressure of demand point is setted on 500 psig. On pipeline system design the preesure before put in to compressor is around 321,7 psig. The design on bottom stability factor to be the main concern, when the pipe wills stabile if the weight of pipe on bottom more than minimum requirement. From the design calculation the minimum pipe weight is 26,61 ton, whereas the design around 932,6 ton. So that pipe will be stabil on bottom of sea. Compressor which be used is 7.000 HP for step I and 7.000 for step II with efficiency 0,75 and ratio Pout /Pin is 1,55. Total of investment cost reach US$ 10.329.901.With 67,79% IRR, B/C 10,4 and payback period 8,16 month."
Depok: Fakultas Teknik Universitas Indonesia, 2008
S49694
UI - Skripsi Open  Universitas Indonesia Library
cover
Asep Handaya Saputra
"Sebagai salah satu bentuk penghematan dan konservasi energi, perusahaan pembangkit listrik Muara Tawar akan mengganti Bahan Bakar Minyak (BBM) menjadi gas bumi. Titik suplai terdekat yang dapat memenuhi kebutuhan gas berada dilokasi Muara Bekasi. Oleh karena itu dibutuhkan pipa yang dapat menghubungkan kedua titik tersebut. Tujuan studi ini adalah untuk menghasilkan suatu rancangan sistem perpipaan transmisi gas dari titik suplai gas dengan tapping point Muara bekasi ke perusahaan pembangkit listrik Muara Tawar melalui jalur lepas pantai. Perancangan ini dimulai dengan pengumpulan data teknis dan data suplai-permintaan gas perusahaan pembangkit listrik Muara Tawar, dilanjutkan dengan analisis data, pembuatan rute serta hasil kondisi teknis desain. Standar desain yang digunakan adalah DnV 2000. Kebutuhan gas perusahaan pembangkit listrik Muara Tawar adalah 400 MMSCFD (Million Standard Cubic Feet per Day). Dari data sekunder, diperoleh panjang total rute alternatif 3,7 km. Diameter pipa Carbon Steel yang digunakan memiliki diameter nominal 22 inch. Tekanan suplai gas adalah 350 psig dengan tekanan di titik demand ditetapkan sebesar 500 psig sehingga dibutuhkan kompresor. Pada sistem perpipaan yang dirancang, diperoleh tekanan di titik akhir sebelum masuk kompresor adalah 321,7 psig. Faktor kestabilan pipa pada dasar laut menjadi faktor penentu dan diperoleh berat minimum pipa yaitu 793,16 ton, sedangkan hasil rancangan sebesar 932,6 ton. Berdasarkan nilai tersebut, dapat disimpulkan pipa akan stabil pada dasar laut.

Power plant Muara Tawar will substitute the need of oil fuel to gas as form of economizing and energy conservation. The nearest supply point to fulfill natural gas needed on Muara Bekasi. So that Power Plant Company needed to develop gas pipeline infrastructure to joining the point.The purpose of this study is to create a system of gas transmission pipeline from gas supply point at Muara Bekasi to Power Plant Muara Tawar trough to offshore area. Design of gas transmission pipeline is started with technical data collection and supply-demand analyzing, continued with data analysis, rute construction and result of condition operation. The standard design of this design is DnV 2000. Gas demand in Power Plant Muara Tawar is 400 MMSCFD. From secondary data had been obtained total length of alternative route 3.7 km. Carbon Steel pipe diameter which had been used 22 inch nominal diameter. Gas supply pressure is 350 psig with pressure of demand point is setted on 500 psig. On pipeline system design the preesure before put in to compressor is around 321.7 psig. The design on bottom stability factor is the main concern. From the design calculation the total minimum pipe weight is 793.16 ton, whereas the design around 932.6 ton. Therefore, the pipe will be stable on bottom of sea."
Depok: Direktorat Riset dan Pengabdian Masyarakat Universitas Indonesia, 2009
AJ-pdf
Artikel Jurnal  Universitas Indonesia Library
cover
Makbul Supena
"ABSTRAK
Dalam menentukan perhitungan desain jaringan pipa lepas pantai pada tugas akhir ini difokuskan pada beberapa hal, yaitu; perhitungan ukuran diameter dan tebal dinding pipa serta analisa kestabilan jaringan pipa dan tegangan pipa saat pengoperasian.
Ukuran diameter pipa akan berpengaruh terhadap laju aliran fluida, kecepatan aliran fluida, dan nilai jatuh tekanan sepanjang saluran pipa. Sedangkan ketebalan dinding pipa sangat dipengaruhi oleh tekanan eksternal (tekanan pada kedalaman laut) tidak hanya diatur berdasarkan tekanan internal (tekanan kerja aliran fluida) dan kualitas material pipa (nilai kekutan luluh material).
Analisa kestabilan saluran pipa didasar laut perlu memenuhi dua parameter. Pertama, berat pipa dalam laut (saat pengoperasian) harus diatas gaya hidrodinamis pipa yang diakibatkan oleh gelombang dan arus laut. Kedua, gejala terjadinya vortax shedding dengan memperhitungkan rentang saluran pipa tidak tertumpu.
Analisa tegangan pipa saat pengoperasian, memperhitungkan beberapa parameter. Pertama, tegangan tarik maksimum pipa disebabkan kerja fluida harus lebih kecil dari nilai tegangan maksimum izin material pipa. Kedua, kedalaman laut dan kekuatan luluh bahan pipa berpengaruh pada kegagalan struktur pipa, seperti buckling (kempis pada pipa). Ketiga, tegangan tarik maksimum saat melewati gundukan atau palung, agar tidak melebihi tegangan tarik izin bahan.
Dari hasil perhitungan diperoleh; ukuran diameter yang dipilih adalah 32 inchi, tebal dinding pipa ideal adalah 0,406 inchi material API 5L X65, berat total pipa saat beroperasi sebesar 2.749,18 N/m yang diperoleh dari tebal dinding pipa anti korosi 3 inchi, tebal lapisan beton 3,94 inchi, tegangan kritis buckling sebesar 926,067 N/m2, sehingga diperoleh kedalaman laut maksimal agar tidak terjadinya buckling sebesar 92,1 m."
Fakultas Teknik Universitas Indonesia, 2011
S1057
UI - Skripsi Open  Universitas Indonesia Library
cover
Jakarta: Perum Pelabuhan II (Public Port Corporation II) ,
R 387.5 Por
Buku Referensi  Universitas Indonesia Library
cover
Raditia Dwi Putra
"ABSTRAK
Kekurangan listrik di Jakarta dikarenakan peningkatan populasi dan permintaan suplai listrik merupakan salah satu masalah energi yang terus terjadi dalam kehidupan sehari-hari. Membangun pembangkit listrik baru tidak akan menjadi solusi karena lahan kosong di Jakarta sangat langka, sempit, dan sangat mahal. Slaah satu solusi untuk mengurangi masalah ini adalah dengan memodifikasi pembangkit listrik yang sudah ada untuk menghasilkan daya yang lebih besar. Sebuah proyek yang mengimplementasikan pendinginan mekanis di pembangkit listrik tenaga gas Tanjung Priok mempunyai tujuan untuk meningkatkan daya bersih keluaran ABB GT13E1 dan juga meningkatkan efisiensi termal dengan mendinginkan udara ambien di inlet turbin gas menuju temperatur ISO (15°C) menurut manufaktur. Skripsi ini mengimplementasikan pendinginan mekanis dengan menggunakan R717 (Amonia) sebagai refrigeran, memanfaatkan penampungan energi termal (TES) dengan tujuan untuk menurunkan kapasitas pendinginan dan juga sebagai parameter untuk mengkalkulasi kapasitas pendingin. Perhitungan akhir akan menunjukan bahwa daya bersih keluaran turbin gas akan meningkat 1,258%, atau sekitar 15 MW.

ABSTRACT
Electricity shortages in Jakarta due to an increase of population and also an overwhelming increase of electricity supply is one of the problems of energy that still happens in our everyday lives. Building new power plants will not be a solution to this problem since vacant lands in Jakarta is very rare, incapacious, and very expensive. One of the solution to this problem is to modify existing power plants so that it produces more power. The project to implement mechanical refrigeration in Tanjung Priok gas power plant is aiming to increase the net power output that the ABB GT13E1 produces and also its thermal efficiency by cooling the ambient air at the inlet gas turbine to the ISO temperature (15°C) according to the manufacturer. This thesis implements mechanical refrigeration cycle using R717 (Ammonia) as the refrigerant, utilize a Thermal Energy Storage in order to reduce mechanical chiller capacity and calculate the cooling load based on the capacity of the Thermal Energy Storage. The final calculations will show that the net power output of the gas turbine will indeed increase 1.258%, about 15 MW total. "
Fakultas Teknik Universitas Indonesia, 2015
S59811
UI - Skripsi Membership  Universitas Indonesia Library
cover
Sonny Dwi Septianto
"Perhitungan optimasi digunakan sebagai data dasar dalam analisis keekonomian, untuk memberikan gambaran seluruh biaya selama investasi. Dan juga manfaat yang diperoleh selama investasi, pajak dan tingkat pengembalian, baik tingkat pengembalian internal IRR maupun tingkat pengembalian minimum MARR. Kemudian ditutup dengan perbandingan manfaat terhadap biaya B/C, sebagai kesimpulan layak atau tidaknya proyek tersebut dikerjakan.

Optimization calculations are used as basic data in economic analysis, to presents of all costs for investment. And also the benefits for investment, and tax returns, whether internal rate of return IRR and on a minimum rate of return MARR. Then closed with a benefit cost ratio B / C, as a conclusion whether this project is feasible."
Depok: Fakultas Teknik Universitas Indonesia, 2011
S1347
UI - Skripsi Open  Universitas Indonesia Library
cover
Adam Wicaksono
"Pembangkit Listrik Tenaga Gas Uap (PLTGU) berperan penting dalam memenuhi kebutuhan listrik masyarakat. Namun, terdapat beberapa masalah seiring dengan perkembangan teknologi, perubahan lingkungan alam dan sosial yang dapat mempengaruhi keberlanjutan PLTGU. Oleh sebab itu, diperlukan kerangka evaluasi keberlanjutan PLTGU yang meliputi dimensi lingkungan, sosial dan ekonomi. Tujuan penelitian ini adalah untuk membuat model evaluasi keberlanjutan PLTGU dengan menggunakan pendekatan Triple Bottom Line dan menggunakan model tersebut untuk mengetahui tingkat keberlanjutan PLTGU. Penelitian ini menggunakan pendekatan kuantitatif dengan metode Life Cycle Assessment (LCA) dan Analytical Hierarchy Process (AHP). Hasil penelitian menunjukkan bahwa kinerja keberlanjutan PLTGU pada dimensi lingkungan, sosial dan ekonomi berturut turut adalah 39%, 19%, dan 17% dengan jumlah nilai 75%. Berdasarkan nilai pada ketiga dimensi tersebut, dapat disimpulkan bahwa kondisi keberlanjutan PLTGU Tanjung Priok berada pada kondisi sustainable.

Combined Cycle Power Generation (PLTGU) plays an important role in meeting the electricity needs of the community. However, there are several problems along with technological developments, changes in the natural and social environment that can affect the sustainability of the PLTGU. Therefore, a PLTGU sustainability evaluation framework is needed which includes environmental, social, and economic dimensions. The purpose of this study is to create a model for evaluating the sustainability of the PLTGU using the Triple Bottom Line approach and using this model to determine the level of sustainability of the PLTGU. This study used a quantitative approach with the method of Life Cycle Assessment (LCA) and Analytical Hierarchy Process (AHP). The results show that the sustainability performance of PLTGU on the environmental, social, and economic dimensions were 39%, 19%, and 17%, respectively, with a total score of 75%. Based on the scores for these three dimensions, it can be concluded that the sustainability condition of the Tanjung Priok PLTGU is in sustainable condition.
"
Jakarta: Sekolah Ilmu Lingkungan Uiniversitas Indonesia, 2021
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Candra N. Darusman
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 1984
S17067
UI - Skripsi Membership  Universitas Indonesia Library
cover
Adriani
Depok: Fakultas Teknik Universitas Indonesia, 1994
S48775
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>